CN105178969A - 工作面切眼掘进施工一次成巷方法 - Google Patents

工作面切眼掘进施工一次成巷方法 Download PDF

Info

Publication number
CN105178969A
CN105178969A CN201510469993.1A CN201510469993A CN105178969A CN 105178969 A CN105178969 A CN 105178969A CN 201510469993 A CN201510469993 A CN 201510469993A CN 105178969 A CN105178969 A CN 105178969A
Authority
CN
China
Prior art keywords
construction
lane
hole
cutting
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510469993.1A
Other languages
English (en)
Inventor
宋小平
王静
李丰廷
程元
张向阳
李建伟
白春娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201510469993.1A priority Critical patent/CN105178969A/zh
Publication of CN105178969A publication Critical patent/CN105178969A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明具体为一种工作面切眼掘进施工一次成巷方法,解决了现有施工方法需要两次成巷的问题。工作面切眼掘进施工一次成巷方法包括以下步骤,以巷左帮开口向巷方向施工工作面切眼,施工过程中采用锚杆、钢带联合支护,并用锚索进行补强支护,首先采用4.7m×2.6m的断面施工一个循环,施工过程中排距为1.5m,循环进度为3m;然后采用2.5m×2.6m的断面进行切眼刷大3m;重复上述两个步骤,每个循环向巷方向施工推进3m,直至切眼导硐施工至巷帮。本发明简化了工艺流程,解决了瓦斯管理的难题,减少了将综掘机倒机到切眼口的工艺,避免了拆道重新钉道,缩减了所需时间。

Description

工作面切眼掘进施工一次成巷方法
技术领域
本发明涉及煤矿工作面切眼掘进工艺,具体为一种工作面切眼掘进施工一次成巷方法。
背景技术
现有施工方法中,施工工作面切眼,先施工切眼导硐至巷帮,之后将综掘机导致切导开口处,进行切眼刷大,施工工作面切眼。现有采煤工作面的切眼施工需要两次成巷,并在施工过程中面临着第二次掘进巷道时风道距离长、有效风流不稳定、回风瓦斯探头难以管理控制容易超限报警,并存在综掘机长距离导机施工和各种辅助设备的重复安装等问题。现有方法导硐掘出后,压入式风筒出风口需延接至距导硐工作面不大于8m处,切眼刷大时由于压入式风筒出风口距切眼刷大工作面风道距离长,刷大时工作面隅角涌出的瓦斯不易稀释,易发生瓦斯超限报警事故,且导硐掘出后,需将综掘机导至导硐口,多出了拆除切眼导硐轨道步骤和导机工艺步骤。
发明内容
本发明为了解决现有施工方法需要两次成巷的问题,提供了一种工作面切眼掘进施工一次成巷方法。
本发明是采用如下技术方案实现的:工作面切眼掘进施工一次成巷方法包括以下步骤,
(1)以巷左帮开口向巷方向施工工作面切眼,施工过程中采用锚杆、钢带联合支护,并用锚索进行补强支护,首先采用4.7m×2.6m的断面施工一个循环,施工过程中排距为1.5m,循环进度为3m;
(2)然后采用2.5m×2.6m的断面进行切眼刷大3m;
(3)重复上述两个步骤,每个循环向巷方向施工推进3m,直至切眼导硐施工至巷帮。
本发明的有益效果如下:将原先的两次掘进巷道形成切眼的方式,合并为一次成巷的方式施工,简化了工艺流程,并解决了施工中瓦斯管理的难题,减少了原先第二次掘进巷道时需将综掘机倒机到切眼口的工艺,并且避免了拆道重新钉道,大大缩减了施工切眼所需要的时间。
附图说明
图1为现有施工方法示意图;
图2为本发明施工方法示意图。
具体实施方式
工作面切眼掘进施工一次成巷方法包括以下步骤,
(1)以巷左帮开口向巷方向施工工作面切眼,施工过程中采用锚杆、钢带联合支护,并用锚索进行补强支护,首先采用4.7m×2.6m的断面施工一个循环,施工过程中排距为1.5m,循环进度为3m;
(2)然后采用2.5m×2.6m的断面进行切眼刷大3m;
(3)重复上述两个步骤,每个循环向巷方向施工推进3m,直至切眼导硐施工至巷帮。
施工过程中,严格按要求构筑工作面的通风设施,工作面通风系统要完善可靠、抓好瓦斯检查工作、切眼巷道掘进至90m处时设警示牌,并有专人守护、
监测监控探头定期派人进行安装维护、调校,保证矿井监测系统的正常、井下电气设备管理,消灭失爆,各种电气设备保护装置安装齐全,灵敏可靠,并定期检查、根据现场情况,通风区应及时调整井下通风系统及各工作点的配风量,在永久支护未到位的情况下及时架设临时支护。

Claims (1)

1.一种工作面切眼掘进施工一次成巷方法,其特征在于:包括以下步骤,
(1)以巷左帮开口向巷方向施工工作面切眼,施工过程中采用锚杆、钢带联合支护,并用锚索进行补强支护,首先采用4.7m×2.6m的断面施工一个循环,施工过程中排距为1.5m,循环进度为3m;
(2)然后采用2.5m×2.6m的断面进行切眼刷大3m;
(3)重复上述两个步骤,每个循环向巷方向施工推进3m,直至切眼导硐施工至巷帮。
CN201510469993.1A 2015-08-04 2015-08-04 工作面切眼掘进施工一次成巷方法 Pending CN105178969A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510469993.1A CN105178969A (zh) 2015-08-04 2015-08-04 工作面切眼掘进施工一次成巷方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510469993.1A CN105178969A (zh) 2015-08-04 2015-08-04 工作面切眼掘进施工一次成巷方法

Publications (1)

Publication Number Publication Date
CN105178969A true CN105178969A (zh) 2015-12-23

Family

ID=54901323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510469993.1A Pending CN105178969A (zh) 2015-08-04 2015-08-04 工作面切眼掘进施工一次成巷方法

Country Status (1)

Country Link
CN (1) CN105178969A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519187A (zh) * 2018-12-17 2019-03-26 山西中煤华晋能源有限责任公司 切眼掘进施工工艺
CN113605925A (zh) * 2021-06-25 2021-11-05 安徽理工大学 一种煤矿大断面开切眼一次成巷方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061771A (zh) * 2012-12-20 2013-04-24 大同煤矿集团有限责任公司 复采矿井综采面切眼掘进及其支护方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061771A (zh) * 2012-12-20 2013-04-24 大同煤矿集团有限责任公司 复采矿井综采面切眼掘进及其支护方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘培东: "龙宫矿综采工作面大断面综采切眼支护技术", 《山西煤炭》 *
尚刚: "综采大断面切眼一次成巷技术研究", 《煤炭与化工》 *
强济江: "全煤大断面开切眼支护技术的推广与应用", 《科技与企业》 *
武立文: "大采高特大断面开切眼一次成巷技术", 《煤矿开采》 *
马良慧: "新窑煤矿大断面开切眼一次成巷技术", 《煤》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109519187A (zh) * 2018-12-17 2019-03-26 山西中煤华晋能源有限责任公司 切眼掘进施工工艺
CN109519187B (zh) * 2018-12-17 2020-02-21 中煤华晋集团有限公司 切眼掘进施工工艺
CN113605925A (zh) * 2021-06-25 2021-11-05 安徽理工大学 一种煤矿大断面开切眼一次成巷方法

Similar Documents

Publication Publication Date Title
CN102061914B (zh) 用于操纵采掘机切割器的方法
CN107060758B (zh) 一种区段小煤柱留设施工方法
AU2019456486B2 (en) Method for coal mining without reserving coal pillar and tunneling roadway in whole mining area
US11377952B2 (en) Method for radially mining open-pit end slope pressed coal
CN105134266A (zh) 综采工作面全负压回撤通道支护方法
CN107060795A (zh) 一种地下矿井tbm组装施工方法
CN103277129A (zh) 一种防止采煤工作面上隅角瓦斯超限技术
CN105178969A (zh) 工作面切眼掘进施工一次成巷方法
CN112610258A (zh) 一种应用于智慧矿山的冲击矿井回采巷道超前支护方法
CN103174424B (zh) 一种长壁布置下的房柱式采煤法
CN102418525A (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN108999615B (zh) 一种降低双护盾tbm卡机风险的构建结构及方法
CN104329117B (zh) 一种综合机械化充填采煤切眼设备安装方法
CN104389605A (zh) 一种采煤工作面密集钢丝绳掩护回撤方法
CN109869151B (zh) 实现工作面开采与保护煤柱回收的协同作业方法
CN105257296A (zh) 工作面切眼掘进施工一次成巷工艺
CN106032756B (zh) 岩石隧道掘进机
CN203822316U (zh) 一种基于隧道掘进机的隧道支护钢筋排安装装置
CN114352282B (zh) 一种临近高危煤柱短距离无辅巷单通道安全回撤方法
CN113944464B (zh) 一种边角煤全负压连采机采煤方法
CN103670499B (zh) 综合治理工作面上隅角瓦斯超限的方法
CN109488208A (zh) 一种水下钻具姿态检测系统
CN110714767A (zh) 一种煤矿岩巷快速掘进施工工艺
CN101915119B (zh) 防治煤矿掘进工作面瓦斯爆炸的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223