CN103308805A CN2013102406481A CN201310240648A CN103308805A CN 103308805 A CN103308805 A CN 103308805A CN 2013102406481 A CN2013102406481 A CN 2013102406481A CN 201310240648 A CN201310240648 A CN 201310240648A CN 103308805 A CN103308805 A CN 103308805A
Authority
CN
China
Prior art keywords
parameter
performance
equipment
substation transformer
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102406481A
Other languages
Chinese (zh)
Inventor
全成文
李俊轩
熊闽
郭俊峰
邬小均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Runch Technology Co ltd
CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Original Assignee
Chongqing Runch Technology Co ltd
CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Runch Technology Co ltd, CHONGQING ELECTRIC POWER CORP WANZHOU POWER SUPPLY BUREAU, State Grid Corp of China SGCC filed Critical Chongqing Runch Technology Co ltd
Priority to CN2013102406481A priority Critical patent/CN103308805A/en
Publication of CN103308805A publication Critical patent/CN103308805A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an overhauling method and an overhauling system for state of a distribution transformer. The overhauling method includes steps of acquiring basic and dynamic parameters; analyzing and evaluating single and overall performance and the like. The overhauling system comprises a parameter acquisition device, a data analyzing and processing device and an overhaul advice releasing device. The parameter acquisition device acquires the basic and dynamic parameters and transmits the same to the data analyzing and processing device, and the basic and dynamic parameters are compared prior to being analyzed and evaluated according to set rules to obtain single and overall performance evaluation results to be transmitted to the overhaul advice releasing device to obtain an overhaul strategy and a plan. Based on equipment state and basic parameters, current equipment running state can be judged, early fault symptom can be identified, and fault locations, seriousness and growing tendency can be decided, and overhauling can be automatically implemented under conditions that the performance drops to a certain degree or before a fault is going to happen according to analysis results, so that reliable technology and management guarantees are provided for safe, stable, long-periodic, full-functional and high-quality running of the equipment.

Description

Repair based on condition of component method and the system thereof of substation transformer
Technical field
The invention belongs to the electric power overhaul technical field, specifically, relate to repair based on condition of component method and the system thereof of substation transformer.
Background technology
Substation transformer is the visual plant of electric system, uses distribution very extensive, and difficult management has very crucial impact to Reliability of Power Supplying Net Work and power supply quality.Domestic running substation transformer type kind is various at present, and version is varied especially.The long operational time of more substation transformer, every station power distribution transformer service condition changes constantly because of natural causes such as customer charge size, environment again.Therefore, part substation transformer equipment service condition can cause badly that transformer is aging, body damages or fall, and insurance fuse failure, the lead-in wire fault such as fall of breaking occurs, to often carry out ad hoc inspection and repair or scheduled overhaul and carry out the defective elimination, to guarantee the normal operation of substation transformer, to client's reliable power supply.
At present, to the judgement of the substation transformer general level of the health and operation conditions mainly by preventive trial PT(preventiontest) and prophylactic repair TBM(time base maintenance) realize.As the usual way of present electric power apparatus examination, preventive trial and prophylactic repair bear the character of much blindness and are mandatory, have wasted manpower and materials, have increased frequency of power cut and power off time, have caused frequently operation, have increased the accident rate of maloperation.Excessively maintenance also can increase new hidden trouble of equipment, and service work might cause the equipment loss and its overall life is descended.Also exist and overhaul difficulty greatly and the high problem of recondition expense.
Along with the day by day complexity of distribution development, power supply reliability and power supply quality require more and more high, and the intelligent degree of distribution net equipment and System information level also increase substantially simultaneously, and traditional maintenance mode can not satisfy the power network development demand.Set up a kind of maintenance mode of foreseeability, accomplish that " should repair required " become the inevitable development trend of power transformer maintenance mode, therefore, " distribution repair based on condition of component " concept has been carried out.From existing data, the exploration of current distribution repair based on condition of component and execution still mainly rest on marks existing maintenance means result and information, specification condition service work flow process and institutional framework, only change Maintenance Mode over to from system, information flow still is verticalization of tradition processing mode, be the pattern that regular stepwise disposal gathers, possess following drawback:
1, a large amount of abundant information of a line are gathering the hidden mistake of middle simplification step by step, higher level's technology authority and expert's experience and the wisdom First Line that can't go directly.
2, management mode and standard are all grasped by personnel, largely affect repair based on condition of component result's accuracy and consistance.
3, state parameter manually obtain, manual typing, the mode of manual evaluation is in the virgin state in current information epoch, causes the large complexity of information processing work amount easily to make mistakes, and also can't reach the real-time processing requirements of repair based on condition of component.
4, the operation parameters of substation transformer can't effectively obtain and enter the state estimation system so that the state estimation of substation transformer and repair based on condition of component some " fall short of the reality ".
Summary of the invention
The repair based on condition of component method that the purpose of this invention is to provide a kind of substation transformer, the method by gathering substation transformer parameters and analyze, thereby identify out of order early stage sign, and trouble location, the fault order of severity and development trend judged, to determine its best maintenance opportunity.
Simultaneously, the present invention also provides a kind of substation transformer Condition-based maintenance system of realizing the method.
The repair based on condition of component method of substation transformer of the present invention, its step is as follows:
(1) obtaining of underlying parameter obtained all rated functional performance parameters of every station power distribution transformer equipment
And the initial state information after putting equipment in service or the overhaul, and will gather database after these parameter quantifications processing;
(2) obtaining of dynamic parameter obtained the various online non-on-line monitoring of every station power distribution transformer equipment and joined
The number, and patrol and examine, test parameters, by various sense terminals, handheld device collection in worksite, the automatic synchronization collection enters database;
(3) single performance analysis and evaluation compares and arranges one with dynamic parameter and the underlying parameter that obtains
Fixed rule obtains the single performance assessment result according to rule, whether this maintenance or change of this performance of judging current device according to the single performance assessment result again;
(4) combination property analysis assessment, with the score of various kinds of equipment single performance assessment according to weight, distribution
Rule is passed judgment in the situation design synthesis, obtains the comprehensive assessment result of equipment through detailed comparing calculation, provides accordingly Tactial problem and comprehensive turnaround plan.
The method defines and measures by certain rule by underlying parameter and the dynamic parameter to substation transformer
Change, and all kinds of online, non-online detection synchronous data samplings are entered database, work out single parameter according to rules and distribution maintenance experience and pass judgment on rule, comprehensive judge rule, and automatically make Strategies of Maintenance and turnaround plan.Because repair based on condition of component is to wish the performance state assessment carried out for transformer or other electric power facility, and every kind of equipment has independently structure and parts relation, maintenance is exactly to form assessment to equipment by the assessment to parts.
The Condition-based maintenance system of substation transformer of the present invention, include the parameter acquisition device, data analysis treating apparatus and maintenance suggestion distributing device, the parameter acquisition device obtains underlying parameter and the dynamic parameter of substation transformer, send to respectively the data analysis treating apparatus, the data analysis treating apparatus compares dynamic parameter and underlying parameter, and the rule that foundation is set is carried out analysis and evaluation, obtain single performance and the synthetic performance evaluation result of substation transformer, send to maintenance suggestion distributing device, provide Strategies of Maintenance and turnaround plan by maintenance suggestion distributing device.
The parameter acquisition device is used for the collection typing of substation transformer underlying parameter on the one hand, be exactly that all rated functional performance parameters of every station power distribution transformer equipment and the initial state information after putting equipment in service or the overhaul are gathered typing, and these parameter quantifications are processed reference data when assessing; Also be used on the other hand the collection typing of substation transformer dynamic parameter, it is exactly the various online non-on-line monitoring parameter with substation transformer equipment, patrol and examine, the parameter such as test gathers at the scene by various device such as sense terminals, handheld device etc., then automatic synchronization is to the data analysis treating apparatus.The data analysis treating apparatus is with the dynamic parameter obtained and underlying parameter compares and draw the single performance assessment result of equipment according to the rule of setting, and can as required each single performance assessment result score be passed judgment on rule according to design synthesiss such as weight, distribution situations, obtain the comprehensive assessment result of equipment through detailed comparing calculation, just can provide accordingly Strategies of Maintenance and the comprehensive turnaround plan of equipment.
The present invention during take the equipment actual motion dynamic parameter and various underlying parameter as foundation, the running status that judgment device is current, the early stage sign of identification fault, trouble location itself and the order of severity, fault progression trend are judged, and according to the analyzing and diagnosing result, drop to a certain degree or fault is initiatively implemented maintenance before will occuring in equipment performance, for electrical equipment safety, stable, long period, full performance, high-quality operation provide reliable technology and management to ensure.
Description of drawings
Fig. 1 is the process flow diagram of the inventive method.
Fig. 2 is the composition structured flowchart of system of the present invention.
Embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
As shown in Figure 1, the repair based on condition of component method of substation transformer of the present invention, carry out according to the following steps:
Step 1: obtaining of underlying parameter, obtain all rated functional performances of every station power distribution transformer equipment
Initial state information after parameter and putting equipment in service or the overhaul, and will gather database after these parameter quantifications processing;
Step 2: obtaining of dynamic parameter, obtain the various online non-online prison of every station power distribution transformer equipment
Survey parameter, and patrol and examine, test parameters, by various sense terminals, handheld device collection in worksite, the automatic synchronization collection enters database;
Step 3: the single performance analysis and evaluation compares dynamic parameter and the underlying parameter that obtains and establish
Put certain rule, obtain the single performance assessment result according to rule, whether this maintenance or change of this performance of judging current device according to the single performance assessment result again;
Step 4: combination property analysis assessment, with the score of various kinds of equipment single performance assessment according to weight,
Rule is passed judgment in the distribution situation design synthesis, obtains the comprehensive assessment result of equipment through detailed comparing calculation, provides accordingly Tactial problem and comprehensive turnaround plan.
This method defines and measures by certain rule by underlying parameter and the dynamic parameter to substation transformer
Change, and all kinds of online, non-online detection synchronous data samplings are entered database, work out single parameter according to rules and distribution maintenance experience and pass judgment on rule, comprehensive judge rule, and automatically make Strategies of Maintenance and turnaround plan.Because repair based on condition of component is to wish the performance state assessment carried out for transformer or other electric power facility, and every kind of equipment has independently structure and parts relation, maintenance is exactly to form assessment to equipment by the assessment to parts.
Referring to Fig. 2, the Condition-based maintenance system of substation transformer of the present invention, contain parameter acquisition device 1, data analysis treating apparatus 2 and maintenance suggestion distributing device 3, parameter acquisition device 1 obtains underlying parameter and the dynamic parameter of substation transformer, send to respectively data analysis treating apparatus 2, data analysis treating apparatus 2 compares dynamic parameter and underlying parameter, and the rule that foundation is set is carried out analysis and evaluation, obtain single performance and the synthetic performance evaluation result of substation transformer, send to maintenance suggestion distributing device 3, provide Strategies of Maintenance and turnaround plan by maintenance suggestion distributing device 3.
Parameter acquisition device 1 is used for the collection typing of substation transformer underlying parameter on the one hand, be exactly that all rated functional performance parameters of every station power distribution transformer equipment and the initial state information after putting equipment in service or the overhaul are gathered typing, and these parameter quantifications are processed reference data when assessing; Also be used on the other hand the collection typing of substation transformer dynamic parameter, it is exactly the various online non-on-line monitoring parameter with substation transformer equipment, patrol and examine, the parameter such as test gathers at the scene by various device such as sense terminals, handheld device etc., then automatic synchronization is to data analysis treating apparatus 2.Data analysis treating apparatus 2 is with the dynamic parameter obtained and underlying parameter compares and draw the single performance assessment result of equipment according to the rule of setting, and can as required each single performance assessment result score be passed judgment on rule according to design synthesiss such as weight, distribution situations, obtain the comprehensive assessment result of equipment through detailed comparing calculation, just can provide accordingly Strategies of Maintenance and the comprehensive turnaround plan of equipment.
Wherein, parameter acquisition device 1 is comprised of apparent parameter acquisition module 11, performance parameter acquisition module 12 and electric parameter acquisition module 13, they gather respectively the typing substation transformer outward appearance, performance and electric aspect underlying parameter and dynamic parameter, send to 2 li formation base parameter databases of data analysis treating apparatus and dynamic parameter data storehouse.Apparent parameter includes the dirt of substation transformer and loses corrosion condition, oil level situation, respirator drying agent color, Grounding, sign etc., and these all will carry out gathering typing after the quantification treatment.The stake resistance that the useful multimeter of performance parameter is measured, direct current resistance, insulation resistance etc., device temperature data with the infrared thermometer measurement, and insulation oil level, shunting switch situation, the demonstration of cooling system oil meter and the intact situation of conduit etc., there are some also to need to carry out gathering typing after the quantification treatment.The parameters such as the overload case of heavy load that the useful three-phase electric energy meter of electric parameter and distribution transforming status monitoring terminal are obtained, three-phase imbalance rate, load factor, reactive power.
Data analysis treating apparatus 2 is by data reception module 21, backstage analysis expert module 22, assessment result generation module 23, webpage release module 24 forms, data reception module 21 receives substation transformer underlying parameter and the dynamic parameter of sending from parameter acquisition device 1, deposit in respectively in underlying parameter database and the dynamic parameter data storehouse, backstage analysis expert module 22 as required, data are carried out analyzing and processing, generated single performance and/or the synthetic performance evaluation result of substation transformer by assessment result generation module 23, and issue demonstration by webpage release module 24.

Claims (4)

1. the repair based on condition of component method of a substation transformer is characterized in that, carries out according to the following steps:
(1) obtaining of underlying parameter obtained all rated functional performance parameters of every station power distribution transformer equipment
And the initial state information after putting equipment in service or the overhaul, and will gather database after these parameter quantifications processing;
(2) obtaining of dynamic parameter obtained the various online non-on-line monitoring of every station power distribution transformer equipment and joined
The number, and patrol and examine, test parameters, by various sense terminals, handheld device collection in worksite, the automatic synchronization collection enters database;
(3) single performance analysis and evaluation compares and arranges one with dynamic parameter and the underlying parameter that obtains
Fixed rule obtains the single performance assessment result according to rule, whether this maintenance or change of this performance of judging current device according to the single performance assessment result again;
(4) combination property analysis assessment, with the score of various kinds of equipment single performance assessment according to weight, distribution
Rule is passed judgment in the situation design synthesis, obtains the comprehensive assessment result of equipment through detailed comparing calculation, provides accordingly Tactial problem and comprehensive turnaround plan.
2. the Condition-based maintenance system of a substation transformer, it is characterized in that: comprise the parameter acquisition device, data analysis treating apparatus and maintenance suggestion distributing device, the parameter acquisition device obtains underlying parameter and the dynamic parameter of substation transformer, send to respectively the data analysis treating apparatus, the data analysis treating apparatus compares dynamic parameter and underlying parameter, and the rule that foundation is set is carried out analysis and evaluation, obtain single performance and the synthetic performance evaluation result of substation transformer, send to maintenance suggestion distributing device, provide Strategies of Maintenance and turnaround plan by maintenance suggestion distributing device.
3. the Condition-based maintenance system of substation transformer as claimed in claim 2, it is characterized in that: described parameter acquisition device is comprised of apparent parameter acquisition module, performance parameter acquisition module and electric parameter acquisition module, they gather respectively the typing substation transformer outward appearance, performance and electric aspect underlying parameter and dynamic parameter, send to formation base parameter database and dynamic parameter data storehouse in the data analysis treating apparatus.
4. the Condition-based maintenance system of substation transformer as claimed in claim 2, it is characterized in that: described data analysis treating apparatus is by data reception module, backstage analysis expert module, the assessment result generation module, the webpage release module forms, data reception module receives substation transformer underlying parameter and the dynamic parameter of sending from the parameter acquisition device, deposit in respectively in underlying parameter database and the dynamic parameter data storehouse, backstage analysis expert module as required, data are carried out analyzing and processing, generated single performance and/or the synthetic performance evaluation result of substation transformer by the assessment result generation module, and issue demonstration by the webpage release module.
CN2013102406481A 2013-06-18 2013-06-18 Overhauling method and overhauling system for state of distribution transformer Pending CN103308805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102406481A CN103308805A (en) 2013-06-18 2013-06-18 Overhauling method and overhauling system for state of distribution transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102406481A CN103308805A (en) 2013-06-18 2013-06-18 Overhauling method and overhauling system for state of distribution transformer

Publications (1)

Publication Number Publication Date
CN103308805A true CN103308805A (en) 2013-09-18

Family

ID=49134237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102406481A Pending CN103308805A (en) 2013-06-18 2013-06-18 Overhauling method and overhauling system for state of distribution transformer

Country Status (1)

Country Link
CN (1) CN103308805A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009403A (en) * 2014-05-21 2014-08-27 国网四川省电力公司成都市新都供电分公司 Overhauling method special for outdoor large transformer
CN105117981A (en) * 2015-08-27 2015-12-02 无锡阳工机械制造有限公司 Power plant equipment maintenance management method
CN105334758A (en) * 2015-11-09 2016-02-17 中广核核电运营有限公司 Partner-type nuclear power plant detection method and system
CN105842575A (en) * 2016-03-09 2016-08-10 国网浙江省电力公司湖州供电公司 Status monitoring data mining and hidden danger identification method and apparatus for transmission and transformation equipment
CN106682081A (en) * 2016-11-23 2017-05-17 云南电网有限责任公司电力科学研究院 Multi-model based comprehensive transformer performance analysis system
CN106849367A (en) * 2017-04-18 2017-06-13 广州供电局有限公司 A kind of transformer station's remote online monitoring and state evaluating method
CN109697513A (en) * 2017-10-23 2019-04-30 云南电网有限责任公司 A kind of distribution net equipment state maintenance method based on big data convergence analysis model
CN110587629A (en) * 2019-10-15 2019-12-20 云南电网有限责任公司电力科学研究院 Transformer substation inspection robot, inspection method and inspection robot control method
CN112112792A (en) * 2020-09-08 2020-12-22 上海发电设备成套设计研究院有限责任公司 State maintenance method and system for electric water feed pump set and terminal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916949B (en) * 2006-09-06 2010-11-10 成都赛康信息技术有限责任公司 Support system for evaluating status of electric power equipments, and maintaining strategy
CN201716381U (en) * 2010-08-03 2011-01-19 广西电网公司电力科学研究院 System for analyzing and managing service life of oil-immersed transformer
CN201852893U (en) * 2010-11-02 2011-06-01 广西电网公司电力科学研究院 Power transformer state evaluation device
CN102436226A (en) * 2011-09-14 2012-05-02 文存润 Online monitoring and condition maintenance management system
CN102663530A (en) * 2012-05-25 2012-09-12 中国南方电网有限责任公司超高压输电公司 Safety early warning and evaluating system for high-voltage direct current transmission system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916949B (en) * 2006-09-06 2010-11-10 成都赛康信息技术有限责任公司 Support system for evaluating status of electric power equipments, and maintaining strategy
CN201716381U (en) * 2010-08-03 2011-01-19 广西电网公司电力科学研究院 System for analyzing and managing service life of oil-immersed transformer
CN201852893U (en) * 2010-11-02 2011-06-01 广西电网公司电力科学研究院 Power transformer state evaluation device
CN102436226A (en) * 2011-09-14 2012-05-02 文存润 Online monitoring and condition maintenance management system
CN102663530A (en) * 2012-05-25 2012-09-12 中国南方电网有限责任公司超高压输电公司 Safety early warning and evaluating system for high-voltage direct current transmission system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009403A (en) * 2014-05-21 2014-08-27 国网四川省电力公司成都市新都供电分公司 Overhauling method special for outdoor large transformer
CN104009403B (en) * 2014-05-21 2015-12-02 国网四川省电力公司成都市新都供电分公司 Be exclusively used in the repair method to outdoor large transformer
CN105117981A (en) * 2015-08-27 2015-12-02 无锡阳工机械制造有限公司 Power plant equipment maintenance management method
CN105334758A (en) * 2015-11-09 2016-02-17 中广核核电运营有限公司 Partner-type nuclear power plant detection method and system
CN105842575A (en) * 2016-03-09 2016-08-10 国网浙江省电力公司湖州供电公司 Status monitoring data mining and hidden danger identification method and apparatus for transmission and transformation equipment
CN106682081A (en) * 2016-11-23 2017-05-17 云南电网有限责任公司电力科学研究院 Multi-model based comprehensive transformer performance analysis system
CN106849367A (en) * 2017-04-18 2017-06-13 广州供电局有限公司 A kind of transformer station's remote online monitoring and state evaluating method
CN109697513A (en) * 2017-10-23 2019-04-30 云南电网有限责任公司 A kind of distribution net equipment state maintenance method based on big data convergence analysis model
CN110587629A (en) * 2019-10-15 2019-12-20 云南电网有限责任公司电力科学研究院 Transformer substation inspection robot, inspection method and inspection robot control method
CN112112792A (en) * 2020-09-08 2020-12-22 上海发电设备成套设计研究院有限责任公司 State maintenance method and system for electric water feed pump set and terminal
CN112112792B (en) * 2020-09-08 2024-04-23 上海发电设备成套设计研究院有限责任公司 State maintenance method, system and terminal for electric water supply pump set

Similar Documents

Publication Publication Date Title
CN103308805A (en) Overhauling method and overhauling system for state of distribution transformer
CN106199305B (en) Underground coal mine power supply system dry-type transformer insulation health state evaluation method
CN106372735B (en) Relay protection state evaluation method
CN102324067B (en) Electrical secondary equipment state evaluation method and system thereof
CN102663530B (en) HVDC (High Voltage Direct Current) transmission system safe early warning and evaluating system
CN104990629B (en) A kind of electrical equipment fault automatic early-warning system of infrared imaging temperature measuring
CN102354918A (en) Method and device for maintaining power transmission and transformation equipment
CN103078403B (en) On-line state evaluation method for secondary system of intelligent substation
CN104331042A (en) State evaluation method of hydropower plant computer monitoring system
CN103164775A (en) Automatic evaluation platform and method for power grid equipment status
CN115549094B (en) Early warning evaluation method and system for substation equipment of smart power grid
CN203534622U (en) Parameter acquisition system of state overhauling platform for distribution transformer
CN106771730A (en) The intelligent substation real-time calibration equipment of protection device analog quantity sampling circuit and method
CN104821789A (en) Method for detecting reliability of photovoltaic power generation system
CN108459269A (en) A kind of 10kV pvs (pole-mounted vacuum switch)s state on-line evaluation method and apparatus
CN106026383A (en) Intelligent transformer station equipment state multi-system cooperative diagnosis method based on information fusion
CN113313403B (en) Power distribution network comprehensive evaluation method, device and system based on large-scale high-power electric vehicle charging and discharging and storage medium
CN106877503B (en) risk identification and early warning method in secondary equipment intelligent operation and maintenance system
CN105844542B (en) WAMS-based online detection method for single large disturbance of power grid
CN111369020B (en) Automatic control system and method for cascade hydropower station group control signals
CN210572666U (en) Rural power grid distribution transformer temperature monitoring cloud service system based on Internet of things
CN108596450B (en) Power grid risk early warning method and system
CN116169778A (en) Processing method and system based on power distribution network anomaly analysis
CN110750500A (en) Method and system for checking CCD (Charge coupled device) file and SCD (substation configuration description) file of intelligent substation
CN111029914B (en) Active first-aid repair system based on ubiquitous Internet of things construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130918