CN108729481A CN201810414566.7A CN201810414566A CN108729481A CN 108729481 A CN108729481 A CN 108729481A CN 201810414566 A CN201810414566 A CN 201810414566A CN 108729481 A CN108729481 A CN 108729481A
Authority
CN
China
Prior art keywords
infundibulate
framework
bracing wire
fixed pulley
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810414566.7A
Other languages
Chinese (zh)
Inventor
钟丹红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810414566.7A priority Critical patent/CN108729481A/en
Publication of CN108729481A publication Critical patent/CN108729481A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/76Graders, bulldozers, or the like with scraper plates or ploughshare-like elements; Levelling scarifying devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/76Graders, bulldozers, or the like with scraper plates or ploughshare-like elements; Levelling scarifying devices
    • E02F3/80Component parts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/22Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
    • E02F5/223Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/22Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
    • E02F5/223Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling
    • E02F5/226Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling with means for processing the soil, e.g. screening belts, separators; Padding machines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/30Auxiliary apparatus, e.g. for thawing, cracking, blowing-up, or other preparatory treatment of the soil

Abstract

Equipment is paved the present invention relates to a kind of ground soil more particularly to a kind of construction paves equipment with ground soil.Therefore, technical problem of the invention is:There is provided a kind of can root out automatically by the soil that ground is protruded, can the soil shoveled out easily be inserted ground recess, can automatically flatten the soil for being filled in ground recess, the construction that the bulk soil shoveled out is broken into pieces automatically paved equipment with ground soil.Technical solution is as follows:A kind of construction paves equipment with ground soil, includes infundibulate framework, stabilizer blade, wheel, hollow pipe, the first spring, scoop, electronic reel etc.;Lower part at left and right sides of infundibulate framework is symmetrically connected with stabilizer blade.The present invention is automatically rooted out the soil that ground is protruded by scoop, and it is poured into infundibulate framework by hollow pipe, so easily soil outstanding can be collected, being moved downward by slamming pedal allows in infundibulate framework the soil collected to fill and lead up ground recess so that the filling of soil is more easy and convenient.

Description

A kind of construction paves equipment with ground soil
Technical field
Equipment is paved the present invention relates to a kind of ground soil more particularly to a kind of construction is paved with ground soil and set It is standby.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
In construction, staff need first by rugged ground flatten it is smooth re-lay ground, so work Personnel can generally be evened out the place that ground is protruded with hand, then the soil shoveled out is filled out to ground recess, and not only be expended in this way Time and manpower, staff also it is bad control ground flatness, so people would generally be solved using some mechanical equipments The certainly rugged problem in ground.
When there is the soil of protrusion on ground, staff generally can manually be rooted out soil with scoop;When there is recess on ground When, the soil shoveled out can be inserted ground recess by staff;After staff completes ground recess, the soil of ground recess Can be not steady and sure enough due to containing large quantity of air, so staff can be flattened soil with pressing plate;It is shoveled out in staff When soil build is larger, staff generally understands hammer and breaks bulk soil into pieces.
Therefore there is an urgent need for research and develop a kind of the soil that ground is protruded can be rooted out, can easily be filled out the soil shoveled out automatically Enter ground recess, can be built automatically by the soil for being filled in ground recess pressing, automatically by what the bulk soil shoveled out was broken into pieces It builds construction land tenure base soil and paves equipment.
Invention content
It needs staff manually to be rooted out the soil of protrusion with scoop to overcome, need staff that will shovel out manually Soil filling ground recess, need staff manually with pressing plate by insert ground recess soil flatten, need work people The shortcomings that member smashes bulk soil with hammer manually, therefore, technical problem of the invention is:There is provided one kind can be automatically by ground The soil of protrusion is rooted out, can the soil shoveled out easily be inserted ground recess, will can be filled in ground recess automatically Soil flattens, the construction that the bulk soil shoveled out is broken into pieces is automatically paved equipment with ground soil.
Technical solution is as follows:A kind of construction paves equipment with ground soil, includes infundibulate framework, stabilizer blade, wheel Son, hollow pipe, the first spring, scoop, electronic reel, the first bracing wire, first baffle, the first guide rod, L-shaped baffle, second Spring, the first fixed pulley, the second fixed pulley, pushing hands, sliding rail, sliding block, pedal and the second bracing wire, at left and right sides of infundibulate framework Lower part is symmetrically connected with stabilizer blade, and the stabilizer blade bottom of the left and right sides is respectively connected with wheel, and the right upper portion of infundibulate framework is hinged It is connected with hollow pipe, the first spring, the bottom of hollow pipe are connected between the left side and the lower right side of infundibulate framework of hollow pipe Portion is connected with scoop, and the right wall top of infundibulate framework is provided with feed opening, and feed opening is located at the upside of hollow pipe, infundibulate framework Right upper portion be connected with electronic reel, electronic reel is located at the top of feed opening, the first drawing is wound on electronic reel The other end of line, the first bracing wire is connected to the right upper portion of hollow pipe, and the opening contact connectio of infundibulate framework bottom has first The bottom left and right sides of baffle, first baffle is provided with guide groove, and slidingtype is connected with first in the guide groove of the left and right sides First guide rod bottom of guide rod, the left and right sides is respectively connected with L-shaped baffle, and the L-shaped baffle other end of the left and right sides connects respectively Be connected on the lower part at left and right sides of infundibulate framework, the L-shaped baffle top center of the left and right sides and the left and right sides of first baffle it Between be connected separately with second spring, be provided with first through hole among the upper wall of infundibulate framework, the connection of infundibulate framework top center There are the first fixed pulley, the first fixed pulley to be located at the left of first through hole, the top left side of infundibulate framework is connected with second and slides calmly The left upper portion of wheel, infundibulate framework is connected with pushing hands, and infundibulate framework left lower is equipped with sliding rail, and slidingtype connects on sliding rail Have sliding block, pedal be connected on the left of sliding block, be connected with the second bracing wire at the top of sliding block, the second bracing wire around the second fixed pulley and First fixed pulley, second is drawstring through first through hole, and the second bracing wire other end is connected to the top center of first baffle.
Preferably, further including having the second guide sleeve, third guide sleeve, the second guide rod, pressing plate, third spring and lifting Plate, infundibulate framework left wall lower part are embedded with the second guide sleeve, and infundibulate framework upper wall left part is embedded with third guide sleeve, and third is oriented to Set and the second guide sleeve inner sliding type are connected with the second guide rod, and the bottom of the second guide rod is connected with pressing plate, the second guide rod Left and right sides top and infundibulate framework upper wall on the inside of between be respectively connected with third spring, be connected at the top of the second guide rod Lifter plate.
Preferably, further including having third fixed pulley, fixture block, third bracing wire and lifting the ball, the top left side of infundibulate framework It is connected with third fixed pulley, third fixed pulley is connected with card between the second fixed pulley and the second guide rod at the top of pushing hands The bottom left of block, lifter plate is connected with third bracing wire, and third bracing wire bypasses third fixed pulley, and third is drawstring through fixture block, the Three bracing wire left ends are connected with lifting the ball.
Preferably, further including having the 4th guide sleeve, third guide rod, rattle balls, the 4th spring, link block the 4th calmly sliding Wheel, the 5th fixed pulley and the 4th bracing wire, infundibulate framework upper wall right part are connected with the 4th guide sleeve, the 4th guide sleeve inner sliding type Be connected with third guide rod, the bottom of third guide rod is connected with rattle balls, the left upper portion of rattle balls in infundibulate framework The 4th spring is connected between top right side, the 4th spring is located at the left of third guide rod, the lower right side of third guide rod Equipped with link block, the upper wall right part of infundibulate framework is provided with the second through-hole, and the second through-hole is located at the right of the 4th guide sleeve, funnel The top right side of shape framework is connected with the 4th fixed pulley, and the 4th fixed pulley is located at the right of the second through-hole, the top of infundibulate framework It is connected with the 5th fixed pulley on the right side of portion, the 5th fixed pulley is located at the right of the 4th fixed pulley, and the 4th drawing is wound on electronic reel Line, the 4th bracing wire bypass the 5th fixed pulley and the 4th fixed pulley, and the 4th is drawstring through the second through-hole, and the 4th bracing wire bottom end is connected to The top of link block.
Preferably, further including having shaft, bearing block, screw bolt and nut, third through-hole is provided in the middle part of pedal, sliding rail Left lower is connected with shaft, and the left part of shaft is connected with bearing block, and the bottom of bearing block is connected with bolt, spiral shell is rotary on bolt It is female.
When staff needs using this equipment, this equipment is pushed into the side of ground raised zones by pushing hands first Side then controls electronic reel and rotates clockwise, and then loosens the first bracing wire again, and the first spring drives hollow pipe to transport downwards Dynamic, hollow pipe drives scoop to move downward, and when scoop moves downwardly to when being contacted with ground, staff controls electronic reel It is stopped, staff holds pushing hands and travels forward again, and then scoop is driven to travel forward, and scoop shovels the soil of protrusion It walks, subsequent staff controls electronic reel and rotates counterclockwise again, and then tightens the first bracing wire, and the first bracing wire drives hollow pipe It is flipped up, the first spring is stretched, and hollow pipe drives scoop to be flipped up, when hollow pipe moves up to the upper right of feed opening Fang Shi, the soil in scoop can flow in hollow pipe, and be entered in infundibulate framework by feed opening, when the soil in scoop is complete After portion enters in infundibulate framework, staff controls electronic reel and rotates clockwise by the first bracing wire releasing, first again Under the action of spring, hollow pipe drives scoop to move downwardly to and sets back, and is constantly controlled by staff repeatedly Electronic reel can constantly pour into the soil of protrusion in infundibulate framework along inverse alternate rotation, when the soil of protrusion shovels After complete, staff pushes this equipment to ground recess again, and the bottom opening of infundibulate framework is adjusted to ground recess Surface, staff slam pedal with foot again and move downward, and pedal band movable slider moves downward on sliding rail, and sliding block passes through the Two bracing wires drive first baffle to move upwards, and the second spring of the left and right sides is stretched, and the soil in infundibulate framework passes through bottom The opening in portion falls to the ground recess, and then ground recess is filled and led up, and after ground is filled and led up, staff again decontrols foot, left The second spring of right both sides sets back, and holds first baffle and move downwardly to and set back, and then stops infundibulate framework Interior soil outflow, under the mutual cooperation of the guide groove and the first guide rod of the left and right sides, first baffle moves up and down more Add steady.
Because further including having the second guide sleeve, third guide sleeve, the second guide rod, pressing plate, third spring and lifter plate, leakage Bucket shape framework left wall lower part be embedded with the second guide sleeve, infundibulate framework upper wall left part be embedded with third guide sleeve, third guide sleeve and Second guide sleeve inner sliding type is connected with the second guide rod, and the bottom of the second guide rod is connected with pressing plate, a left side for the second guide rod It is respectively connected with third spring between on the inside of right two upper lateral parts and infundibulate framework upper wall, lifting is connected at the top of the second guide rod Plate, so after staff fills and leads up ground recess, then pin lifter plate and move downward, lifter plate passes through the second guide rod band Dynamic pressure plate moves downward, and the third spring of the left and right sides is stretched, and pressing plate, which moves downward, flattens the region for being filled with soil, It can prevent soil from causing to fill because of fluffy imperfect, subsequent staff unclamps again the soil compaction of filling in this way The third spring of lifter plate, the left and right sides sets back, and the second guide rod is driven to move upwards, the second guide rod band dynamic pressure plate It moves up to and sets back, constantly pin and unclamp lifter plate downwards by staff, it can preferably will be on ground Soil pave.
Because further including thering is third fixed pulley, fixture block, third bracing wire and lifting the ball, the top left side of infundibulate framework to be connected with Third fixed pulley, third fixed pulley are connected with fixture block between the second fixed pulley and the second guide rod at the top of pushing hands, lifting The bottom left of plate is connected with third bracing wire, and third bracing wire bypasses third fixed pulley, and third is drawstring through fixture block, and third bracing wire is left End is connected with lifting the ball, so when staff needs to flatten ground, holds lifting the ball and moves downward, lifting the ball passes through third bracing wire band Dynamic lifter plate moves downward, and then is moved downward with dynamic pressure plate and flatten ground, and after ground is driven plain, staff unclamps again Lifting the ball, under the action of the third spring of the left and right sides, pressing plate, which moves up to, to set back, such staff there is no need to Soil is flattened to press lifter plate so that staff's work is more convenient with hand every time.
Because further including having the 4th guide sleeve, third guide rod, rattle balls, the 4th spring, the 4th fixed pulley of link block, Five fixed pulleys and the 4th bracing wire, infundibulate framework upper wall right part are connected with the 4th guide sleeve, the connection of the 4th guide sleeve inner sliding type There are third guide rod, the bottom of third guide rod to be connected with rattle balls, left upper portion and the infundibulate framework inner top of rattle balls The 4th spring is connected between right side, the 4th spring is located at the left of third guide rod, and the lower right side of third guide rod is equipped with The upper wall right part of link block, infundibulate framework is provided with the second through-hole, and the second through-hole is located at the right of the 4th guide sleeve, infundibulate frame The top right side of body is connected with the 4th fixed pulley, and the 4th fixed pulley is located at the right of the second through-hole, the top right of infundibulate framework Side is connected with the 5th fixed pulley, and the 5th fixed pulley is located at the right of the 4th fixed pulley, and the 4th bracing wire is full of on electronic reel, the Four bracing wires bypass the 5th fixed pulley and the 4th fixed pulley, and the 4th is drawstring through the second through-hole, and the 4th bracing wire bottom end is connected to connection The top of block, so when staff controls electronic reel and rotates counterclockwise, electronic reel can loosen the 4th bracing wire, Under the action of rattle balls gravity and the 4th spring, rattle balls can move downward, and then larger fast soil is smashed, in this way can be with Solve the problems, such as that bulk soil can not go out because infundibulate framework bottom opening is too small, when staff controls electronic coiling again When wheel rotates clockwise, electronic reel can tighten the 4th bracing wire, and the 4th bracing wire is struck by link block and the drive of third guide rod Batting moves upwards, and is ready to break soil into pieces next time.
Because further including having shaft, bearing block, screw bolt and nut, third through-hole, the left side of sliding rail are provided in the middle part of pedal Lower part is connected with shaft, and the left part of shaft is connected with bearing block, and the bottom of bearing block is connected with bolt, nut is rotary on bolt, So after staff fills and leads up ground recess, in infundibulate framework and surplus when having soil, staff needs funnel Soil in shape framework clears, and at this moment staff can rotate counterclockwise nut, and then nut is back-outed from bolt, Bolt 180 degree is rotated clockwise again, and bolt rotates clockwise 180 degree by bearing block in shaft, and subsequent staff steps on again Firmly pedal moves downward, and then bolt is made to pass through third through-hole, and staff again goes back to nut on bolt clockwise later, this Sample can fix the position of first baffle, and then staff is facilitated to clear up the soil in infundibulate framework, when infundibulate frame After internal soil has been cleared up, staff again back-outs nut from bolt, and pedal can move upwards, and bolt can leave third Through-hole, subsequent staff again go back to nut on bolt clockwise.
The present invention is automatically rooted out the soil that ground is protruded by scoop, and pours into infundibulate framework by hollow pipe It is interior, so easily soil outstanding can be collected, moved downward by slamming pedal and collected to allow in infundibulate framework Soil fills and leads up ground recess so that the filling of soil is more easy and convenient;The mud that will be filled by pressing down on lifter plate Soil pressure is flat, can prevent soil from causing to fill incomplete happen because of fluffy;Bulk soil is struck by rattle balls It is broken so that soil can preferably be filled ground.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Figure label title:1:Infundibulate framework, 2:Stabilizer blade, 3:Wheel, 4:Hollow pipe, 5:First spring, 6:Scoop, 7: Feed opening, 8:Electronic reel, 9:First bracing wire, 10:First baffle, 11:Guide groove, 12:First guide rod, 13:L-shaped is kept off Plate, 14:Second spring, 15:First through hole, 16:First fixed pulley, 17:Second fixed pulley, 18:Pushing hands, 19:Sliding rail, 20:It is sliding Block, 21:Pedal, 22:Second bracing wire, 23:Second guide sleeve, 24:Third guide sleeve, 25:Second guide rod, 26:Pressing plate, 27: Third spring, 28:Lifter plate, 29:Third fixed pulley, 30:Fixture block, 31:Third bracing wire, 32:Lifting the ball, 33:4th guide sleeve, 34:Third guide rod, 35:Rattle balls, 36:4th spring, 37:Link block, 38:Second through-hole, 39:4th fixed pulley, 40:The Five fixed pulleys, 41:4th bracing wire, 42:Third through-hole, 43:Shaft, 44:Bearing block, 45:Bolt, 46:Nut.
Specific implementation mode
Embodiments of the present invention is described in detail with reference to the accompanying drawings.
Embodiment 1
A kind of construction paves equipment with ground soil, as shown in Figs. 1-5, include infundibulate framework 1, stabilizer blade 2, wheel 3, Hollow pipe 4, the first spring 5, scoop 6, electronic reel 8, the first bracing wire 9, first baffle 10, the first guide rod 12, L-shaped baffle 13, second spring 14, the first fixed pulley 16, the second fixed pulley 17, pushing hands 18, sliding rail 19, sliding block 20, pedal 21 and the second bracing wire 22, the lower part of 1 left and right sides of infundibulate framework is symmetrically connected with stabilizer blade 2, and 2 bottom of stabilizer blade of the left and right sides is respectively connected with wheel 3, the right upper portion of infundibulate framework 1 is hingedly connected with hollow pipe 4, the lower right side in the left side and infundibulate framework 1 of hollow pipe 4 Between be connected with the first spring 5, the bottom of hollow pipe 4 is connected with scoop 6, and the right wall top of infundibulate framework 1 is provided with feed opening 7, feed opening 7 is located at the upside of hollow pipe 4, and the right upper portion of infundibulate framework 1 is connected with electronic reel 8, electronic reel 8 Positioned at the top of feed opening 7, the first bracing wire 9 is wound on electronic reel 8, the other end of the first bracing wire 9 is connected to hollow pipe 4 The opening contact connectio of right upper portion, 1 bottom of infundibulate framework has first baffle 10, and the bottom left and right sides of first baffle 10 is It is provided with guide groove 11, slidingtype is connected with the first guide rod 12 in the guide groove 11 of the left and right sides, and the first of the left and right sides leads It is respectively connected with L-shaped baffle 13 to 12 bottom of bar, 13 other end of L-shaped baffle of the left and right sides is connected to 1 left side of infundibulate framework The lower part of right both sides is connected separately between 13 top center of L-shaped baffle of the left and right sides and the left and right sides of first baffle 10 Second spring 14 is provided with first through hole 15 among the upper wall of infundibulate framework 1, and 1 top center of infundibulate framework is connected with first Fixed pulley 16, the first fixed pulley 16 are located at the left of first through hole 15, and the top left side of infundibulate framework 1 is connected with second and slides calmly Wheel 17, the left upper portion of infundibulate framework 1 are connected with pushing hands 18, and 1 left lower of infundibulate framework is equipped with sliding rail 19, on sliding rail 19 Slidingtype is connected with sliding block 20, and the left side of sliding block 20 is connected with pedal 21, and the top of sliding block 20 is connected with the second bracing wire 22, and second Bracing wire 22 bypasses the second fixed pulley 17 and the first fixed pulley 16, and the second bracing wire 22 passes through first through hole 15, the second bracing wire 22 another End is connected to the top center of first baffle 10.
Embodiment 2
A kind of construction paves equipment with ground soil, as shown in Figs. 1-5, include infundibulate framework 1, stabilizer blade 2, wheel 3, Hollow pipe 4, the first spring 5, scoop 6, electronic reel 8, the first bracing wire 9, first baffle 10, the first guide rod 12, L-shaped baffle 13, second spring 14, the first fixed pulley 16, the second fixed pulley 17, pushing hands 18, sliding rail 19, sliding block 20, pedal 21 and the second bracing wire 22, the lower part of 1 left and right sides of infundibulate framework is symmetrically connected with stabilizer blade 2, and 2 bottom of stabilizer blade of the left and right sides is respectively connected with wheel 3, the right upper portion of infundibulate framework 1 is hingedly connected with hollow pipe 4, the lower right side in the left side and infundibulate framework 1 of hollow pipe 4 Between be connected with the first spring 5, the bottom of hollow pipe 4 is connected with scoop 6, and the right wall top of infundibulate framework 1 is provided with feed opening 7, feed opening 7 is located at the upside of hollow pipe 4, and the right upper portion of infundibulate framework 1 is connected with electronic reel 8, electronic reel 8 Positioned at the top of feed opening 7, the first bracing wire 9 is wound on electronic reel 8, the other end of the first bracing wire 9 is connected to hollow pipe 4 The opening contact connectio of right upper portion, 1 bottom of infundibulate framework has first baffle 10, and the bottom left and right sides of first baffle 10 is It is provided with guide groove 11, slidingtype is connected with the first guide rod 12 in the guide groove 11 of the left and right sides, and the first of the left and right sides leads It is respectively connected with L-shaped baffle 13 to 12 bottom of bar, 13 other end of L-shaped baffle of the left and right sides is connected to 1 left side of infundibulate framework The lower part of right both sides is connected separately between 13 top center of L-shaped baffle of the left and right sides and the left and right sides of first baffle 10 Second spring 14 is provided with first through hole 15 among the upper wall of infundibulate framework 1, and 1 top center of infundibulate framework is connected with first Fixed pulley 16, the first fixed pulley 16 are located at the left of first through hole 15, and the top left side of infundibulate framework 1 is connected with second and slides calmly Wheel 17, the left upper portion of infundibulate framework 1 are connected with pushing hands 18, and 1 left lower of infundibulate framework is equipped with sliding rail 19, on sliding rail 19 Slidingtype is connected with sliding block 20, and the left side of sliding block 20 is connected with pedal 21, and the top of sliding block 20 is connected with the second bracing wire 22, and second Bracing wire 22 bypasses the second fixed pulley 17 and the first fixed pulley 16, and the second bracing wire 22 passes through first through hole 15, the second bracing wire 22 another End is connected to the top center of first baffle 10.
Further include having the second guide sleeve 23, third guide sleeve 24, the second guide rod 25, pressing plate 26, third spring 27 and rising Plate 28 drops, and 1 left wall lower part of infundibulate framework is embedded with the second guide sleeve 23, and 1 upper wall left part of infundibulate framework is embedded with third guide sleeve 24, third guide sleeve 24 and 23 inner sliding type of the second guide sleeve are connected with the second guide rod 25, and the bottom of the second guide rod 25 connects It is connected to pressing plate 26, third bullet is respectively connected between the left and right sides top and 1 upper wall of infundibulate framework inside of the second guide rod 25 The top of spring 27, the second guide rod 25 is connected with lifter plate 28.
Embodiment 3
A kind of construction paves equipment with ground soil, as shown in Figs. 1-5, include infundibulate framework 1, stabilizer blade 2, wheel 3, Hollow pipe 4, the first spring 5, scoop 6, electronic reel 8, the first bracing wire 9, first baffle 10, the first guide rod 12, L-shaped baffle 13, second spring 14, the first fixed pulley 16, the second fixed pulley 17, pushing hands 18, sliding rail 19, sliding block 20, pedal 21 and the second bracing wire 22, the lower part of 1 left and right sides of infundibulate framework is symmetrically connected with stabilizer blade 2, and 2 bottom of stabilizer blade of the left and right sides is respectively connected with wheel 3, the right upper portion of infundibulate framework 1 is hingedly connected with hollow pipe 4, the lower right side in the left side and infundibulate framework 1 of hollow pipe 4 Between be connected with the first spring 5, the bottom of hollow pipe 4 is connected with scoop 6, and the right wall top of infundibulate framework 1 is provided with feed opening 7, feed opening 7 is located at the upside of hollow pipe 4, and the right upper portion of infundibulate framework 1 is connected with electronic reel 8, electronic reel 8 Positioned at the top of feed opening 7, the first bracing wire 9 is wound on electronic reel 8, the other end of the first bracing wire 9 is connected to hollow pipe 4 The opening contact connectio of right upper portion, 1 bottom of infundibulate framework has first baffle 10, and the bottom left and right sides of first baffle 10 is It is provided with guide groove 11, slidingtype is connected with the first guide rod 12 in the guide groove 11 of the left and right sides, and the first of the left and right sides leads It is respectively connected with L-shaped baffle 13 to 12 bottom of bar, 13 other end of L-shaped baffle of the left and right sides is connected to 1 left side of infundibulate framework The lower part of right both sides is connected separately between 13 top center of L-shaped baffle of the left and right sides and the left and right sides of first baffle 10 Second spring 14 is provided with first through hole 15 among the upper wall of infundibulate framework 1, and 1 top center of infundibulate framework is connected with first Fixed pulley 16, the first fixed pulley 16 are located at the left of first through hole 15, and the top left side of infundibulate framework 1 is connected with second and slides calmly Wheel 17, the left upper portion of infundibulate framework 1 are connected with pushing hands 18, and 1 left lower of infundibulate framework is equipped with sliding rail 19, on sliding rail 19 Slidingtype is connected with sliding block 20, and the left side of sliding block 20 is connected with pedal 21, and the top of sliding block 20 is connected with the second bracing wire 22, and second Bracing wire 22 bypasses the second fixed pulley 17 and the first fixed pulley 16, and the second bracing wire 22 passes through first through hole 15, the second bracing wire 22 another End is connected to the top center of first baffle 10.
Further include having the second guide sleeve 23, third guide sleeve 24, the second guide rod 25, pressing plate 26, third spring 27 and rising Plate 28 drops, and 1 left wall lower part of infundibulate framework is embedded with the second guide sleeve 23, and 1 upper wall left part of infundibulate framework is embedded with third guide sleeve 24, third guide sleeve 24 and 23 inner sliding type of the second guide sleeve are connected with the second guide rod 25, and the bottom of the second guide rod 25 connects It is connected to pressing plate 26, third bullet is respectively connected between the left and right sides top and 1 upper wall of infundibulate framework inside of the second guide rod 25 The top of spring 27, the second guide rod 25 is connected with lifter plate 28.
Further include having third fixed pulley 29, fixture block 30, third bracing wire 31 and lifting the ball 32, the top left side of infundibulate framework 1 It is connected with third fixed pulley 29, third fixed pulley 29 is between the second fixed pulley 17 and the second guide rod 25, the top of pushing hands 18 Portion is connected with fixture block 30, and the bottom left of lifter plate 28 is connected with third bracing wire 31, and third bracing wire 31 bypasses third fixed pulley 29, Third bracing wire 31 passes through fixture block 30,31 left end of third bracing wire to be connected with lifting the ball 32.
Embodiment 4
A kind of construction paves equipment with ground soil, as shown in Figs. 1-5, include infundibulate framework 1, stabilizer blade 2, wheel 3, Hollow pipe 4, the first spring 5, scoop 6, electronic reel 8, the first bracing wire 9, first baffle 10, the first guide rod 12, L-shaped baffle 13, second spring 14, the first fixed pulley 16, the second fixed pulley 17, pushing hands 18, sliding rail 19, sliding block 20, pedal 21 and the second bracing wire 22, the lower part of 1 left and right sides of infundibulate framework is symmetrically connected with stabilizer blade 2, and 2 bottom of stabilizer blade of the left and right sides is respectively connected with wheel 3, the right upper portion of infundibulate framework 1 is hingedly connected with hollow pipe 4, the lower right side in the left side and infundibulate framework 1 of hollow pipe 4 Between be connected with the first spring 5, the bottom of hollow pipe 4 is connected with scoop 6, and the right wall top of infundibulate framework 1 is provided with feed opening 7, feed opening 7 is located at the upside of hollow pipe 4, and the right upper portion of infundibulate framework 1 is connected with electronic reel 8, electronic reel 8 Positioned at the top of feed opening 7, the first bracing wire 9 is wound on electronic reel 8, the other end of the first bracing wire 9 is connected to hollow pipe 4 The opening contact connectio of right upper portion, 1 bottom of infundibulate framework has first baffle 10, and the bottom left and right sides of first baffle 10 is It is provided with guide groove 11, slidingtype is connected with the first guide rod 12 in the guide groove 11 of the left and right sides, and the first of the left and right sides leads It is respectively connected with L-shaped baffle 13 to 12 bottom of bar, 13 other end of L-shaped baffle of the left and right sides is connected to 1 left side of infundibulate framework The lower part of right both sides is connected separately between 13 top center of L-shaped baffle of the left and right sides and the left and right sides of first baffle 10 Second spring 14 is provided with first through hole 15 among the upper wall of infundibulate framework 1, and 1 top center of infundibulate framework is connected with first Fixed pulley 16, the first fixed pulley 16 are located at the left of first through hole 15, and the top left side of infundibulate framework 1 is connected with second and slides calmly Wheel 17, the left upper portion of infundibulate framework 1 are connected with pushing hands 18, and 1 left lower of infundibulate framework is equipped with sliding rail 19, on sliding rail 19 Slidingtype is connected with sliding block 20, and the left side of sliding block 20 is connected with pedal 21, and the top of sliding block 20 is connected with the second bracing wire 22, and second Bracing wire 22 bypasses the second fixed pulley 17 and the first fixed pulley 16, and the second bracing wire 22 passes through first through hole 15, the second bracing wire 22 another End is connected to the top center of first baffle 10.
Further include having the second guide sleeve 23, third guide sleeve 24, the second guide rod 25, pressing plate 26, third spring 27 and rising Plate 28 drops, and 1 left wall lower part of infundibulate framework is embedded with the second guide sleeve 23, and 1 upper wall left part of infundibulate framework is embedded with third guide sleeve 24, third guide sleeve 24 and 23 inner sliding type of the second guide sleeve are connected with the second guide rod 25, and the bottom of the second guide rod 25 connects It is connected to pressing plate 26, third bullet is respectively connected between the left and right sides top and 1 upper wall of infundibulate framework inside of the second guide rod 25 The top of spring 27, the second guide rod 25 is connected with lifter plate 28.
Further include having third fixed pulley 29, fixture block 30, third bracing wire 31 and lifting the ball 32, the top left side of infundibulate framework 1 It is connected with third fixed pulley 29, third fixed pulley 29 is between the second fixed pulley 17 and the second guide rod 25, the top of pushing hands 18 Portion is connected with fixture block 30, and the bottom left of lifter plate 28 is connected with third bracing wire 31, and third bracing wire 31 bypasses third fixed pulley 29, Third bracing wire 31 passes through fixture block 30,31 left end of third bracing wire to be connected with lifting the ball 32.
Further include having the 4th guide sleeve 33, third guide rod 34, rattle balls 35, the 4th spring 36, link block 37 the 4th fixed Pulley 39, the 5th fixed pulley 40 and the 4th bracing wire 41,1 upper wall right part of infundibulate framework are connected with the 4th guide sleeve 33, and the 4th leads It is connected with third guide rod 34 to 33 inner sliding types of set, the bottom of third guide rod 34 is connected with rattle balls 35, rattle balls 35 It is connected with the 4th spring 36 between on the right side of 1 inner top of left upper portion and infundibulate framework, the 4th spring 36 is located at third guide rod The lower right side of 34 left, third guide rod 34 is equipped with link block 37, and the upper wall right part of infundibulate framework 1 is provided with the second through-hole 38, the second through-hole 38 is located at the right of the 4th guide sleeve 33, and the top right side of infundibulate framework 1 is connected with the 4th fixed pulley 39, 4th fixed pulley 39 is located at the right of the second through-hole 38, and the top right side of infundibulate framework 1 is connected with the 5th fixed pulley 40, and the 5th Fixed pulley 40 is located at the right of the 4th fixed pulley 39, and the 4th bracing wire 41 is wound on electronic reel 8, and the 4th bracing wire 41 bypasses the 5th Fixed pulley 40 and the 4th fixed pulley 39, the 4th bracing wire 41 pass through the second through-hole 38, and 41 bottom end of the 4th bracing wire is connected to link block 37 Top.
Further include having shaft 43, bearing block 44, bolt 45 and nut 46, the middle part of pedal 21 is provided with third through-hole 42, sliding The left lower of rail 19 is connected with shaft 43, and the left part of shaft 43 is connected with bearing block 44, and the bottom of bearing block 44 is connected with spiral shell Bolt 45 is rotary with nut 46 on bolt 45.
When staff needs using this equipment, this equipment is pushed into the side of ground raised zones by pushing hands 18 first Side then controls electronic reel 8 and rotates clockwise, and then loosens the first bracing wire 9 again, and the first spring 5 drives hollow pipe 4 downward Movement, hollow pipe 4 drive scoop 6 to move downward, and when scoop 6 moves downwardly to when being contacted with ground, staff's control is electronic Reel 8 is stopped, and staff holds pushing hands 18 and travels forward again, and then scoop 6 is driven to travel forward, and scoop 6 will be convex The soil shovel gone out is walked, and subsequent staff controls electronic reel 8 and rotates counterclockwise again, and then tightens the first bracing wire 9, and first draws Line 9 drives hollow pipe 4 to be flipped up, and the first spring 5 is stretched, and hollow pipe 4 drives scoop 6 to be flipped up, when hollow pipe 4 is upward When moving to the upper right side of feed opening 7, the soil in scoop 6 can flow in hollow pipe 4, and enter infundibulate by feed opening 7 In framework 1, after the soil in scoop 6 fully enters in infundibulate framework 1, staff controls 8 up time of electronic reel again The first bracing wire 9 is released in needle rotation, and under the action of the first spring 5, hollow pipe 4 drives scoop 6 to move downwardly to and sets back, Electronic reel 8 is constantly controlled by staff repeatedly along inverse alternate rotation, it can be by the soil of protrusion constantly It pours into infundibulate framework 1, after the soil of protrusion has shoveled, staff pushes this equipment to ground recess again, and by funnel The bottom opening of shape framework 1 is adjusted to the surface of ground recess, and staff slams pedal 21 with foot again and moves downward, pedal 21 band movable sliders 20 move downward on sliding rail 19, and sliding block 20 drives first baffle 10 to move upwards by the second bracing wire 22, left The second spring 14 of right both sides is stretched, and the soil in infundibulate framework 1 falls to the ground recess by the opening of bottom, and then will Ground recess is filled and led up, and after ground is filled and led up, staff again decontrols foot, and the second spring 14 of the left and right sides sets back, And hold first baffle 10 and move downwardly to and set back, and then stop the soil outflow in infundibulate framework 1, in the left and right sides Guide groove 11 and the first guide rod 12 mutual cooperation under, first baffle 10 moves up and down more steady.
Because further including having the second guide sleeve 23, third guide sleeve 24, the second guide rod 25, pressing plate 26, third spring 27 With lifter plate 28,1 left wall lower part of infundibulate framework is embedded with the second guide sleeve 23, and 1 upper wall left part of infundibulate framework is led embedded with third To set 24, third guide sleeve 24 and 23 inner sliding type of the second guide sleeve are connected with the second guide rod 25, the bottom of the second guide rod 25 Portion is connected with pressing plate 26, on the inside of 1 upper wall of left and right sides top and infundibulate framework of the second guide rod 25 between be respectively connected with the The top of three springs 27, the second guide rod 25 is connected with lifter plate 28, so after staff fills and leads up ground recess, then press Firmly lifter plate 28 moves downward, and lifter plate 28 is moved downward by the second guide rod 25 with dynamic pressure plate 26, the third of the left and right sides Spring 27 is stretched, pressing plate 26 move downward will be filled with soil region flatten, in this way can by the soil compaction of filling, Prevent soil causes to fill imperfect because of fluffy, and subsequent staff unclamps again lifter plate 28, the third bullet of the left and right sides Spring 27 sets back, and the second guide rod 25 is driven to move upwards, and the second guide rod 25 moves up to recovery with dynamic pressure plate 26 It is in situ, it constantly pins and unclamps lifter plate 28 downwards by staff, can preferably pave the soil on ground.
Because further including having third fixed pulley 29, fixture block 30, third bracing wire 31 and lifting the ball 32, the top of infundibulate framework 1 Left side is connected with third fixed pulley 29, and third fixed pulley 29 is between the second fixed pulley 17 and the second guide rod 25, pushing hands 18 Top be connected with fixture block 30, the bottom left of lifter plate 28 is connected with third bracing wire 31, and third bracing wire 31 is slided surely around third Wheel 29, third bracing wire 31 pass through fixture block 30,31 left end of third bracing wire to be connected with lifting the ball 32, so when staff needs to flatten ground When face, holds lifting the ball 32 and move downward, lifting the ball 32 drives lifter plate 28 to move downward by third bracing wire 31, and then with dynamic pressure plate 26 move downward and flatten ground, and after ground is driven plain, staff unclamps again lifting the ball 32, the third spring in the left and right sides Under the action of 27, pressing plate 26, which moves up to, to set back, and there is no need to press lifting with hand every time by such staff Plate 28 flattens soil so that staff's work is more convenient.
Because further including having the 4th guide sleeve 33, third guide rod 34, rattle balls 35, the 4th spring 36, link block 37 Four fixed pulleys 39, the 5th fixed pulley 40 and the 4th bracing wire 41,1 upper wall right part of infundibulate framework are connected with the 4th guide sleeve 33, the Four guide sleeves, 33 inner sliding type is connected with third guide rod 34, and the bottom of third guide rod 34 is connected with rattle balls 35, rattle balls It is connected with the 4th spring 36 between on the right side of 35 1 inner top of left upper portion and infundibulate framework, the 4th spring 36 is led positioned at third To the left of bar 34, the lower right side of third guide rod 34 is equipped with link block 37, and the upper wall right part of infundibulate framework 1 is provided with second Through-hole 38, the second through-hole 38 are located at the right of the 4th guide sleeve 33, and the top right side of infundibulate framework 1 is connected with the 4th fixed pulley 39, the 4th fixed pulley 39 is located at the right of the second through-hole 38, and the top right side of infundibulate framework 1 is connected with the 5th fixed pulley 40, 5th fixed pulley 40 is located at the right of the 4th fixed pulley 39, and the 4th bracing wire 41 is full of on electronic reel 8, and the 4th bracing wire 41 bypasses 5th fixed pulley 40 and the 4th fixed pulley 39, the 4th bracing wire 41 pass through the second through-hole 38, and 41 bottom end of the 4th bracing wire is connected to connection The top of block 37, so when staff controls electronic reel 8 and rotates counterclockwise, electronic reel 8 can loosen the 4th drawing Line 41, under the action of 35 gravity of rattle balls and the 4th spring 36, rattle balls 35 can move downward, and then by larger fast soil It smashes, can solve the problems, such as that bulk soil can not go out because 1 bottom opening of infundibulate framework is too small in this way, work as staff When controlling electronic reel 8 again and rotating clockwise, electronic reel 8 can tighten the 4th bracing wire 41, and the 4th bracing wire 41 passes through connection Block 37 and third guide rod 34 drive rattle balls 35 to move upwards, and are ready to break soil into pieces next time.
Because further including thering is shaft 43, bearing block 44, bolt 45 and nut 46, the middle part of pedal 21 to be provided with third through-hole 42, the left lower of sliding rail 19 is connected with shaft 43, and the left part of shaft 43 is connected with bearing block 44, the bottom connection of bearing block 44 There is bolt 45, nut 46 is rotary on bolt 45, so after staff fills and leads up ground recess, in infundibulate framework 1 again Surplus when having soil, staff needs to clear in the soil in infundibulate framework 1, and at this moment staff can turn counterclockwise Dynamic nut 46, and then nut 46 is back-outed from bolt 45, then 45180 degree of bolt is rotated clockwise, bolt 45 passes through bearing block 44 rotate clockwise 180 degree in shaft 43, and subsequent staff slams pedal 21 and moves downward again, and then bolt 45 is made to pass through Third through-hole 42, later staff nut 46 is gone back to clockwise on bolt 45 again, can thus fix first baffle 10 Position, and then staff is facilitated to clear up the soil in infundibulate framework 1, after the soil in infundibulate framework 1 has been cleared up, Staff again back-outs nut 46 from bolt 45, and pedal 21 can move upwards, and bolt 45 can leave third through-hole 42, then Staff again goes back to nut 46 on bolt 45 clockwise.
Although describing the present invention with reference to exemplary embodiment, it should be understood that the present invention is not limited to disclosed to show Example property embodiment.The scope of the following claims should give broadest explanation, to cover all modifications and equivalent Structure and function.

Claims (5)

1. a kind of construction paves equipment with ground soil, which is characterized in that include infundibulate framework(1), stabilizer blade(2), Wheel(3), hollow pipe(4), the first spring(5), scoop(6), electronic reel(8), the first bracing wire(9), first baffle(10), First guide rod(12), L-shaped baffle(13), second spring(14), the first fixed pulley(16), the second fixed pulley(17), pushing hands (18), sliding rail(19), sliding block(20), pedal(21)With the second bracing wire(22), infundibulate framework(1)The lower part of the left and right sides is right Title is connected with stabilizer blade(2), the stabilizer blade of the left and right sides(2)Bottom is respectively connected with wheel(3), infundibulate framework(1)Right upper portion It is hingedly connected with hollow pipe(4), hollow pipe(4)Left side and infundibulate framework(1)Lower right side between be connected with the first bullet Spring(5), hollow pipe(4)Bottom be connected with scoop(6), infundibulate framework(1)Right wall top be provided with feed opening(7), charging Hole(7)Positioned at hollow pipe(4)Upside, infundibulate framework(1)Right upper portion be connected with electronic reel(8), electronic coiling Wheel(8)Positioned at feed opening(7)Top, electronic reel(8)On be wound with the first bracing wire(9), the first bracing wire(9)The other end connect It is connected on hollow pipe(4)Right upper portion, infundibulate framework(1)The opening contact connectio of bottom has first baffle(10), first gear Plate(10)Bottom at left and right sides of be provided with guide groove(11), the guide groove of the left and right sides(11)Interior equal slidingtype is connected with first Guide rod(12), the first guide rod of the left and right sides(12)Bottom is respectively connected with L-shaped baffle(13), the L-shaped baffle of the left and right sides (13)The other end is connected to infundibulate framework(1)The lower part of the left and right sides, the L-shaped baffle of the left and right sides(13)Top center With first baffle(10)The left and right sides between be connected separately with second spring(14), infundibulate framework(1)Upper wall among open There is first through hole(15), infundibulate framework(1)Top center is connected with the first fixed pulley(16), the first fixed pulley(16)Positioned at One through-hole(15)Left, infundibulate framework(1)Top left side be connected with the second fixed pulley(17), infundibulate framework(1)'s Left upper portion is connected with pushing hands(18), infundibulate framework(1)Left lower is equipped with sliding rail(19), sliding rail(19)Upper slidingtype connection There is sliding block(20), sliding block(20)Left side be connected with pedal(21), sliding block(20)Top be connected with the second bracing wire(22), second Bracing wire(22)Around the second fixed pulley(17)With the first fixed pulley(16), the second bracing wire(22)Across first through hole(15), second Bracing wire(22)The other end is connected to first baffle(10)Top center.
2. a kind of construction according to claim 1 paves equipment with ground soil, which is characterized in that further include having Two guide sleeves(23), third guide sleeve(24), the second guide rod(25), pressing plate(26), third spring(27)And lifter plate(28), Infundibulate framework(1)Left wall lower part is embedded with the second guide sleeve(23), infundibulate framework(1)Upper wall left part is embedded with third guide sleeve (24), third guide sleeve(24)With the second guide sleeve(23)Inner sliding type is connected with the second guide rod(25), the second guide rod (25)Bottom be connected with pressing plate(26), the second guide rod(25)Left and right sides top and infundibulate framework(1)On the inside of upper wall Between be respectively connected with third spring(27), the second guide rod(25)Top be connected with lifter plate(28).
3. a kind of construction according to claim 2 paves equipment with ground soil, which is characterized in that further include having Three fixed pulleys(29), fixture block(30), third bracing wire(31)And lifting the ball(32), infundibulate framework(1)Top left side be connected with Three fixed pulleys(29), third fixed pulley(29)Positioned at the second fixed pulley(17)With the second guide rod(25)Between, pushing hands(18)'s Top is connected with fixture block(30), lifter plate(28)Bottom left be connected with third bracing wire(31), third bracing wire(31)Around Three fixed pulleys(29), third bracing wire(31)Across fixture block(30), third bracing wire(31)Left end is connected with lifting the ball(32).
4. a kind of construction according to claim 3 paves equipment with ground soil, which is characterized in that further include having Four guide sleeves(33), third guide rod(34), rattle balls(35), the 4th spring(36), link block(37)4th fixed pulley(39), 5th fixed pulley(40)With the 4th bracing wire(41), infundibulate framework(1)Upper wall right part is connected with the 4th guide sleeve(33), the 4th leads To set(33)Inner sliding type is connected with third guide rod(34), third guide rod(34)Bottom be connected with rattle balls(35), strike Batting(35)Left upper portion and infundibulate framework(1)It is connected with the 4th spring between on the right side of inner top(36), the 4th spring (36)Positioned at third guide rod(34)Left, third guide rod(34)Lower right side be equipped with link block(37), infundibulate frame Body(1)Upper wall right part be provided with the second through-hole(38), the second through-hole(38)Positioned at the 4th guide sleeve(33)Right, infundibulate frame Body(1)Top right side be connected with the 4th fixed pulley(39), the 4th fixed pulley(39)Positioned at the second through-hole(38)Right, funnel Shape framework(1)Top right side be connected with the 5th fixed pulley(40), the 5th fixed pulley(40)Positioned at the 4th fixed pulley(39)The right side Side, electronic reel(8)On be wound with the 4th bracing wire(41), the 4th bracing wire(41)Around the 5th fixed pulley(40)With the 4th fixed pulley (39), the 4th bracing wire(41)Across the second through-hole(38), the 4th bracing wire(41)Bottom end is connected to link block(37)Top.
5. a kind of construction according to claim 4 paves equipment with ground soil, which is characterized in that further include having to turn Axis(43), bearing block(44), bolt(45)And nut(46), pedal(21)Middle part be provided with third through-hole(42), sliding rail(19) Left lower be connected with shaft(43), shaft(43)Left part be connected with bearing block(44), bearing block(44)Bottom connection There is bolt(45), bolt(45)On be rotary with nut(46).
CN201810414566.7A 2018-05-03 2018-05-03 A kind of construction paves equipment with ground soil Pending CN108729481A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810414566.7A CN108729481A (en) 2018-05-03 2018-05-03 A kind of construction paves equipment with ground soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810414566.7A CN108729481A (en) 2018-05-03 2018-05-03 A kind of construction paves equipment with ground soil

Publications (1)

Publication Number Publication Date
CN108729481A true CN108729481A (en) 2018-11-02

Family

ID=63937932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810414566.7A Pending CN108729481A (en) 2018-05-03 2018-05-03 A kind of construction paves equipment with ground soil

Country Status (1)

Country Link
CN (1) CN108729481A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109479410A (en) * 2019-01-18 2019-03-19 南县伟业机械制造有限公司 A kind of telescopic planisher
CN110644544A (en) * 2019-09-03 2020-01-03 曾财旺 Foundation is filled and is leveled with little soil package and pushes away flat equipment
CN110747920A (en) * 2019-10-09 2020-02-04 曾财旺 Foundation is filled and is leveled with little soil package and pushes away flat equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545043A (en) * 2016-12-12 2017-03-29 邱艳 A kind of efficient excavating gear of mineral mining
US20170183844A1 (en) * 2011-09-22 2017-06-29 The Charles Machine Works, Inc. Trench Filling Machine
CN206562608U (en) * 2017-03-07 2017-10-17 许磊 A kind of building lot compaction apparatus
CN107882086A (en) * 2017-11-22 2018-04-06 魏超军 A kind of discarded stone collecting device of construction protection
CN107905061A (en) * 2017-11-20 2018-04-13 刘城 A kind of road construction breaks equipment into pieces with bulk stone

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170183844A1 (en) * 2011-09-22 2017-06-29 The Charles Machine Works, Inc. Trench Filling Machine
CN106545043A (en) * 2016-12-12 2017-03-29 邱艳 A kind of efficient excavating gear of mineral mining
CN206562608U (en) * 2017-03-07 2017-10-17 许磊 A kind of building lot compaction apparatus
CN107905061A (en) * 2017-11-20 2018-04-13 刘城 A kind of road construction breaks equipment into pieces with bulk stone
CN107882086A (en) * 2017-11-22 2018-04-06 魏超军 A kind of discarded stone collecting device of construction protection

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109479410A (en) * 2019-01-18 2019-03-19 南县伟业机械制造有限公司 A kind of telescopic planisher
CN109479410B (en) * 2019-01-18 2021-06-22 南县伟业机械制造有限公司 Telescopic levelling machine
CN110644544A (en) * 2019-09-03 2020-01-03 曾财旺 Foundation is filled and is leveled with little soil package and pushes away flat equipment
CN110644544B (en) * 2019-09-03 2022-02-11 安徽雄康建设工程有限公司 Foundation is filled and is leveled with little soil package and pushes away flat equipment
CN110747920A (en) * 2019-10-09 2020-02-04 曾财旺 Foundation is filled and is leveled with little soil package and pushes away flat equipment

Similar Documents

Publication Publication Date Title
CN111436347B (en) Desert salix mongolica planter
CN108729481A (en) A kind of construction paves equipment with ground soil
CN106732899B (en) A kind of ground and foundation engineering garbage disposer
CN109487993A (en) A kind of construction and decoration ceramic tile cement plastering equipment
CN107338718A (en) A kind of green city builds the automatic joint filling equipment with grass-planting brick road pavement
CN206397499U (en) One kind mining heading equipment
CN106342450A (en) Automatic planting device of zoning anti-dazzle plants on expressways
CN111226567B (en) Quick peanut picking equipment
CN113338282A (en) Piling equipment for road construction
CN208039228U (en) A kind of automatic brush wall device for diaphram wall
CN207219680U (en) corn root fertilizer placement drill
CN217136293U (en) Desert tree planter
CN203768967U (en) Grab bucket underground-hole-forming device
CN111512741A (en) A equipment of digging pit for fruit tree is planted
CN207592402U (en) A kind of feeding device of steel ball cleaning equipment
CN211201745U (en) Novel crawler-type anchoring rotary jet drilling machine
CN207240430U (en) The vibrating forming machine of base of high-speed railway plate construction
CN117738183A (en) Pile core soil taking shovel for prefabricated pipe pile
CN2157223Y (en) Vibration screw extrusion piling machines and tools
CN112482419A (en) Building pile foundation
CN208201963U (en) A kind of road construction bull-dozer
CN217183791U (en) A automatic landfill device of planting for granulated sugar orange tree is planted
CN216277680U (en) Piling device for building construction
CN218417245U (en) Full-automatic desert tree planter
CN212985112U (en) Pile hole bottom expanding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102