A kind of construction and decoration ceramic tile cement plastering equipment
Technical field
The present invention relates to a kind of smearing equipment more particularly to a kind of construction and decoration ceramic tile cement plastering equipment.
Background technique
People are carrying out building operation, when being laid with ceramic tile to ground or wall, it usually needs first dug cement with block knife and put
Cement is paved on ceramic tile, then with knife is built, then ceramic tile could be laid on ground or wall, the course of work is more multiple
It is miscellaneous, it needs to take considerable time, in addition, people usually hold the cement amount of bad needs, cement is few when with knife digging cement is built
Need to dig cement again, cement to be needed to scoop away extra cement, has both wasted time or wasted cement.
Summary of the invention
In order to overcome people when being laid with ceramic tile, the course of work is more complicated to be taken considerable time, hold bad needs
Cement amount will cause cement waste the shortcomings that, technical problem are as follows: provide one kind can quickly to ceramic tile carry out blanking be bulldozed, no
It can be to cement wasting construction and decoration ceramic tile cement plastering equipment.
Technical solution: a kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate, wheel, the first strut, leads
Bar, guide sleeve, L shaped plate, connecting rod, L shape strut, storage hopper, blanking device and flattening device, bottom base plate left and right sides front and back two
Portion is equipped with wheel, and left and right sides front and back two is equipped with the first strut at the top of bottom plate, and two, front the first strut top is with after
It is equipped with guide rod at the top of the first strut of side two, slidingtype is equipped with guide sleeve on guide rod, is equipped with L shape at the top of two side's guide sleeve of front and back
Plate is equipped with connecting rod between two side's L shaped plate bottom of front and back, and bottom plate top center is equipped with L shape strut, and L shape strut is located at front and back two
Between square guide rod, L shape strut forward upper is equipped with storage hopper, is equipped with blanking device, storage hopper or so two among storage hopper bottom
Side lower part is equipped with flattening device.
In a preferred embodiment of the present invention, blanking device includes connecting rod, first bearing seat, shaft, cylinder, swing
Bar, link block, bracing wire and weight are provided with blanking hole among storage hopper bottom, and storage hopper front and rear sides lower part is symmetrically set
There is connecting rod, front connecting rod lower part and rear connecting rod lower part are equipped with first bearing seat, are equipped between two side's first bearing seat of front and back
Shaft is equipped with cylinder in shaft, and cylinder is located at immediately below blanking hole, and shaft front end is equipped with oscillating rod, oscillating rod lower front
Equipped with link block, middle part is connected with bracing wire on front side of link block, and bracing wire is located in front of guide rod, and bracing wire bottom end is connected with weight.
In a preferred embodiment of the present invention, flattening device includes connecting plate, guide rod, is bulldozed plate, second bearing
Seat, the first nut and the first bolt, storage hopper left and right sides lower part are equipped with connecting plate, guiding are provided among connecting plate bottom
Slot is placed with guide rod in guide groove, and guide rod bottom, which is equipped with, is bulldozed plate, and left connecting plate left lower and right connecting plate are right
Side lower part is equipped with second bearing seat, and left is bulldozed plate left upper portion and right is bulldozed plate right upper portion and is equipped with the first nut,
The first bolt is connected in second bearing seat, the first bolt lower part is threadingly connect with the first nut.
It in a preferred embodiment of the present invention, further include having mounting blocks, tapping bar, tap ball and spring, storage hopper is left
Right two middle side parts are equipped with mounting blocks, and rotary type, which is equipped with, on mounting blocks taps bar, tap bar bottom end and are equipped with rattle balls, left taps
Respectively with lower contacts at left and right sides of storage hopper on the right side of ball and on the left of the rattle balls of right, rattle balls are located at connecting plate top, left
It taps bar right upper portion and right taps bar left upper portion and is equipped with spring, left spring right end and storage hopper left upper portion connect
It connects, right spring left end is connect with storage hopper right upper portion.
It in a preferred embodiment of the present invention, further include having pulley, wirerope and lifting the ball, left and right two on front side of the guide rod of front
Portion is equipped with pulley, and wirerope is wound on two side's pulleys of left and right, is connect on the left of left wirerope right end and guide sleeve, right steel wire
It is connect on the right side of rope left end and guide sleeve, left wirerope left end and right wirerope right end are respectively connected with lifting the ball, two side's lifting the balls of left and right
It is located at the left and right sides at the top of bottom plate.
It in a preferred embodiment of the present invention, further include having lifting device, lifting device is located at left and right two on front side of L shaped plate
Portion, lifting device include the second bolt, snap-gauge, wing nut and lifter plate, and left and right two is equipped with the second spiral shell on front side of L shaped plate
Bolt, card has snap-gauge on the second bolt, and card slot is provided among snap-gauge bottom, and the second bolt passes through card slot, and two walls of left and right are equal in snap-gauge
Multiple non-slip grooves are provided with, wing nut is threadingly connected in the second bolt, is connected with liter at the top of two side's snap-gauge of left and right
Plate drops.
When people need to smear cement to ceramic tile, first cement is poured into storage hopper, then people adjust flattening device
Height to suitable position, then ceramic tile is placed in L shaped plate by people again, and pushes L shaped plate to the left, and guide sleeve is therewith to moving to left
Dynamic, guide rod play the guiding role to guide sleeve, L shaped plate is moved to the left contacted with blanking device after, cement is fallen on ceramic tile therewith, L
Shape plate is moved to the left do not contacted with blanking device after, blanking device stop blanking, L shaped plate, which is moved to the left, is bulldozed dress with left
After setting contact, the cement on ceramic tile can be bulldozed by flattening device, and after the cement on ceramic tile is all bulldozed, people are by ceramic tile from L
It is taken down on shape plate, then the ceramic tile for needing to smear cement can be placed in L shaped plate by people again, and then people push away to the right again
Dynamic L shaped plate, i.e., repeatable aforesaid operations wipe ceramic tile painting, and such people can push L shaped plate will be remaining by left and right
Ceramic tile is all applied and is wiped.
When people need storage hopper blanking, the height of flattening device is first adjusted to suitable position, then people are again by porcelain
Brick is placed in L shaped plate, and then people push L shaped plate to the left again, and guide sleeve is moved to the left therewith, and guide rod play the guiding role to guide sleeve, L
Shape plate is moved to the left when contacting with oscillating rod, and oscillating rod lower part turns left, and oscillating rod top turns right therewith, oscillating rod
Top turns right drives cylinder to turn right by shaft, and cement passes through blanking hole therewith and falls on ceramic tile, and L shaped plate is to moving to left
It moves to when not contacted with oscillating rod, oscillating rod lower part moves right reset under the gravity of weight, and oscillating rod top is therewith
It is moved to the left reset, the blanking to ceramic tile so can be completed in blanking hole no longer blanking.
When people need to adjust the height of flattening device, the first bolt, the first bolt band are rotated clockwise or counterclockwise
Dynamic first nut moves up or down, and moves up or down to drive and be bulldozed plate, and guide groove plays guiding to guide rod and makees
With when being bulldozed plate and moving to suitable position, people stop operating the first bolt, and then it is enterprising to be placed on L shaped plate again by people for ceramic tile
When row cement plastering, the cement on ceramic tile can be bulldozed by being bulldozed plate.
When the cement in storage hopper has blocking, people, which can inwardly rotate, taps bar top, taps bar top and inwardly turns
Dynamic that percussion bar lower part is driven to be turned out, percussion bar lower part, which is turned out, drives rattle balls to be turned out, and spring is compressed therewith,
After percussion bar top inwardly turns to suitable position, people, which unclamp again, taps bar top, and the reset response of spring, which drives, taps bar
Top is turned out, and percussion bar top is turned out drive percussion bar lower part and inwardly rotates, and is tapped bar lower part and is inwardly rotated drive
Rattle balls inwardly rotate, so that rattle balls tap storage hopper, people can repeat aforesaid operations, constantly pass through rattle balls
Storage hopper is tapped, cement can be effectively prevent to block.
When people need to push L shaped plate to the left, left lifting the ball can be pulled to the right, and left lifting the ball, which moves right, passes through a left side
Square steel cord drives guide sleeve to be moved to the left, and guide sleeve, which is moved to the left, drives L shaped plate to be moved to the left, right wirerope and lifting the ball therewith to
It moves left, when people need to push L shaped plate to the right, right lifting the ball can be pulled to the left, right lifting the ball moves left through the right side
Square steel cord drives guide sleeve to move right, and guide sleeve, which moves right, drives L shaped plate to move right, left wirerope and lifting the ball therewith to
It moves right, this measure allows people not need to push directly on L shaped plate with hand, prevents cement from falling to hand, causes to skin
Damage.
When people need to be laid with more cement on ceramic tile, first rotate wing nut, wing nut turn to not with
After snap-gauge contact, people stop operating wing nut, and non-slip groove can increase the frictional force between the second bolt and card slot, then
People move up snap-gauge again, and snap-gauge, which moves up, drives lifter plate to move up, after lifter plate is moved upward to suitable position,
People stop mobile snap-gauge, and then people again inwardly rotate wing nut, to fix the position of snap-gauge, and then fix
The position of lifter plate, then ceramic tile is placed on lifter plate by people again, and then left and right pushes L shaped plate, the position of ceramic tile to people again
It gets higher so that the angle of oscillating rod swing is bigger, so that the angle of rotary drum is bigger, blanking hole will fall more water
On mud to ceramic tile.
Beneficial effect is: the present invention can be such that the cement in storage hopper automatically falls off to porcelain by the blanking device of setting
On brick, by the flattening device of setting, the cement fallen on ceramic tile can be bulldozed, improve the working efficiency of people,
By the rattle balls of setting, the cement in storage hopper can be effectively prevent to block, wirerope and lifting the ball by setting, Neng Goufang
Sealing mud falls to people on hand, causes to damage to skin, by the lifting device of setting, can adjust the amount that cement is fallen.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the first part schematic view of the front view of the invention.
Fig. 3 is second of part schematic view of the front view of the invention.
Fig. 4 is the third part schematic view of the front view of the invention.
Fig. 5 is the 4th kind of part schematic view of the front view of the invention.
Wherein: 1. bottom plates, 2. wheels, 3. first struts, 4. guide rods, 5. guide sleeves, 6.L shape plate, 61. connecting rods, 7.L shape branch
Bar, 8. storage hoppers, 9. blanking devices, 91. blanking holes, 92. connecting rods, 93. first bearing seats, 94. shafts, 95. cylinders, 96. pendulum
Lever, 97. link blocks, 98. bracing wires, 99. weights, 10. flattening devices, 101. connecting plates, 102. guide grooves, 103. guide rods,
104. being bulldozed plate, 105. second bearing seats, 106. first nuts, 107. first bolts, 11. mounting blocks, 12. tap bar, and 13. strike
Batting, 14. springs, 15. pulleys, 16. wirerope, 17. lifting the balls, 18. lifting devices, 181. second bolts, 182. snap-gauges, 183.
Card slot, 184. non-slip grooves, 185. wing nuts, 19. lifter plates.
Specific embodiment
Technical solution is described further combined with specific embodiments below, it should be noted that: described in herein
The words of the indicating positions such as upper and lower, left and right be only for shown structure in respective figure for position.It is herein zero
Part institute serialization number itself, such as: first, second etc., it is only used for distinguishing described object, contain without any sequence or technology
Justice.And described in the application such as: connection, connection include unless otherwise instructed directly or indirectly connecting (connection).
Embodiment 1
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5
Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left
Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the
It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4
It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape
Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper
Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Embodiment 2
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5
Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left
Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the
It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4
It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape
Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper
Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws
Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with
Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it
Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94
Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod
4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Embodiment 3
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5
Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left
Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the
It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4
It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape
Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper
Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws
Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with
Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it
Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94
Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod
4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut
106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom
Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate
Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away
104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105
Lower part is threadingly connect with the first nut 106.
Embodiment 4
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5
Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left
Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the
It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4
It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape
Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper
Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws
Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with
Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it
Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94
Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod
4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut
106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom
Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate
Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away
104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105
Lower part is threadingly connect with the first nut 106.
It further include having mounting blocks 11, tapping bar 12, rattle balls 13 and spring 14,8 left and right sides middle part of storage hopper is equipped with
Mounting blocks 11, rotary type, which is equipped with, on mounting blocks 11 taps bar 12, taps 12 bottom end of bar and is equipped with rattle balls 13, left rattle balls 13 are right
Respectively with 8 left and right sides lower contacts of storage hopper, rattle balls 13 are located above connecting plate 101 for side and the left side of right rattle balls 13,
Left taps 12 right upper portion of bar and right taps 12 left upper portion of bar and is equipped with spring 14,14 right end of left spring and storage hopper
The connection of 8 left upper portions, spring 14 left end in right is connect with 8 right upper portion of storage hopper.
Embodiment 5
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5
Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left
Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the
It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4
It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape
Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper
Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws
Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with
Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it
Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94
Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod
4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut
106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom
Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate
Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away
104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105
Lower part is threadingly connect with the first nut 106.
It further include having mounting blocks 11, tapping bar 12, rattle balls 13 and spring 14,8 left and right sides middle part of storage hopper is equipped with
Mounting blocks 11, rotary type, which is equipped with, on mounting blocks 11 taps bar 12, taps 12 bottom end of bar and is equipped with rattle balls 13, left rattle balls 13 are right
Respectively with 8 left and right sides lower contacts of storage hopper, rattle balls 13 are located above connecting plate 101 for side and the left side of right rattle balls 13,
Left taps 12 right upper portion of bar and right taps 12 left upper portion of bar and is equipped with spring 14,14 right end of left spring and storage hopper
The connection of 8 left upper portions, spring 14 left end in right is connect with 8 right upper portion of storage hopper.
It further include having pulley 15, wirerope 16 and lifting the ball 17, left and right two is equipped with pulley 15 on front side of front guide rod 4, left
It is wound with wirerope 16 on right two side's pulleys 15, is connected on the left of 16 right end of left wirerope and guide sleeve 5,16 left end of right wirerope
It is connected on the right side of guide sleeve 5,16 left end of left wirerope and 16 right end of right wirerope are respectively connected with lifting the ball 17, two side's lifting the balls of left and right
17 are located at the 1 top left and right sides of bottom plate.
It further include having lifting device 18, lifting device 18 is located at left and right two, lifting device 18 on front side of L shaped plate 6 and includes
Second bolt 181, snap-gauge 182, wing nut 185 and lifter plate 19, left and right two is equipped with the second bolt on front side of L shaped plate 6
181, card has snap-gauge 182 on the second bolt 181, and card slot 183 is provided among 182 bottom of snap-gauge, and the second bolt 181 passes through card slot
183, two walls of the interior left and right of snap-gauge 182 are provided with multiple non-slip grooves 184, are threadingly connected with butterfly in the second bolt 181
Nut 185 controls and is connected with lifter plate 19 at the top of two side's snap-gauges 182.
When people need to smear cement to ceramic tile, first cement is poured into storage hopper 8, then people adjust flattening device
10 height is to suitable position, and then ceramic tile is placed in L shaped plate 6 by people again, and pushes L shaped plate 6 to the left, guide sleeve 5 therewith to
Move left, guide rod 4 play the guiding role to guide sleeve 5, L shaped plate 6 is moved to the left contacted with blanking device 9 after, cement is fallen in therewith
On ceramic tile, L shaped plate 6 is moved to the left do not contacted with blanking device 9 after, blanking device 9 stops blanking, and L shaped plate 6 is moved to the left
After contacting with left flattening device 10, the cement on ceramic tile can be bulldozed by flattening device 10, and the cement on ceramic tile is all bulldozed
Afterwards, people take down ceramic tile from L shaped plate 6, and then the ceramic tile for needing to smear cement can be placed on L shaped plate 6 again by people
On, then people push to the right L shaped plate 6 again, i.e., repeatable aforesaid operations wipe ceramic tile painting, and such people can pass through a left side
Right promotion L shaped plate 6, which all applies remaining ceramic tile, to be wiped.
When people need 8 blanking of storage hopper, the height of flattening device 10 is first adjusted to suitable position, then people again will
Ceramic tile is placed in L shaped plate 6, and then people push L shaped plate 6 to the left again, and guide sleeve 5 is moved to the left therewith, and guide rod 4 plays guide sleeve 5 and leads
To effect, L shaped plate 6 is moved to the left when contacting with oscillating rod 96, and 96 lower part of oscillating rod turns left, and 96 top of oscillating rod is therewith
It turns right, 96 top of oscillating rod turns right drives cylinder 95 to turn right by shaft 94, and cement passes through blanking hole therewith
91 fall on ceramic tile, and L shaped plate 6 is moved to the left when not contacting with oscillating rod 96, and 96 lower part of oscillating rod is made in the gravity of weight 99
Move right reset under, and 96 top of oscillating rod is moved to the left reset therewith, the no longer blanking of blanking hole 91, so can be completed pair
The blanking of ceramic tile.
When people need to adjust the height of flattening device 10, the first bolt 107, the first spiral shell are rotated clockwise or counterclockwise
Bolt 107 drives the first nut 106 to move up or down, and moves up or down to drive and be bulldozed plate 104, guide groove 102
It play the guiding role to guide rod 103, when being bulldozed plate 104 and moving to suitable position, people stop operating the first bolt 107, then
When ceramic tile is placed on progress cement plastering in L shaped plate 6 again by people, the cement on ceramic tile can be bulldozed by being bulldozed plate 104.
When the cement in storage hopper 8 has blocking, people can inwardly rotate tap 12 top of bar, tap 12 top of bar to
Interior rotation drives percussion 12 lower part of bar to be turned out, and percussion 12 lower part of bar, which is turned out, drives rattle balls 13 to be turned out, spring
14 are compressed therewith, and after percussion 12 top of bar inwardly turns to suitable position, people, which unclamp again, taps 12 top of bar, spring 14
Reset response drives percussion 12 top of bar to be turned out, and percussion 12 top of bar is turned out drive percussion 12 lower part of bar and inwardly turns
It is dynamic, it taps 12 lower part of bar and inwardly rotates the inwardly rotation of drive rattle balls 13, so that rattle balls 13 tap storage hopper 8, people
Can repeat aforesaid operations, constantly storage hopper 8 is tapped by rattle balls 13, cement can be effectively prevent to block.
When people need to push L shaped plate 6 to the left, left lifting the ball 17 can be pulled to the right, and left lifting the ball 17 moves right
Guide sleeve 5 is driven to be moved to the left by left wirerope 16, guide sleeve 5, which is moved to the left, drives L shaped plate 6 to be moved to the left, right wirerope
16 and lifting the ball 17 be moved to the left therewith, when people need to push L shaped plate 6 to the right, right lifting the ball 17, right can be pulled to the left
Lifting the ball 17 moves left through right wirerope 16 and guide sleeve 5 is driven to move right, and guide sleeve 5, which moves right, drives L shaped plate 6 to move right
Dynamic, left wirerope 16 and lifting the ball 17 move right therewith, and this measure allows people not need to push directly on L shaped plate 6 with hand,
It prevents cement from falling to hand, skin is caused to damage.
When people need to be laid with more cement on ceramic tile, wing nut 185 is first rotated, wing nut 185 rotates
To after not contacting with snap-gauge 182, people stop operating wing nut 185, and non-slip groove 184 can increase the second bolt 181 and card
Frictional force between slot 183, then people move up snap-gauge 182 again, and snap-gauge 182, which moves up, drives lifter plate 19 to moving up
Dynamic, after lifter plate 19 is moved upward to suitable position, people stop mobile snap-gauge 182, then people again by wing nut 185 to
Interior rotation to fix the position of snap-gauge 182, and then fixes the position of lifter plate 19, and then ceramic tile is placed on by people again
On lifter plate 19, then people again left and right push L shaped plate 6, the position of ceramic tile get higher so that oscillating rod 96 swing angle it is bigger,
So that the angle that cylinder 95 rotates is bigger, blanking hole 91 will be fallen on more cement to ceramic tile.
Although describing the disclosure only with respect to the embodiment of limited quantity, the ability of the disclosure is benefited from
Field technique personnel will be understood that, without departing from the scope of the invention, can design various other embodiments.Therefore,
The scope of the present invention should be limited only by the following claims.