CN109491311A - A kind of CEMS data transmission failure judgment method - Google Patents

A kind of CEMS data transmission failure judgment method Download PDF

Info

Publication number
CN109491311A
CN109491311A CN201811344926.7A CN201811344926A CN109491311A CN 109491311 A CN109491311 A CN 109491311A CN 201811344926 A CN201811344926 A CN 201811344926A CN 109491311 A CN109491311 A CN 109491311A
Authority
CN
China
Prior art keywords
plc
failure
cems
data transmission
upload
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811344926.7A
Other languages
Chinese (zh)
Inventor
孙建栋
王刚
陈岚
金超
顾志君
陈谷枫
王明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Jiangsu Province Electricity Generating Corp Ltd
Original Assignee
Changshu Jiangsu Province Electricity Generating Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Jiangsu Province Electricity Generating Corp Ltd filed Critical Changshu Jiangsu Province Electricity Generating Corp Ltd
Priority to CN201811344926.7A priority Critical patent/CN109491311A/en
Publication of CN109491311A publication Critical patent/CN109491311A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/14Plc safety
    • G05B2219/14005Alarm

Abstract

The invention discloses a kind of CEMS data transmission failure judgment methods, system is judged using CEMS data transmission failure, the CEMS data transmission failure judges that system includes PLC failure monitoring and upload host computer failure monitoring, the PLC failure monitoring includes former flue gas PLC, neat stress PLC and auxiliary important parameter PLC, and the upload host computer failure monitoring is including uploading host and uploading slave.By above-mentioned, CEMS data transmission failure judgment method provided by the invention, the reliability of data transmission has been effectively ensured, it realizes to sending is alarmed in time after breaking down in CEMS data transmission procedure, and accurately show failure happening part, service personnel can find out rapidly failure happening part, provide strong guarantee for timely and effectively handling failure.

Description

A kind of CEMS data transmission failure judgment method
Technical field
The present invention relates to the technical fields of analysis Instrument equipment, more particularly to a kind of CEMS data transmission failure judgement side Method is related to CEMS system.
Background technique
With the development of the social economy, people constantly enhance the consciousness of environmental protection, country is to the big of pollution sources enterprise Gas blowdown supervision is increasingly reinforced, to flue gas discharge continuous monitoring system (Continuous Emission Monitoring System, CEMS) upload data reliability requirement it is more and more harsher.
For CEMS as one independent monitoring system in power plant, country, local environmental protection administration require CEMS control room It can only individually set up, and not allow to set up monitoring personnel on duty, and regulation CEMS control room has stringent discrepancy resignation system. CEMS system equipment can only lean on regular point inspection, the inspection of personnel that could find when breaking down, can not accomplish equipment fault, exception When find, handle in time.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of CEMS data transmission failure judgment methods, are effectively ensured The reliability of data transmission is realized to sending is alarmed in time after breaking down in CEMS data transmission procedure, and accurately shows event Hinder happening part, service personnel can find out rapidly failure happening part, provide strong guarantee for timely and effectively handling failure.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: provide a kind of CEMS data transmission Fault judgment method judges system using CEMS data transmission failure, and the CEMS data transmission failure judges that system includes PLC failure monitoring and host computer failure monitoring is uploaded, the PLC failure monitoring includes former flue gas PLC, neat stress PLC and auxiliary Important parameter PLC is helped, the upload host computer failure monitoring includes uploading host and upload slave,
Wherein, the PLC failure monitoring fault judgment method comprising the following specific steps
A, by former flue gas PLC, neat stress PLC and auxiliary important parameter PLC real-time sampling data, then output entrance is dirty respectively Contaminate object concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value;
B, entrance pollutant concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value pass through AO fastener It send to DCS, by DCS real-time sampling data;
C, DCS carries out delay process to sampled data, is delayed 180 seconds and exports delay value, delay value is subtracted the real-time of each parameter It is worth, judges whether to be greater than 0.2 after carrying out absolute value processing,
D, after carrying out delay 180 seconds if it is greater than 0.2, the corresponding former flue gas PLC of output CEMS system, neat stress PLC or The fault alarm of important parameter PLC is assisted, then is sent to DCS;
Wherein, the described upload host computer failure monitoring fault judgment method comprising the following specific steps
" heartbeat " method is used by two-node cluster hot backup, host is being uploaded and is uploading between slave, mutually sent out according to certain interval Communication signal is sent, shows the current operating status of CEMS system, host is uploaded with confirmation and uploads whether slave is in failure shape State exports corresponding upload host or uploads slave fault alarm, will upload hostdown alarm and upload slave fault alarm Output uploads host computer fault alarm after merging, then send to DCS;
Among the above, the former flue gas PLC fault alarm, neat stress PLC fault alarm of CEMS system, auxiliary important parameter PLC failure Alarm uploads host computer fault alarm after DCS summarizes, and output CEMS data transmission failure is alarmed and in the alarm photon of DCS Board finds fault point in time.
In a preferred embodiment of the present invention, the entrance pollutant concentration real value and outlet pollutant concentration are real Pollutant in duration is SO2.
In a preferred embodiment of the present invention, the auxiliary important parameter real value is that slurry circulating pump total current is real Duration.
In a preferred embodiment of the present invention, the upload host and slave is uploaded also respectively to former flue gas PLC, net Flue gas PLC and auxiliary important parameter PLC carry out Communication Monitoring, if it find that former flue gas PLC, neat stress PLC and the important ginseng of auxiliary The communication abnormality of number PLC then exports the corresponding former flue gas PLC of CEMS system, neat stress PLC or auxiliary important parameter PLC Fault alarm, then give to DCS.
The beneficial effects of the present invention are: CEMS data transmission failure judgment method of the invention, has been effectively ensured data biography Defeated reliability is realized to sending is alarmed in time after breaking down in CEMS data transmission procedure, and accurately shows failure Position, service personnel can find out rapidly failure happening part, provide strong guarantee for timely and effectively handling failure.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is the flow chart of a preferred embodiment of CEMS data transmission failure judgment method of the present invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
As shown in Figure 1, the embodiment of the present invention includes:
A kind of CEMS data transmission failure judgment method judges system, the CEMS data using CEMS data transmission failure Transmission fault judges that system includes PLC failure monitoring and uploads host computer failure monitoring, and the PLC failure monitoring includes former cigarette Gas PLC, neat stress PLC and auxiliary important parameter PLC, the upload host computer failure monitoring include upload host and upload from Machine.
Wherein, the PLC failure monitoring fault judgment method comprising the following specific steps
A, by former flue gas PLC, neat stress PLC and auxiliary important parameter PLC real-time sampling data, then output entrance is dirty respectively Contaminate object concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value;
B, entrance pollutant concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value pass through AO fastener It send to DCS, by DCS real-time sampling data;
C, DCS carries out delay process to sampled data, is delayed 180 seconds and exports delay value, delay value is subtracted the real-time of each parameter It is worth, judges whether to be greater than 0.2 after carrying out absolute value processing,
D, after carrying out delay 180 seconds if it is greater than 0.2, the corresponding former flue gas PLC of output CEMS system, neat stress PLC or The fault alarm of important parameter PLC is assisted, then is sent to DCS;
Wherein, the described upload host computer failure monitoring fault judgment method comprising the following specific steps
" heartbeat " method is used by two-node cluster hot backup, host is being uploaded and is uploading between slave, mutually sent out according to certain interval Communication signal is sent, shows the current operating status of CEMS system, host is uploaded with confirmation and uploads whether slave is in failure shape State exports corresponding upload host or uploads slave fault alarm, will upload hostdown alarm and upload slave fault alarm Output uploads host computer fault alarm after merging, then send to DCS.
Further, the upload host and upload slave are also respectively to former flue gas PLC, neat stress PLC and auxiliary weight Parameter PLC is wanted to carry out Communication Monitoring, if it find that former flue gas PLC, neat stress PLC and the communication abnormality for assisting important parameter PLC, Then export the corresponding former flue gas PLC of CEMS system, neat stress PLC or the fault alarm for assisting important parameter PLC, then send to DCS
Among the above, the former flue gas PLC fault alarm, neat stress PLC fault alarm of CEMS system, auxiliary important parameter PLC failure Alarm uploads host computer fault alarm after DCS summarizes, and output CEMS data transmission failure is alarmed and in the alarm photon of DCS Board finds fault point in time.
Pollutant in the present embodiment, in the entrance pollutant concentration real value and outlet pollutant concentration real value For SO2;The auxiliary important parameter real value is slurry circulating pump total current real value.
DCS(scattered control system) it is monitored in real time by each parameter simulation amount data to CEMS system and calculation process, There is no due variations to judge some corresponding device fails of the system for the data before the deadline, with And to host computer realtime monitoring is uploaded, host is uploaded with confirmation and whether upload slave is in malfunction.Utilize DCS's Alarm photon board finds fault point in time, accurate to show failure happening part, and operations staff notifies service personnel to carry out event in time Barrier processing, service personnel can find out rapidly failure happening part, and the reliability of data transmission has been effectively ensured, for timely and effectively Handling failure provides strong guarantee.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (4)

1. a kind of CEMS data transmission failure judgment method, which is characterized in that judge system using CEMS data transmission failure, institute The CEMS data transmission failure stated judges that system includes PLC failure monitoring and upload host computer failure monitoring, the PLC failure Monitoring includes former flue gas PLC, neat stress PLC and auxiliary important parameter PLC, and the upload host computer failure monitoring includes uploading Host and upload slave,
Wherein, the PLC failure monitoring fault judgment method comprising the following specific steps
A, by former flue gas PLC, neat stress PLC and auxiliary important parameter PLC real-time sampling data, then output entrance is dirty respectively Contaminate object concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value;
B, entrance pollutant concentration real value, outlet pollutant concentration real value and auxiliary important parameter real value pass through AO fastener It send to DCS, by DCS real-time sampling data;
C, DCS carries out delay process to sampled data, is delayed 180 seconds and exports delay value, delay value is subtracted the real-time of each parameter It is worth, judges whether to be greater than 0.2 after carrying out absolute value processing,
D, after carrying out delay 180 seconds if it is greater than 0.2, the corresponding former flue gas PLC of output CEMS system, neat stress PLC or The fault alarm of important parameter PLC is assisted, then is sent to DCS;
Wherein, the described upload host computer failure monitoring fault judgment method comprising the following specific steps
" heartbeat " method is used by two-node cluster hot backup, host is being uploaded and is uploading between slave, mutually sent out according to certain interval Communication signal is sent, shows the current operating status of CEMS system, host is uploaded with confirmation and uploads whether slave is in failure shape State exports corresponding upload host or uploads slave fault alarm, will upload hostdown alarm and upload slave fault alarm Output uploads host computer fault alarm after merging, then send to DCS;
Among the above, the former flue gas PLC fault alarm, neat stress PLC fault alarm of CEMS system, auxiliary important parameter PLC failure Alarm uploads host computer fault alarm after DCS summarizes, and output CEMS data transmission failure is alarmed and in the alarm photon of DCS Board finds fault point in time.
2. CEMS data transmission failure judgment method according to claim 1, which is characterized in that the entrance pollutant Pollutant in concentration real value and outlet pollutant concentration real value is SO2.
3. CEMS data transmission failure judgment method according to claim 1, which is characterized in that the important ginseng of the auxiliary Number real value is slurry circulating pump total current real value.
4. CEMS data transmission failure judgment method according to claim 1, which is characterized in that the upload host and It uploads slave and Communication Monitoring also is carried out to former flue gas PLC, neat stress PLC and auxiliary important parameter PLC respectively, if it find that former cigarette Gas PLC, neat stress PLC and the communication abnormality for assisting important parameter PLC then export the corresponding former flue gas PLC of CEMS system, net cigarette Gas PLC or the fault alarm for assisting important parameter PLC, then give to DCS.
CN201811344926.7A 2018-11-13 2018-11-13 A kind of CEMS data transmission failure judgment method Pending CN109491311A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811344926.7A CN109491311A (en) 2018-11-13 2018-11-13 A kind of CEMS data transmission failure judgment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811344926.7A CN109491311A (en) 2018-11-13 2018-11-13 A kind of CEMS data transmission failure judgment method

Publications (1)

Publication Number Publication Date
CN109491311A true CN109491311A (en) 2019-03-19

Family

ID=65694348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811344926.7A Pending CN109491311A (en) 2018-11-13 2018-11-13 A kind of CEMS data transmission failure judgment method

Country Status (1)

Country Link
CN (1) CN109491311A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024141A (en) * 2019-11-23 2020-04-17 宜宾学院 On-line detection system of environmental pollution detection equipment based on wireless communication
CN111413948A (en) * 2020-03-26 2020-07-14 大唐环境产业集团股份有限公司 Device and method for judging whether P L C and DCS are in normal communication
CN112731859A (en) * 2020-11-24 2021-04-30 江苏方天电力技术有限公司 Monitoring method of CEMS (continuous emission monitoring System) environment-friendly data transmission system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101738973A (en) * 2009-12-17 2010-06-16 四川中鼎自动控制有限公司 Intelligent monitoring method of auxiliary engine equipment
CN104998532A (en) * 2015-07-23 2015-10-28 智胜化工股份有限公司 Boiler ammonia desulphurization flue gas emission and ammonia escape balance control device and method
CN104360667B (en) * 2014-11-28 2016-06-22 山东省环境保护信息中心 A kind of polluter on-line monitoring platform and the anti-counterfeiting method of pollution source monitoring data
CN106569465A (en) * 2016-10-20 2017-04-19 吕子含 Method for DCS to monitor CEMS system in real time
CN107741945A (en) * 2017-08-25 2018-02-27 国网吉林省电力有限公司 A kind of CEMS system trouble analysis methods of outlier detection based on density
CN107854982A (en) * 2017-11-17 2018-03-30 华电电力科学研究院 The pre- spray-absorption device of ozone denitration
CN108255646A (en) * 2018-01-17 2018-07-06 重庆大学 A kind of self-healing method of industrial control program failure based on heartbeat detection
CN110750480A (en) * 2019-10-18 2020-02-04 苏州浪潮智能科技有限公司 Dual-computer hot standby system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101738973A (en) * 2009-12-17 2010-06-16 四川中鼎自动控制有限公司 Intelligent monitoring method of auxiliary engine equipment
CN104360667B (en) * 2014-11-28 2016-06-22 山东省环境保护信息中心 A kind of polluter on-line monitoring platform and the anti-counterfeiting method of pollution source monitoring data
CN104998532A (en) * 2015-07-23 2015-10-28 智胜化工股份有限公司 Boiler ammonia desulphurization flue gas emission and ammonia escape balance control device and method
CN106569465A (en) * 2016-10-20 2017-04-19 吕子含 Method for DCS to monitor CEMS system in real time
CN107741945A (en) * 2017-08-25 2018-02-27 国网吉林省电力有限公司 A kind of CEMS system trouble analysis methods of outlier detection based on density
CN107854982A (en) * 2017-11-17 2018-03-30 华电电力科学研究院 The pre- spray-absorption device of ozone denitration
CN108255646A (en) * 2018-01-17 2018-07-06 重庆大学 A kind of self-healing method of industrial control program failure based on heartbeat detection
CN110750480A (en) * 2019-10-18 2020-02-04 苏州浪潮智能科技有限公司 Dual-computer hot standby system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴邦灿: "《《现代环境监测技术 第3版》》", 30 April 2014 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111024141A (en) * 2019-11-23 2020-04-17 宜宾学院 On-line detection system of environmental pollution detection equipment based on wireless communication
CN111413948A (en) * 2020-03-26 2020-07-14 大唐环境产业集团股份有限公司 Device and method for judging whether P L C and DCS are in normal communication
CN111413948B (en) * 2020-03-26 2021-01-26 大唐环境产业集团股份有限公司 Device and method for judging whether communication between PLC and DCS is normal
CN112731859A (en) * 2020-11-24 2021-04-30 江苏方天电力技术有限公司 Monitoring method of CEMS (continuous emission monitoring System) environment-friendly data transmission system

Similar Documents

Publication Publication Date Title
CN110011829B (en) Comprehensive airborne task system health management subsystem
CN110929898B (en) Hydropower station start-stop equipment operation and maintenance and fault monitoring online evaluation system and method
CN109491311A (en) A kind of CEMS data transmission failure judgment method
CN103078403B (en) On-line state evaluation method for secondary system of intelligent substation
CN108931972A (en) A kind of substation secondary device condition intelligent diagnostic method based on model-driven
CN102570601A (en) Transformer substation control cabin technology
CN110988559A (en) Online monitoring method for full life cycle of transformer substation direct current system based on Internet of things
CN103309334A (en) Man-machine interface display operation method and configuration system for factory control system
CN111597231A (en) Intelligent substation inspection system based on multi-source heterogeneous system data mining
CN206775517U (en) A kind of garbage compression station redundant configuration system based on Cloud Server
CN115562144A (en) Major hazard source safety monitoring and early warning management system based on 5G technology
CN106022582A (en) Work order control system service automatic analyzing and processing method and system
CN109100994A (en) A kind of production line for manufacturing battery method for real-time monitoring
CN204883304U (en) A environment thing networking systems that is used for river to gush quality of water administering control
CN102749906A (en) On-line processing method for rail transit integrated-monitoring alarm information
CN105158610A (en) Screening processing method of transformer state early warning data suspected value
CN207764643U (en) A kind of remote centralized monitoring system of intelligence manufacture
CN203942333U (en) Transformer substation grounding wire management system
CN214372621U (en) Industrial filter control system based on Internet of things
CN109917734A (en) Building equipment intelligent monitor system
CN106569465A (en) Method for DCS to monitor CEMS system in real time
CN105182930A (en) Continuous casting production process automation safety control system
RU65175U1 (en) SYSTEM OF TELEMECHANICS OF MANAGEMENT OF THE MAIN AND INTER-FIELD GAS PIPELINE
CN204480018U (en) A kind of thermal power unit operation early warning and fault diagnosis system
CN204758719U (en) Dissolved gas situation early -warning data process system in blowout formula oil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319