CN109505295A - Diaphram wall joint seal freezes construction technology - Google Patents

Diaphram wall joint seal freezes construction technology Download PDF

Info

Publication number
CN109505295A
CN109505295A CN201811376314.6A CN201811376314A CN109505295A CN 109505295 A CN109505295 A CN 109505295A CN 201811376314 A CN201811376314 A CN 201811376314A CN 109505295 A CN109505295 A CN 109505295A
Authority
CN
China
Prior art keywords
freezing
temperature
pipe
construction
brine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811376314.6A
Other languages
Chinese (zh)
Inventor
张哲彬
邹峰
蔡素素
黄周琰
郑憧
顾欢
黄泽涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201811376314.6A priority Critical patent/CN109505295A/en
Publication of CN109505295A publication Critical patent/CN109505295A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The present invention relates to a kind of diaphram wall joint seals to freeze construction technology, its step: 1. freezings, temp measuring system installation: refrigeration system installs cooling tower, freezing unit, brine pump respectively, brine pump connection freezing unit, freezing unit are connect by cooling tower with freezing pipe;Temp measuring system installs thermometer and fresh water pump, and fresh water pump is connect by thermometer with temperature tube;Freezing pipe, temperature tube are transferred together to seam edge;2. freezing construction: refrigeration system and temp measuring system are opened, through in liquid supply pipe injection freezing pipe, freezing pipe, which starts the cycle over the salt water abutment joint soil body, to be freezed after brine freezing is handled;Temperature in clear water the real time measure pipe is recycled in temperature tube simultaneously, until the freezing parameters that temperature measuring reaches setting complete freezing construction.The present invention has treatment effeciency high, and water-stagnating effect is significant, can effectively solve the leakage problems of diaphram wall seam crossing.

Description

Diaphram wall joint seal freezes construction technology
Technical field
The present invention relates to a kind of diaphram wall joint seal construction technology, especially a kind of diaphram wall joint seal Freeze construction technology.
Background technique
Diaphram wall is in the case where mud off, to excavate a long and narrow deep trouth in ground special equipment, Steel reinforcement cage and placing concrete are placed in slot, form one section of reinforced concrete wall section.Each section of wall sequentially construct and connect it is integral, Form a continuous underground wall body.Its role is to antiseepage, earth-retaining when excavation of foundation pit, the supporting of close to buildings, Yi Jizuo Based on a part.Since construction of diaphragm wall is unable to one-pass molding, framing is needed to construct, exists between every width and connect Seam, in excavation construction, seam crossing gushes husky risk there are water burst, therefore it is also difficult point that its joint treatment, which is emphasis,.Refrigeration Technique is big It is chiefly used in Tunnel Engineering soil stabilization, it can reinforce the freezing soil of a certain range and depth, and consolidation effect is substantially better than Other reinforcement measures.Refrigeration Technique applies to the processing of diaphram wall joint seal, no matter in sealing range or water-stagnating effect The quality requirement of seam can effectively be met.
Summary of the invention
In order to overcome the construction qualities such as traditional diaphram wall joint seal reinforcing area is insufficient, water-stagnating effect is bad to ask Topic, affects the shortcomings that entire diaphram wall goes along with sb. to guard him quality, and the present invention provides a kind of diaphram wall joint seal freezing and applies Work technique, during which can effectively solve construction of diaphragm wall, the water burst of adjacent slot section seaming position gushes husky and construction Mass defect problem,.
The technical scheme adopted by the invention is that: a kind of diaphram wall joint seal freezing construction technology, including it is as follows Step:
(1) freezing, temp measuring system installation
Refrigeration system installs cooling tower, freezing unit, brine pump, brine pump connection freezing unit respectively, and freezing unit leads to Supercooling tower is connect with freezing pipe;Temp measuring system installs thermometer and fresh water pump, and fresh water pump is connected by thermometer and temperature tube It connects;Freezing pipe, temperature tube are transferred together to seam edge;
(2) freezing construction
Refrigeration system and temp measuring system are opened, through in liquid supply pipe injection freezing pipe, freezing pipe is opened after brine freezing is handled The beginning circulating brine abutment joint soil body is freezed;Temperature in clear water the real time measure pipe is recycled in temperature tube simultaneously, until temperature is surveyed Surely the freezing parameters for reaching setting complete freezing construction.
Further, freeze control parameter in the freezing construction are as follows: frozen soil wall thickness >=2.6m, frozen soil mean temperature≤- 10 DEG C, -28 DEG C~-30 DEG C of brine temp, salt water go loop temperature it is poor≤2 DEG C, temperature tube temperature≤- 5 DEG C.
The beneficial effects of the present invention are:
The present invention has treatment effeciency high, and water-stagnating effect is significant, and the leakage that can effectively solve diaphram wall seam crossing is asked Topic.Diaphram wall joint seal excellent effect after this bright freezing construction, is greatly improved construction efficiency, it is ensured that go along with sb. to guard him Engineering is fulfiled ahead of schedule on schedule.
Detailed description of the invention
The schematic diagram of system installation Fig. 1 of the invention;
Fig. 2 is the bottom view of Fig. 1.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
As shown in figures 1 and 2, a kind of diaphram wall joint seal freezes construction technology, and its step are as follows:
(1) freezing, temp measuring system installation
Refrigeration system installs cooling tower 3, freezing unit 4, brine pump 5, the connection freezing unit 4 of brine pump 5, refrigerator respectively Group 4 is connect by cooling tower 3 with freezing pipe 1;Temp measuring system installs thermometer 6 and fresh water pump 7, and fresh water pump 7 passes through thermometer 6 It is connect with temperature tube 2;Freezing pipe 1, temperature tube 2 are transferred together to seam edge.
(2) freezing construction
Refrigeration system and temp measuring system are opened, through in liquid supply pipe injection freezing pipe, freezing pipe is opened after brine freezing is handled The beginning circulating brine abutment joint soil body is freezed;Temperature in clear water the real time measure pipe is recycled in temperature tube simultaneously, until temperature is surveyed Surely the freezing parameters for reaching setting complete freezing construction.
Freeze control parameter in freezing construction are as follows: frozen soil wall thickness >=2.6m, frozen soil mean temperature≤- 10 DEG C, salt water temperature Degree -28 DEG C~-30 DEG C, salt water go loop temperature it is poor≤2 DEG C, temperature tube temperature≤- 5 DEG C.
Embodiment:
Shanghai sponge city conveyance system vertical shaft is located at Shanghai City downtown, and surface state is complicated, and the net depth of vertical shaft is 66m, net diameter 50m, specific digging diameter are 56m, cutting depth 72m, digging diameter peripheral hardware 1800mm diaphram wall One circle is used as excavation supporting.Since diaphram wall framing is constructed, sealing closure is carried out to this seam using freezing process.Tool Body construction method are as follows: in the construction diaphram wall descending reinforcing cage period of the day from 11 p.m. to 1 a.m, freezing pipe, temperature tube arrive the soil body with reinforcing steel bar cage is same at present In, after diaphram wall reaches design strength, freezing pipe, which starts the cycle over the salt water abutment joint soil body, to be freezed.Freeze 7 days Salt water minimum temperature reaches -18 DEG C hereinafter, actively freeze-off time completion seam freezing construction in 35 days.
Diaphram wall joint seal excellent effect, substantially increases construction efficiency after chilled construction, it is ensured that goes along with sb. to guard him Engineering is fulfiled ahead of schedule on schedule.

Claims (2)

1. a kind of diaphram wall joint seal freezes construction technology, which comprises the steps of:
(1) freezing, temp measuring system installation
Refrigeration system installs cooling tower (3), freezing unit (4), brine pump (5) respectively, and brine pump (5) connection freezes unit (4), Freezing unit (4) is connect by cooling tower (3) with freezing pipe (1);Temp measuring system installs thermometer (6) and fresh water pump (7), Fresh water pump (7) is connect by thermometer (6) with temperature tube (2);Freezing pipe (1), temperature tube (2) are transferred vertically to seam together Edge;
(2) freezing construction
Refrigeration system and temp measuring system are opened, through in liquid supply pipe injection freezing pipe, freezing pipe starts to follow after brine freezing is handled The ring salt water abutment joint soil body is freezed;Temperature in clear water the real time measure pipe is recycled in temperature tube simultaneously, until temperature measuring reaches Freezing parameters to setting complete freezing construction.
2. diaphram wall joint seal according to claim 1 freezes construction technology, it is characterised in that: the freezing is applied Work freezes control parameter are as follows: frozen soil wall thickness >=2.6m, frozen soil mean temperature≤- 10 DEG C, and -28 DEG C~-30 DEG C of brine temp, Salt water go loop temperature it is poor≤2 DEG C, temperature tube temperature≤- 5 DEG C.
CN201811376314.6A 2018-11-19 2018-11-19 Diaphram wall joint seal freezes construction technology Withdrawn CN109505295A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811376314.6A CN109505295A (en) 2018-11-19 2018-11-19 Diaphram wall joint seal freezes construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811376314.6A CN109505295A (en) 2018-11-19 2018-11-19 Diaphram wall joint seal freezes construction technology

Publications (1)

Publication Number Publication Date
CN109505295A true CN109505295A (en) 2019-03-22

Family

ID=65749096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811376314.6A Withdrawn CN109505295A (en) 2018-11-19 2018-11-19 Diaphram wall joint seal freezes construction technology

Country Status (1)

Country Link
CN (1) CN109505295A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63255420A (en) * 1987-04-14 1988-10-21 Ohbayashigumi Ltd Construction work of underground wall
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN102852146A (en) * 2012-08-21 2013-01-02 清华大学 Real-time online individualized heat-exchanging intelligent temperature control system of mass concretes
CN105297742A (en) * 2015-10-22 2016-02-03 北京城建集团有限责任公司 Structure and method of water stopping support of underground space
CN105887936A (en) * 2016-05-13 2016-08-24 中国矿业大学 Freezing pipe embedding type water sealing method of trench wall connector
CN105909260A (en) * 2016-06-16 2016-08-31 山东省地矿工程勘察院 Subway station water stop structure for protecting groundwater environment and construction method thereof
CN108071400A (en) * 2016-11-10 2018-05-25 上海宝冶集团有限公司 Horizontal freezing consolidation combines shield driving construction method with steel jacket box

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63255420A (en) * 1987-04-14 1988-10-21 Ohbayashigumi Ltd Construction work of underground wall
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN102852146A (en) * 2012-08-21 2013-01-02 清华大学 Real-time online individualized heat-exchanging intelligent temperature control system of mass concretes
CN105297742A (en) * 2015-10-22 2016-02-03 北京城建集团有限责任公司 Structure and method of water stopping support of underground space
CN105887936A (en) * 2016-05-13 2016-08-24 中国矿业大学 Freezing pipe embedding type water sealing method of trench wall connector
CN105909260A (en) * 2016-06-16 2016-08-31 山东省地矿工程勘察院 Subway station water stop structure for protecting groundwater environment and construction method thereof
CN108071400A (en) * 2016-11-10 2018-05-25 上海宝冶集团有限公司 Horizontal freezing consolidation combines shield driving construction method with steel jacket box

Similar Documents

Publication Publication Date Title
CN102913250B (en) Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand
CN107676097B (en) A kind of high hydraulic pressure soft soil layer HFE composite shield originating method
CN105909260B (en) Subway station water stop structure for protecting groundwater environment and construction method thereof
CN104695964B (en) Subway shield tunnel freeze entering method
CN105908765B (en) For protecting the open trench tunnel water sealing structure and construction method of groundwater environment
CN101634148B (en) Soil nailing wall foundation pit support and construction method
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN104832196B (en) Pipe curtain freezing process supporting construction and its construction method
CN104963334A (en) Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN201460904U (en) Ultra-long horizontal freezing consolidation structure for shield entry
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN102619522A (en) Construction method for subway contact passage
CN101418567A (en) Protective cutting construction method for tunnel segment
CN106121686B (en) Underground excavation tunnel water stop structure for protecting groundwater environment and construction method thereof
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN205260038U (en) Wall reinforced structure is freezed to shield tunnel end box
Yang et al. A new cryogenic sealing process for the launch and reception of a tunnel shield
CN111236947A (en) Construction method of vertical freezing subway shaft
CN208718670U (en) Frost wall building enclosure in the construction of portal ring beam
CN106759375B (en) A kind of high water level soft soil foundation pit freezes soil nail wall supporting structure system and construction method
CN105040710A (en) Support structure for bilge well construction
CN109268018A (en) The device and method of synchronous thaw settlement grouting when a kind of defrosting
CN104453911A (en) Freezer and vertical shaft freezing system
CN212272200U (en) Vertical shaft freezing system
CN109505295A (en) Diaphram wall joint seal freezes construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190322

WW01 Invention patent application withdrawn after publication