CN109523107A - A kind of Construction Management System and method based on BIM - Google Patents
A kind of Construction Management System and method based on BIM Download PDFInfo
- Publication number
- CN109523107A CN109523107A CN201811064079.9A CN201811064079A CN109523107A CN 109523107 A CN109523107 A CN 109523107A CN 201811064079 A CN201811064079 A CN 201811064079A CN 109523107 A CN109523107 A CN 109523107A
- Authority
- CN
- China
- Prior art keywords
- construction
- information
- bim
- cost
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of Construction Management System and method based on BIM, which includes information acquisition module, is acquired for the basic information to engineering construction point;3-D image generation module;BIM modeling unit, for establishing BIM buildings model according to the 3-D image, engineering construction point is converted into construction coordinate point, and indicate construction information on construction coordinate point, list counts specification and budget amount are transmitted in BIM buildings model simultaneously, generate schedule estimation information;Monitoring module;Information sending module;Cost accounting analysis module;Schedule estimation module.The execution management method therefor includes information collection, buildings model is established, monitors early warning in real time, data synchronize shared, cost accounting analysis, schedule estimation.The present invention can in real time be monitored engineering construction point, accurately calculated to the cost of construction, estimated progress, so that construction party is more efficient to the management of cost and progress.
Description
Technical field
The present invention relates to architectural control technical fields, and in particular to a kind of Construction Management System and side based on BIM
Method.
Background technique
Architecture information model (BIM) is information integration and management system based on Digital Three-Dimensional buildings model, is to work as
Modern construction industry mainstream technology the most advanced utilizes digital information in the design of engineering, construction, operation Life cycle
Model can find and avoid risk in advance, realize lean management, improve efficiency, and save time and cost.Architecture information mould
Type can make all project data be associated to project information, it includes project include prepare preparation, the design phase, construction rank
Section, operation maintenance, plane drawing, threedimensional model, virtual reality, statistics detail, energy consumption analysis etc..
In the construction stage, construction project time management and cost information management occupy very important in construction management
Status.But generally existing following problems: 1, traditional construction cost control method is to carry out cost based on two-dimentional construction drawing
Control, is difficult accurately to be calculated and cost control, although geological information of the existing BIM comprising component, need into
Row project amount statistics, building detail structural classification statistics, it is necessary to it is consistent with national budget quota and list counts, at present still
So it is difficult to reach;2, traditional progress control method there are information delay, the level of informatization is lower the disadvantages of, generally just for certain
One specific engineering, can not generally be applicable in.
Summary of the invention
In order to overcome above-mentioned technical problem, the construction management based on BIM that the purpose of the present invention is to provide a kind of
System and method is based on BIM Virtual Simulation, the 3-D image of construction point can be generated, establish BIM buildings model, in real time
Ground is monitored engineering construction point, and is accurately calculated to the cost of construction, estimates progress, can be timely
Engineering operation is reminded on ground, so that construction party is more efficient to the management of cost and progress.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of Construction Management System based on BIM, comprising:
Information acquisition module is acquired for the basic information to engineering construction point;
3-D image generation module is handled for the basic information to the engineering construction point, and by basic information
It is converted into visual 3-D image;
Engineering construction point is converted to and is applied for establishing BIM buildings model according to the 3-D image by BIM modeling unit
Work area punctuate, and construction information is indicated on construction coordinate point;List counts specification and budget amount BIM is transmitted to simultaneously to build
It builds in model, generates schedule estimation information;
Monitoring module, for monitoring in real time to each engineering construction point, and the information indicating that monitoring is obtained is in BIM
On the corresponding construction coordinate point of buildings model;
Information sending module for sharing the construction information, schedule estimation information, and is used for the BIM
Buildings model is transmitted to BIM background manager, establishes data sharing with units in charge of construction at different levels and docks;
Cost accounting analysis module, for calculating construction according to the BIM buildings model for being transmitted to BIM background manager
Every cost total value and calculate separately out the management of each movable actual cost and unit cost in the process, to project at
This forming process and the factor for influencing cost lifting are analyzed;
Schedule estimation module, the information for being obtained according to the monitoring, prediction construction start to construction required for terminating
Total time.
As a further solution of the present invention, the information acquisition module is the unmanned plane for carrying camera and memory,
The basic information of the engineering construction point includes location information and real scene image information.
As a further solution of the present invention, the construction information includes construction material composition, project amount statistics, is built into
Product image, project amount statistics include cubic amount of concrete, steel structure material dosage, construction point area, electromechanical equipment quantity.
As a further solution of the present invention, the Construction Management System further include:
Display screen, for showing visual 3-D image;
Warning module, for issuing warning information when the Information abnormity of monitoring acquisition.
As a further solution of the present invention, the mode of the schedule estimation are as follows: the construction speed is divided by the construction speed
Accounting in total engineering carries out data upload to the usage amount of raw material, and whether judges usage amount according to the data of acquisition
Dosage beyond the construction speed is reminded by way of alarm if exceeding the dosage of the construction speed.
The construction management method based on BIM that the present invention also provides a kind of, comprising the following steps:
S100: information collection is acquired the basic information of engineering construction point, and the basic information of acquisition includes position letter
Breath and real scene image information, and location information and real scene image information are shown in the form of 3-D image;
S200: buildings model is established, and BIM buildings model is established according to the 3-D image shown, by engineering construction point
Be converted into construction coordinate point, and indicate construction information on construction coordinate point, the construction information of mark include construction material composition,
Project amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generated
Schedule estimation information;
S300: real time monitoring early warning monitors each engineering construction point in real time, the information indicating that monitoring obtains is existed
On the corresponding construction coordinate point of BIM buildings model;When the Information abnormity that monitoring obtains, warning information is issued;
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by wirelessly or non-wirelessly
Mode carries out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data with units in charge of construction at different levels
Shared docking;
S500: cost accounting analysis, according to the BIM buildings model for being transmitted to BIM background manager, to every cost
It exercises supervision, instruct, correct and limits, calculate every cost in work progress and total value occurs and calculates separately out every
The management of movable actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide,
The forming process of project cost and the factor for influencing cost lifting are analyzed;
S600: schedule estimation, according to the information that monitoring obtains, when prediction construction starts to construction total required for terminating
Between, schedule estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering, to the usage amounts of raw material into
Row data upload, and judges whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceed the construction into
The dosage of degree, is reminded by way of alarm.
Beneficial effects of the present invention:
1, the Construction Management System and method of the invention based on BIM, by BIM Virtual Simulation, to engineering
The basic information of construction point is acquired, and generates the 3-D image of construction point, passes through 3-D image, list counts specification, budget
The amount of money establishes BIM buildings model, generates construction information and schedule estimation information;Monitoring module can be in real time to engineering construction point
It is monitored, and the cost of construction is accurately calculated, progress is estimated, engineering can be reminded to grasp in time
Make, so that construction party is more efficient to the management of cost and progress.
2, information acquisition module is the unmanned plane for carrying camera and memory, not only can be by freely manipulating unmanned plane
Flight path shoot with video-corder the location information and real scene image information of construction point, can also be by location information and real scene image information
It is stored, BIM modeling unit is facilitated to transfer and consult in time, improve the efficiency and accuracy of modeling.
3, cost accounting analysis calculates construction by the way that every cost is exercised supervision, instructs, corrects and limited
Every cost occurs total value and calculates separately out the management of each movable actual cost and unit cost, then root in the process
It calculates according to statistics, the data that business calculation and accounting provide, on the forming process of project cost and influences cost lifting
Factor is analyzed, and many-sided can ensure the accuracy of cost accounting.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is the modular structure schematic diagram of the Construction Management System the present invention is based on BIM.
Fig. 2 is the flow chart of the construction management method the present invention is based on BIM.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, all other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the scope of protection of the invention.
Embodiment 1
Refering to Figure 1, a kind of Construction Management System based on BIM of the present embodiment, comprising: information collection mould
Block 200,3-D image generation module 300, BIM modeling unit 400, monitoring module 500, information sending module 600, cost accounting
Analysis module 700, schedule estimation module 800, BIM background manager 900, display screen 1000, warning module 1100.Specifically,
Information acquisition module 200 is for being acquired the basic information of engineering construction point 100.3-D image generation module 300 is used for
The basic information of engineering construction point 100 is handled, and converts basic information to visual 3-D image.Wherein, basic
Information includes location information and real scene image information, preferably nobody of carrying camera and memory of information acquisition module 200
Machine is additionally provided with GPRS positioning system on unmanned plane.By the flight path of manual control unmanned plane, camera is to engineering construction point
Image carry out shooting, collecting, GPRS positioning system be accurately positioned engineering construction point position.Unmanned plane uses commercially available outfit
The civilian unmanned plane of remote controler is lower than the engineering construction point of 120m for 500 meters of visual sighting distance inside radius, relative altitude,
To carry out basic information collection.
BIM modeling is 400 yuan single, and for establishing BIM buildings model according to 3-D image, engineering construction point 100 is converted to
Construction coordinate point, and construction information is indicated on construction coordinate point;List counts specification and budget amount are transmitted to BIM simultaneously
In buildings model, schedule estimation information is generated.Modeling process need according to LOD300 standard model, including building element have
Wall, aproll, curtain wall, building column, door and window, roof, floor, ceiling, stair, elevator etc., structural elements has plate, beam, column, beam column
Node, wall, pre-buried and hanging ring, basis, base pit engineering, column, truss, beam, suspension column etc..
Monitoring module 500 exists for monitoring in real time to each engineering construction point, and by the information indicating that monitoring obtains
On the corresponding construction coordinate point of BIM buildings model.Information sending module 600, for by construction information, schedule estimation information into
Row is shared, and for BIM buildings model to be transmitted to BIM background manager 900, establishes data sharing pair with units in charge of construction at different levels
It connects.Cost accounting analysis module 700, for calculating construction according to the BIM buildings model for being transmitted to BIM background manager 900
Every cost total value and calculate separately out the management of each movable actual cost and unit cost in the process, to project at
This forming process and the factor for influencing cost lifting are analyzed.Schedule estimation module 800, the letter for being obtained according to monitoring
Breath, prediction construction start to construction to terminate required total time.Display screen 1000, for showing visual 3-D image.In advance
Alert module 1100, for issuing warning information when the Information abnormity of monitoring acquisition.The setting of warning module 1100 is on the backstage BIM
At manager and engineering construction point, when monitoring obtain Information abnormity, as construction speed slowly, occur construction accident when, can
It sounds the alarm in time, construction personnel and administrative staff is reminded, to take timely measure.
Wherein, construction information includes construction material composition, project amount statistics, building finished product image, and project amount statistics includes
Cubic amount of concrete, steel structure material dosage, construction point area, electromechanical equipment quantity.The mode of schedule estimation are as follows: the construction speed
Divided by accounting of the construction speed in total engineering, data upload is carried out to the usage amount of raw material, and according to the data of acquisition
Judge whether usage amount exceeds the dosage of the construction speed, if exceeding the dosage of the construction speed, is reminded by way of alarm.
Embodiment 2
As shown in fig.2, present embodiments providing a kind of construction management method based on BIM, comprising the following steps:
S100: information collection is acquired the basic information of engineering construction point, and the basic information of acquisition includes position letter
Breath and real scene image information, and location information and real scene image information are shown in the form of 3-D image.
S200: buildings model is established, and BIM buildings model is established according to the 3-D image shown, by engineering construction point
Be converted into construction coordinate point, and indicate construction information on construction coordinate point, the construction information of mark include construction material composition,
Project amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generated
Schedule estimation information.
S300: real time monitoring early warning monitors each engineering construction point in real time, the information indicating that monitoring obtains is existed
On the corresponding construction coordinate point of BIM buildings model;When the Information abnormity that monitoring obtains, warning information is issued.
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by wirelessly or non-wirelessly
Mode carries out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data with units in charge of construction at different levels
Shared docking.
S500: cost accounting analysis, according to the BIM buildings model for being transmitted to BIM background manager, to every cost
It exercises supervision, instruct, correct and limits, calculate every cost in work progress and total value occurs and calculates separately out every
The management of movable actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide,
The forming process of project cost and the factor for influencing cost lifting are analyzed.
S600: schedule estimation, according to the information that monitoring obtains, when prediction construction starts to construction total required for terminating
Between, schedule estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering, to the usage amounts of raw material into
Row data upload, and judges whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceed the construction into
The dosage of degree, is reminded by way of alarm.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close
Suitable mode combines.
Above content is only citing made for the present invention and explanation, affiliated those skilled in the art are to being retouched
The specific embodiment stated does various modifications or additions or is substituted in a similar manner, and without departing from invention or surpasses
More range defined in the claims, is within the scope of protection of the invention.
Claims (6)
1. a kind of Construction Management System based on BIM characterized by comprising
Information acquisition module is acquired for the basic information to engineering construction point;
3-D image generation module handles for the basic information to the engineering construction point, and basic information is converted
For visual 3-D image;
Engineering construction point is converted to construction and sat by BIM modeling unit for establishing BIM buildings model according to the 3-D image
Punctuate, and construction information is indicated on construction coordinate point;List counts specification and budget amount are transmitted to BIM building mould simultaneously
In type, schedule estimation information is generated;
Monitoring module, for monitoring in real time to each engineering construction point, and the information indicating that monitoring is obtained is built in BIM
On the corresponding construction coordinate point of model;
Information sending module, for sharing the construction information, schedule estimation information, and for building the BIM
Model is transmitted to BIM background manager, establishes data sharing with units in charge of construction at different levels and docks;
Cost accounting analysis module, for calculating work progress according to the BIM buildings model for being transmitted to BIM background manager
Middle items cost total value and the management for calculating separately out each movable actual cost and unit cost, to project cost
Forming process and the factor for influencing cost lifting are analyzed;
Schedule estimation module, the information for being obtained according to the monitoring, prediction construction starts to construction total required for terminating
Time.
2. the Construction Management System according to claim 1 based on BIM, which is characterized in that the information collection mould
Block is the unmanned plane for carrying camera and memory, and the basic information of the engineering construction point includes location information and real scene image
Information.
3. the Construction Management System according to claim 1 based on BIM, which is characterized in that the construction information packet
Construction material composition, project amount statistics, building finished product image are included, project amount statistics is used including cubic amount of concrete, steel structure material
Amount, construction point area, electromechanical equipment quantity.
4. the Construction Management System according to claim 1 based on BIM, which is characterized in that the construction management
System further include:
Display screen, for showing visual 3-D image;
Warning module, for issuing warning information when the Information abnormity of monitoring acquisition.
5. the Construction Management System according to claim 1 based on BIM, which is characterized in that the schedule estimation
Mode are as follows: accounting of the construction speed divided by the construction speed in total engineering carries out data upload to the usage amount of raw material,
And judge whether usage amount exceeds the dosage of the construction speed according to the data of acquisition, if exceeding the dosage of the construction speed, lead to
The mode for crossing alarm is reminded.
6. a kind of construction management method based on BIM, which comprises the following steps:
S100: information collection is acquired the basic information of engineering construction point, the basic information of acquisition include location information and
Real scene image information, and location information and real scene image information are shown in the form of 3-D image;
S200: buildings model is established, and establishes BIM buildings model according to the 3-D image shown, engineering construction point is converted
At construction coordinate point, and construction information is indicated on construction coordinate point, the construction information of mark includes construction material composition, engineering
Amount statistics, building finished product image;List counts specification and budget amount are transmitted in BIM buildings model simultaneously, generate progress
Estimate information;
S300: real time monitoring early warning monitors each engineering construction point in real time, and the information indicating that monitoring is obtained is in BIM
On the corresponding construction coordinate point of buildings model;When the Information abnormity that monitoring obtains, warning information is issued;
S400: data synchronize it is shared, by above-mentioned steps construction information, schedule estimation information is by way of wirelessly or non-wirelessly
Carry out data sharing;BIM buildings model is transmitted to BIM background manager simultaneously, establishes data sharing with units in charge of construction at different levels
Docking;
S500: cost accounting analysis carries out every cost according to the BIM buildings model for being transmitted to BIM background manager
Supervision, guidance, amendment and limitation calculate every cost in work progress and total value occur and calculates separately out each work
The management of dynamic actual cost and unit cost, further according to the data that statistical calculation, business calculation and accounting provide, to item
The forming process of mesh cost and the factor for influencing cost lifting are analyzed;
S600: schedule estimation, according to the information that monitoring obtains, prediction construction starts to construction to terminate required total time, into
Spend estimation mode are as follows: accounting of the construction speed divided by the construction speed in total engineering counts the usage amount of raw material
Judge whether usage amount exceeds the dosage of the construction speed according to upload, and according to the data of acquisition, if beyond the construction speed
Dosage is reminded by way of alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811064079.9A CN109523107A (en) | 2018-09-12 | 2018-09-12 | A kind of Construction Management System and method based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811064079.9A CN109523107A (en) | 2018-09-12 | 2018-09-12 | A kind of Construction Management System and method based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109523107A true CN109523107A (en) | 2019-03-26 |
Family
ID=65770876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811064079.9A Pending CN109523107A (en) | 2018-09-12 | 2018-09-12 | A kind of Construction Management System and method based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109523107A (en) |
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978387A (en) * | 2019-03-28 | 2019-07-05 | 浙江鑫润工程管理有限公司 | A kind of BIM engineering information management method and system |
CN110398982A (en) * | 2019-06-21 | 2019-11-01 | 万翼科技有限公司 | A kind of method for inspecting and system of unmanned plane |
CN110490415A (en) * | 2019-07-15 | 2019-11-22 | 同济大学 | A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration |
CN110510520A (en) * | 2019-07-26 | 2019-11-29 | 上海建工七建集团有限公司 | The voice guidance hanging apparatus and method of prefabricated building components |
CN111143459A (en) * | 2019-12-26 | 2020-05-12 | 晶晨半导体(深圳)有限公司 | Ground construction event detection system and detection method |
CN111428965A (en) * | 2020-02-27 | 2020-07-17 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111524172A (en) * | 2020-03-30 | 2020-08-11 | 平安城市建设科技(深圳)有限公司 | Building construction progress evaluation method and device and storage medium |
CN111563627A (en) * | 2020-05-09 | 2020-08-21 | 湖南大为工程咨询有限公司 | Engineering cost progress management method, system and storage medium |
CN111612523A (en) * | 2020-04-26 | 2020-09-01 | 四川同兴达建设咨询有限公司 | Evaluation method and evaluation system for construction engineering cost operation |
CN111784967A (en) * | 2020-07-23 | 2020-10-16 | 南通市达欣工程股份有限公司 | Building construction safety early warning protection system based on BIM |
CN112001655A (en) * | 2020-08-31 | 2020-11-27 | 福州中润电子科技有限公司 | Building quality traceability management system based on BIM |
CN112069576A (en) * | 2020-08-28 | 2020-12-11 | 浙江省围海建设集团股份有限公司 | Channel excavation construction method and system |
CN112097823A (en) * | 2020-07-29 | 2020-12-18 | 安徽建筑大学 | Based on big dipper high accuracy location and BIM construction multiple spot synchronous monitoring system |
CN112116382A (en) * | 2020-09-01 | 2020-12-22 | 上海康诚建设工程咨询有限公司 | Engineering cost method, system, computer equipment and medium |
CN112163747A (en) * | 2020-09-18 | 2021-01-01 | 华航环境发展有限公司 | Construction engineering project quality management system |
CN112183905A (en) * | 2020-11-30 | 2021-01-05 | 江苏康行信息技术有限公司 | Building design plan comprehensive optimization method based on BIM modeling |
CN112329117A (en) * | 2020-11-25 | 2021-02-05 | 陕西铁路工程职业技术学院 | Building construction supervision method based on BIM |
CN112381675A (en) * | 2020-11-23 | 2021-02-19 | 浙江宝龙建设有限公司 | BIM-based real estate construction project construction method |
CN112651126A (en) * | 2020-12-24 | 2021-04-13 | 河南省第八建设集团有限公司 | Building engineering construction optimization system, method, terminal and storage medium based on BIM |
CN112926841A (en) * | 2021-02-05 | 2021-06-08 | 国家电网有限公司 | Engineering construction quality process data integration monitoring method and system |
CN112966920A (en) * | 2021-03-01 | 2021-06-15 | 四川大学锦城学院 | Building construction management system |
CN113111414A (en) * | 2021-01-20 | 2021-07-13 | 同济大学 | Existing building reconstruction project hybrid simulation system based on three-dimensional monitoring and BIM |
CN113128961A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform |
CN113191731A (en) * | 2021-04-30 | 2021-07-30 | 重庆天智慧启科技有限公司 | Intelligent building engineering management system based on BIM platform |
CN113256155A (en) * | 2021-06-17 | 2021-08-13 | 温州开晨科技有限公司 | Digital management method and system for foundation engineering construction |
CN113297656A (en) * | 2021-05-12 | 2021-08-24 | 中筑(山东)数字科技有限公司 | Building construction safety early warning protection system and method based on BIM |
CN113378274A (en) * | 2021-06-16 | 2021-09-10 | 升维科技有限公司 | Building construction monitoring method and system based on BIM |
CN113592283A (en) * | 2021-07-27 | 2021-11-02 | 陈毓斌 | Building construction equipment, construction management system and construction management method based on BIM |
CN113592422A (en) * | 2021-06-18 | 2021-11-02 | 王锁荣 | Cost management method for building network + |
CN113656868A (en) * | 2021-08-07 | 2021-11-16 | 上海容基工程项目管理有限公司 | BIM technology-based hospital construction collaborative management platform |
CN113657795A (en) * | 2021-08-24 | 2021-11-16 | 浙江长城工程监理有限公司 | Civil air defense engineering supervision method, system and storage medium |
CN113673899A (en) * | 2021-08-28 | 2021-11-19 | 江苏苏科建设项目管理有限公司 | Road engineering progress management method based on supervision cloud system |
CN114331081A (en) * | 2021-12-22 | 2022-04-12 | 南京同筑盛世信息科技有限公司 | BIM-based visual construction whole-course safety management system |
CN114493477A (en) * | 2021-12-13 | 2022-05-13 | 南通科达建材科技股份有限公司 | BIM-based multi-dimensional statistical method and system for building cost |
CN114862093A (en) * | 2022-03-17 | 2022-08-05 | 深圳市深安企业有限公司 | BIM-based engineering quality supervision method and system |
CN115271546A (en) * | 2022-09-21 | 2022-11-01 | 深圳市斯维尔科技股份有限公司 | BIM-based digital engineering supervision method and system |
CN115794759A (en) * | 2023-02-08 | 2023-03-14 | 中建深圳装饰有限公司 | BIM-based multi-target construction data sharing transmission method |
CN116189367A (en) * | 2022-12-09 | 2023-05-30 | 嘉应学院 | Building fire alarm system based on Internet of things |
CN116308188A (en) * | 2023-03-23 | 2023-06-23 | 中宬建设管理有限公司 | Digital engineering management method and system based on BIM technology |
CN116384595A (en) * | 2023-06-05 | 2023-07-04 | 中铁四局集团有限公司 | Project progress prediction analysis method based on cost linkage |
CN116452753A (en) * | 2023-05-08 | 2023-07-18 | 杨浩 | Multi-data mapping system for construction progress identification |
CN116703127A (en) * | 2023-08-03 | 2023-09-05 | 山东青建智慧建筑科技有限公司 | Building construction supervision method and system based on BIM |
CN117350682A (en) * | 2023-12-04 | 2024-01-05 | 山东平安建设集团有限公司 | Building construction progress management method and system based on BIM |
CN117541023A (en) * | 2024-01-05 | 2024-02-09 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000073956A2 (en) * | 1999-05-27 | 2000-12-07 | Andersen Consulting Llp | System, method and computer program for representing priority information concerning components of a system |
WO2011156801A2 (en) * | 2010-06-11 | 2011-12-15 | Satterfield & Pontikes Construction, Inc. | Model inventory manager |
CN105184505A (en) * | 2015-09-24 | 2015-12-23 | 武汉英思工程科技股份有限公司 | Digital management method and system used for water conservancy and hydropower engineering construction process |
CN107818430A (en) * | 2017-12-15 | 2018-03-20 | 武汉理工大学 | A kind of building engineering construction progress msg management method and system based on BIM |
CN107958357A (en) * | 2018-01-22 | 2018-04-24 | 东华理工大学 | A kind of Cost Management System of BIM projects |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
-
2018
- 2018-09-12 CN CN201811064079.9A patent/CN109523107A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000073956A2 (en) * | 1999-05-27 | 2000-12-07 | Andersen Consulting Llp | System, method and computer program for representing priority information concerning components of a system |
WO2011156801A2 (en) * | 2010-06-11 | 2011-12-15 | Satterfield & Pontikes Construction, Inc. | Model inventory manager |
EP2580700A2 (en) * | 2010-06-11 | 2013-04-17 | Satterfield & Pontikes Construction, Inc. | Model inventory manager |
CN105184505A (en) * | 2015-09-24 | 2015-12-23 | 武汉英思工程科技股份有限公司 | Digital management method and system used for water conservancy and hydropower engineering construction process |
CN107818430A (en) * | 2017-12-15 | 2018-03-20 | 武汉理工大学 | A kind of building engineering construction progress msg management method and system based on BIM |
CN108280281A (en) * | 2018-01-18 | 2018-07-13 | 宋强 | A kind of construction cost control method and system based on BIM technology |
CN107958357A (en) * | 2018-01-22 | 2018-04-24 | 东华理工大学 | A kind of Cost Management System of BIM projects |
Cited By (58)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109978387A (en) * | 2019-03-28 | 2019-07-05 | 浙江鑫润工程管理有限公司 | A kind of BIM engineering information management method and system |
CN110398982A (en) * | 2019-06-21 | 2019-11-01 | 万翼科技有限公司 | A kind of method for inspecting and system of unmanned plane |
CN110490415B (en) * | 2019-07-15 | 2023-07-14 | 同济大学 | Building progress assessment method for visual coordination of multiple unmanned aerial vehicles |
CN110490415A (en) * | 2019-07-15 | 2019-11-22 | 同济大学 | A kind of building progress appraisal procedure of multiple no-manned plane vision collaboration |
CN110510520A (en) * | 2019-07-26 | 2019-11-29 | 上海建工七建集团有限公司 | The voice guidance hanging apparatus and method of prefabricated building components |
CN111143459A (en) * | 2019-12-26 | 2020-05-12 | 晶晨半导体(深圳)有限公司 | Ground construction event detection system and detection method |
CN111428965A (en) * | 2020-02-27 | 2020-07-17 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111428965B (en) * | 2020-02-27 | 2023-11-03 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111524172A (en) * | 2020-03-30 | 2020-08-11 | 平安城市建设科技(深圳)有限公司 | Building construction progress evaluation method and device and storage medium |
CN111612523A (en) * | 2020-04-26 | 2020-09-01 | 四川同兴达建设咨询有限公司 | Evaluation method and evaluation system for construction engineering cost operation |
CN111563627A (en) * | 2020-05-09 | 2020-08-21 | 湖南大为工程咨询有限公司 | Engineering cost progress management method, system and storage medium |
CN111784967A (en) * | 2020-07-23 | 2020-10-16 | 南通市达欣工程股份有限公司 | Building construction safety early warning protection system based on BIM |
CN111784967B (en) * | 2020-07-23 | 2021-07-16 | 南通市达欣工程股份有限公司 | Building construction safety early warning protection system based on BIM |
CN112097823A (en) * | 2020-07-29 | 2020-12-18 | 安徽建筑大学 | Based on big dipper high accuracy location and BIM construction multiple spot synchronous monitoring system |
CN112069576A (en) * | 2020-08-28 | 2020-12-11 | 浙江省围海建设集团股份有限公司 | Channel excavation construction method and system |
CN112001655A (en) * | 2020-08-31 | 2020-11-27 | 福州中润电子科技有限公司 | Building quality traceability management system based on BIM |
CN112116382A (en) * | 2020-09-01 | 2020-12-22 | 上海康诚建设工程咨询有限公司 | Engineering cost method, system, computer equipment and medium |
CN112163747A (en) * | 2020-09-18 | 2021-01-01 | 华航环境发展有限公司 | Construction engineering project quality management system |
CN112381675A (en) * | 2020-11-23 | 2021-02-19 | 浙江宝龙建设有限公司 | BIM-based real estate construction project construction method |
CN112329117A (en) * | 2020-11-25 | 2021-02-05 | 陕西铁路工程职业技术学院 | Building construction supervision method based on BIM |
CN112183905A (en) * | 2020-11-30 | 2021-01-05 | 江苏康行信息技术有限公司 | Building design plan comprehensive optimization method based on BIM modeling |
CN112651126B (en) * | 2020-12-24 | 2024-01-12 | 河南省第八建设集团有限公司 | BIM-based construction engineering construction optimization system, method, terminal and storage medium |
CN112651126A (en) * | 2020-12-24 | 2021-04-13 | 河南省第八建设集团有限公司 | Building engineering construction optimization system, method, terminal and storage medium based on BIM |
CN113111414A (en) * | 2021-01-20 | 2021-07-13 | 同济大学 | Existing building reconstruction project hybrid simulation system based on three-dimensional monitoring and BIM |
CN112926841A (en) * | 2021-02-05 | 2021-06-08 | 国家电网有限公司 | Engineering construction quality process data integration monitoring method and system |
CN112966920A (en) * | 2021-03-01 | 2021-06-15 | 四川大学锦城学院 | Building construction management system |
CN113128961A (en) * | 2021-04-16 | 2021-07-16 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform |
CN113128961B (en) * | 2021-04-16 | 2022-03-11 | 深圳市艾赛克科技有限公司 | Wisdom building site management cloud platform system |
CN113191731A (en) * | 2021-04-30 | 2021-07-30 | 重庆天智慧启科技有限公司 | Intelligent building engineering management system based on BIM platform |
CN113297656A (en) * | 2021-05-12 | 2021-08-24 | 中筑(山东)数字科技有限公司 | Building construction safety early warning protection system and method based on BIM |
CN113378274A (en) * | 2021-06-16 | 2021-09-10 | 升维科技有限公司 | Building construction monitoring method and system based on BIM |
CN113378274B (en) * | 2021-06-16 | 2023-12-01 | 鼎正工程咨询股份有限公司 | Building construction monitoring method and system based on BIM |
CN113256155B (en) * | 2021-06-17 | 2021-10-15 | 温州开晨科技有限公司 | Digital management method and system for foundation engineering construction |
CN113256155A (en) * | 2021-06-17 | 2021-08-13 | 温州开晨科技有限公司 | Digital management method and system for foundation engineering construction |
CN113592422A (en) * | 2021-06-18 | 2021-11-02 | 王锁荣 | Cost management method for building network + |
CN113592283A (en) * | 2021-07-27 | 2021-11-02 | 陈毓斌 | Building construction equipment, construction management system and construction management method based on BIM |
CN113656868A (en) * | 2021-08-07 | 2021-11-16 | 上海容基工程项目管理有限公司 | BIM technology-based hospital construction collaborative management platform |
CN113657795A (en) * | 2021-08-24 | 2021-11-16 | 浙江长城工程监理有限公司 | Civil air defense engineering supervision method, system and storage medium |
CN113673899A (en) * | 2021-08-28 | 2021-11-19 | 江苏苏科建设项目管理有限公司 | Road engineering progress management method based on supervision cloud system |
CN114493477A (en) * | 2021-12-13 | 2022-05-13 | 南通科达建材科技股份有限公司 | BIM-based multi-dimensional statistical method and system for building cost |
CN114493477B (en) * | 2021-12-13 | 2023-11-21 | 南通科达建材科技股份有限公司 | Building cost multidimensional statistics method and system based on BIM |
CN114331081A (en) * | 2021-12-22 | 2022-04-12 | 南京同筑盛世信息科技有限公司 | BIM-based visual construction whole-course safety management system |
CN114862093A (en) * | 2022-03-17 | 2022-08-05 | 深圳市深安企业有限公司 | BIM-based engineering quality supervision method and system |
CN115271546A (en) * | 2022-09-21 | 2022-11-01 | 深圳市斯维尔科技股份有限公司 | BIM-based digital engineering supervision method and system |
CN116189367B (en) * | 2022-12-09 | 2023-09-26 | 嘉应学院 | Building fire alarm system based on Internet of things |
CN116189367A (en) * | 2022-12-09 | 2023-05-30 | 嘉应学院 | Building fire alarm system based on Internet of things |
CN115794759A (en) * | 2023-02-08 | 2023-03-14 | 中建深圳装饰有限公司 | BIM-based multi-target construction data sharing transmission method |
CN116308188B (en) * | 2023-03-23 | 2023-09-26 | 中宬建设管理有限公司 | Digital engineering management method and system based on BIM technology |
CN116308188A (en) * | 2023-03-23 | 2023-06-23 | 中宬建设管理有限公司 | Digital engineering management method and system based on BIM technology |
CN116452753A (en) * | 2023-05-08 | 2023-07-18 | 杨浩 | Multi-data mapping system for construction progress identification |
CN116452753B (en) * | 2023-05-08 | 2024-01-26 | 浙江省二建建设集团有限公司 | Multi-data mapping system for construction progress identification |
CN116384595B (en) * | 2023-06-05 | 2023-08-08 | 中铁四局集团有限公司 | Project progress prediction analysis method based on cost linkage |
CN116384595A (en) * | 2023-06-05 | 2023-07-04 | 中铁四局集团有限公司 | Project progress prediction analysis method based on cost linkage |
CN116703127A (en) * | 2023-08-03 | 2023-09-05 | 山东青建智慧建筑科技有限公司 | Building construction supervision method and system based on BIM |
CN117350682A (en) * | 2023-12-04 | 2024-01-05 | 山东平安建设集团有限公司 | Building construction progress management method and system based on BIM |
CN117350682B (en) * | 2023-12-04 | 2024-02-20 | 山东平安建设集团有限公司 | Building construction progress management method and system based on BIM |
CN117541023A (en) * | 2024-01-05 | 2024-02-09 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
CN117541023B (en) * | 2024-01-05 | 2024-04-05 | 山东金呈阳建设工程有限公司 | BIM-based bridge construction progress management method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109523107A (en) | A kind of Construction Management System and method based on BIM | |
CN107679310A (en) | The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology | |
CN108280281A (en) | A kind of construction cost control method and system based on BIM technology | |
CN106022979A (en) | BIM-based water conservancy and hydropower project management cloud platform and application method thereof | |
CN109063973B (en) | Construction project construction method based on artificial intelligence | |
CN113505499B (en) | Hydraulic engineering building full life cycle management system based on BIM and big data analysis | |
CN110046364A (en) | A kind of method for computing work amount based on BIM technology | |
CN104501766B (en) | Monitor parameter and method for early warning in Side Slope of Deep Foundation Pit Excavation vertical displacement vectors angle | |
WO2020056669A1 (en) | Control method and apparatus for unmanned aerial vehicle cruise based on prefabricated building platform | |
CN110807571A (en) | Building engineering quality control system based on combination of 3d laser sensing and BIM | |
CN109544051A (en) | A kind of construction management application platform based on BIM technology application | |
CN107818430A (en) | A kind of building engineering construction progress msg management method and system based on BIM | |
CN104463717A (en) | Construction expert information system applicable to extra-large underground cavern group | |
CN107355963A (en) | A kind of detecting system for being used to build the monitoring of O&M device temperature based on threedimensional model | |
CN102749071A (en) | Method for monitoring soil erosion based on unmanned aerial vehicle aerial photography | |
CN111898990A (en) | Building construction progress management method | |
CN109856655A (en) | A kind of construction time personnel positioning based on Beidou GNSS and BIM, monitoring and managing method | |
CN110618429A (en) | Laser range finder for house measurement and method thereof | |
CN106027962A (en) | Video monitoring coverage rate calculation method and device, and video monitoring layout method and system | |
CN106484977A (en) | High arch dam construction progress self-adapting simulation analysis method | |
CN104965964B (en) | A kind of building personnel's distributed model method for building up based on monitor video analysis | |
CN113011832A (en) | Engineering cost system based on BIM | |
CN112464494A (en) | Construction system is built to wisdom | |
CN109978387A (en) | A kind of BIM engineering information management method and system | |
CN209486723U (en) | A kind of construction management application platform based on BIM technology application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190326 |