CN109523107A - A kind of Construction Management System and method based on BIM - Google Patents

A kind of Construction Management System and method based on BIM Download PDF

Info

Publication number
CN109523107A
CN109523107A CN201811064079.9A CN201811064079A CN109523107A CN 109523107 A CN109523107 A CN 109523107A CN 201811064079 A CN201811064079 A CN 201811064079A CN 109523107 A CN109523107 A CN 109523107A
Authority
CN
China
Prior art keywords
construction
information
bim
cost
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811064079.9A
Other languages
Chinese (zh)
Inventor
夏华
谢贻军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianzhu University
Original Assignee
Anhui Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianzhu University filed Critical Anhui Jianzhu University
Priority to CN201811064079.9A priority Critical patent/CN109523107A/en
Publication of CN109523107A publication Critical patent/CN109523107A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a kind of Construction Management System and method based on BIM, which includes information acquisition module, is acquired for the basic information to engineering construction point;3-D image generation module;BIM modeling unit, for establishing BIM buildings model according to the 3-D image, engineering construction point is converted into construction coordinate point, and indicate construction information on construction coordinate point, list counts specification and budget amount are transmitted in BIM buildings model simultaneously, generate schedule estimation information;Monitoring module;Information sending module;Cost accounting analysis module;Schedule estimation module.The execution management method therefor includes information collection, buildings model is established, monitors early warning in real time, data synchronize shared, cost accounting analysis, schedule estimation.The present invention can in real time be monitored engineering construction point, accurately calculated to the cost of construction, estimated progress, so that construction party is more efficient to the management of cost and progress.

Description

A kind of Construction Management System and method based on BIM
Technical field
The present invention relates to architectural control technical fields, and in particular to a kind of Construction Management System and side based on BIM Method.
Background technique
Architecture information model (BIM) is information integration and management system based on Digital Three-Dimensional buildings model, is to work as Modern construction industry mainstream technology the most advanced utilizes digital information in the design of engineering, construction, operation Life cycle Model can find and avoid risk in advance, realize lean management, improve efficiency, and save time and cost.Architecture information mould Type can make all project data be associated to project information, it includes project include prepare preparation, the design phase, construction rank Section, operation maintenance, plane drawing, threedimensional model, virtual reality, statistics detail, energy consumption analysis etc..
In the construction stage, construction project time management and cost information management occupy very important in construction management Status.But generally existing following problems: 1, traditional construction cost control method is to carry out cost based on two-dimentional construction drawing Control, is difficult accurately to be calculated and cost control, although geological information of the existing BIM comprising component, need into Row project amount statistics, building detail structural classification statistics, it is necessary to it is consistent with national budget quota and list counts, at present still So it is difficult to reach;2, traditional progress control method there are information delay, the level of informatization is lower the disadvantages of, generally just for certain One specific engineering, can not generally be applicable in.
Summary of the invention
In order to overcome above-mentioned technical problem, the construction management based on BIM that the purpose of the present invention is to provide a kind of System and method is based on BIM Virtual Simulation, the 3-D image of construction point can be generated, establish BIM buildings model, in real time Ground is monitored engineering construction point, and is accurately calculated to the cost of construction, estimates progress, can be timely Engineering operation is reminded on ground, so that construction party is more efficient to the management of cost and progress.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of Construction Management System based on BIM, comprising:
Information acquisition module is acquired for the basic information to engineering construction point;
3-D image generation module is handled for the basic information to the engineering construction point, and by basic information It is converted into visual 3-D image;
Engineering construction point is converted to and is applied for establishing BIM buildings model according to the 3-D image by BIM modeling unit Work area punctuate, and construction information is indicated on construction coordinate point;List counts specification and budget amount BIM is transmitted to simultaneously to build It builds in model, generates schedule estimation information;
Monitoring module, for monitoring in real time to each engineering construction point, and the information indicating that monitoring is obtained is in BIM On the corresponding construction coordinate point of buildings model;
Information sending module for sharing the construction information, schedule estimation information, and is used for the BIM Buildings model is transmitted to BIM background manager, establishes data sharing with units in charge of construction at different levels and docks;
Cost accounting analysis module, for calculating construction according to the BIM buildings model for being transmitted to BIM background manager Every cost total value and calculate separately out the management of each movable actual cost and unit cost in the process, to project at This forming process and the factor for influencing cost lifting are analyzed;
Schedule estimation module, the information for being obtained according to the monitoring, prediction construction start to construction required for terminating Total time.
As a further solution of the present invention, the information acquisition module is the unmanned plane for carrying camera and memory, The basic information of the engineering construction point includes location information and real scene image information.
As a further solution of the present invention, the construction information includes construction material composition, project amount statistics, is built into Product image, project amount statistics include cubic amount of concrete, steel structure material dosage, construction point area, electromechanical equipment quantity.
As a further solution of the present invention, the Construction Management System further include:
Display screen, for showing visual 3-D image;
Warning module, for issuing warning information when the Information abnormity of monitoring acquisition.
As a further solution of the present invention, the mode of the schedule estimation are as follows: the construction speed is divided by the construction speed Accounting in total engineering carries out data upload to the usage amount of raw material, and whether judges usage amount according to the data of acquisition Dosage beyond the construction speed is reminded by way of alarm if exceeding the dosage of the construction speed.
The construction management method based on BIM that the present invention also provides a kind of, comprising the following steps:
S100: information collection is acquired the basic information of engineering construction point, and the basic information of acquisition includes position letter Breath and real scene image information, and location information and real scene image information are shown in the form of 3-D image;
S200: buildings model is established, and BIM buildings model is established according to the 3-D image shown, by engineering construction point Be converted into construction coordinate point, and indicate construction information on construction coordinate point, the construction information of mark include construction material composition, Project amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generated Schedule estimation information;
S300: real time monitoring early warning monitors each engineering construction point in real time, the information indicating that monitoring obtains is existed On the corresponding construction coordinate point of BIM buildings model;When the Information abnormity that monitoring obtains, warning information is issued;
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by wirelessly or non-wirelessly Mode carries out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data with units in charge of construction at different levels Shared docking;
S500: cost accounting analysis, according to the BIM buildings model for being transmitted to BIM background manager, to every cost It exercises supervision, instruct, correct and limits, calculate every cost in work progress and total value occurs and calculates separately out every The management of movable actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide, The forming process of project cost and the factor for influencing cost lifting are analyzed;
S600: schedule estimation, according to the information that monitoring obtains, when prediction construction starts to construction total required for terminating Between, schedule estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering, to the usage amounts of raw material into Row data upload, and judges whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceed the construction into The dosage of degree, is reminded by way of alarm.
Beneficial effects of the present invention:
1, the Construction Management System and method of the invention based on BIM, by BIM Virtual Simulation, to engineering The basic information of construction point is acquired, and generates the 3-D image of construction point, passes through 3-D image, list counts specification, budget The amount of money establishes BIM buildings model, generates construction information and schedule estimation information;Monitoring module can be in real time to engineering construction point It is monitored, and the cost of construction is accurately calculated, progress is estimated, engineering can be reminded to grasp in time Make, so that construction party is more efficient to the management of cost and progress.
2, information acquisition module is the unmanned plane for carrying camera and memory, not only can be by freely manipulating unmanned plane Flight path shoot with video-corder the location information and real scene image information of construction point, can also be by location information and real scene image information It is stored, BIM modeling unit is facilitated to transfer and consult in time, improve the efficiency and accuracy of modeling.
3, cost accounting analysis calculates construction by the way that every cost is exercised supervision, instructs, corrects and limited Every cost occurs total value and calculates separately out the management of each movable actual cost and unit cost, then root in the process It calculates according to statistics, the data that business calculation and accounting provide, on the forming process of project cost and influences cost lifting Factor is analyzed, and many-sided can ensure the accuracy of cost accounting.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is the modular structure schematic diagram of the Construction Management System the present invention is based on BIM.
Fig. 2 is the flow chart of the construction management method the present invention is based on BIM.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, all other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
Embodiment 1
Refering to Figure 1, a kind of Construction Management System based on BIM of the present embodiment, comprising: information collection mould Block 200,3-D image generation module 300, BIM modeling unit 400, monitoring module 500, information sending module 600, cost accounting Analysis module 700, schedule estimation module 800, BIM background manager 900, display screen 1000, warning module 1100.Specifically, Information acquisition module 200 is for being acquired the basic information of engineering construction point 100.3-D image generation module 300 is used for The basic information of engineering construction point 100 is handled, and converts basic information to visual 3-D image.Wherein, basic Information includes location information and real scene image information, preferably nobody of carrying camera and memory of information acquisition module 200 Machine is additionally provided with GPRS positioning system on unmanned plane.By the flight path of manual control unmanned plane, camera is to engineering construction point Image carry out shooting, collecting, GPRS positioning system be accurately positioned engineering construction point position.Unmanned plane uses commercially available outfit The civilian unmanned plane of remote controler is lower than the engineering construction point of 120m for 500 meters of visual sighting distance inside radius, relative altitude, To carry out basic information collection.
BIM modeling is 400 yuan single, and for establishing BIM buildings model according to 3-D image, engineering construction point 100 is converted to Construction coordinate point, and construction information is indicated on construction coordinate point;List counts specification and budget amount are transmitted to BIM simultaneously In buildings model, schedule estimation information is generated.Modeling process need according to LOD300 standard model, including building element have Wall, aproll, curtain wall, building column, door and window, roof, floor, ceiling, stair, elevator etc., structural elements has plate, beam, column, beam column Node, wall, pre-buried and hanging ring, basis, base pit engineering, column, truss, beam, suspension column etc..
Monitoring module 500 exists for monitoring in real time to each engineering construction point, and by the information indicating that monitoring obtains On the corresponding construction coordinate point of BIM buildings model.Information sending module 600, for by construction information, schedule estimation information into Row is shared, and for BIM buildings model to be transmitted to BIM background manager 900, establishes data sharing pair with units in charge of construction at different levels It connects.Cost accounting analysis module 700, for calculating construction according to the BIM buildings model for being transmitted to BIM background manager 900 Every cost total value and calculate separately out the management of each movable actual cost and unit cost in the process, to project at This forming process and the factor for influencing cost lifting are analyzed.Schedule estimation module 800, the letter for being obtained according to monitoring Breath, prediction construction start to construction to terminate required total time.Display screen 1000, for showing visual 3-D image.In advance Alert module 1100, for issuing warning information when the Information abnormity of monitoring acquisition.The setting of warning module 1100 is on the backstage BIM At manager and engineering construction point, when monitoring obtain Information abnormity, as construction speed slowly, occur construction accident when, can It sounds the alarm in time, construction personnel and administrative staff is reminded, to take timely measure.
Wherein, construction information includes construction material composition, project amount statistics, building finished product image, and project amount statistics includes Cubic amount of concrete, steel structure material dosage, construction point area, electromechanical equipment quantity.The mode of schedule estimation are as follows: the construction speed Divided by accounting of the construction speed in total engineering, data upload is carried out to the usage amount of raw material, and according to the data of acquisition Judge whether usage amount exceeds the dosage of the construction speed, if exceeding the dosage of the construction speed, is reminded by way of alarm.
Embodiment 2
As shown in fig.2, present embodiments providing a kind of construction management method based on BIM, comprising the following steps:
S100: information collection is acquired the basic information of engineering construction point, and the basic information of acquisition includes position letter Breath and real scene image information, and location information and real scene image information are shown in the form of 3-D image.
S200: buildings model is established, and BIM buildings model is established according to the 3-D image shown, by engineering construction point Be converted into construction coordinate point, and indicate construction information on construction coordinate point, the construction information of mark include construction material composition, Project amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generated Schedule estimation information.
S300: real time monitoring early warning monitors each engineering construction point in real time, the information indicating that monitoring obtains is existed On the corresponding construction coordinate point of BIM buildings model;When the Information abnormity that monitoring obtains, warning information is issued.
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by wirelessly or non-wirelessly Mode carries out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data with units in charge of construction at different levels Shared docking.
S500: cost accounting analysis, according to the BIM buildings model for being transmitted to BIM background manager, to every cost It exercises supervision, instruct, correct and limits, calculate every cost in work progress and total value occurs and calculates separately out every The management of movable actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide, The forming process of project cost and the factor for influencing cost lifting are analyzed.
S600: schedule estimation, according to the information that monitoring obtains, when prediction construction starts to construction total required for terminating Between, schedule estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering, to the usage amounts of raw material into Row data upload, and judges whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceed the construction into The dosage of degree, is reminded by way of alarm.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Above content is only citing made for the present invention and explanation, affiliated those skilled in the art are to being retouched The specific embodiment stated does various modifications or additions or is substituted in a similar manner, and without departing from invention or surpasses More range defined in the claims, is within the scope of protection of the invention.

Claims (6)

1. a kind of Construction Management System based on BIM characterized by comprising
Information acquisition module is acquired for the basic information to engineering construction point;
3-D image generation module handles for the basic information to the engineering construction point, and basic information is converted For visual 3-D image;
Engineering construction point is converted to construction and sat by BIM modeling unit for establishing BIM buildings model according to the 3-D image Punctuate, and construction information is indicated on construction coordinate point;List counts specification and budget amount are transmitted to BIM building mould simultaneously In type, schedule estimation information is generated;
Monitoring module, for monitoring in real time to each engineering construction point, and the information indicating that monitoring is obtained is built in BIM On the corresponding construction coordinate point of model;
Information sending module, for sharing the construction information, schedule estimation information, and for building the BIM Model is transmitted to BIM background manager, establishes data sharing with units in charge of construction at different levels and docks;
Cost accounting analysis module, for calculating work progress according to the BIM buildings model for being transmitted to BIM background manager Middle items cost total value and the management for calculating separately out each movable actual cost and unit cost, to project cost Forming process and the factor for influencing cost lifting are analyzed;
Schedule estimation module, the information for being obtained according to the monitoring, prediction construction starts to construction total required for terminating Time.
2. the Construction Management System according to claim 1 based on BIM, which is characterized in that the information collection mould Block is the unmanned plane for carrying camera and memory, and the basic information of the engineering construction point includes location information and real scene image Information.
3. the Construction Management System according to claim 1 based on BIM, which is characterized in that the construction information packet Construction material composition, project amount statistics, building finished product image are included, project amount statistics is used including cubic amount of concrete, steel structure material Amount, construction point area, electromechanical equipment quantity.
4. the Construction Management System according to claim 1 based on BIM, which is characterized in that the construction management System further include:
Display screen, for showing visual 3-D image;
Warning module, for issuing warning information when the Information abnormity of monitoring acquisition.
5. the Construction Management System according to claim 1 based on BIM, which is characterized in that the schedule estimation Mode are as follows: accounting of the construction speed divided by the construction speed in total engineering carries out data upload to the usage amount of raw material, And judge whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceeding the dosage of the construction speed, lead to The mode for crossing alarm is reminded.
6. a kind of construction management method based on BIM, which comprises the following steps:
S100: information collection is acquired the basic information of engineering construction point, the basic information of acquisition include location information and Real scene image information, and location information and real scene image information are shown in the form of 3-D image;
S200: buildings model is established, and establishes BIM buildings model according to the 3-D image shown, engineering construction point is converted At construction coordinate point, and construction information is indicated on construction coordinate point, the construction information of mark includes construction material composition, engineering Amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generate progress Estimate information;
S300: real time monitoring early warning monitors each engineering construction point in real time, and the information indicating that monitoring is obtained is in BIM On the corresponding construction coordinate point of buildings model;When the Information abnormity that monitoring obtains, warning information is issued;
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by way of wirelessly or non-wirelessly Carry out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data sharing with units in charge of construction at different levels Docking;
S500: cost accounting analysis carries out every cost according to the BIM buildings model for being transmitted to BIM background manager Supervision, guidance, amendment and limitation calculate every cost in work progress and total value occur and calculates separately out each work The management of dynamic actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide, to item The forming process of mesh cost and the factor for influencing cost lifting are analyzed;
S600: schedule estimation, according to the information that monitoring obtains, prediction construction starts to construction to terminate required total time, into Spend estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering counts the usage amount of raw material Judge whether usage amount exceeds the dosage of the construction speed according to upload, and according to the data of acquisition, if beyond the construction speed Dosage is reminded by way of alarm.
CN201811064079.9A 2018-09-12 2018-09-12 A kind of Construction Management System and method based on BIM Pending CN109523107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811064079.9A CN109523107A (en) 2018-09-12 2018-09-12 A kind of Construction Management System and method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811064079.9A CN109523107A (en) 2018-09-12 2018-09-12 A kind of Construction Management System and method based on BIM

Publications (1)

Publication Number Publication Date
CN109523107A true CN109523107A (en) 2019-03-26

Family

ID=65770876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811064079.9A Pending CN109523107A (en) 2018-09-12 2018-09-12 A kind of Construction Management System and method based on BIM

Country Status (1)

Country Link
CN (1) CN109523107A (en)

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978387A (en) * 2019-03-28 2019-07-05 浙江鑫润工程管理有限公司 A kind of BIM engineering information management method and system
CN110398982A (en) * 2019-06-21 2019-11-01 万翼科技有限公司 A kind of method for inspecting and system of unmanned plane
CN110490415A (en) * 2019-07-15 2019-11-22 同济大学 A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration
CN110510520A (en) * 2019-07-26 2019-11-29 上海建工七建集团有限公司 The voice guidance hanging apparatus and method of prefabricated building components
CN111143459A (en) * 2019-12-26 2020-05-12 晶晨半导体(深圳)有限公司 Ground construction event detection system and detection method
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111524172A (en) * 2020-03-30 2020-08-11 平安城市建设科技(深圳)有限公司 Building construction progress evaluation method and device and storage medium
CN111563627A (en) * 2020-05-09 2020-08-21 湖南大为工程咨询有限公司 Engineering cost progress management method, system and storage medium
CN111612523A (en) * 2020-04-26 2020-09-01 四川同兴达建设咨询有限公司 Evaluation method and evaluation system for construction engineering cost operation
CN111784967A (en) * 2020-07-23 2020-10-16 南通市达欣工程股份有限公司 Building construction safety early warning protection system based on BIM
CN112001655A (en) * 2020-08-31 2020-11-27 福州中润电子科技有限公司 Building quality traceability management system based on BIM
CN112069576A (en) * 2020-08-28 2020-12-11 浙江省围海建设集团股份有限公司 Channel excavation construction method and system
CN112097823A (en) * 2020-07-29 2020-12-18 安徽建筑大学 Based on big dipper high accuracy location and BIM construction multiple spot synchronous monitoring system
CN112116382A (en) * 2020-09-01 2020-12-22 上海康诚建设工程咨询有限公司 Engineering cost method, system, computer equipment and medium
CN112163747A (en) * 2020-09-18 2021-01-01 华航环境发展有限公司 Construction engineering project quality management system
CN112183905A (en) * 2020-11-30 2021-01-05 江苏康行信息技术有限公司 Building design plan comprehensive optimization method based on BIM modeling
CN112329117A (en) * 2020-11-25 2021-02-05 陕西铁路工程职业技术学院 Building construction supervision method based on BIM
CN112381675A (en) * 2020-11-23 2021-02-19 浙江宝龙建设有限公司 BIM-based real estate construction project construction method
CN112651126A (en) * 2020-12-24 2021-04-13 河南省第八建设集团有限公司 Building engineering construction optimization system, method, terminal and storage medium based on BIM
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN112966920A (en) * 2021-03-01 2021-06-15 四川大学锦城学院 Building construction management system
CN113111414A (en) * 2021-01-20 2021-07-13 同济大学 Existing building reconstruction project hybrid simulation system based on three-dimensional monitoring and BIM
CN113128961A (en) * 2021-04-16 2021-07-16 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform
CN113191731A (en) * 2021-04-30 2021-07-30 重庆天智慧启科技有限公司 Intelligent building engineering management system based on BIM platform
CN113256155A (en) * 2021-06-17 2021-08-13 温州开晨科技有限公司 Digital management method and system for foundation engineering construction
CN113297656A (en) * 2021-05-12 2021-08-24 中筑(山东)数字科技有限公司 Building construction safety early warning protection system and method based on BIM
CN113378274A (en) * 2021-06-16 2021-09-10 升维科技有限公司 Building construction monitoring method and system based on BIM
CN113592283A (en) * 2021-07-27 2021-11-02 陈毓斌 Building construction equipment, construction management system and construction management method based on BIM
CN113592422A (en) * 2021-06-18 2021-11-02 王锁荣 Cost management method for building network +
CN113656868A (en) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 BIM technology-based hospital construction collaborative management platform
CN113657795A (en) * 2021-08-24 2021-11-16 浙江长城工程监理有限公司 Civil air defense engineering supervision method, system and storage medium
CN113673899A (en) * 2021-08-28 2021-11-19 江苏苏科建设项目管理有限公司 Road engineering progress management method based on supervision cloud system
CN114331081A (en) * 2021-12-22 2022-04-12 南京同筑盛世信息科技有限公司 BIM-based visual construction whole-course safety management system
CN114493477A (en) * 2021-12-13 2022-05-13 南通科达建材科技股份有限公司 BIM-based multi-dimensional statistical method and system for building cost
CN114862093A (en) * 2022-03-17 2022-08-05 深圳市深安企业有限公司 BIM-based engineering quality supervision method and system
CN115271546A (en) * 2022-09-21 2022-11-01 深圳市斯维尔科技股份有限公司 BIM-based digital engineering supervision method and system
CN115794759A (en) * 2023-02-08 2023-03-14 中建深圳装饰有限公司 BIM-based multi-target construction data sharing transmission method
CN116189367A (en) * 2022-12-09 2023-05-30 嘉应学院 Building fire alarm system based on Internet of things
CN116308188A (en) * 2023-03-23 2023-06-23 中宬建设管理有限公司 Digital engineering management method and system based on BIM technology
CN116384595A (en) * 2023-06-05 2023-07-04 中铁四局集团有限公司 Project progress prediction analysis method based on cost linkage
CN116452753A (en) * 2023-05-08 2023-07-18 杨浩 Multi-data mapping system for construction progress identification
CN116703127A (en) * 2023-08-03 2023-09-05 山东青建智慧建筑科技有限公司 Building construction supervision method and system based on BIM
CN117350682A (en) * 2023-12-04 2024-01-05 山东平安建设集团有限公司 Building construction progress management method and system based on BIM
CN117541023A (en) * 2024-01-05 2024-02-09 山东金呈阳建设工程有限公司 BIM-based bridge construction progress management method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000073956A2 (en) * 1999-05-27 2000-12-07 Andersen Consulting Llp System, method and computer program for representing priority information concerning components of a system
WO2011156801A2 (en) * 2010-06-11 2011-12-15 Satterfield & Pontikes Construction, Inc. Model inventory manager
CN105184505A (en) * 2015-09-24 2015-12-23 武汉英思工程科技股份有限公司 Digital management method and system used for water conservancy and hydropower engineering construction process
CN107818430A (en) * 2017-12-15 2018-03-20 武汉理工大学 A kind of building engineering construction progress msg management method and system based on BIM
CN107958357A (en) * 2018-01-22 2018-04-24 东华理工大学 A kind of Cost Management System of BIM projects
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000073956A2 (en) * 1999-05-27 2000-12-07 Andersen Consulting Llp System, method and computer program for representing priority information concerning components of a system
WO2011156801A2 (en) * 2010-06-11 2011-12-15 Satterfield & Pontikes Construction, Inc. Model inventory manager
EP2580700A2 (en) * 2010-06-11 2013-04-17 Satterfield & Pontikes Construction, Inc. Model inventory manager
CN105184505A (en) * 2015-09-24 2015-12-23 武汉英思工程科技股份有限公司 Digital management method and system used for water conservancy and hydropower engineering construction process
CN107818430A (en) * 2017-12-15 2018-03-20 武汉理工大学 A kind of building engineering construction progress msg management method and system based on BIM
CN108280281A (en) * 2018-01-18 2018-07-13 宋强 A kind of construction cost control method and system based on BIM technology
CN107958357A (en) * 2018-01-22 2018-04-24 东华理工大学 A kind of Cost Management System of BIM projects

Cited By (58)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109978387A (en) * 2019-03-28 2019-07-05 浙江鑫润工程管理有限公司 A kind of BIM engineering information management method and system
CN110398982A (en) * 2019-06-21 2019-11-01 万翼科技有限公司 A kind of method for inspecting and system of unmanned plane
CN110490415B (en) * 2019-07-15 2023-07-14 同济大学 Building progress assessment method for visual coordination of multiple unmanned aerial vehicles
CN110490415A (en) * 2019-07-15 2019-11-22 同济大学 A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration
CN110510520A (en) * 2019-07-26 2019-11-29 上海建工七建集团有限公司 The voice guidance hanging apparatus and method of prefabricated building components
CN111143459A (en) * 2019-12-26 2020-05-12 晶晨半导体(深圳)有限公司 Ground construction event detection system and detection method
CN111428965A (en) * 2020-02-27 2020-07-17 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111428965B (en) * 2020-02-27 2023-11-03 中铁城建集团有限公司 Method for rapidly analyzing project cost
CN111524172A (en) * 2020-03-30 2020-08-11 平安城市建设科技(深圳)有限公司 Building construction progress evaluation method and device and storage medium
CN111612523A (en) * 2020-04-26 2020-09-01 四川同兴达建设咨询有限公司 Evaluation method and evaluation system for construction engineering cost operation
CN111563627A (en) * 2020-05-09 2020-08-21 湖南大为工程咨询有限公司 Engineering cost progress management method, system and storage medium
CN111784967A (en) * 2020-07-23 2020-10-16 南通市达欣工程股份有限公司 Building construction safety early warning protection system based on BIM
CN111784967B (en) * 2020-07-23 2021-07-16 南通市达欣工程股份有限公司 Building construction safety early warning protection system based on BIM
CN112097823A (en) * 2020-07-29 2020-12-18 安徽建筑大学 Based on big dipper high accuracy location and BIM construction multiple spot synchronous monitoring system
CN112069576A (en) * 2020-08-28 2020-12-11 浙江省围海建设集团股份有限公司 Channel excavation construction method and system
CN112001655A (en) * 2020-08-31 2020-11-27 福州中润电子科技有限公司 Building quality traceability management system based on BIM
CN112116382A (en) * 2020-09-01 2020-12-22 上海康诚建设工程咨询有限公司 Engineering cost method, system, computer equipment and medium
CN112163747A (en) * 2020-09-18 2021-01-01 华航环境发展有限公司 Construction engineering project quality management system
CN112381675A (en) * 2020-11-23 2021-02-19 浙江宝龙建设有限公司 BIM-based real estate construction project construction method
CN112329117A (en) * 2020-11-25 2021-02-05 陕西铁路工程职业技术学院 Building construction supervision method based on BIM
CN112183905A (en) * 2020-11-30 2021-01-05 江苏康行信息技术有限公司 Building design plan comprehensive optimization method based on BIM modeling
CN112651126B (en) * 2020-12-24 2024-01-12 河南省第八建设集团有限公司 BIM-based construction engineering construction optimization system, method, terminal and storage medium
CN112651126A (en) * 2020-12-24 2021-04-13 河南省第八建设集团有限公司 Building engineering construction optimization system, method, terminal and storage medium based on BIM
CN113111414A (en) * 2021-01-20 2021-07-13 同济大学 Existing building reconstruction project hybrid simulation system based on three-dimensional monitoring and BIM
CN112926841A (en) * 2021-02-05 2021-06-08 国家电网有限公司 Engineering construction quality process data integration monitoring method and system
CN112966920A (en) * 2021-03-01 2021-06-15 四川大学锦城学院 Building construction management system
CN113128961A (en) * 2021-04-16 2021-07-16 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform
CN113128961B (en) * 2021-04-16 2022-03-11 深圳市艾赛克科技有限公司 Wisdom building site management cloud platform system
CN113191731A (en) * 2021-04-30 2021-07-30 重庆天智慧启科技有限公司 Intelligent building engineering management system based on BIM platform
CN113297656A (en) * 2021-05-12 2021-08-24 中筑(山东)数字科技有限公司 Building construction safety early warning protection system and method based on BIM
CN113378274A (en) * 2021-06-16 2021-09-10 升维科技有限公司 Building construction monitoring method and system based on BIM
CN113378274B (en) * 2021-06-16 2023-12-01 鼎正工程咨询股份有限公司 Building construction monitoring method and system based on BIM
CN113256155B (en) * 2021-06-17 2021-10-15 温州开晨科技有限公司 Digital management method and system for foundation engineering construction
CN113256155A (en) * 2021-06-17 2021-08-13 温州开晨科技有限公司 Digital management method and system for foundation engineering construction
CN113592422A (en) * 2021-06-18 2021-11-02 王锁荣 Cost management method for building network +
CN113592283A (en) * 2021-07-27 2021-11-02 陈毓斌 Building construction equipment, construction management system and construction management method based on BIM
CN113656868A (en) * 2021-08-07 2021-11-16 上海容基工程项目管理有限公司 BIM technology-based hospital construction collaborative management platform
CN113657795A (en) * 2021-08-24 2021-11-16 浙江长城工程监理有限公司 Civil air defense engineering supervision method, system and storage medium
CN113673899A (en) * 2021-08-28 2021-11-19 江苏苏科建设项目管理有限公司 Road engineering progress management method based on supervision cloud system
CN114493477A (en) * 2021-12-13 2022-05-13 南通科达建材科技股份有限公司 BIM-based multi-dimensional statistical method and system for building cost
CN114493477B (en) * 2021-12-13 2023-11-21 南通科达建材科技股份有限公司 Building cost multidimensional statistics method and system based on BIM
CN114331081A (en) * 2021-12-22 2022-04-12 南京同筑盛世信息科技有限公司 BIM-based visual construction whole-course safety management system
CN114862093A (en) * 2022-03-17 2022-08-05 深圳市深安企业有限公司 BIM-based engineering quality supervision method and system
CN115271546A (en) * 2022-09-21 2022-11-01 深圳市斯维尔科技股份有限公司 BIM-based digital engineering supervision method and system
CN116189367B (en) * 2022-12-09 2023-09-26 嘉应学院 Building fire alarm system based on Internet of things
CN116189367A (en) * 2022-12-09 2023-05-30 嘉应学院 Building fire alarm system based on Internet of things
CN115794759A (en) * 2023-02-08 2023-03-14 中建深圳装饰有限公司 BIM-based multi-target construction data sharing transmission method
CN116308188B (en) * 2023-03-23 2023-09-26 中宬建设管理有限公司 Digital engineering management method and system based on BIM technology
CN116308188A (en) * 2023-03-23 2023-06-23 中宬建设管理有限公司 Digital engineering management method and system based on BIM technology
CN116452753A (en) * 2023-05-08 2023-07-18 杨浩 Multi-data mapping system for construction progress identification
CN116452753B (en) * 2023-05-08 2024-01-26 浙江省二建建设集团有限公司 Multi-data mapping system for construction progress identification
CN116384595B (en) * 2023-06-05 2023-08-08 中铁四局集团有限公司 Project progress prediction analysis method based on cost linkage
CN116384595A (en) * 2023-06-05 2023-07-04 中铁四局集团有限公司 Project progress prediction analysis method based on cost linkage
CN116703127A (en) * 2023-08-03 2023-09-05 山东青建智慧建筑科技有限公司 Building construction supervision method and system based on BIM
CN117350682A (en) * 2023-12-04 2024-01-05 山东平安建设集团有限公司 Building construction progress management method and system based on BIM
CN117350682B (en) * 2023-12-04 2024-02-20 山东平安建设集团有限公司 Building construction progress management method and system based on BIM
CN117541023A (en) * 2024-01-05 2024-02-09 山东金呈阳建设工程有限公司 BIM-based bridge construction progress management method and system
CN117541023B (en) * 2024-01-05 2024-04-05 山东金呈阳建设工程有限公司 BIM-based bridge construction progress management method and system

Similar Documents

Publication Publication Date Title
CN109523107A (en) A kind of Construction Management System and method based on BIM
CN107679310A (en) The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology
CN108280281A (en) A kind of construction cost control method and system based on BIM technology
CN106022979A (en) BIM-based water conservancy and hydropower project management cloud platform and application method thereof
CN109063973B (en) Construction project construction method based on artificial intelligence
CN113505499B (en) Hydraulic engineering building full life cycle management system based on BIM and big data analysis
CN110046364A (en) A kind of method for computing work amount based on BIM technology
CN104501766B (en) Monitor parameter and method for early warning in Side Slope of Deep Foundation Pit Excavation vertical displacement vectors angle
WO2020056669A1 (en) Control method and apparatus for unmanned aerial vehicle cruise based on prefabricated building platform
CN110807571A (en) Building engineering quality control system based on combination of 3d laser sensing and BIM
CN109544051A (en) A kind of construction management application platform based on BIM technology application
CN107818430A (en) A kind of building engineering construction progress msg management method and system based on BIM
CN104463717A (en) Construction expert information system applicable to extra-large underground cavern group
CN107355963A (en) A kind of detecting system for being used to build the monitoring of O&M device temperature based on threedimensional model
CN102749071A (en) Method for monitoring soil erosion based on unmanned aerial vehicle aerial photography
CN111898990A (en) Building construction progress management method
CN109856655A (en) A kind of construction time personnel positioning based on Beidou GNSS and BIM, monitoring and managing method
CN110618429A (en) Laser range finder for house measurement and method thereof
CN106027962A (en) Video monitoring coverage rate calculation method and device, and video monitoring layout method and system
CN106484977A (en) High arch dam construction progress self-adapting simulation analysis method
CN104965964B (en) A kind of building personnel's distributed model method for building up based on monitor video analysis
CN113011832A (en) Engineering cost system based on BIM
CN112464494A (en) Construction system is built to wisdom
CN109978387A (en) A kind of BIM engineering information management method and system
CN209486723U (en) A kind of construction management application platform based on BIM technology application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190326