CN109487993A - A kind of construction and decoration ceramic tile cement plastering equipment - Google Patents

A kind of construction and decoration ceramic tile cement plastering equipment Download PDF

Info

Publication number
CN109487993A
CN109487993A CN201811380566.6A CN201811380566A CN109487993A CN 109487993 A CN109487993 A CN 109487993A CN 201811380566 A CN201811380566 A CN 201811380566A CN 109487993 A CN109487993 A CN 109487993A
Authority
CN
China
Prior art keywords
plate
storage hopper
ceramic tile
strut
guide rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811380566.6A
Other languages
Chinese (zh)
Other versions
CN109487993B (en
Inventor
卜伟斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Shijia Information Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811380566.6A priority Critical patent/CN109487993B/en
Publication of CN109487993A publication Critical patent/CN109487993A/en
Application granted granted Critical
Publication of CN109487993B publication Critical patent/CN109487993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/023Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls for applying adhesive, e.g. glue or mortar, on the covering elements, in particular tiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention relates to a kind of smearing equipment more particularly to a kind of construction and decoration ceramic tile cement plastering equipment.Technical problem are as follows: provide one kind can quickly to ceramic tile carry out blanking be bulldozed, will not be to the wasting construction and decoration ceramic tile cement plastering equipment of cement.Technical solution: a kind of construction and decoration ceramic tile cement plastering equipment, includes bottom plate, wheel, the first strut, guide rod, guide sleeve, L shaped plate, connecting rod etc.;Bottom base plate left and right sides front and back two is equipped with wheel, and left and right sides front and back two is equipped with the first strut at the top of bottom plate, is equipped with guide rod at the top of two, front the first strut top and the first strut of two, rear, slidingtype is equipped with guide sleeve on guide rod.The blanking device that the present invention passes through setting, the cement in storage hopper can be made to automatically fall off to ceramic tile, pass through the flattening device of setting, the cement fallen on ceramic tile can be bulldozed, improve the working efficiency of people, by the rattle balls of setting, the cement in storage hopper can be effectively prevent to block.

Description

A kind of construction and decoration ceramic tile cement plastering equipment
Technical field
The present invention relates to a kind of smearing equipment more particularly to a kind of construction and decoration ceramic tile cement plastering equipment.
Background technique
People are carrying out building operation, when being laid with ceramic tile to ground or wall, it usually needs first dug cement with block knife and put Cement is paved on ceramic tile, then with knife is built, then ceramic tile could be laid on ground or wall, the course of work is more multiple It is miscellaneous, it needs to take considerable time, in addition, people usually hold the cement amount of bad needs, cement is few when with knife digging cement is built Need to dig cement again, cement to be needed to scoop away extra cement, has both wasted time or wasted cement.
Summary of the invention
In order to overcome people when being laid with ceramic tile, the course of work is more complicated to be taken considerable time, hold bad needs Cement amount will cause cement waste the shortcomings that, technical problem are as follows: provide one kind can quickly to ceramic tile carry out blanking be bulldozed, no It can be to cement wasting construction and decoration ceramic tile cement plastering equipment.
Technical solution: a kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate, wheel, the first strut, leads Bar, guide sleeve, L shaped plate, connecting rod, L shape strut, storage hopper, blanking device and flattening device, bottom base plate left and right sides front and back two Portion is equipped with wheel, and left and right sides front and back two is equipped with the first strut at the top of bottom plate, and two, front the first strut top is with after It is equipped with guide rod at the top of the first strut of side two, slidingtype is equipped with guide sleeve on guide rod, is equipped with L shape at the top of two side's guide sleeve of front and back Plate is equipped with connecting rod between two side's L shaped plate bottom of front and back, and bottom plate top center is equipped with L shape strut, and L shape strut is located at front and back two Between square guide rod, L shape strut forward upper is equipped with storage hopper, is equipped with blanking device, storage hopper or so two among storage hopper bottom Side lower part is equipped with flattening device.
In a preferred embodiment of the present invention, blanking device includes connecting rod, first bearing seat, shaft, cylinder, swing Bar, link block, bracing wire and weight are provided with blanking hole among storage hopper bottom, and storage hopper front and rear sides lower part is symmetrically set There is connecting rod, front connecting rod lower part and rear connecting rod lower part are equipped with first bearing seat, are equipped between two side's first bearing seat of front and back Shaft is equipped with cylinder in shaft, and cylinder is located at immediately below blanking hole, and shaft front end is equipped with oscillating rod, oscillating rod lower front Equipped with link block, middle part is connected with bracing wire on front side of link block, and bracing wire is located in front of guide rod, and bracing wire bottom end is connected with weight.
In a preferred embodiment of the present invention, flattening device includes connecting plate, guide rod, is bulldozed plate, second bearing Seat, the first nut and the first bolt, storage hopper left and right sides lower part are equipped with connecting plate, guiding are provided among connecting plate bottom Slot is placed with guide rod in guide groove, and guide rod bottom, which is equipped with, is bulldozed plate, and left connecting plate left lower and right connecting plate are right Side lower part is equipped with second bearing seat, and left is bulldozed plate left upper portion and right is bulldozed plate right upper portion and is equipped with the first nut, The first bolt is connected in second bearing seat, the first bolt lower part is threadingly connect with the first nut.
It in a preferred embodiment of the present invention, further include having mounting blocks, tapping bar, tap ball and spring, storage hopper is left Right two middle side parts are equipped with mounting blocks, and rotary type, which is equipped with, on mounting blocks taps bar, tap bar bottom end and are equipped with rattle balls, left taps Respectively with lower contacts at left and right sides of storage hopper on the right side of ball and on the left of the rattle balls of right, rattle balls are located at connecting plate top, left It taps bar right upper portion and right taps bar left upper portion and is equipped with spring, left spring right end and storage hopper left upper portion connect It connects, right spring left end is connect with storage hopper right upper portion.
It in a preferred embodiment of the present invention, further include having pulley, wirerope and lifting the ball, left and right two on front side of the guide rod of front Portion is equipped with pulley, and wirerope is wound on two side's pulleys of left and right, is connect on the left of left wirerope right end and guide sleeve, right steel wire It is connect on the right side of rope left end and guide sleeve, left wirerope left end and right wirerope right end are respectively connected with lifting the ball, two side's lifting the balls of left and right It is located at the left and right sides at the top of bottom plate.
It in a preferred embodiment of the present invention, further include having lifting device, lifting device is located at left and right two on front side of L shaped plate Portion, lifting device include the second bolt, snap-gauge, wing nut and lifter plate, and left and right two is equipped with the second spiral shell on front side of L shaped plate Bolt, card has snap-gauge on the second bolt, and card slot is provided among snap-gauge bottom, and the second bolt passes through card slot, and two walls of left and right are equal in snap-gauge Multiple non-slip grooves are provided with, wing nut is threadingly connected in the second bolt, is connected with liter at the top of two side's snap-gauge of left and right Plate drops.
When people need to smear cement to ceramic tile, first cement is poured into storage hopper, then people adjust flattening device Height to suitable position, then ceramic tile is placed in L shaped plate by people again, and pushes L shaped plate to the left, and guide sleeve is therewith to moving to left Dynamic, guide rod play the guiding role to guide sleeve, L shaped plate is moved to the left contacted with blanking device after, cement is fallen on ceramic tile therewith, L Shape plate is moved to the left do not contacted with blanking device after, blanking device stop blanking, L shaped plate, which is moved to the left, is bulldozed dress with left After setting contact, the cement on ceramic tile can be bulldozed by flattening device, and after the cement on ceramic tile is all bulldozed, people are by ceramic tile from L It is taken down on shape plate, then the ceramic tile for needing to smear cement can be placed in L shaped plate by people again, and then people push away to the right again Dynamic L shaped plate, i.e., repeatable aforesaid operations wipe ceramic tile painting, and such people can push L shaped plate will be remaining by left and right Ceramic tile is all applied and is wiped.
When people need storage hopper blanking, the height of flattening device is first adjusted to suitable position, then people are again by porcelain Brick is placed in L shaped plate, and then people push L shaped plate to the left again, and guide sleeve is moved to the left therewith, and guide rod play the guiding role to guide sleeve, L Shape plate is moved to the left when contacting with oscillating rod, and oscillating rod lower part turns left, and oscillating rod top turns right therewith, oscillating rod Top turns right drives cylinder to turn right by shaft, and cement passes through blanking hole therewith and falls on ceramic tile, and L shaped plate is to moving to left It moves to when not contacted with oscillating rod, oscillating rod lower part moves right reset under the gravity of weight, and oscillating rod top is therewith It is moved to the left reset, the blanking to ceramic tile so can be completed in blanking hole no longer blanking.
When people need to adjust the height of flattening device, the first bolt, the first bolt band are rotated clockwise or counterclockwise Dynamic first nut moves up or down, and moves up or down to drive and be bulldozed plate, and guide groove plays guiding to guide rod and makees With when being bulldozed plate and moving to suitable position, people stop operating the first bolt, and then it is enterprising to be placed on L shaped plate again by people for ceramic tile When row cement plastering, the cement on ceramic tile can be bulldozed by being bulldozed plate.
When the cement in storage hopper has blocking, people, which can inwardly rotate, taps bar top, taps bar top and inwardly turns Dynamic that percussion bar lower part is driven to be turned out, percussion bar lower part, which is turned out, drives rattle balls to be turned out, and spring is compressed therewith, After percussion bar top inwardly turns to suitable position, people, which unclamp again, taps bar top, and the reset response of spring, which drives, taps bar Top is turned out, and percussion bar top is turned out drive percussion bar lower part and inwardly rotates, and is tapped bar lower part and is inwardly rotated drive Rattle balls inwardly rotate, so that rattle balls tap storage hopper, people can repeat aforesaid operations, constantly pass through rattle balls Storage hopper is tapped, cement can be effectively prevent to block.
When people need to push L shaped plate to the left, left lifting the ball can be pulled to the right, and left lifting the ball, which moves right, passes through a left side Square steel cord drives guide sleeve to be moved to the left, and guide sleeve, which is moved to the left, drives L shaped plate to be moved to the left, right wirerope and lifting the ball therewith to It moves left, when people need to push L shaped plate to the right, right lifting the ball can be pulled to the left, right lifting the ball moves left through the right side Square steel cord drives guide sleeve to move right, and guide sleeve, which moves right, drives L shaped plate to move right, left wirerope and lifting the ball therewith to It moves right, this measure allows people not need to push directly on L shaped plate with hand, prevents cement from falling to hand, causes to skin Damage.
When people need to be laid with more cement on ceramic tile, first rotate wing nut, wing nut turn to not with After snap-gauge contact, people stop operating wing nut, and non-slip groove can increase the frictional force between the second bolt and card slot, then People move up snap-gauge again, and snap-gauge, which moves up, drives lifter plate to move up, after lifter plate is moved upward to suitable position, People stop mobile snap-gauge, and then people again inwardly rotate wing nut, to fix the position of snap-gauge, and then fix The position of lifter plate, then ceramic tile is placed on lifter plate by people again, and then left and right pushes L shaped plate, the position of ceramic tile to people again It gets higher so that the angle of oscillating rod swing is bigger, so that the angle of rotary drum is bigger, blanking hole will fall more water On mud to ceramic tile.
Beneficial effect is: the present invention can be such that the cement in storage hopper automatically falls off to porcelain by the blanking device of setting On brick, by the flattening device of setting, the cement fallen on ceramic tile can be bulldozed, improve the working efficiency of people, By the rattle balls of setting, the cement in storage hopper can be effectively prevent to block, wirerope and lifting the ball by setting, Neng Goufang Sealing mud falls to people on hand, causes to damage to skin, by the lifting device of setting, can adjust the amount that cement is fallen.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the first part schematic view of the front view of the invention.
Fig. 3 is second of part schematic view of the front view of the invention.
Fig. 4 is the third part schematic view of the front view of the invention.
Fig. 5 is the 4th kind of part schematic view of the front view of the invention.
Wherein: 1. bottom plates, 2. wheels, 3. first struts, 4. guide rods, 5. guide sleeves, 6.L shape plate, 61. connecting rods, 7.L shape branch Bar, 8. storage hoppers, 9. blanking devices, 91. blanking holes, 92. connecting rods, 93. first bearing seats, 94. shafts, 95. cylinders, 96. pendulum Lever, 97. link blocks, 98. bracing wires, 99. weights, 10. flattening devices, 101. connecting plates, 102. guide grooves, 103. guide rods, 104. being bulldozed plate, 105. second bearing seats, 106. first nuts, 107. first bolts, 11. mounting blocks, 12. tap bar, and 13. strike Batting, 14. springs, 15. pulleys, 16. wirerope, 17. lifting the balls, 18. lifting devices, 181. second bolts, 182. snap-gauges, 183. Card slot, 184. non-slip grooves, 185. wing nuts, 19. lifter plates.
Specific embodiment
Technical solution is described further combined with specific embodiments below, it should be noted that: described in herein The words of the indicating positions such as upper and lower, left and right be only for shown structure in respective figure for position.It is herein zero Part institute serialization number itself, such as: first, second etc., it is only used for distinguishing described object, contain without any sequence or technology Justice.And described in the application such as: connection, connection include unless otherwise instructed directly or indirectly connecting (connection).
Embodiment 1
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5 Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4 It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Embodiment 2
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5 Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4 It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94 Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod 4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Embodiment 3
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5 Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4 It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94 Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod 4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut 106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away 104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105 Lower part is threadingly connect with the first nut 106.
Embodiment 4
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5 Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4 It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94 Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod 4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut 106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away 104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105 Lower part is threadingly connect with the first nut 106.
It further include having mounting blocks 11, tapping bar 12, rattle balls 13 and spring 14,8 left and right sides middle part of storage hopper is equipped with Mounting blocks 11, rotary type, which is equipped with, on mounting blocks 11 taps bar 12, taps 12 bottom end of bar and is equipped with rattle balls 13, left rattle balls 13 are right Respectively with 8 left and right sides lower contacts of storage hopper, rattle balls 13 are located above connecting plate 101 for side and the left side of right rattle balls 13, Left taps 12 right upper portion of bar and right taps 12 left upper portion of bar and is equipped with spring 14,14 right end of left spring and storage hopper The connection of 8 left upper portions, spring 14 left end in right is connect with 8 right upper portion of storage hopper.
Embodiment 5
A kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate 1, wheel 2, the first strut 3, leads as shown in Figs. 1-5 Bar 4, guide sleeve 5, L shaped plate 6, connecting rod 61, L shape strut 7, storage hopper 8, blanking device 9 and flattening device 10,1 bottom of bottom plate are left Two are equipped with wheel 2 before and after right two sides, and 1 top left and right sides front and back two of bottom plate is equipped with the first strut 3, front two the It is equipped with guide rod 4 at the top of one strut, 3 top and the first strut 3 of two, rear, slidingtype is equipped with guide sleeve 5, two side of front and back on guide rod 4 It is equipped with L shaped plate 6 at the top of guide sleeve 5, connecting rod 61 is equipped between two side's L shaped plate of front and back, 6 bottom, 1 top center of bottom plate is equipped with L shape Strut 7, L shape strut 7 are located between two side's guide rod 4 of front and back, and 7 forward upper of L shape strut is equipped with storage hopper 8, in 8 bottom of storage hopper Between be equipped with blanking device 9,8 left and right sides lower part of storage hopper is equipped with flattening device 10.
Blanking device 9 includes connecting rod 92, first bearing seat 93, shaft 94, cylinder 95, oscillating rod 96, link block 97, draws Line 98 and weight 99, are provided with blanking hole 91 among 8 bottom of storage hopper, 8 front and rear sides lower part of the storage hopper symmetrically company of being equipped with Bar 92,92 lower part of front connecting rod and 92 lower part of rear connecting rod are equipped with first bearing seat 93, two side's first bearing seat 93 of front and back it Between be equipped with shaft 94, cylinder 95 is installed, cylinder 95 is located at immediately below blanking hole 91, and 94 front end of shaft is equipped with swing in shaft 94 Bar 96,96 lower front of oscillating rod are equipped with link block 97, and 97 front side middle part of link block is connected with bracing wire 98, and bracing wire 98 is located at guide rod 4 fronts, 98 bottom end of bracing wire is connected with weight 99.
Flattening device 10 includes connecting plate 101, guide rod 103, is bulldozed plate 104, second bearing seat 105, the first nut 106 and first bolt 107,8 left and right sides lower part of storage hopper be equipped with connecting plate 101, connecting plate is provided with guiding among 101 bottom Slot 102 is placed with guide rod 103 in guide groove 102, and 103 bottom of guide rod, which is equipped with, is bulldozed plate 104,101 left side of left connecting plate Lower part and 101 lower right side of right connecting plate are equipped with second bearing seat 105, and left is bulldozed 104 left upper portion of plate and right pushes away 104 right upper portion of plate is equipped with the first nut 106, and the first bolt 107, the first bolt 107 are connected in second bearing seat 105 Lower part is threadingly connect with the first nut 106.
It further include having mounting blocks 11, tapping bar 12, rattle balls 13 and spring 14,8 left and right sides middle part of storage hopper is equipped with Mounting blocks 11, rotary type, which is equipped with, on mounting blocks 11 taps bar 12, taps 12 bottom end of bar and is equipped with rattle balls 13, left rattle balls 13 are right Respectively with 8 left and right sides lower contacts of storage hopper, rattle balls 13 are located above connecting plate 101 for side and the left side of right rattle balls 13, Left taps 12 right upper portion of bar and right taps 12 left upper portion of bar and is equipped with spring 14,14 right end of left spring and storage hopper The connection of 8 left upper portions, spring 14 left end in right is connect with 8 right upper portion of storage hopper.
It further include having pulley 15, wirerope 16 and lifting the ball 17, left and right two is equipped with pulley 15 on front side of front guide rod 4, left It is wound with wirerope 16 on right two side's pulleys 15, is connected on the left of 16 right end of left wirerope and guide sleeve 5,16 left end of right wirerope It is connected on the right side of guide sleeve 5,16 left end of left wirerope and 16 right end of right wirerope are respectively connected with lifting the ball 17, two side's lifting the balls of left and right 17 are located at the 1 top left and right sides of bottom plate.
It further include having lifting device 18, lifting device 18 is located at left and right two, lifting device 18 on front side of L shaped plate 6 and includes Second bolt 181, snap-gauge 182, wing nut 185 and lifter plate 19, left and right two is equipped with the second bolt on front side of L shaped plate 6 181, card has snap-gauge 182 on the second bolt 181, and card slot 183 is provided among 182 bottom of snap-gauge, and the second bolt 181 passes through card slot 183, two walls of the interior left and right of snap-gauge 182 are provided with multiple non-slip grooves 184, are threadingly connected with butterfly in the second bolt 181 Nut 185 controls and is connected with lifter plate 19 at the top of two side's snap-gauges 182.
When people need to smear cement to ceramic tile, first cement is poured into storage hopper 8, then people adjust flattening device 10 height is to suitable position, and then ceramic tile is placed in L shaped plate 6 by people again, and pushes L shaped plate 6 to the left, guide sleeve 5 therewith to Move left, guide rod 4 play the guiding role to guide sleeve 5, L shaped plate 6 is moved to the left contacted with blanking device 9 after, cement is fallen in therewith On ceramic tile, L shaped plate 6 is moved to the left do not contacted with blanking device 9 after, blanking device 9 stops blanking, and L shaped plate 6 is moved to the left After contacting with left flattening device 10, the cement on ceramic tile can be bulldozed by flattening device 10, and the cement on ceramic tile is all bulldozed Afterwards, people take down ceramic tile from L shaped plate 6, and then the ceramic tile for needing to smear cement can be placed on L shaped plate 6 again by people On, then people push to the right L shaped plate 6 again, i.e., repeatable aforesaid operations wipe ceramic tile painting, and such people can pass through a left side Right promotion L shaped plate 6, which all applies remaining ceramic tile, to be wiped.
When people need 8 blanking of storage hopper, the height of flattening device 10 is first adjusted to suitable position, then people again will Ceramic tile is placed in L shaped plate 6, and then people push L shaped plate 6 to the left again, and guide sleeve 5 is moved to the left therewith, and guide rod 4 plays guide sleeve 5 and leads To effect, L shaped plate 6 is moved to the left when contacting with oscillating rod 96, and 96 lower part of oscillating rod turns left, and 96 top of oscillating rod is therewith It turns right, 96 top of oscillating rod turns right drives cylinder 95 to turn right by shaft 94, and cement passes through blanking hole therewith 91 fall on ceramic tile, and L shaped plate 6 is moved to the left when not contacting with oscillating rod 96, and 96 lower part of oscillating rod is made in the gravity of weight 99 Move right reset under, and 96 top of oscillating rod is moved to the left reset therewith, the no longer blanking of blanking hole 91, so can be completed pair The blanking of ceramic tile.
When people need to adjust the height of flattening device 10, the first bolt 107, the first spiral shell are rotated clockwise or counterclockwise Bolt 107 drives the first nut 106 to move up or down, and moves up or down to drive and be bulldozed plate 104, guide groove 102 It play the guiding role to guide rod 103, when being bulldozed plate 104 and moving to suitable position, people stop operating the first bolt 107, then When ceramic tile is placed on progress cement plastering in L shaped plate 6 again by people, the cement on ceramic tile can be bulldozed by being bulldozed plate 104.
When the cement in storage hopper 8 has blocking, people can inwardly rotate tap 12 top of bar, tap 12 top of bar to Interior rotation drives percussion 12 lower part of bar to be turned out, and percussion 12 lower part of bar, which is turned out, drives rattle balls 13 to be turned out, spring 14 are compressed therewith, and after percussion 12 top of bar inwardly turns to suitable position, people, which unclamp again, taps 12 top of bar, spring 14 Reset response drives percussion 12 top of bar to be turned out, and percussion 12 top of bar is turned out drive percussion 12 lower part of bar and inwardly turns It is dynamic, it taps 12 lower part of bar and inwardly rotates the inwardly rotation of drive rattle balls 13, so that rattle balls 13 tap storage hopper 8, people Can repeat aforesaid operations, constantly storage hopper 8 is tapped by rattle balls 13, cement can be effectively prevent to block.
When people need to push L shaped plate 6 to the left, left lifting the ball 17 can be pulled to the right, and left lifting the ball 17 moves right Guide sleeve 5 is driven to be moved to the left by left wirerope 16, guide sleeve 5, which is moved to the left, drives L shaped plate 6 to be moved to the left, right wirerope 16 and lifting the ball 17 be moved to the left therewith, when people need to push L shaped plate 6 to the right, right lifting the ball 17, right can be pulled to the left Lifting the ball 17 moves left through right wirerope 16 and guide sleeve 5 is driven to move right, and guide sleeve 5, which moves right, drives L shaped plate 6 to move right Dynamic, left wirerope 16 and lifting the ball 17 move right therewith, and this measure allows people not need to push directly on L shaped plate 6 with hand, It prevents cement from falling to hand, skin is caused to damage.
When people need to be laid with more cement on ceramic tile, wing nut 185 is first rotated, wing nut 185 rotates To after not contacting with snap-gauge 182, people stop operating wing nut 185, and non-slip groove 184 can increase the second bolt 181 and card Frictional force between slot 183, then people move up snap-gauge 182 again, and snap-gauge 182, which moves up, drives lifter plate 19 to moving up Dynamic, after lifter plate 19 is moved upward to suitable position, people stop mobile snap-gauge 182, then people again by wing nut 185 to Interior rotation to fix the position of snap-gauge 182, and then fixes the position of lifter plate 19, and then ceramic tile is placed on by people again On lifter plate 19, then people again left and right push L shaped plate 6, the position of ceramic tile get higher so that oscillating rod 96 swing angle it is bigger, So that the angle that cylinder 95 rotates is bigger, blanking hole 91 will be fallen on more cement to ceramic tile.
Although describing the disclosure only with respect to the embodiment of limited quantity, the ability of the disclosure is benefited from Field technique personnel will be understood that, without departing from the scope of the invention, can design various other embodiments.Therefore, The scope of the present invention should be limited only by the following claims.

Claims (6)

1. a kind of construction and decoration ceramic tile cement plastering equipment includes bottom plate (1), wheel (2), the first strut (3), guide rod (4), guide sleeve (5) and L shaped plate (6), bottom plate (1) bottom left and right sides front and back two are equipped with wheel (2), bottom plate (1) top left Two are equipped with the first strut (3) before and after right two sides, two, front the first strut (3) top and two, rear the first strut (3) Top is equipped with guide rod (4), and slidingtype is equipped with guide sleeve (5) on guide rod (4), is equipped with L shaped plate at the top of two side's guide sleeve (5) of front and back (6), characterized in that further include having connecting rod (61), L shape strut (7), storage hopper (8), blanking device (9) and flattening device (10), connecting rod (61) are equipped between front and back two side's L shaped plate (6) bottom, bottom plate (1) top center is equipped with L shape strut (7), L shape Strut (7) is located between two side's guide rod (4) of front and back, and L shape strut (7) forward upper is equipped with storage hopper (8), storage hopper (8) bottom Centre is equipped with blanking device (9), and lower part is equipped with flattening device (10) at left and right sides of storage hopper (8).
2. a kind of construction and decoration according to claim 1 ceramic tile cement plastering equipment, characterized in that blanking device (9) It include connecting rod (92), first bearing seat (93), shaft (94), cylinder (95), oscillating rod (96), link block (97), bracing wire (98) and weight (99) it, is provided with blanking hole (91) among storage hopper (8) bottom, storage hopper (8) front and rear sides lower part left and right pair Claim to be equipped with connecting rod (92), front connecting rod (92) lower part and rear connecting rod (92) lower part are equipped with first bearing seat (93), front and back two Shaft (94) are equipped between square first bearing seat (93), are equipped with cylinder (95) in shaft (94), cylinder (95) is located at blanking hole (91) immediately below, shaft (94) front end is equipped with oscillating rod (96), and oscillating rod (96) lower front is equipped with link block (97), link block (97) front side middle part is connected with bracing wire (98), and bracing wire (98) is located in front of guide rod (4), and bracing wire (98) bottom end is connected with weight (99).
3. a kind of construction and decoration according to claim 2 ceramic tile cement plastering equipment, characterized in that flattening device (10) Include connecting plate (101), guide rod (103), be bulldozed plate (104), second bearing seat (105), the first nut (106) and first Bolt (107), storage hopper (8) left and right sides lower part are equipped with connecting plate (101), are provided with guiding among connecting plate (101) bottom Slot (102), guide groove (102) is interior to be placed with guide rod (103), and guide rod (103) bottom is equipped with and is bulldozed plate (104), and left connects Fishplate bar (101) left lower and right connecting plate (101) lower right side are equipped with second bearing seat (105), and left is bulldozed plate (104) left upper portion and right are bulldozed plate (104) right upper portion and are equipped with the first nut (106), connect in second bearing seat (105) It is connected to the first bolt (107), the first bolt (107) lower part is threadingly connect with the first nut (106).
4. a kind of construction and decoration according to claim 3 ceramic tile cement plastering equipment, characterized in that further include having installation Block (11) taps bar (12), rattle balls (13) and spring (14), and middle part is equipped with mounting blocks (11) at left and right sides of storage hopper (8), Rotary type, which is equipped with, on mounting blocks (11) taps bar (12), taps bar (12) bottom end and is equipped with rattle balls (13), left rattle balls (13) Respectively with lower contacts at left and right sides of storage hopper (8) on the left of right side and right rattle balls (13), rattle balls (13) are located at connecting plate (101) top, left taps bar (12) right upper portion and right taps bar (12) left upper portion and is equipped with spring (14), left bullet Spring (14) right end is connect with storage hopper (8) left upper portion, and spring (14) left end in right is connect with storage hopper (8) right upper portion.
5. a kind of construction and decoration according to claim 4 ceramic tile cement plastering equipment, characterized in that further include having pulley (15), wirerope (16) and lifting the ball (17), front guide rod (4) front side left and right two are equipped with pulley (15), two side's pulleys of left and right (15) it is wound with wirerope (16), is connect on the left of left wirerope (16) right end and guide sleeve (5), right wirerope (16) left end on It is connect with guide sleeve (5) right side, left wirerope (16) left end and right wirerope (16) right end are respectively connected with lifting the ball (17), left and right Two side's lifting the balls (17) are located at the left and right sides at the top of bottom plate (1).
6. a kind of construction and decoration according to claim 5 ceramic tile cement plastering equipment, characterized in that further include having lifting Device (18), lifting device (18) are located at left and right two on front side of L shaped plate (6), and lifting device (18) includes the second bolt (181), snap-gauge (182), wing nut (185) and lifter plate (19), L shaped plate (6) front side left and right two are equipped with the second bolt (181), there is snap-gauge (182) card on the second bolt (181), is provided with card slot (183), the second bolt among snap-gauge (182) bottom (181) card slot (183) are passed through, two walls of left and right are provided with multiple non-slip grooves (184) in snap-gauge (182), in the second bolt (181) with The mode of screw thread is connected with wing nut (185), is connected with lifter plate (19) at the top of two side's snap-gauges (182) of left and right.
CN201811380566.6A 2018-11-20 2018-11-20 Ceramic tile cement daubs equipment for building decoration Active CN109487993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811380566.6A CN109487993B (en) 2018-11-20 2018-11-20 Ceramic tile cement daubs equipment for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811380566.6A CN109487993B (en) 2018-11-20 2018-11-20 Ceramic tile cement daubs equipment for building decoration

Publications (2)

Publication Number Publication Date
CN109487993A true CN109487993A (en) 2019-03-19
CN109487993B CN109487993B (en) 2020-05-19

Family

ID=65696261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811380566.6A Active CN109487993B (en) 2018-11-20 2018-11-20 Ceramic tile cement daubs equipment for building decoration

Country Status (1)

Country Link
CN (1) CN109487993B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173097A (en) * 2019-06-20 2019-08-27 曾福兰 A kind of ceramic tile lays cement device
CN110419482A (en) * 2019-08-07 2019-11-08 王彩峰 A kind of feeding apparatus used for aquiculture
CN111622464A (en) * 2020-05-22 2020-09-04 杨志春 Ceramic tile cement daubs device for building decoration
CN111894238A (en) * 2020-07-03 2020-11-06 钟明有 Interior decoration is with ceramic tile ash expeller
CN111962888A (en) * 2020-07-10 2020-11-20 陈来 Lime device is criticized with criticizing to black brick wall
CN112627554A (en) * 2020-12-04 2021-04-09 朱运鹏 Building site wall building brick cement coating machine
CN114482465A (en) * 2021-12-29 2022-05-13 张碧思 Building ceramic tile cement paints and scrapes all-in-one
CN114482579A (en) * 2022-01-11 2022-05-13 谢新苟 Red brick mortar paints device for construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666165A (en) * 2009-09-18 2010-03-10 朱世友 Fast mortar-spreading device for building brick wall
US20130000246A1 (en) * 2011-06-29 2013-01-03 Marvon Bourelle Tile Floor Adhesive Spreading and Leveling Device
CN104405116A (en) * 2014-12-04 2015-03-11 胡达广 Numerical control tile slurry applying machine
CN106869459A (en) * 2015-12-10 2017-06-20 王勇 Ceramic tile mechanical float
CN207003956U (en) * 2017-07-20 2018-02-13 山东三箭建设工程股份有限公司 Ceramic tile emplaster automatic painting apparatus
CN207363217U (en) * 2017-09-27 2018-05-15 中建八局第一建设有限公司 A kind of automatic dust device of ceramic tile and ceramic thin plate bonding mortar

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101666165A (en) * 2009-09-18 2010-03-10 朱世友 Fast mortar-spreading device for building brick wall
US20130000246A1 (en) * 2011-06-29 2013-01-03 Marvon Bourelle Tile Floor Adhesive Spreading and Leveling Device
CN104405116A (en) * 2014-12-04 2015-03-11 胡达广 Numerical control tile slurry applying machine
CN106869459A (en) * 2015-12-10 2017-06-20 王勇 Ceramic tile mechanical float
CN207003956U (en) * 2017-07-20 2018-02-13 山东三箭建设工程股份有限公司 Ceramic tile emplaster automatic painting apparatus
CN207363217U (en) * 2017-09-27 2018-05-15 中建八局第一建设有限公司 A kind of automatic dust device of ceramic tile and ceramic thin plate bonding mortar

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173097A (en) * 2019-06-20 2019-08-27 曾福兰 A kind of ceramic tile lays cement device
CN110419482A (en) * 2019-08-07 2019-11-08 王彩峰 A kind of feeding apparatus used for aquiculture
CN111622464A (en) * 2020-05-22 2020-09-04 杨志春 Ceramic tile cement daubs device for building decoration
CN111894238B (en) * 2020-07-03 2021-10-22 钟明有 Interior decoration is with ceramic tile ash expeller
CN111894238A (en) * 2020-07-03 2020-11-06 钟明有 Interior decoration is with ceramic tile ash expeller
CN111962888A (en) * 2020-07-10 2020-11-20 陈来 Lime device is criticized with criticizing to black brick wall
CN111962888B (en) * 2020-07-10 2022-01-25 安徽携昇建设工程有限公司 Lime device is criticized with criticizing to black brick wall
CN112627554A (en) * 2020-12-04 2021-04-09 朱运鹏 Building site wall building brick cement coating machine
CN112627554B (en) * 2020-12-04 2022-06-17 通圆建筑集团有限公司 Building site wall building brick cement coating machine
CN114482465A (en) * 2021-12-29 2022-05-13 张碧思 Building ceramic tile cement paints and scrapes all-in-one
CN114482465B (en) * 2021-12-29 2023-10-10 新晟建设集团有限公司 Building ceramic tile cement is paintd and is strickleed off all-in-one
CN114482579A (en) * 2022-01-11 2022-05-13 谢新苟 Red brick mortar paints device for construction
CN114482579B (en) * 2022-01-11 2023-12-22 江西盛鼎环保科技有限公司 Red brick mortar smearing device for building construction

Also Published As

Publication number Publication date
CN109487993B (en) 2020-05-19

Similar Documents

Publication Publication Date Title
CN109487993A (en) A kind of construction and decoration ceramic tile cement plastering equipment
CN104179096B (en) A kind of sleeper relaying machine
CN104195899B (en) The quick swivel block machine of a kind of mechanization
CN107568193A (en) A kind of oil exploration ground weeder
CN100588777C (en) Pedals type elevating control device for ground sweeper
CN204023332U (en) A kind of sleeper relaying machine
CN106192777A (en) A kind of sleeve connection type inclined cable power conversion device and operational approach thereof
CN108729481A (en) A kind of construction paves equipment with ground soil
CN108049444A (en) A kind of automatic pit-picker
CN112554812A (en) Auxiliary rod changing system capable of automatically leveling and control method thereof
CN104153261A (en) Rapid sleeper replacing machine
CN208486825U (en) A kind of novel pit-picker
CN204112180U (en) A kind of Quick sleeper replacer
CN201598543U (en) Automatic reduction multiple cylinder track-lifting track shifter
CN206903168U (en) A kind of movable up-down builds scaffold by laying bricks or stones
CN204023333U (en) Pillow machine is changed in a kind of mechanization
CN201459791U (en) Grab bucket underground pore-forming device
CN204804700U (en) Pneumatic scraper of well drilling trip -out operation
CN101781872B (en) Automatic resetting multi-level-cylinder type track raising or shifting device
CN207332386U (en) One kind is easy to clean steel-structure factory building
CN208776201U (en) A kind of prefabricated effective tool of removing stage makeup and costume of cement concrete
CN108265951A (en) A kind of plastering machine scraper that grey thickness is scraped convenient for adjusting
CN207092162U (en) A kind of construction is shoveled with husky
CN204023331U (en) A kind of Fully-mechanized fast quick change pillow machine
CN208430400U (en) The device for preventing backfill from settling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201116

Address after: No.905 Yongchang Road, Suining County, Xuzhou City, Jiangsu Province

Patentee after: JIANGSU LYUNENG AUTO ACCESSORIES TECHNOLOGY Co.,Ltd.

Address before: 337000, 106 East Jade Road, Pingxiang Economic Development Zone, Jiangxi, China

Patentee before: Bu Weifei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210810

Address after: 221200 Floor 9, business center, Jincheng Street, Suining County, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Shijia Information Technology Co.,Ltd.

Address before: 221000 no.905, Yongchang Road, Suining County, Xuzhou City, Jiangsu Province

Patentee before: JIANGSU LYUNENG AUTO ACCESSORIES TECHNOLOGY Co.,Ltd.