CN109853600A - Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method - Google Patents

Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method Download PDF

Info

Publication number
CN109853600A
CN109853600A CN201910012864.8A CN201910012864A CN109853600A CN 109853600 A CN109853600 A CN 109853600A CN 201910012864 A CN201910012864 A CN 201910012864A CN 109853600 A CN109853600 A CN 109853600A
Authority
CN
China
Prior art keywords
steel
lock
pipe pile
pipe
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910012864.8A
Other languages
Chinese (zh)
Inventor
张鸿
陈鸣
肖文福
曾炜
刘建波
黄厚卿
吴启和
沈俊成
万猛
肖翀
杨苏海
黄修平
李思吟
张宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201910012864.8A priority Critical patent/CN109853600A/en
Publication of CN109853600A publication Critical patent/CN109853600A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, several lock steel-pipe piles and several I-shaped jam plates including head and the tail splicing each other;Wherein, the lock steel-pipe pile lateral wall installs at least two c-type lock;The both ends of the I-shaped jam plate, which block to set respectively, to be inserted into the c-type lock of two neighboring lock steel-pipe pile, to connect two neighboring lock steel-pipe pile.The present invention while reducing project cost, also improves construction efficiency by using lock steel-pipe pile and I-shaped sheet pile combined structure form.It latches steel-pipe pile and I-shaped sheet pile uses the connection type of C-shaped lock, structure is simple, and connection is reliable, improves the globality in cofferdam.

Description

Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method
Technical field
The present invention relates to cofferdam fields.It is more particularly related to a kind of lock steel-pipe pile and I-shaped sheet pile group Close cofferdam structure.
Background technique
With the continuous development of bridge foundation construction technology, bridge engineering construction is increasingly to deep water, the direction of large span Development, the island cofferdam structure pattern of building of ultra-large type continue to bring out.Suspension bridge is as a kind of maximum bridge knot of current span ability Configuration formula, its most of load are born by main push-towing rope, are dispersed on anchorage by strand and anchorage frame, then transmitted by Anchor Foundation To ground.Therefore, the construction quality of Anchor Foundations of Suspension Bridge also becomes the control stress point of Excitations for Long Span Suspension bridge construction.
Currently, most of Anchor Foundations of Suspension Bridge are located at land both at home and abroad, and for Deepwater Open Sea bridge, anchor in suspension bridge water Heavy stone used as an anchor foundation construction need to carry out first cofferdam and build island, convert land construction for over-water construction.It is marine super since cofferdam size is larger Large-scale cofferdam construction will change the flow shape of local flow field, and the water velocity of cofferdam bottom is increase accordingly, and cause local punching Brush, influences the stabilization of cofferdam structure itself.In addition, traditional builds island cofferdam structure in marine construction, wanted by water blocking rate It asks, builds island cofferdam structure type selecting difficulty and gradually increase.
It is relatively conventional at present build island cofferdam structure pattern and can be divided into jackstone build island cofferdam, lock steel pipe pile cofferdam, lock Steel sheet-pile cofferdam etc..It is easy that jackstone builds island cofferdam construction, but jackstone side's amount is big, and water blocking rate is high, gradually subtracts in heavy construction It is few to use.It is big to latch the steel pipe pile cofferdam rigidity of structure, but consumption of materials is big, engineering cost is higher.Latch steel sheet-pile cofferdam material Expect that consumption is smaller, engineering cost is lower, but structure stiffness by itself is smaller, and safety is poor.
Summary of the invention
In order to achieve the goal above, the present invention provides a kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, packet Include several lock steel-pipe piles and several I-shaped jam plates of head and the tail splicing each other;
Wherein, the lock steel-pipe pile lateral wall installs at least two c-type lock;
The both ends of the I-shaped jam plate, which block to set respectively, to be inserted into the c-type lock of two neighboring lock steel-pipe pile, thus even Connect two neighboring lock steel-pipe pile.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, the lock steel-pipe pile outside Wall axially and symmetrically installs 2 c-type locks.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, if the I-shaped jam plate by Dry a jam plate unit is snapped into one another to be spliced, and each jam plate unit includes that i shaped steel and c-type connection steel, the c-type connect It connects ladle and includes intermediate steel plate, and be welded on the c-type lock at its both ends, pass through between the i shaped steel and c-type connection steel I shaped steel both ends, which block to set respectively, to be inserted into the c-type lock of two neighboring c-type connection steel, realizes connection;
Wherein, in the I-shaped jam plate, what it is positioned at outermost both ends is all i shaped steel.
A kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, comprising the following steps:
Step 1: applying heavy 3 auxiliary steel-pipe pile in designated position, and it is connected to each other and forms entirety, and 2 auxiliary wherein Leading truck is installed on steel-pipe pile, applies heavy lock steel-pipe pile for subsequent;
Step 2: first is put into the Longkou of leading truck wait apply heavy lock steel-pipe pile, and using pacifying on leading truck The limiting device and rackwork of dress are adjusted, it is ensured that first plan-position wait apply heavy lock steel-pipe pile and vertical Degree is all met the requirements;
Step 3: the lock steel-pipe pile finished to position adjustment carries out rapping, first of completion is wait apply heavy lock steel Tubular pole is applied heavy;
Step 4: releasing the connection of leading truck with 2 noted earlier auxiliary steel-pipe piles, and selected according to practice of construction needs It is installed on this 2 auxiliary steel-pipe piles for installing 2 auxiliary steel-pipe piles of leading truck, and by leading truck;
Step 5: repeat the above steps two and step 3, until complete all lock steel-pipe piles apply it is heavy;
Step 6: first I-shaped jam plate of lifting be between two neighboring lock steel-pipe pile, and by I-shaped jam plate Both ends are respectively blocked in the c-type lock for setting two lock steel-pipe piles of insertion, and rapping apply it is heavy, to realize two lock steel-pipe piles Securely connection;
Step 7: repeat the above steps six, until that completes all I-shaped sheet piles applies heavy and itself and lock steel pipe The lock connection of stake, forms cofferdam structure.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, in step 1,3 Root auxiliary steel-pipe pile is triangularly arranged, and stability is more preferably.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, wherein leading truck It is fixedly connected between 2 auxiliary steel-pipe piles using hydraulically operated fixture;
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, above-mentioned leading truck Including the left stretcher body and right stretcher body being connected as one, wherein the left stretcher body is installed on 2 auxiliary steel-pipe pile tops, it will be entire Leading truck is fixed on 2 auxiliary steel-pipe piles, facilitates subsequent construction;The right stretcher body forms open guiding along its short transverse Space, i.e. Longkou, for wait apply heavy lock steel-pipe pile entrance and be oriented to for it;
And the whole height of the right stretcher body is greater than left stretcher body, and right stretcher body, compared with left stretcher body, bottom is more protruded into, close to water Face.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, the leading truck Further include above-mentioned limiting device, be 2 pieces of limited blocks for being fixed on right stretcher body Longkou surrounding, card sets limit lock catch steel-pipe pile respectively On 2 c-types lock for being symmetrically installed, to avoid its sinking watching from deviating to entire lock steel-pipe pile limit.
Preferably, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, the leading truck Further include above-mentioned rackwork, be 4 hydraulic stems for being fixed on right stretcher body Longkou surrounding, telescopic end is towards the lock steel Tubular pole simultaneously offsets therewith, by adjusting the length of hydraulic stem, to adjust the verticality of lock steel-pipe pile, meets its verticality It is required that.
The present invention is include at least the following beneficial effects: the present invention provides a kind of lock steel-pipe pile and surrounds with I-shaped sheet pile group Weir structure and construction method meet the construction demand of off-lying sea bridge deepwater foundation, build island by backfilling inside cofferdam, thus Land construction is converted by over-water construction.By using lock steel-pipe pile and I-shaped sheet pile combined structure form, work is reduced While journey cost, construction efficiency is also improved.It latches steel-pipe pile and I-shaped sheet pile uses the connection type of C-shaped lock, knot Structure is simple, and connection is reliable, improves the globality in cofferdam.It is guide locating device provided to have developed " straddle-type " cantilevered, has been applied with 2 Heavy steel-pipe pile installation is fixed, and cantilever end is arranged limiting device and fixes to steel-pipe pile lock position, in addition setting positioning Device is adjusted lock steel-pipe pile plan-position and verticality, and effective guarantee lock steel-pipe pile and I-shaped sheet pile are applied Work required precision.Lock steel-pipe pile apply it is heavy after the completion of, I-shaped sheet pile can be inserted into hydraulic in the case where not mobile guide frame In 2 fixed lock steel-pipe pile c-types of fixture latch, be done directly the installation of I-shaped sheet pile with apply it is heavy.Apparatus structure is simple, Connection is reliable, improves the construction efficiency of lock steel-pipe pile and I-shaped sheet pile.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the overall structure diagram of combined cofferdam structure of the present invention;
Fig. 2 is the connection schematic diagram in the present invention between two neighboring lock steel-pipe pile;
Fig. 3 is the clamping schematic diagram latched between the c-type lock of steel-pipe pile and I-shaped jam plate in Fig. 2;
Fig. 4 is the structural schematic diagram of I-shaped jam plate in another embodiment;
Fig. 5 is leading truck in work progress, auxiliary steel-pipe pile and closes wait apply the connection between heavy lock steel-pipe pile three The top view of system;
Fig. 6 is leading truck in work progress, auxiliary steel-pipe pile and closes wait apply the connection between heavy lock steel-pipe pile three The side view of system.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text Word can be implemented accordingly.
It should be noted that experimental method described in following embodiments is unless otherwise specified conventional method, institute Reagent and material are stated, unless otherwise specified, is commercially obtained;In the description of the present invention, term " transverse direction ", " vertical To ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", the instructions such as "outside" side Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, and are merely for convenience of description of the present invention and simplification of the description, It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, because This is not considered as limiting the invention.
As shown in Figure 1-3, the present invention provides a kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, including each other Several lock steel-pipe piles 1 and several I-shaped jam plates 2 of head and the tail splicing, are processed and formed at one time in factory;The lock Steel-pipe pile and its horizontal layout form of I-shaped sheet pile combined cofferdam are round or other shapes, according to engineering structure position shape Rational choice.Wherein, 1 lateral wall of lock steel-pipe pile installs at least two c-type lock 3;The both ends of the I-shaped jam plate 2 Card, which is set, respectively is inserted into the c-type lock 3 of two neighboring lock steel-pipe pile 1, to connect two neighboring lock steel-pipe pile 1.I-shaped The flange plate of type jam plate 2 and web size according to requiring to be made,
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, the lock steel Tubular pole lateral wall axially and symmetrically installs 2 c-type locks 3.
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, as shown in figure 4, Jam plate unit is snapped into one another is spliced by several for the I-shaped jam plate 2, and each jam plate unit includes an i shaped steel 201 and c-type connect steel 202, the c-type connection ladle includes intermediate steel plate, and is welded on the c-type lock at its both ends Button is blocked respectively by 201 both ends of i shaped steel between the i shaped steel 201 and c-type connection steel 202 and sets the two neighboring C of insertion Type connects in the c-type lock of steel 202, realizes connection;Wherein, in the I-shaped jam plate 2, what it is positioned at outermost both ends is all I-shaped Fashioned iron is so that it is convenient to latch splicing with the c-type of lock steel-pipe pile.In this way, I-shaped lock can be adjusted according to actual needs The quantity of plate, such as water are shallow, when water wave is lesser, when the resistance being subject to is less big, and adjustable I-shaped jam plate Length (by the quantity for increasing jam plate unit therein), can not only play the role of cofferdam fence, but also can be as far as possible in this way The quantity for reducing lock steel-pipe pile 1, to reduce cost;Work as depth of water water wave it is larger when, when the resistance ratios being subject to are biggish It waits, adjustable I-shaped jam plate length shortens (by the quantity for reducing jam plate unit therein), in this way can be more firm Play the role of cofferdam fence.
A kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, as seen in figs. 5-6, including following step It is rapid:
Step 1: applying heavy 3 auxiliary steel-pipe pile 4 in designated position, and be connected to each other and to form entirety, and wherein 2 it is auxiliary Installation leading truck 5 on steel-pipe pile 4 is helped, applies heavy lock steel-pipe pile for subsequent;
Step 2: first is put into the Longkou of leading truck 5 wait apply heavy lock steel-pipe pile 6, and using on leading truck 5 The limiting device 8 and rackwork 7 of installation are adjusted, it is ensured that first wait apply the plan-position of heavy lock steel-pipe pile 6 with And verticality is all met the requirements;
Step 3: the lock steel-pipe pile finished to position adjustment carries out rapping, first of completion is wait apply heavy lock steel It is heavy that tubular pole 6 is applied;
Step 4: releasing the connection of leading truck 5 with 2 noted earlier auxiliary steel-pipe piles 4, and chosen according to practice of construction needs 2 auxiliary steel-pipe piles 4 of installation leading truck are selected to, and leading truck is installed on this 2 auxiliary steel-pipe piles 4;
Step 5: repeat the above steps two and step 3, until complete all lock steel-pipe piles apply it is heavy;
Step 6: first I-shaped jam plate 2 of lifting be between two neighboring lock steel-pipe pile 1, and by I-shaped jam plate 1 Both ends block respectively set insertion two lock steel-pipe piles 2 c-type lock in, and rapping apply it is heavy, thus realize two lock steel pipes The secured connection of stake;
Step 7: repeat the above steps six, until that completes all I-shaped sheet piles applies heavy and itself and lock steel pipe The lock connection of stake, forms cofferdam structure.
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, step In rapid one, 3 auxiliary steel-pipe piles are triangularly arranged, and stability is more preferably.
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, In, it is fixedly connected between leading truck and 2 auxiliary steel-pipe piles using hydraulically operated fixture 9;
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, on Stating leading truck 5 includes the left stretcher body 501 and right stretcher body 502 being connected as one, wherein the left stretcher body 501 is installed on 2 auxiliary Entire leading truck 5 is fixed on 2 auxiliary steel-pipe piles, facilitates subsequent construction by 4 top of steel-pipe pile;502 edge of right stretcher body Its short transverse forms open guide space, i.e. Longkou, for wait apply heavy lock steel-pipe pile entrance and be oriented to for it;And institute The whole height for stating right stretcher body is greater than left stretcher body, and right stretcher body, compared with left stretcher body, bottom is more protruded into, and leans on approximately level.
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, institute Stating leading truck further includes above-mentioned limiting device 8, is 2 pieces of limited blocks for being fixed on right stretcher body Longkou surrounding, blocks position of limiting respectively The 2 c-types lock being symmetrically installed on lock steel-pipe pile, to avoid its sinking watching from deviating to entire lock steel-pipe pile limit.
In another embodiment, the lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, institute Stating leading truck further includes above-mentioned rackwork 7, is 4 hydraulic stems for being fixed on right stretcher body Longkou surrounding, telescopic end direction The lock steel-pipe pile simultaneously offsets therewith, by adjusting the length of hydraulic stem, to adjust the verticality of lock steel-pipe pile, makes it Verticality meets the requirements.
A kind of lock steel-pipe pile provided by the invention and I-shaped sheet pile combined cofferdam construction method are as follows:
Step 1 in designated position applies heavy 3 auxiliary steel-pipe pile first, and 3 auxiliary steel-pipe piles are triangularly arranged, and make It is attached to form entirety with lateral, sinks preceding 2 lock steel-pipe pile stages installation leading truck for applying;
After step 2, the positioning of lifting secure, heavy first, second are being applied in lifting cantilevered leading truck " riding " It assists on steel-pipe pile, leading truck and 2 auxiliary steel-pipe piles are attached fixation using hydraulically operated fixture;
Step 3 adjusts the upper and lower layer Longkou rackwork of leading truck, treats and applies heavy lock steel-pipe pile center and adjusted Lock steel-pipe pile position initial adjustment is completed in position;
Step 4, crane ship lift first and enter in leading truck Longkou wait apply heavy lock steel-pipe pile, measure again Setting-out, and be adjusted using the rackwork on the upper and lower layer Longkou of leading truck, it is ensured that first wait apply heavy lock steel-pipe pile Plan-position/verticality meets related request, completes lock steel-pipe pile position accurate adjustment;
Step 5 releases first wait apply heavy lock steel-pipe pile suspension hook, lifts vibration hammer/jump bit by crane ship, completes It is heavy that first lock steel-pipe pile is applied;
Step 6 releases the hydraulically operated fixture that " straddle-type " leading truck is connect with auxiliary steel-pipe pile, lifts leading truck by crane ship It has been applied to first, third root on heavy auxiliary steel-pipe pile, leading truck is attached with 2 auxiliary steel-pipe piles using hydraulically operated fixture It is fixed, complete leading truck displacement;
Step 7, repeat step 3~step 5, complete second lock steel-pipe pile apply it is heavy;
Step 8 lifts leading truck by crane ship to having applied on 2 heavy lock steel-pipe piles, leading truck and 2 lock steel pipes Stake is attached fixation using hydraulically operated fixture, completes leading truck displacement;
Step 9 repeats step 3~step 5, and it is heavy that completion third root lock steel-pipe pile is applied;
Step 10, third root lock steel-pipe pile apply it is heavy after the completion of, by crane ship lift first I-shaped sheet pile install to In c-type lock between first, second lock steel-pipe pile;
Step 11 releases I-shaped sheet pile suspension hook, lifts vibration hammer/jump bit, it is heavy that first I-shaped sheet pile of completion is applied;
Step 12, repeat step 8~step 11, until complete it is all lock steel-pipe piles and I-shaped sheet pile apply it is heavy.
After step 13, lock steel-pipe pile and I-shaped sheet pile combined cofferdam close up, hydraulic reclamation is carried out in cofferdam, completes cofferdam Construction with artificial island.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (9)

1. a kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure, which is characterized in that if including head and the tail splicing each other Dry lock steel-pipe pile and several I-shaped jam plates;
Wherein, the lock steel-pipe pile lateral wall installs at least two c-type lock;
The both ends of the I-shaped jam plate, which block to set respectively, to be inserted into the c-type lock of two neighboring lock steel-pipe pile, to connect phase Adjacent two lock steel-pipe piles.
2. lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure as described in claim 1, which is characterized in that the lock Steel-pipe pile lateral wall axially and symmetrically installs 2 c-type locks.
3. lock steel-pipe pile and I-shaped sheet pile combined cofferdam structure as claimed in claim 2, which is characterized in that the I-shaped Jam plate unit is snapped into one another is spliced by several for type jam plate, and each jam plate unit includes i shaped steel and c-type connection steel, The c-type connection ladle includes intermediate steel plate, and is welded on the c-type lock at its both ends, and the i shaped steel connect steel with c-type Between block to set respectively by i shaped steel both ends and is inserted into two neighboring c-type and connects in the c-type lock of steel, realize and connect;
Wherein, in the I-shaped jam plate, what it is positioned at outermost both ends is all i shaped steel.
4. a kind of lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method, which comprises the following steps:
Step 1: applying heavy 3 auxiliary steel-pipe pile in designated position, and it is connected to each other and forms entirety, and 2 auxiliary steel pipe wherein Leading truck is installed in stake, applies heavy lock steel-pipe pile for subsequent;
Step 2: first is put into the Longkou of leading truck wait apply heavy lock steel-pipe pile, and using being installed on leading truck Limiting device and rackwork are adjusted, it is ensured that first plan-position and verticality wait apply heavy lock steel-pipe pile is all It meets the requirements;
Step 3: the lock steel-pipe pile finished to position adjustment carries out rapping, first of completion is wait apply heavy lock steel-pipe pile Shi Chen;
Step 4: releasing the connection of leading truck with 2 noted earlier auxiliary steel-pipe piles, and is selected and be used for according to practice of construction needs 2 auxiliary steel-pipe piles of leading truck are installed, and leading truck is installed on this 2 auxiliary steel-pipe piles;
Step 5: repeat the above steps two and step 3, until complete all lock steel-pipe piles apply it is heavy;
Step 6: first I-shaped jam plate of lifting be between two neighboring lock steel-pipe pile, and by the both ends of I-shaped jam plate Respectively card set insertion two lock steel-pipe piles c-type lock in, and rapping apply it is heavy, thus realize two lock steel-pipe piles it is secured Connection;
Step 7: repeat the above steps six, until it is heavy and itself and lock steel-pipe pile to complete applying for all I-shaped sheet piles Lock connection, forms cofferdam structure.
5. lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method as claimed in claim 4, which is characterized in that In step 1,3 auxiliary steel-pipe piles are triangularly arranged, and stability is more preferably.
6. lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method as claimed in claim 4, which is characterized in that It is fixedly connected between leading truck and 2 auxiliary steel-pipe piles using hydraulically operated fixture.
7. lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method as claimed in claim 4, which is characterized in that Above-mentioned leading truck includes the left stretcher body and right stretcher body being connected as one, wherein the left stretcher body is installed on 2 auxiliary steel pipe stake tops End, entire leading truck is fixed on 2 auxiliary steel-pipe piles, subsequent construction is facilitated;The right stretcher body is along its short transverse shape At open guide space, i.e. Longkou, for wait apply heavy lock steel-pipe pile entrance and be oriented to for it;
And the whole height of the right stretcher body is greater than left stretcher body, and right stretcher body, compared with left stretcher body, bottom is more protruded into, and leans on approximately level.
8. lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method as claimed in claim 4, which is characterized in that The leading truck further includes above-mentioned limiting device, is 2 pieces of limited blocks for being fixed on right stretcher body Longkou surrounding, blocks position of limiting respectively The 2 c-types lock being symmetrically installed on lock steel-pipe pile, to avoid its sinking watching from deviating to entire lock steel-pipe pile limit.
9. lock steel-pipe pile and I-shaped sheet pile combined cofferdam construction method as claimed in claim 4, which is characterized in that The leading truck further includes above-mentioned rackwork, is 4 hydraulic stems for being fixed on right stretcher body Longkou surrounding, telescopic end direction The lock steel-pipe pile simultaneously offsets therewith, by adjusting the length of hydraulic stem, to adjust the verticality of lock steel-pipe pile, makes it Verticality meets the requirements.
CN201910012864.8A 2019-01-07 2019-01-07 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method Pending CN109853600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910012864.8A CN109853600A (en) 2019-01-07 2019-01-07 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910012864.8A CN109853600A (en) 2019-01-07 2019-01-07 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method

Publications (1)

Publication Number Publication Date
CN109853600A true CN109853600A (en) 2019-06-07

Family

ID=66894100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910012864.8A Pending CN109853600A (en) 2019-01-07 2019-01-07 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method

Country Status (1)

Country Link
CN (1) CN109853600A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485446A (en) * 2019-09-12 2019-11-22 中国五冶集团有限公司 A kind of steel pipe pile element and steel pipe pile cofferdam
CN110565669A (en) * 2019-09-12 2019-12-13 北京崇建工程有限公司 Well pit water-intercepting and soil-retaining construction method
CN112878349A (en) * 2021-01-15 2021-06-01 北京市市政四建设工程有限责任公司 Underground water control method for PBA underground excavation subway station construction stage
CN114319352A (en) * 2021-12-31 2022-04-12 中国港湾工程有限责任公司 Steel pipe pile water pile sinking construction method
CN114575333A (en) * 2022-03-22 2022-06-03 中交二公局第二工程有限公司 Construction method for inserting and driving locking steel pipe pile bedrock
CN114753368A (en) * 2022-04-21 2022-07-15 中交第二航务工程局有限公司 Guide positioning support for ultra-long lock catch steel pipe pile and use method thereof
CN115467327A (en) * 2022-08-17 2022-12-13 中交第二航务工程局有限公司 Self-walking intelligent high-precision positioning pile driving frame system and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842775A (en) * 2018-08-02 2018-11-20 中交武汉港湾工程设计研究院有限公司 Stake top clamp brace type steel-pipe pile pile sinking is guide locating device provided and its construction method
CN209620061U (en) * 2019-01-07 2019-11-12 中交第二航务工程局有限公司 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842775A (en) * 2018-08-02 2018-11-20 中交武汉港湾工程设计研究院有限公司 Stake top clamp brace type steel-pipe pile pile sinking is guide locating device provided and its construction method
CN209620061U (en) * 2019-01-07 2019-11-12 中交第二航务工程局有限公司 Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485446A (en) * 2019-09-12 2019-11-22 中国五冶集团有限公司 A kind of steel pipe pile element and steel pipe pile cofferdam
CN110565669A (en) * 2019-09-12 2019-12-13 北京崇建工程有限公司 Well pit water-intercepting and soil-retaining construction method
CN110565669B (en) * 2019-09-12 2022-02-18 北京崇建工程有限公司 Well pit water-intercepting and soil-retaining construction method
CN112878349A (en) * 2021-01-15 2021-06-01 北京市市政四建设工程有限责任公司 Underground water control method for PBA underground excavation subway station construction stage
CN112878349B (en) * 2021-01-15 2022-05-06 北京市市政四建设工程有限责任公司 Underground water control method for PBA underground excavation subway station construction stage
CN114319352A (en) * 2021-12-31 2022-04-12 中国港湾工程有限责任公司 Steel pipe pile water pile sinking construction method
CN114575333A (en) * 2022-03-22 2022-06-03 中交二公局第二工程有限公司 Construction method for inserting and driving locking steel pipe pile bedrock
CN114753368A (en) * 2022-04-21 2022-07-15 中交第二航务工程局有限公司 Guide positioning support for ultra-long lock catch steel pipe pile and use method thereof
CN115467327A (en) * 2022-08-17 2022-12-13 中交第二航务工程局有限公司 Self-walking intelligent high-precision positioning pile driving frame system and construction method thereof
CN115467327B (en) * 2022-08-17 2023-08-29 中交第二航务工程局有限公司 Self-walking intelligent high-precision positioning pile driving frame system and construction method thereof

Similar Documents

Publication Publication Date Title
CN109853600A (en) Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method
CN103938616B (en) Diaphram wall reinforcement cage structure and its construction method
CN209620061U (en) Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure
CN105926628B (en) One kind is floated, fixed convertible pile foundation in water construction platform device
CN109944593B (en) Reinforcing method for shield tunnel to penetrate existing building
CN107700366B (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN215329972U (en) Steel cofferdam positioning system for deep water bare rock geology
CN106088120B (en) A kind of cofferdam decentralization construction method
CN109779636B (en) Reinforcing structure for shield tunnel to penetrate through existing building
CN102677592A (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN107227741B (en) Basement supporting construction
CN109723081A (en) Subway station lattice column construction method
CN110847047B (en) Open sea bare rock trestle construction method
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN209620060U (en) Heavy leading truck is applied convenient for cofferdam lock steel-pipe pile
CN208201658U (en) A kind of steel trestle rapid construction device
CN108505449B (en) The construction method of bracket lifting system in a kind of CFST Arch Bridge water
CN210555475U (en) Floating type drilling platform
CN210033432U (en) Reinforcing structure for shield tunnel to penetrate existing building
CN205804363U (en) A kind of floating, fixing convertible pile foundation in water construction platform device
CN211948382U (en) Bored concrete pile steel reinforcement cage fixing device
CN105401564A (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN208136959U (en) A kind of waters tunnel formwork erecting structure and internal mould supporter integral slipping structure
CN111676799A (en) Height-adjustable simple cable-stayed diversion trench temporary bridge and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210906

Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Applicant after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Applicant after: China Communication 2nd Navigational Bureau 2nd Engineering Co.,Ltd.

Applicant after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Applicant before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Applicant before: China Communication 2nd Navigational Bureau 2nd Engineering Co.,Ltd.