CN109519187A - 切眼掘进施工工艺 - Google Patents
切眼掘进施工工艺 Download PDFInfo
- Publication number
- CN109519187A CN109519187A CN201811545166.6A CN201811545166A CN109519187A CN 109519187 A CN109519187 A CN 109519187A CN 201811545166 A CN201811545166 A CN 201811545166A CN 109519187 A CN109519187 A CN 109519187A
- Authority
- CN
- China
- Prior art keywords
- fully
- digging machine
- mechanized digging
- machine
- mechanized
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
- E21C35/20—General features of equipment for removal of chippings, e.g. for loading on conveyor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/126—Loading devices or installations
Abstract
切眼掘进施工工艺,本发明切眼掘进施工工艺,属于煤矿施工方法技术领域;所要解决的技术问题为提供一种施工时间短,出煤连续的切眼掘进施工工艺;采用的技术方案为:(1)、采用综掘机对切眼导硐巷道进行导硐;(2)、解体综掘机二运,综掘机二运机头、机尾悬吊在龙门架上,敷设刮板输送机,向前掘进;(3)、拆除龙门架,恢复通用掘进方式向前掘进;(4)、拆除刮板输送机,安装皮带输送机;(5)、刷扩综掘机窝硐室;(6)、拆除综掘机二运,再次将综掘机二运机头、机尾悬吊在龙门架上,拆除皮带输送机,敷设刮板输送机;(7)、进行机头段刷扩,完成后恢复综掘机二运,对切眼进行刷扩至设计位置;本发明用于煤矿切眼掘进施工。
Description
技术领域
本发明切眼掘进施工工艺,属于煤矿施工方法技术领域。
背景技术
在煤矿开采中,都需要开掘出用来安装采煤设备的巷道,即切眼。通常的施工方法中,在切眼导硐开口及反刷期间一般采用铲车出煤,不方便的同时费时,另外,一般切眼刷矿期间,最后都会遗留三角煤,该煤体出煤繁琐,施工时间长。
发明内容
本发明克服现有技术存在的不足,所要解决的技术问题为提供一种施工时间短,出煤连续的切眼掘进施工工艺。
为了解决上述技术问题,本发明采用的技术方案为:切眼掘进施工工艺,包括以下步骤:
(1)、在胶带巷施工至末端到位后,继续采用综掘机对切眼导硐巷道进行导硐,按设计宽度开口,在不解体综掘机二运的情况下对切眼导硐巷道采用通用掘进方式向前掘进至综掘机二运和巷道干涉无法前进,所述综掘机二运指机头架、机尾架和多个中间架;
(2)、进行系统调整,解体综掘机二运,加装龙门架,装设综掘机二运机头、机尾,综掘机二运机头、机尾采用锚链斜拉悬吊在龙门架上,并顺掘进巷道敷设刮板输送机至综掘机后方,刮板输送机随着综掘机向前掘进而向前延伸,综掘机向前掘进至可恢复通用掘进方式;
(3)、再次进行系统调整,拆除龙门架,加装综掘机二运中间架至原长,同时安装刮板输送机滑靴,恢复步骤(1)中的通用掘进方式继续向前掘进至具备安装皮带输送机的距离条件;
(4)、拆除刮板输送机,安装皮带输送机,同时在切眼导硐巷道刷扩帮迎头退后一段距离,该距离根据综掘机窝硐室尺寸确定,顺巷道方向打设一排锁口梁,做综掘机窝开口准备;
(5)、刷扩综掘机窝硐室,尺寸按所用综掘机大小确定,深度为至切眼刷扩帮,并在综掘机窝硐室内加装顶板观测装置,之后继续向前导硐施工至设计位置,在此导硐施工过程中,施工出中部材料硐室;
(6)、拆除综掘机二运,在中部材料硐室掉转综掘机,之后再次加装龙门架,装设综掘机二运机头、机尾,综掘机二运机头、机尾采用锚链斜拉悬吊在龙门架上,并将综掘机开至综掘机窝硐室,同时拆除皮带输送机,并在切眼设计单体偏刷扩侧0.5米位置敷设刮板输送机,为切眼机头处的三角煤刷扩做准备;
(7)、开动综掘机进行机头段刷扩,完成后拆除龙门架、综掘机二运、刮板输送机并掉转综掘机至综掘机窝硐室内,在原刮板输送机敷设位置安装皮带输送机,恢复综掘机二运,对切眼进行刷扩至设计位置,切眼掘进施工完成。
所述步骤(2)和步骤(6)中,综掘机二运龙门架固定在综掘机一运溜槽上。
所述通用掘进方式为掘进巷道的一般掘进方式。
本发明与现有技术相比具有以下有益效果。
1、本发明在切眼导硐开口及反刷期间用综掘机二运、刮板输送机或皮带输送机出煤,不用铲车,强化了现场的施工环境,出煤连续、方便。
2、本发明中采用预施工综掘机窝进行反刷,减少了重复敷设设备占用时间,另外由于克服了铲车出煤的不连续性,缩短了施工时间。
3、本发明中运用了龙门架悬吊综掘机二运,代替了一般施工中安装滑道,综掘机二运置于滑道上的工艺,使得综掘机二运安装方便、占用空间小。
4、由于皮带输送机运行稳定,维护简单方便,适用于长距离运输,所以本发明中只要满足了皮带输送机的安装距离要求,即进行系统调整,用皮带输送机代替刮板输送机,提高了出煤运输的稳定性。
具体实施方式
下面以具体实例来对本发明做进一步详细的说明。
本发明切眼掘进施工工艺,包括以下步骤:
(1)、在胶带巷施工至末端到位后,继续采用综掘机对切眼导硐巷道进行导硐,开口宽5.4米,在不解体综掘机二运的情况下对切眼导硐巷道向前掘进12米,所述综掘机二运指机头架、机尾架和4个中间架,工16米;
(2)、进行系统调整,解体综掘机二运,加装龙门架,将综掘机二运机头、机尾共4米用锚链斜拉悬吊在龙门架上,并顺掘进巷道敷设刮板输送机至综掘机后方,刮板输送机随着综掘机向前掘进而向前延伸,综掘机向前掘进18米左右,此时综掘机已向前进入切眼导硐巷道30米左右,可恢复步骤(1)中的通用掘进方式;
(3)、再次进行系统调整,拆除龙门架,加装综掘机二运中间架至原长,同时安装刮板输送机滑靴,恢复步骤(1)中的通用掘进方式继续向前掘进50米左右,此时综掘机已向前进入切眼导硐巷道80米左右,可安装皮带输送机;
(4)、拆除刮板输送机,安装皮带输送机,同时在切眼导硐巷道刷扩帮迎头退后13米,距帮0.5米顺巷道方向打设一排锁口梁,索梁长15米,做综掘机窝开口准备;
(5)、刷扩综掘机窝硐室,外口13米,里口10米,深3.6米,并在综掘机窝硐室内加装离层仪等顶板观测装置,之后继续向前导硐施工至设计位置,在此导硐施工过程中,施工出中部材料硐室;
(6)、拆除综掘机二运,在中部材料硐室掉转综掘机,之后再次加装龙门架,装设综掘机二运机头、机尾,综掘机二运机头、机尾采用锚链斜拉悬吊在龙门架上,并将综掘机开至综掘机窝硐室,同时拆除皮带输送机,并在切眼设计单体偏刷扩侧0.5米位置(切眼导硐巷道中)敷设刮板输送机,为切眼机头处的70米三角煤刷扩做准备;
(7)、开动综掘机进行机头段刷扩,完成后拆除龙门架、综掘机二运、刮板输送机并掉转综掘机至综掘机窝硐室内,在原刮板输送机敷设位置安装皮带输送机,恢复综掘机二运,对切眼进行刷扩至设计位置,切眼掘进施工完成。
上面对本发明的实施例作了详细说明,但是本发明并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。
Claims (2)
1.切眼掘进施工工艺,其特征在于包括以下步骤:
(1)、在胶带巷施工至末端到位后,继续采用综掘机对切眼导硐巷道进行导硐,按设计宽度开口,在不解体综掘机二运的情况下对切眼导硐巷道采用通用掘进方式向前掘进至综掘机二运和巷道干涉无法前进,所述综掘机二运指机头架、机尾架和多个中间架;
(2)、进行系统调整,解体综掘机二运,加装龙门架,装设综掘机二运机头、机尾,综掘机二运机头、机尾采用锚链斜拉悬吊在龙门架上,并顺掘进巷道敷设刮板输送机至综掘机后方,刮板输送机随着综掘机向前掘进而向前延伸,综掘机向前掘进至可恢复通用掘进方式;
(3)、再次进行系统调整,拆除龙门架,加装综掘机二运中间架至原长,同时安装刮板输送机滑靴,恢复步骤(1)中的通用掘进方式继续向前掘进至具备安装皮带输送机的距离条件;
(4)、拆除刮板输送机,安装皮带输送机,同时在切眼导硐巷道刷扩帮迎头退后一段距离,该距离根据综掘机窝硐室尺寸确定,顺巷道方向打设一排锁口梁,做综掘机窝开口准备;
(5)、刷扩综掘机窝硐室,尺寸按所用综掘机大小确定,深度为至切眼刷扩帮,并在综掘机窝硐室内加装顶板观测装置,之后继续向前导硐施工至设计位置,在此导硐施工过程中,施工出中部材料硐室;
(6)、拆除综掘机二运,在中部材料硐室掉转综掘机,之后再次加装龙门架,装设综掘机二运机头、机尾,综掘机二运机头、机尾采用锚链斜拉悬吊在龙门架上,并将综掘机开至综掘机窝硐室,同时拆除皮带输送机,并在切眼设计单体偏刷扩侧0.5米位置敷设刮板输送机,为切眼机头处的三角煤刷扩做准备;
(7)、开动综掘机进行机头段刷扩,完成后拆除龙门架、综掘机二运、刮板输送机并掉转综掘机至综掘机窝硐室内,在原刮板输送机敷设位置安装皮带输送机,恢复综掘机二运,对切眼进行刷扩至设计位置,切眼掘进施工完成。
2.根据权利要求1所述的切眼掘进施工工艺,其特征在于:所述步骤(2)和步骤(6)中,综掘机二运龙门架固定在综掘机一运溜槽上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811545166.6A CN109519187B (zh) | 2018-12-17 | 2018-12-17 | 切眼掘进施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811545166.6A CN109519187B (zh) | 2018-12-17 | 2018-12-17 | 切眼掘进施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109519187A true CN109519187A (zh) | 2019-03-26 |
CN109519187B CN109519187B (zh) | 2020-02-21 |
Family
ID=65795594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811545166.6A Active CN109519187B (zh) | 2018-12-17 | 2018-12-17 | 切眼掘进施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109519187B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764917A (zh) * | 2020-06-24 | 2020-10-13 | 临沂矿业集团菏泽煤电有限公司 | 一种综掘机快速开门巷道掘进施工方法 |
CN113464141A (zh) * | 2021-08-25 | 2021-10-01 | 国能神东煤炭集团有限责任公司 | 一种三角煤区域回采方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4992657A (en) * | 1987-12-17 | 1991-02-12 | Ruhrkohle Aktiengesellschaft | Apparatus for detecting the cutting horizon for mining machines |
CN102505942A (zh) * | 2011-11-11 | 2012-06-20 | 山西晋城无烟煤矿业集团有限责任公司 | 大断面切眼分次成巷安全快速掘进方法 |
CN102877847A (zh) * | 2012-09-24 | 2013-01-16 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面切眼扩帮开口段掘进方法 |
CN104265319A (zh) * | 2014-09-15 | 2015-01-07 | 中国神华能源股份有限公司 | 一种用于施工切眼的施工方法 |
CN104329117A (zh) * | 2014-08-28 | 2015-02-04 | 江苏中矿立兴能源科技有限公司 | 一种综合机械化充填采煤切眼设备安装方法 |
CN105041323A (zh) * | 2014-12-31 | 2015-11-11 | 龙口矿业集团有限公司 | 三软岩层切眼大断面施工及其支护方法 |
CN105178969A (zh) * | 2015-08-04 | 2015-12-23 | 山西晋城无烟煤矿业集团有限责任公司 | 工作面切眼掘进施工一次成巷方法 |
CN105525919A (zh) * | 2014-09-29 | 2016-04-27 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | 一种急倾斜综采面切眼扩刷与设备安装交叉作业方法 |
CN106223957A (zh) * | 2016-08-20 | 2016-12-14 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | 一种急倾斜煤层开切眼分段施工的方法 |
CN106351663A (zh) * | 2016-09-29 | 2017-01-25 | 淮南矿业(集团)有限责任公司 | 切眼施工后退式刷扩工艺 |
-
2018
- 2018-12-17 CN CN201811545166.6A patent/CN109519187B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4992657A (en) * | 1987-12-17 | 1991-02-12 | Ruhrkohle Aktiengesellschaft | Apparatus for detecting the cutting horizon for mining machines |
CN102505942A (zh) * | 2011-11-11 | 2012-06-20 | 山西晋城无烟煤矿业集团有限责任公司 | 大断面切眼分次成巷安全快速掘进方法 |
CN102877847A (zh) * | 2012-09-24 | 2013-01-16 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面切眼扩帮开口段掘进方法 |
CN104329117A (zh) * | 2014-08-28 | 2015-02-04 | 江苏中矿立兴能源科技有限公司 | 一种综合机械化充填采煤切眼设备安装方法 |
CN104265319A (zh) * | 2014-09-15 | 2015-01-07 | 中国神华能源股份有限公司 | 一种用于施工切眼的施工方法 |
CN105525919A (zh) * | 2014-09-29 | 2016-04-27 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | 一种急倾斜综采面切眼扩刷与设备安装交叉作业方法 |
CN105041323A (zh) * | 2014-12-31 | 2015-11-11 | 龙口矿业集团有限公司 | 三软岩层切眼大断面施工及其支护方法 |
CN105178969A (zh) * | 2015-08-04 | 2015-12-23 | 山西晋城无烟煤矿业集团有限责任公司 | 工作面切眼掘进施工一次成巷方法 |
CN106223957A (zh) * | 2016-08-20 | 2016-12-14 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | 一种急倾斜煤层开切眼分段施工的方法 |
CN106351663A (zh) * | 2016-09-29 | 2017-01-25 | 淮南矿业(集团)有限责任公司 | 切眼施工后退式刷扩工艺 |
Non-Patent Citations (2)
Title |
---|
李建等: "综掘工艺在切眼刷宽施工过程中的应用", 《内蒙古煤炭经济》 * |
王庆来等: "综采工作面大断面切眼刷扩技术", 《中国科技信息》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764917A (zh) * | 2020-06-24 | 2020-10-13 | 临沂矿业集团菏泽煤电有限公司 | 一种综掘机快速开门巷道掘进施工方法 |
CN113464141A (zh) * | 2021-08-25 | 2021-10-01 | 国能神东煤炭集团有限责任公司 | 一种三角煤区域回采方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109519187B (zh) | 2020-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101769158B (zh) | 掘护锚一体化成套设备 | |
CN201344032Y (zh) | 掘护锚一体化成套设备 | |
CN102606152B (zh) | 新型矩形煤巷快速掘锚一体机 | |
CN107060795B (zh) | 一种地下矿井tbm组装施工方法 | |
CN109519187A (zh) | 切眼掘进施工工艺 | |
CN111927482B (zh) | 一种可用于硬岩地层的异形全断面掘进机 | |
CN104632233A (zh) | 变形巷道的机械化修复工艺及巷道修复机 | |
CN104747201A (zh) | 不稳定围岩条件下的煤巷快速掘锚一体化设备 | |
CN202500562U (zh) | 掘、护、锚平行作业系统 | |
CN102787847A (zh) | 一种巷道掘进机 | |
CN111305842B (zh) | 一种基于刀把式综采工作面的快速对接安装方法 | |
CN104265319B (zh) | 一种用于施工切眼的施工方法 | |
CN105240016A (zh) | 缓倾斜薄层状玉石矿矿块切割条带拖曳充填采矿方法 | |
CN204754942U (zh) | 隧道掘进机用双喷射支护系统 | |
JP2016223114A (ja) | トンネルの急速施工方法 | |
CN104389605B (zh) | 一种采煤工作面密集钢丝绳掩护回撤方法 | |
WO2018121143A1 (zh) | 一种小直径中心轴驱动凯式tbm | |
CN106368715B (zh) | 一种双护盾tbm组装期间施工的出渣方法 | |
CN202810858U (zh) | 一种巷道掘进机 | |
CN104564056A (zh) | 掘探一体机 | |
US20020096934A1 (en) | Mining machine and method of mining | |
CN208168883U (zh) | 一种马蹄形全断面岩石隧道掘进机 | |
CN106761791B (zh) | 一种隧道掘进机及其施工法 | |
CN206267853U (zh) | 一种大断面岩巷掘进系统 | |
CN104121022A (zh) | 煤矿巷道开口掘进工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Building 2, manzhoufen community, Yingze District, Taiyuan City, Shanxi Province Applicant after: China Coal Huajin Group Co., Ltd Address before: 043300, Shanxi, Yuncheng province Hejin Fan Village town of Guzhen Jia Ling mine Applicant before: Shanxi Zhongmei Huajin Energy Co., Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |