CN109494625A - The installation method of cable testing bridge - Google Patents

The installation method of cable testing bridge Download PDF

Info

Publication number
CN109494625A
CN109494625A CN201811242724.1A CN201811242724A CN109494625A CN 109494625 A CN109494625 A CN 109494625A CN 201811242724 A CN201811242724 A CN 201811242724A CN 109494625 A CN109494625 A CN 109494625A
Authority
CN
China
Prior art keywords
testing bridge
cable testing
installation method
bracket
gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811242724.1A
Other languages
Chinese (zh)
Inventor
刘照国
陈雷
金辽东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811242724.1A priority Critical patent/CN109494625A/en
Publication of CN109494625A publication Critical patent/CN109494625A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of installation methods of cable testing bridge, comprising the following steps: multiple parallel columns is first installed on the wall of high-altitude, and the equal right angle setting bracket on each column;Springboard is laid in the standoff top of institute again;Then construction personnel tramples on springboard, and trailing arm is respectively mounted on each column, and trailing arm is located at the top of bracket;Gantry is respectively mounted on each trailing arm;The cabling on gantry, or the equal cabling on gantry and bracket.Operation of the present invention is simple and convenient, can be improved installation effectiveness.

Description

The installation method of cable testing bridge
Technical field
The present invention relates to electrical construction technical fields, and in particular to a kind of installation method of cable testing bridge.
Background technique
Carrier of the gantry as cable, is the pith in electrical construction, and gantry is generally disposed at height in the air, usually adopts The installation of gantry is carried out with the mode for setting up ladder, the mounting means is complicated for operation, installation effectiveness is lower, and being unable to satisfy construction needs It asks.
Summary of the invention
It is simple and convenient, can the technical problem to be solved in the present invention is to provide a kind of installation method of cable testing bridge Improve installation effectiveness.
In order to solve the above technical problem, the present invention provides technical solution it is as follows:
A kind of installation method of cable testing bridge, comprising the following steps:
1) multiple parallel columns are installed on the wall of high-altitude, and the equal right angle setting bracket on each column;
2) springboard is laid in the standoff top of institute;
3) construction personnel tramples on springboard, and trailing arm is then respectively mounted on each column, and the trailing arm is located at bracket Top;
4) gantry is respectively mounted on each trailing arm;
5) cabling on gantry, or the equal cabling on gantry and bracket.
In the step 3), multiple trailing arms being vertically arranged are respectively mounted on each column.
Multiple trailing arms on each column are equally arranged.
In the step 2), the standoff top of institute is equipped with multiple springboards, multiple springboards along bracket length direction according to Secondary laying.
The bracket uses angle steel or channel steel.
It is provided with the groove for accommodating the cable on the gantry, partition, the partition are fixed in the groove It is perpendicular with the slot bottom of the groove.
The opening both ends of the groove are respectively and fixedly provided with the baffle extended to partition direction.
The trailing arm includes top plate, and the bottom of the top plate is fixed with bearing diagonal.
The invention has the following advantages: the installation method of cable testing bridge of the invention, carries out high-altitude bridge using springboard The installation of frame, it is simple and convenient, substantially increase installation effectiveness, construction risk is reduced, improves construction safety coefficient, together When be also convenient for carrying out later period maintenance and detection after being installed;Integral construction cost and construction workload are saved.
Detailed description of the invention
Fig. 1 is the scheme of installation of the cable testing bridge of one embodiment of the present of invention;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the scheme of installation of Fig. 1 central post and bracket;
Fig. 4 is the scheme of installation of springboard in Fig. 1, bracket and column;
Fig. 5 is the scheme of installation of trailing arm in Fig. 1, springboard, column and bracket;
Fig. 6 is the three-dimensional scheme of installation of cable testing bridge in Fig. 1;
Fig. 7 is structural schematic diagram after cable testing bridge cabling in Fig. 6;
Fig. 8 is the structural schematic diagram of the cable testing bridge of another embodiment of the invention;
Fig. 9 is the side view of Fig. 8;
Figure 10 is the structural schematic diagram in Fig. 8 after cable testing bridge cabling;
In figure: 1, wall, 2, column, 3, bracket, 4, springboard, 5, trailing arm, 51, top plate, 52, bearing diagonal, 7, gantry, 71, Groove, 72, partition, 73, baffle, 8, cable.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
As Figure 1-Figure 2, present embodiment discloses a kind of installation methods of cable testing bridge, comprising the following steps:
1) as shown in figure 3, installing multiple parallel columns 2 on high-altitude wall 1, and the vertical peace on each column 2 Fill bracket 3;
2) as shown in figure 4, being laid with springboard 4 in the top of all brackets 3;Safety walking of the springboard 4 for subsequent construction is logical Road;
Further, the top of all brackets 3 is equipped with multiple springboards 4, multiple springboards 4 along bracket 3 length direction according to Secondary laying is also conducive to widen the scope of activities of subsequent construction, more conducively be constructed with enhancing structure stability.
It should be understood that corresponding life rope need to also be arranged around it when springboard 4 is laid with.
3) as shown in figure 5, construction personnel tramples on springboard 4, trailing arm 5, trailing arm 5 are then respectively mounted on each column 2 Positioned at the top of bracket 3;
Wherein, multiple trailing arms 5 being vertically arranged are respectively mounted on each column 2, in order to the laying of multiple rows of cable 8.
Further, multiple trailing arms 5 on each column 2 are equally arranged.
4) as shown in fig. 6, construction personnel tramples on springboard 4, gantry 7 is respectively mounted on each trailing arm 5;
5) as shown in fig. 7, construction personnel tramples on springboard 4, the cabling 8 on gantry 7, at this point, the only conduct of springboard 4 Safe walking passageway uses, and bracket 3 is only used for support springboard 4, and bracket 3 uses angle steel at this time.
The installation of the trailing arm 5, gantry 7 and cable 8 of the present embodiment is carried out using springboard 4, is greatly facilitated construction, is improved Installation effectiveness.
As illustrated in figs. 8-9, the present embodiment also discloses the installation method of another cable testing bridge, the installation method with The difference of above-mentioned installation method is that bracket 3 is used not only for support springboard 4, also uses as lowest level trailing arm, at this time bracket Spacing between 3 and its adjacent trailing arm 5 is equal to the spacing of adjacent trailing arm 5, at this point, as shown in Figure 10, on gantry 7 and bracket 3 Cabling 8, bracket 3 uses channel steel in this method, to guarantee load intensity, enhances support degree and stability.This method into One step reduces installation workload, improves installation effectiveness.
In a wherein embodiment, it is provided with the groove 71 for accommodating cable 8 on gantry 7, is fixed in groove 71 There is a partition 72, the slot bottom of partition 72 and groove 71 is perpendicular.Groove 71 is divided into two spaces by partition 72, is respectively used to accommodate not The cable 8 of same specification.
In a wherein embodiment, the opening both ends of groove 71 are respectively and fixedly provided with the baffle extended to 72 direction of partition 73, for playing certain barrier effect to the cable 8 in groove 71, prevent cable 8 from slipping.
In a wherein embodiment, trailing arm 5 includes top plate 51,51 top erection bridge 7 of top plate, the bottom of top plate 51 It is fixed with bearing diagonal 52, to enhance the support strength and stability of trailing arm 5.
The installation method of above-mentioned cable testing bridge carries out the installation of high-altitude gantry 7 using springboard 4, simple and convenient, significantly Installation effectiveness is improved, construction risk is reduced, improves construction safety coefficient, while being also convenient for carrying out the later period after being installed Maintenance and detection, such as overhauled convenient for the later period and increase cable or dismounting and again cabling;Cost is relatively low for integral construction, applies Work workload is smaller.
Embodiment described above is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection model of the invention It encloses without being limited thereto.Those skilled in the art's made equivalent substitute or transformation on the basis of the present invention, in the present invention Protection scope within.Protection scope of the present invention is subject to claims.

Claims (8)

1. a kind of installation method of cable testing bridge, characterized in that the following steps are included:
1) multiple parallel columns are installed on the wall of high-altitude, and the equal right angle setting bracket on each column;
2) springboard is laid in the standoff top of institute;
3) construction personnel tramples on springboard, and trailing arm is then respectively mounted on each column, and the trailing arm is located at the top of bracket;
4) gantry is respectively mounted on each trailing arm;
5) cabling on gantry, or the equal cabling on gantry and bracket.
2. the installation method of cable testing bridge as described in claim 1, characterized in that in the step 3), on each column Multiple trailing arms being vertically arranged are installed.
3. the installation method of cable testing bridge as claimed in claim 2, characterized in that between multiple trailing arms on each column are in equal Away from arrangement.
4. the installation method of cable testing bridge as described in claim 1, characterized in that in the step 2), institute it is standoff on Side is equipped with multiple springboards, and multiple springboards are successively laid with along the length direction of bracket.
5. the installation method of cable testing bridge as described in claim 1, characterized in that the bracket uses angle steel or channel steel.
6. the installation method of cable testing bridge as described in claim 1, characterized in that be provided on the gantry for accommodating The groove of cable is stated, is fixed with partition in the groove, the slot bottom of the partition and the groove is perpendicular.
7. the installation method of cable testing bridge as claimed in claim 6, characterized in that the opening both ends of the groove are respectively and fixedly provided with The baffle extended to partition direction.
8. the installation method of cable testing bridge as described in claim 1, characterized in that the trailing arm includes top plate, the top plate Bottom be fixed with bearing diagonal.
CN201811242724.1A 2018-10-24 2018-10-24 The installation method of cable testing bridge Pending CN109494625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811242724.1A CN109494625A (en) 2018-10-24 2018-10-24 The installation method of cable testing bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811242724.1A CN109494625A (en) 2018-10-24 2018-10-24 The installation method of cable testing bridge

Publications (1)

Publication Number Publication Date
CN109494625A true CN109494625A (en) 2019-03-19

Family

ID=65692658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811242724.1A Pending CN109494625A (en) 2018-10-24 2018-10-24 The installation method of cable testing bridge

Country Status (1)

Country Link
CN (1) CN109494625A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200451716Y1 (en) * 2010-04-22 2011-01-07 김동수 Pedestrian Railings Fixed on Brackets of Bridge Bridges
CN203707688U (en) * 2014-02-24 2014-07-09 中建安装工程有限公司 Support used for mounting self-locking armoured aluminum alloy cable
CN104065006A (en) * 2014-06-26 2014-09-24 镇江市江岛电器制造有限公司 Cable bridge installation method
CN104269790A (en) * 2014-09-15 2015-01-07 镇江市电器设备厂有限公司 Nuclear power plant anti-seismic cable support
CN204552182U (en) * 2015-04-08 2015-08-12 北京亚欧震达科技发展有限公司 A kind of inspection platform
CN105559358A (en) * 2015-12-17 2016-05-11 哈尔滨鹏程食品有限公司 Detachable goods shelf for food
CN106711880A (en) * 2015-11-18 2017-05-24 天津市盟特电气仪表配件制造有限公司 Combined cable bridge
CN106848938A (en) * 2017-02-17 2017-06-13 中国十七冶集团有限公司 Cable testing bridge hanging installation method under a kind of High Altitude Platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200451716Y1 (en) * 2010-04-22 2011-01-07 김동수 Pedestrian Railings Fixed on Brackets of Bridge Bridges
CN203707688U (en) * 2014-02-24 2014-07-09 中建安装工程有限公司 Support used for mounting self-locking armoured aluminum alloy cable
CN104065006A (en) * 2014-06-26 2014-09-24 镇江市江岛电器制造有限公司 Cable bridge installation method
CN104269790A (en) * 2014-09-15 2015-01-07 镇江市电器设备厂有限公司 Nuclear power plant anti-seismic cable support
CN204552182U (en) * 2015-04-08 2015-08-12 北京亚欧震达科技发展有限公司 A kind of inspection platform
CN106711880A (en) * 2015-11-18 2017-05-24 天津市盟特电气仪表配件制造有限公司 Combined cable bridge
CN105559358A (en) * 2015-12-17 2016-05-11 哈尔滨鹏程食品有限公司 Detachable goods shelf for food
CN106848938A (en) * 2017-02-17 2017-06-13 中国十七冶集团有限公司 Cable testing bridge hanging installation method under a kind of High Altitude Platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
上海市城乡建设和管理委员会人才服务考核评价中心: "《施工员岗位知识和专业技能》", 30 April 2016 *

Similar Documents

Publication Publication Date Title
CN107119898A (en) A kind of building construction hanging basket
CN204418629U (en) Integrated form climbs frame
CN109494625A (en) The installation method of cable testing bridge
CN206422456U (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN105152052B (en) Glass curtain wall component installing method
CN107069533A (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN205740123U (en) Sound barrier panel hoisting machine under high-voltage fence
CN206174469U (en) Attach to L type load device of wall body suitable for skyscraper construction
CN206289544U (en) A kind of simple electric nacelle device
CN212406044U (en) Anti-falling climbing frame device for high-rise building construction
CN214034706U (en) Tower crane pedestrian safety passage used on attached lifting scaffold
CN210140985U (en) Electric hanging basket counterweight mechanism
CN201347719Y (en) Telescopic safety ladder
CN208721845U (en) Overhead type fiber cable cross connection box
CN209797206U (en) Elevator is to heavy rearmounted device
CN204980945U (en) Supplementary tower crane dismounting device
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN111364789A (en) Combined suspension and protection device for deep foundation pit operation
CN205857668U (en) The attachment type raise scaffold guide rail attachment device of plate building of wafing for plane
CN219032944U (en) Hanging basket for installing longitudinal drain pipe
CN205076619U (en) Single hoisting point double -deck elevator hanging flower basket
CN212129852U (en) Be used for civil engineering construction support
CN113653439A (en) Cat ladder, operation platform suitable for steel construction high altitude installation
CN214067349U (en) Intelligent detection device for leakage fault of overhead line
CN206735572U (en) A kind of adjustable computer room fag end seat

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319