CN104065006A - Cable bridge installation method - Google Patents

Cable bridge installation method Download PDF

Info

Publication number
CN104065006A
CN104065006A CN201410291886.XA CN201410291886A CN104065006A CN 104065006 A CN104065006 A CN 104065006A CN 201410291886 A CN201410291886 A CN 201410291886A CN 104065006 A CN104065006 A CN 104065006A
Authority
CN
China
Prior art keywords
cable testing
testing bridge
installation method
cable
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410291886.XA
Other languages
Chinese (zh)
Inventor
戴跃明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Original Assignee
ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd filed Critical ZHENJIANG JIANGDAO ELECTRICAL Manufacturing Co Ltd
Priority to CN201410291886.XA priority Critical patent/CN104065006A/en
Publication of CN104065006A publication Critical patent/CN104065006A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a cable bridge installation method which is characterized in that the cable bridge installation method comprises a step of carrying out scribing and positioning, installing a fixed piece, and installing a bridge support member, a step of installing a ladder rack, a tray and a cable groove and a step of laying a cable. According to the method, through the strict scribing and positioning and the installation of the fixed piece, the bridge support member, the ladder rack, the tray and the cable groove, the method has the advantages of simple operation, high installation efficiency, safety and reliability.

Description

A kind of installation method of cable testing bridge
Technical field
the present invention relates to a kind of installation method of cable testing bridge.
Background technology
It is requisite in engineering that crane span structure is arranged in engineering, along with the use of various electrified equipment in engineering, in engineering, circuit also becomes increasingly complex, so crane span structure is as the supporting body of cable, also becoming and becoming increasingly complex thereupon, especially be embodied in crane span structure and be conventionally arranged in high-altitude or narrow space, can run into when mounted a lot of difficulties.
The installation method of traditional crane span structure has complicated operation, and installation effectiveness is low, the shortcoming of poor stability.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind ofly installs by strict line location and fixture, crane span structure strutting piece, ladder, pallet, wire casing, has simple to operately, and installation effectiveness is high, the installation method of the cable testing bridge of safe and reliable advantage.
For solving the problems of the technologies described above, the invention provides a kind of installation method of cable testing bridge, it is characterized in that: the installation method step of described a kind of cable testing bridge is:
1: line location;
2: mounting fixing parts;
3: erection bridge strutting piece;
4: ladder, pallet, wire casing are installed;
5: cabling.
Further, described line location can be according to design drawing or construction plan, from cable testing bridge top to terminal, (branch line first main line) finds level or vertical line (building is if any the gradient, cable testing bridge should with its gradient), determines and mark the particular location of supporter.
Further, described mounting fixing parts adopts diameter be not less than the round steel self-control of 8mm or select finished product, and at civil engineering structure, the position of delimiting in construction is pre-buried, notes fixation, with adhesive plaster looping threaded portion.
Further, described erection bridge strutting piece adopts self-control support and suspension bracket to install, and described self-control is hung rack outer surface and scribbled one deck anticorrosive paint, and described support and suspension bracket answer hanging wire or snap the line to look for directly when mounted, use level gauge levelling, rear smooth vertical and horizontal to ensure installation.
Further, described installation ladder, pallet, wire casing adopt connecting plate to connect, and with packing ring, bullet pad, fastening nuts, nut should be positioned at ladder, pallet, wire casing outside.
Further, described cabling adopts along crane span structure cabling mode, describedly first cable is arranged in advance during along crane span structure cabling, draws permutation table and constructs, and lays afterwards one again and arranges one, fixes one.
Compared with prior art, beneficial effect of the present invention is:
Method of the present invention is installed by strict line location and fixture, crane span structure strutting piece, ladder, pallet, wire casing, has simple to operately, and installation effectiveness is high, safe and reliable advantage.
Embodiment
Embodiment 1:
A kind of installation method of cable testing bridge, the installation method step of described a kind of cable testing bridge is: line location, mounting fixing parts, erection bridge strutting piece, ladder is installed, pallet, wire casing, cabling, described line location can be according to design drawing or construction plan, from cable testing bridge top to terminal, (branch line first main line) finds level or vertical line (building is if any the gradient, cable testing bridge should be with its gradient), determine and mark the particular location of supporter, described mounting fixing parts adopts diameter be not less than the round steel self-control of 8mm or select finished product, at civil engineering structure, the position of delimiting in construction is pre-buried, note fixation, with adhesive plaster looping threaded portion, described erection bridge strutting piece adopts self-control support and suspension bracket to install, described self-control is hung rack outer surface and is scribbled one deck anticorrosive paint, described support and suspension bracket answer hanging wire or snap the line to look for directly when mounted, use level gauge levelling, rear smooth vertical and horizontal to ensure installation, described installation ladder, pallet, wire casing adopts connecting plate to connect, with packing ring, bullet pad, fastening nuts, nut should be positioned at ladder, pallet, wire casing outside, described cabling adopts along crane span structure cabling mode, describedly first cable is arranged in advance during along crane span structure cabling, drawing permutation table constructs, lay again afterwards one and arrange one, fix one.
In sum, method of the present invention is installed by strict line location and fixture, crane span structure strutting piece, ladder, pallet, wire casing, has simple to operately, and installation effectiveness is high, safe and reliable advantage.
The foregoing is only preferred embodiments of the present invention; protection scope of the present invention is not limited with above-mentioned execution mode; in every case the equivalence that those of ordinary skill in the art do according to disclosed content is modified or is changed, and all should include the protection range of recording in claims in.

Claims (6)

1. an installation method for cable testing bridge, is characterized in that: the installation method step of described a kind of cable testing bridge is:
1: line location;
2: mounting fixing parts;
3: erection bridge strutting piece;
4: ladder, pallet, wire casing are installed;
5: cabling.
2. the installation method of a kind of cable testing bridge according to claim 1, it is characterized in that: described line location can be according to design drawing or construction plan, from cable testing bridge top to terminal, (branch line first main line) finds level or vertical line (building is if any the gradient, cable testing bridge should be with its gradient), determine and mark the particular location of supporter.
3. the installation method of a kind of cable testing bridge according to claim 1, it is characterized in that: described mounting fixing parts adopts diameter be not less than the round steel self-control of 8mm or select finished product, and at civil engineering structure, the position of delimiting in construction is pre-buried, note fixation, with adhesive plaster looping threaded portion.
4. the installation method of a kind of cable testing bridge according to claim 1, it is characterized in that: described erection bridge strutting piece adopts self-control support and suspension bracket to install, described self-control is hung rack outer surface and is scribbled one deck anticorrosive paint, described support and suspension bracket answer hanging wire or snap the line to look for directly when mounted, use level gauge levelling, rear smooth vertical and horizontal to ensure installation.
5. the installation method of a kind of cable testing bridge according to claim 1, is characterized in that: described installation ladder, pallet, wire casing adopt connecting plate to connect, and with packing ring, bullet pad, fastening nuts, nut should be positioned at ladder, pallet, wire casing outside.
6. the installation method of a kind of cable testing bridge according to claim 1, it is characterized in that: described cabling adopts along crane span structure cabling mode, describedly first cable is arranged in advance during along crane span structure cabling, draw permutation table and construct, lay again afterwards one of an arrangement, fix one.
CN201410291886.XA 2014-06-26 2014-06-26 Cable bridge installation method Pending CN104065006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410291886.XA CN104065006A (en) 2014-06-26 2014-06-26 Cable bridge installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410291886.XA CN104065006A (en) 2014-06-26 2014-06-26 Cable bridge installation method

Publications (1)

Publication Number Publication Date
CN104065006A true CN104065006A (en) 2014-09-24

Family

ID=51552595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410291886.XA Pending CN104065006A (en) 2014-06-26 2014-06-26 Cable bridge installation method

Country Status (1)

Country Link
CN (1) CN104065006A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332906A (en) * 2014-10-18 2015-02-04 福州万山电力咨询有限公司 Power distribution project-used cable bridge mounting structure and mounting method
CN106848938A (en) * 2017-02-17 2017-06-13 中国十七冶集团有限公司 Cable testing bridge hanging installation method under a kind of High Altitude Platform
CN107611865A (en) * 2017-08-07 2018-01-19 浩翔电气集团有限公司 A kind of crane span structure installation and adjustment method
CN107769108A (en) * 2016-09-05 2018-03-06 北京新创迪克系统集成技术有限公司 A kind of installation method of the cable testing bridge of weak electricity system
CN108233286A (en) * 2016-12-10 2018-06-29 沈阳铝镁设计研究院有限公司 Electronic type static state cable testing bridge
CN109494625A (en) * 2018-10-24 2019-03-19 中国二十冶集团有限公司 The installation method of cable testing bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1185049A (en) * 1996-12-09 1998-06-17 钟江晖 Ventilation and light wt. type flame-retardant tray for electric cable
CN1614278A (en) * 2004-10-30 2005-05-11 王强 Assembled cable crane span
CN101476644A (en) * 2008-12-09 2009-07-08 殷炳发 Special double-rod hanger for electric cable bridge
CN103701074A (en) * 2014-01-14 2014-04-02 成都市第六建筑工程公司 Cable bridge and mounting method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1185049A (en) * 1996-12-09 1998-06-17 钟江晖 Ventilation and light wt. type flame-retardant tray for electric cable
CN1614278A (en) * 2004-10-30 2005-05-11 王强 Assembled cable crane span
CN101476644A (en) * 2008-12-09 2009-07-08 殷炳发 Special double-rod hanger for electric cable bridge
CN103701074A (en) * 2014-01-14 2014-04-02 成都市第六建筑工程公司 Cable bridge and mounting method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
啊小双OK: "技术(质量)交底记录", 《百度文库》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332906A (en) * 2014-10-18 2015-02-04 福州万山电力咨询有限公司 Power distribution project-used cable bridge mounting structure and mounting method
CN107769108A (en) * 2016-09-05 2018-03-06 北京新创迪克系统集成技术有限公司 A kind of installation method of the cable testing bridge of weak electricity system
CN108233286A (en) * 2016-12-10 2018-06-29 沈阳铝镁设计研究院有限公司 Electronic type static state cable testing bridge
CN106848938A (en) * 2017-02-17 2017-06-13 中国十七冶集团有限公司 Cable testing bridge hanging installation method under a kind of High Altitude Platform
CN107611865A (en) * 2017-08-07 2018-01-19 浩翔电气集团有限公司 A kind of crane span structure installation and adjustment method
CN109494625A (en) * 2018-10-24 2019-03-19 中国二十冶集团有限公司 The installation method of cable testing bridge

Similar Documents

Publication Publication Date Title
CN104065006A (en) Cable bridge installation method
CN206128597U (en) Assembly type structure work platform
CN108862014B (en) Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM
CN103818840B (en) A kind of lifting part and hanging method
CN203707688U (en) Support used for mounting self-locking armoured aluminum alloy cable
CN205646578U (en) Special lifting rope of bridge formula transformer installation
CN202834602U (en) Mounting structure of ball machine on bracket
CN202474763U (en) Novel suspension type cable fixture
CN204257494U (en) adjustable outdoor vacuum switch installing rack
CN211037455U (en) High steel construction building curtain of stability
CN203201015U (en) Combined type I-shaped steel component
CN205643809U (en) Divide fine case optical cable fender bracket
CN205134977U (en) Life rope
CN209402118U (en) Street code
CN204571798U (en) The special installation ladder of a kind of dynamometer instrument case
CN206332393U (en) A kind of main transformer body linear temperature sensitive cable lays support meanss
CN104973524B (en) Cable bridge inverted-type installation system on overhead vertical structural body
CN204592565U (en) A kind of automobile oil pipe fixes buckle
CN204530760U (en) A kind of adjustable balanced type member mounting device
CN204243650U (en) Integral type power cable crane span structure support in tunnel
CN205278551U (en) Fixed frame
CN203517524U (en) Illumination platform with maintenance station for high factory buildings
KR20190072361A (en) A method of fixing a ceiling structure including a fixed fastener
CN204312869U (en) A kind of modified model card code
KR20140000686U (en) Fixing device for handrail lighting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140924