- CN109505245A CN109505245A CN201811143308.6A CN201811143308A CN109505245A CN 109505245 A CN109505245 A CN 109505245A CN 201811143308 A CN201811143308 A CN 201811143308A CN 109505245 A CN109505245 A CN 109505245A
- Authority
- CN
- China
- Prior art keywords
- steel
- anchoring pile
- main body
- pile
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
- E02D5/285—Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Revetment (AREA)
Abstract
Description
Claims (9)
- The channel construction method 1. a kind of ocean deepwater area shallow overburden anchoring pile form is constructed, which comprises the following steps:S1, it is inserted into anchoring pile steel-pipe pile toward water-bed in temporary trestle bridge two sides, and it is fixedly connected with the steel-pipe pile of temporary trestle bridge;S2, in anchoring pile steel-pipe pile internal drilling, and steel reinforcement cage is transferred in it, casting concrete makes concrete steel pipe anchoring pile and faces When trestle be collectively formed construction channel, with facilitate construction.
- The channel construction method 2. shallow overburden anchoring pile form in ocean deepwater area as described in claim 1 is constructed, which is characterized in that Before step S1 further include:S0, steel-pipe pile is set up in construction waters, forms temporary trestle bridge.
- The channel construction method 3. shallow overburden anchoring pile form in ocean deepwater area as described in claim 1 is constructed, which is characterized in that The anchoring pile steel-pipe pile includes:Steel pipe main body, excircle horizontal loops set annular bottom plate, for carrying fixer compression bar;Steel pipe main body top is outside Hinged several limited blocks;Several hydraulic stems, interval are fixed on the annular bottom plate, and telescopic end is fixed on same stop collar simultaneously;When limited block freely hangs on the outside of steel pipe main body, the stop collar be sandwiched in steel pipe main body and several limited blocks it Between;Stop collar will pump with the realization of the synchronization telescope of several hydraulic stems, to drive several limited blocks along steel Cyclic structure is collectively formed in the rotation of pipe main body top hinged place, all limited blocks, and the steel reinforcement cage for treating decentralization is tentatively led To limit;Wherein, the steel pipe bottom part body extends outward to form several insertion plates in the same direction, and the insertion plate is in cambered surface triangle shape, And along the direction far from the steel pipe main body, the thickness for being inserted into plate is gradually reduced;Several parallel sliding rails are arranged along its short transverse in the steel pipe main body;The annular bottom plate is made in extraneous lineoutofservice signal pull It is slided up and down under along the sliding rail, and can realize and be fixed temporarily under lineoutofservice signal pull.
- The channel construction method 4. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 3 is constructed, which is characterized in that The steel pipe main body inner sleeve sets limit damper comprising intermediate intermediate sleeve and splicing is in the side at intermediate sleeve both ends Sleeve, one end of the separate intermediate sleeve of two side sleeves are respectively and fixedly connected in steel pipe main body both ends;The arc-shaped mistake of side sleeve It crosses, in horn-like;And it is connected by spring between the intermediate sleeve, side sleeve and steel pipe main body inner sidewall.
- The channel construction method 5. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 4 is constructed, which is characterized in that Further include:Controller controls all hydraulic bar synchronization lifting.
- The channel construction method 6. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 5 is constructed, which is characterized in that In step S2, steel reinforcement cage, concrete operations are transferred in anchoring pile steel-pipe pile are as follows:1) steel reinforcement cage is lifted by crane;2) the synchronous elongation of controller control all hydraulic bar, pushes to predeterminated position for stop collar, thus to all limits Block synchronization of jacking up and block and set and be fixed temporarily, cyclic structure is collectively formed in limited blocks all at this time, treats the steel reinforcement cage of decentralization Carry out preliminary guide and limit function;3) steel reinforcement cage is adjusted to suitable position, then transferred, is collectively formed in cyclic structure until steel reinforcement cage is transferred to limited block;After Continuous decentralization enters to steel reinforcement cage in the limit damper of steel pipe main body, until completing rectification steel reinforcement cage decentralization process.
- The channel construction method 7. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 3 is constructed, which is characterized in that Wherein, the limit ring surface coat one layer it is lubricious.
- The channel construction method 8. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 6 is constructed, which is characterized in that When stop collar is pushed to predeterminated position, stop collar collision type will occur with all limited blocks and contact at this time, and temporarily solid Fixing limit block, the position of limited block is contacted on the stop collar, and recess forms groove downwards, to carry out to the limited block Limiting card is set, and moves upwards it under the pushing tow of stop collar, more smoothly.
- The channel construction method 9. shallow overburden anchoring pile form in ocean deepwater area as claimed in claim 4 is constructed, which is characterized in that The spring includes being located in the middle columned central spring, and be set in its external outer spring, the outer spring two End is big intermediate small.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811143308.6A CN109505245B (en) | 2018-09-28 | 2018-09-28 | Construction method of shallow-covering-layer anchor pile type construction channel in ocean deep water area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811143308.6A CN109505245B (en) | 2018-09-28 | 2018-09-28 | Construction method of shallow-covering-layer anchor pile type construction channel in ocean deep water area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109505245A true CN109505245A (en) | 2019-03-22 |
CN109505245B CN109505245B (en) | 2020-09-08 |
Family
ID=65746413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811143308.6A Active CN109505245B (en) | 2018-09-28 | 2018-09-28 | Construction method of shallow-covering-layer anchor pile type construction channel in ocean deep water area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109505245B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324039A (en) * | 2022-07-29 | 2022-11-11 | 中交路桥建设有限公司 | Construction process of simple foundation pile |
CN115324039B (en) * | 2022-07-29 | 2024-05-31 | 中交路桥建设有限公司 | Construction process of simple foundation pile |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899829A (en) * | 2010-07-22 | 2010-12-01 | 浙江中隧桥波形钢腹板有限公司 | Evaginable wing plate hollow steel pipe pile |
CN102312442A (en) * | 2011-07-01 | 2012-01-11 | 中铁大桥局股份有限公司 | Construction method of trestle steel pipe pile foundation |
CN104404861A (en) * | 2014-11-05 | 2015-03-11 | 中交第二航务工程局有限公司 | Steel trestle provided with steel anchor pile and construction method of steel trestle |
JP2017095955A (en) * | 2015-11-24 | 2017-06-01 | 新日鐵住金株式会社 | Pile foundation structure and construction method thereof |
CN108442232A (en) * | 2018-04-30 | 2018-08-24 | 安徽省公路桥梁工程有限公司 | Assembled steel suspension bridge structure and its construction method |
-
2018
- 2018-09-28 CN CN201811143308.6A patent/CN109505245B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101899829A (en) * | 2010-07-22 | 2010-12-01 | 浙江中隧桥波形钢腹板有限公司 | Evaginable wing plate hollow steel pipe pile |
CN102312442A (en) * | 2011-07-01 | 2012-01-11 | 中铁大桥局股份有限公司 | Construction method of trestle steel pipe pile foundation |
CN104404861A (en) * | 2014-11-05 | 2015-03-11 | 中交第二航务工程局有限公司 | Steel trestle provided with steel anchor pile and construction method of steel trestle |
JP2017095955A (en) * | 2015-11-24 | 2017-06-01 | 新日鐵住金株式会社 | Pile foundation structure and construction method thereof |
CN108442232A (en) * | 2018-04-30 | 2018-08-24 | 安徽省公路桥梁工程有限公司 | Assembled steel suspension bridge structure and its construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115324039A (en) * | 2022-07-29 | 2022-11-11 | 中交路桥建设有限公司 | Construction process of simple foundation pile |
CN115324039B (en) * | 2022-07-29 | 2024-05-31 | 中交路桥建设有限公司 | Construction process of simple foundation pile |
Also Published As
Publication number | Publication date |
---|---|
CN109505245B (en) | 2020-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107165058B (en) | One kind being used for existing operation Bridge pier reinforcement means | |
CN104631438B (en) | Long auger guncreting uplift pile construction method | |
CN103741657A (en) | Construction method of large multifunctional over-water construction platform | |
CN109853600A (en) | Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method | |
CN106522989A (en) | Air shaft structure and shield excavation parallel construction method | |
CN111058458A (en) | Construction method and structure based on cutter suction type ground connecting wall local replacement row pile support | |
CN105625425A (en) | Construction method for carrying out pile sinking based on floating walking platform | |
CN110004981A (en) | A kind of combined assembled underground structure and reversed construction method | |
CN105839537A (en) | Construction method for hoisting stiffening girder of suspension bridge by adopting girdle-carrying traveling of deck erection gantry | |
CN110042867A (en) | Complete combined assembled subway station prefabricated components mechanization transportation system and method | |
CN110042863A (en) | Complete combined assembled subway station subterranean wall and prefabricated middle plate node and construction method | |
CN105113414A (en) | Method for quickly setting up main ropes of suspension bridge | |
CN107443550A (en) | Prefabricated cushion cap template and its installation method | |
CN103174141A (en) | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method | |
CN109505245A (en) | Ocean deepwater area shallow overburden anchoring pile form construction channel construction method | |
CN106545343B (en) | Construction method for underground pipe gallery and storage well | |
US20020195274A1 (en) | Underground shell-pile continuous wall job practice and its special drill | |
CN105986578A (en) | Ejecting pipe construction method of roadside tubular underground garage | |
CN107299640A (en) | A kind of variable cross-section well shaft type ground continuous wall base and its construction method | |
CN110004980A (en) | A kind of combined assembled underground structure and first inverse rear suitable construction method | |
CN106284303B (en) | A kind of prefabricated ground-connecting-wall and its construction method with the limit of angle steel connector | |
CN105544510B (en) | A kind of pile making method of cast-in-situ bored pile | |
CN205276273U (en) | Civil engineering construction uses hollow pile body | |
CN110004979A (en) | Stringer end node and assembly method in combined assembled subway station integrated precast | |
CN208136959U (en) | A kind of waters tunnel formwork erecting structure and internal mould supporter integral slipping structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210907 Address after: 400010 No. 27 Changjiang Branch Road, Yuzhong District, Chongqing Patentee after: China Communication 2nd Navigational Bureau 2nd Engineering Co.,Ltd. Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Address before: No.27 Changjiang Branch Road, Yuzhong District, Chongqing Patentee before: China Communication 2nd Navigational Bureau 2nd Engineering Co.,Ltd. Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220216 Address after: 400010 No. 27 Changjiang Branch Road, Yuzhong District, Chongqing Patentee after: China Communications 2nd Navigational Bureau 2nd Engineering Co.,Ltd. Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee after: CCCC WUHAN HARBOUR ENGINEERING DESIGN AND RESEARCH Co.,Ltd. Address before: 400010 No. 27 Changjiang Branch Road, Yuzhong District, Chongqing Patentee before: China Communications 2nd Navigational Bureau 2nd Engineering Co.,Ltd. Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd. Patentee before: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. |
|