CN103078403A - On-line state evaluation method for secondary system of intelligent substation - Google Patents

On-line state evaluation method for secondary system of intelligent substation Download PDF

Info

Publication number
CN103078403A
CN103078403A CN2012105841343A CN201210584134A CN103078403A CN 103078403 A CN103078403 A CN 103078403A CN 2012105841343 A CN2012105841343 A CN 2012105841343A CN 201210584134 A CN201210584134 A CN 201210584134A CN 103078403 A CN103078403 A CN 103078403A
Authority
CN
China
Prior art keywords
secondary system
intelligent substation
electrical secondary
appraisal procedure
object database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105841343A
Other languages
Chinese (zh)
Other versions
CN103078403B (en
Inventor
刘洋
杨威
金广厚
刘四春
蒲天骄
陈艳霞
吕立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210584134.3A priority Critical patent/CN103078403B/en
Publication of CN103078403A publication Critical patent/CN103078403A/en
Application granted granted Critical
Publication of CN103078403B publication Critical patent/CN103078403B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention provides an on-line state evaluation method for a secondary system of an intelligent substation. The secondary system comprises a secondary network and secondary equipment. The method comprises the following steps of monitoring on-line states of the secondary equipment; collecting the on-line states of the secondary equipment and on-line states of the secondary network to an object database; and evaluating the on-line states of the secondary system. The on-line state evaluation method has the advantages that the risk of false judgment caused by experience difference between different persons is reduced, the troubleshooting time is shortened, the non-planned outage time and the overhauling outage time of the intelligent substation are reduced, and the on-site overhauling workload is saved.

Description

A kind of presence appraisal procedure of intelligent substation electrical secondary system
Technical field
The invention belongs to technical field of automation, be specifically related to a kind of presence appraisal procedure of intelligent substation electrical secondary system.
Background technology
In the tradition transformer station, set up detailed test, monitoring and the operation management standard of secondary device, formed rounded system, effectively guaranteed the normal enforcement of secondary function, ensured the safe and stable operation of electrical network.Compare with traditional transformer station, the secondary function of intelligent substation realizes having occured major transformation, originally the function of single device realization is broken down into a plurality of devices and realizes that the coupling that function realizes increases greatly, so the links of the performance index of secondary function and whole system is closely related.Because the secondary function realization link increases, system is more complicated, while is along with the application of new technology and new equipment, practical experience is relatively deficient, in service at the scene, it is unusual but can't in time analyze failsafe link secondary function repeatedly to occur, causes the promptly and accurately problem such as failure judgement equipment and failure cause, timely discovery and the elimination of fault have been affected, for system safety stable operation has brought hidden danger.Simultaneously, at present in the intelligent substation process of construction, because a large amount of new technologies and new equipment drop into the field, the monitoring standard of intelligent substation electrical secondary system and operation management standard are not yet issued, various places are all according to the fulfillment capability of own strength and existing equipment, worked out the operation management standard that is applied to local intelligent transformer station, the monitoring management of electrical secondary system is continued to use traditional transformer station pattern mostly, Contents for Monitoring is relatively simple, utilize the state estimation of manually realizing electrical secondary system according to monitoring result, level and the degree of depth differ.Popularize the construction period in an all-round way along with intelligent substation enters, the operation management level of intelligent substation electrical secondary system is needed lifting badly, when new technology, new equipment are popularized in an all-round way, must take into account this fundamental requirement of security of system stability.
In the prior art, the local on-line monitoring scheme that the secondary device of individual types is carried out, just collection information, need manual analysis, and information integrity and the availability of collecting are not passed through complete demonstration, and be limited to the help of user's artificial judgment, still needs a large amount of manual interventions.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of presence appraisal procedure of intelligent substation electrical secondary system, reduce the risk that different personnel's experience differences cause error in judgement, shorten the time of investigation fault, the non-planned outage and the maintenance that reduce intelligent substation stop the labour time, have saved the site examining and repairing workload.
In order to realize the foregoing invention purpose, the present invention takes following technical scheme:
A kind of presence appraisal procedure of intelligent substation electrical secondary system is provided, and described electrical secondary system comprises secondary network and secondary device, said method comprising the steps of:
Step 1: monitoring secondary device presence;
Step 2: gather secondary device presence and secondary network presence to object database;
Step 3: the presence to electrical secondary system is assessed.
In the described step 1, the secondary device presence comprise environment presence, protection presence, observing and controlling presence, merge cells presence, can only the control box presence, server presence, clock presence, record ripple presence and communication apparatus presence.
In the described step 2, by stand interior network collection secondary device presence and secondary network presence to object database.
Described station Intranet ruton is crossed IEC61850 and is gathered the secondary device presence, and gathers the secondary network presence by SNMP.
Described object database is deposited data to be analyzed, intermediate data and the historical data from monitored secondary device; Described object database is real-time data base.
Described expert knowledge library is deposited the accident analysis of electrical secondary system simultaneously.
In the described step 3, the inference machine of electrical secondary system online evaluation information substation mates screening with the information in the object database and the condition in the expert knowledge library, expert knowledge library provides suggestion for operation and assessment result according to coupling, interpreter is presented to man-machine interface intuitively with suggestion for operation and assessment result that expert knowledge library provides, and realization information and operating personnel's is mutual.
Presence to electrical secondary system is assessed, and the report of reaching a conclusion, the report of described conclusion comprise to the description of having broken down, fault rank, fault point and maintenance suggestion and to early warning, degree of risk and the maintenance suggestion of incipient fault.
Compared with prior art, beneficial effect of the present invention is:
1. realize the on-line monitoring of electrical secondary system, for intelligent substation electrical secondary system repair based on condition of component provides effective detection means, shortened the time of investigation fault, reduced the risk that different personnel's experience differences cause error in judgement, shorten the time of investigation fault, the non-planned outage and the maintenance that have reduced intelligent substation stop the labour time, have saved the site examining and repairing workload, have promoted overall economic efficiency;
2. the present invention has proposed electrical secondary system online evaluation information substation based on artificial intelligence technology at framework, and operates in the expert knowledge library on this platform, provides through the data type of demonstration and reliable criterion;
3. comprehensively secondary device and the network state of monitoring intelligent transformer station of this method, and can automatically assess state, draw intuitively result, need not the initial data of human interpretation large amount of complex.
Description of drawings
Fig. 1 is the presence appraisal procedure flow chart of intelligent substation electrical secondary system.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
Such as Fig. 1, a kind of presence appraisal procedure of intelligent substation electrical secondary system is provided, described electrical secondary system comprises secondary network and secondary device, said method comprising the steps of:
Step 1: monitoring secondary device presence;
Step 2: gather secondary device presence and secondary network presence to object database;
Step 3: the presence to electrical secondary system is assessed.
In the described step 1, the secondary device presence comprise environment presence, protection presence, observing and controlling presence, merge cells presence, can only the control box presence, server presence, clock presence, record ripple presence and communication apparatus presence.
In the described step 2, by stand interior network collection secondary device presence and secondary network presence to object database.Network is the mutual bridge of online monitoring system and evaluating system in standing, and also is the carrier of intelligent substation business information, and the state of itself also is the object that is detected.
Described station Intranet ruton is crossed IEC61850 and is gathered the secondary device presence, and gathers the secondary network presence by SNMP.
Described object database is deposited data to be analyzed, intermediate data and the historical data from monitored secondary device; Described object database is real-time data base.
Described expert knowledge library is deposited the accident analysis of electrical secondary system simultaneously.
In the described step 3, the inference machine of electrical secondary system online evaluation information substation mates screening with the information in the object database and the condition in the expert knowledge library, information by the coupling screening is deposited to described expert knowledge library, expert knowledge library provides suggestion for operation and assessment result according to self stored maintenance suggestion, interpreter is presented to man-machine interface intuitively with suggestion for operation and assessment result that expert knowledge library provides, realization information and operating personnel's is mutual, and good man-machine interface is conducive to reduce operating personnel's error.
Presence to electrical secondary system is assessed, and the report of reaching a conclusion, the report of described conclusion comprise to the description of having broken down, fault rank, fault point and maintenance suggestion and to early warning, degree of risk and the maintenance suggestion of incipient fault.
The custom rule that the user creates is undertaken alternately by man-machine interface, operation by knowledge acquisition is to expert knowledge library: knowledge acquisition is divided into two parts, part of opening is to the our station staff, in order to add inapplicable rule in the java standard library according to actual conditions, or revise the nonstandard wrong definite value of monitored target etc., another part is used for upgrading and from domestic authority the general secondary device O﹠M knowledge of formulating is discussed.Allow the transformer station that is equipped with this cover system arrive high-caliber managerial experiences by unceasing study, have again and can locally revise flexibility.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (7)

1. the presence appraisal procedure of an intelligent substation electrical secondary system, described electrical secondary system comprises secondary network and secondary device, it is characterized in that: said method comprising the steps of:
Step 1: monitoring secondary device presence;
Step 2: gather secondary device presence and secondary network presence to object database;
Step 3: the presence to electrical secondary system is assessed.
2. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 1; it is characterized in that: in the described step 1, the secondary device presence comprise environment presence, protection presence, observing and controlling presence, merge cells presence, can only the control box presence, server presence, clock presence, record ripple presence and communication apparatus presence.
3. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 1 is characterized in that: in the described step 2, by stand interior network collection secondary device presence and secondary network presence to object database.
4. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 3 is characterized in that: described station Intranet ruton is crossed IEC61850 and is gathered the secondary device presence, and gathers the secondary network presence by SNMP.
5. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 3, it is characterized in that: described object database is deposited data to be analyzed, intermediate data and the historical data from monitored secondary device; Described object database is real-time data base.
6. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 5, it is characterized in that: described expert knowledge library is deposited the accident analysis of electrical secondary system simultaneously.
The presence appraisal procedure of intelligent substation electrical secondary system according to claim 1, it is characterized in that: in the described step 3, the inference machine of electrical secondary system online evaluation information substation mates screening with the information in the object database and the condition in the expert knowledge library, expert knowledge library provides suggestion for operation and assessment result according to coupling, interpreter is presented to man-machine interface intuitively with suggestion for operation and assessment result that expert knowledge library provides, and realization information and operating personnel's is mutual.
7. the presence appraisal procedure of intelligent substation electrical secondary system according to claim 1, it is characterized in that: the presence to electrical secondary system is assessed, the report of reaching a conclusion, described conclusion report comprise to the description of having broken down, fault rank, fault point and maintenance suggestion and to early warning, degree of risk and the maintenance suggestion of incipient fault.
CN201210584134.3A 2012-12-28 2012-12-28 On-line state evaluation method for secondary system of intelligent substation Active CN103078403B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210584134.3A CN103078403B (en) 2012-12-28 2012-12-28 On-line state evaluation method for secondary system of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210584134.3A CN103078403B (en) 2012-12-28 2012-12-28 On-line state evaluation method for secondary system of intelligent substation

Publications (2)

Publication Number Publication Date
CN103078403A true CN103078403A (en) 2013-05-01
CN103078403B CN103078403B (en) 2014-07-02

Family

ID=48154845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210584134.3A Active CN103078403B (en) 2012-12-28 2012-12-28 On-line state evaluation method for secondary system of intelligent substation

Country Status (1)

Country Link
CN (1) CN103078403B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103296757A (en) * 2013-05-21 2013-09-11 国家电网公司 Multi-parameter identification based secondary system fault diagnosing method for intelligent substation
CN103617561A (en) * 2013-12-02 2014-03-05 深圳供电局有限公司 System and method for evaluating state of secondary device of power grid intelligent substation
CN103616579A (en) * 2013-11-07 2014-03-05 山东大学 Fault diagnosis method used for intelligent substation secondary system
CN104281976A (en) * 2013-07-09 2015-01-14 国家电网公司 Power secondary system reliability assessment information processing method
CN104539051A (en) * 2014-12-30 2015-04-22 国家电网公司 Online evaluation system of secondary equipment of intelligent substation
CN104734344A (en) * 2014-12-04 2015-06-24 国家电网公司 Intelligent substation measuring and controlling device with equipment operating state information processing function
CN105372600A (en) * 2015-11-24 2016-03-02 珠海朗尔电气有限公司 Storage battery fault diagnosis system and method based on big data
CN107302264A (en) * 2017-07-06 2017-10-27 国电南瑞科技股份有限公司 A kind of substation secondary automation equipment stable operation management-control method
CN107465185A (en) * 2017-07-31 2017-12-12 中国南方电网有限责任公司 A kind of intelligent substation operational system based on the electrical secondary system method of operation
CN109768625A (en) * 2019-03-29 2019-05-17 国网山东省电力公司费县供电公司 A kind of electric system overhaul management terminal and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102496072A (en) * 2011-12-19 2012-06-13 国电南瑞科技股份有限公司 System for estimating distributive state of intelligent transformer station
CN102545382A (en) * 2011-11-28 2012-07-04 河南省电力公司焦作供电公司 Online monitoring system of transformer device of intelligent transformer substation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102545382A (en) * 2011-11-28 2012-07-04 河南省电力公司焦作供电公司 Online monitoring system of transformer device of intelligent transformer substation
CN102496072A (en) * 2011-12-19 2012-06-13 国电南瑞科技股份有限公司 System for estimating distributive state of intelligent transformer station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周国强; 赵路新;: "数字化变电站二次系统的设计与应用", 《工程技术》 *
高鹏: "变电站继电保护状态评估的探讨", 《硅谷》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103296757A (en) * 2013-05-21 2013-09-11 国家电网公司 Multi-parameter identification based secondary system fault diagnosing method for intelligent substation
CN104281976A (en) * 2013-07-09 2015-01-14 国家电网公司 Power secondary system reliability assessment information processing method
CN103616579A (en) * 2013-11-07 2014-03-05 山东大学 Fault diagnosis method used for intelligent substation secondary system
CN103617561A (en) * 2013-12-02 2014-03-05 深圳供电局有限公司 System and method for evaluating state of secondary device of power grid intelligent substation
CN104734344A (en) * 2014-12-04 2015-06-24 国家电网公司 Intelligent substation measuring and controlling device with equipment operating state information processing function
CN104539051A (en) * 2014-12-30 2015-04-22 国家电网公司 Online evaluation system of secondary equipment of intelligent substation
CN104539051B (en) * 2014-12-30 2017-06-23 国网江苏省电力公司经济技术研究院 A kind of secondary equipment of intelligent converting station online evaluation system
CN105372600A (en) * 2015-11-24 2016-03-02 珠海朗尔电气有限公司 Storage battery fault diagnosis system and method based on big data
CN107302264A (en) * 2017-07-06 2017-10-27 国电南瑞科技股份有限公司 A kind of substation secondary automation equipment stable operation management-control method
CN107302264B (en) * 2017-07-06 2020-11-13 国电南瑞科技股份有限公司 Control method for stable operation of secondary automation equipment of transformer substation
CN107465185A (en) * 2017-07-31 2017-12-12 中国南方电网有限责任公司 A kind of intelligent substation operational system based on the electrical secondary system method of operation
CN109768625A (en) * 2019-03-29 2019-05-17 国网山东省电力公司费县供电公司 A kind of electric system overhaul management terminal and method

Also Published As

Publication number Publication date
CN103078403B (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103078403B (en) On-line state evaluation method for secondary system of intelligent substation
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
CN114640173B (en) Early warning model of transformer and generator based on many characteristic quantities
CN108931972B (en) A kind of substation secondary device condition intelligent diagnostic method based on model-driven
CN102663530B (en) HVDC (High Voltage Direct Current) transmission system safe early warning and evaluating system
CN107346466A (en) A kind of control method and device of electric power dispatching system
CN104182902A (en) Monitoring method based on centralized operation and maintenance system of dispatching data network
CN110941918B (en) Intelligent substation fault analysis system
CN107798395A (en) A kind of power grid accident signal automatic diagnosis method and system
CN102737287B (en) Regional power grid on-line power supply risk assessment system
CN103473710A (en) Graded handling method for faults of centralized operation and maintenance systems
CN107967520A (en) A kind of synthetical condition assessment theoretical method towards novel intelligent station relay protection device
CN108051709A (en) Transformer state online evaluation analysis method based on artificial intelligence technology
CN102866313A (en) Power tunnel cable running state comprehensive monitoring method
CN104753173B (en) A kind of method of automatic diagnosis power grid EMS system telemetry data transmission failure
CN105262210A (en) System and method for analysis and early warning of substation network security
CN103701212A (en) Method and system for monitoring and analyzing power grid safety and stability control device
CN102682560A (en) Method and device for assessing level of fire interlock alarming in ship cabin
CN109884473A (en) A kind of electric power overhaul system and method
CN103308805A (en) Overhauling method and overhauling system for state of distribution transformer
CN104425046A (en) Method and system for quantizing operation security indexes of nuclear power station
CN107545519B (en) Power grid enterprise operation and inspection management and control method
CN106093636A (en) The analog quantity check method of the secondary device of intelligent grid and device
CN102545381A (en) Data analysis center system for technical supervision of power grid equipment
CN105913126A (en) Transformer station intelligent alarm model method for big data and cloud environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant