CN109487677A - The bridge plate bridge pier connection method of prefabricated bridge - Google Patents
The bridge plate bridge pier connection method of prefabricated bridge Download PDFInfo
- Publication number
- CN109487677A CN109487677A CN201811513892.XA CN201811513892A CN109487677A CN 109487677 A CN109487677 A CN 109487677A CN 201811513892 A CN201811513892 A CN 201811513892A CN 109487677 A CN109487677 A CN 109487677A
- Authority
- CN
- China
- Prior art keywords
- pilot hole
- bar
- bridge
- ring cover
- clasp joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000010276 construction Methods 0.000 claims abstract description 42
- 230000000630 rising effect Effects 0.000 claims abstract description 33
- 238000005266 casting Methods 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 239000002184 metal Substances 0.000 claims description 11
- 229910052751 metal Inorganic materials 0.000 claims description 11
- 230000005484 gravity Effects 0.000 claims description 4
- 210000003205 muscle Anatomy 0.000 claims description 4
- 238000010521 absorption reaction Methods 0.000 claims 1
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 6
- 239000011229 interlayer Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 3
- 238000002955 isolation Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 241000656145 Thyrsites atun Species 0.000 description 1
- 230000005294 ferromagnetic effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000004073 vulcanization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of bridge plate bridge pier connection method of prefabricated bridge, upper pilot hole is arranged in bridge plate in the first step, and pilot hole under being arranged on bridge pier makes rubber bar;Second step wears the lower end of rubber bar in phase pilot hole;Bridge plate is liftably fixed on above bridge pier by third step;4th step wears the upper end of rubber bar in upper pilot hole;5th step is overlapped on lower clasp joint bar on lower pilot hole ring cover to be overlapped on pilot hole ring cover with extension bar of rising to the bait;6th step, the casting concrete in upper pilot hole, the casting concrete in lower pilot hole;7th step removes the support construction after concrete in the concrete and lower pilot hole in upper pilot hole all solidifies.The present invention provides a kind of bridge plate bridge pier connection method of prefabricated bridge, solve the problems, such as that the vibration isolating effect between existing prefabricated concrete structure interlayer is poor.
Description
Technical field
The present invention relates to the bridge plate bridge pier connection methods of building engineering field more particularly to a kind of prefabricated bridge.
Background technique
Bridge construction highway, high-speed railway and overhead road of city construction in be accent, in bridge construction, bridge plate into
There are two types of the modes of row construction: one kind is prefabricated construction, and another kind is cast in situs construction.Prefabricated construction, just
It is that bridge plate is resolved into cell cube to make in factory or precasting yard, then transports to the cell cube for constituting bridge plate at bridge place simultaneously
It is mounted on bridge pier.The advantages of this kind of method for bridge construction, is: bridge pier and bridge plate can parallel construction, the duration is relatively short;Bridge
(boat) current under bridge is influenced in process of construction small.It is existing when being attached to prefabricated bridge plate and bridge pier for by concrete into
Row pours together, and there are the deficiencies of junction Lateral resisting ability difference for which, have then been changed to pass through company in order to overcome the problems referred above
Joint chair is supported between bridge plate and bridge pier, and attachment base is linked together by bolt with bridge plate and bridge pier, although the connection type
Overcome the deficiency of anti-lateral displacement effect difference present in concrete binding mode, but there are bolt it is exposed be easy corrosion outside and
It damages short so as to cause service life.All there is the deficiency of vibration isolating effect difference in any way.
Summary of the invention
The present invention provides a kind of bridge plate bridge pier connection methods of prefabricated bridge that anti-lateral displacement vibration isolating effect is good, solve existing
Prefabricated assembled bridge plate and bridge pier between vibration isolating effect difference problem.
The above technical problem solves by the following technical programs: a kind of bridge plate bridge pier connection method of prefabricated bridge,
It is characterized in that, the first step, the upper pilot hole of setting on the lower end surface of bridge plate, integrally formed with upper in the opening of the upper pilot hole
Pilot hole ring cover, pilot hole under being arranged on the upper surface of bridge pier, integrally formed with lower dress in the opening of the lower pilot hole
Distribution ring cover makes rubber bar, if the upper end of the rubber bar is hinged with several extension bars of rising to the bait, lower end is hinged with
Dry lower clasp joint bar;Second step wears the lower end of the rubber bar in the lower pilot hole ring cover;Third step is led to
Support construction is crossed liftably to be fixed on bridge plate above bridge pier;The upper end of the rubber bar is worn institute by the 4th step
It states in pilot hole ring cover;Gap between 5th step, adjustment bridge plate and bridge pier is overlapped on lower assembly to the lower clasp joint bar
Hole annular is covered to be overlapped on upper pilot hole ring cover with the extension bar of rising to the bait;6th step, poured in the upper pilot hole it is mixed
It coagulates soil and the extension bar of rising to the bait is fixed together with bridge plate so that extension bar of rising to the bait keeps clasp joint in the upper assembly orifice ring
Shape covers, the casting concrete in the lower pilot hole and the lower clasp joint bar is fixed together with bridge pier so that lower hook
Extension bar keeps clasp joint on the lower pilot hole ring cover;7th step, when in the concrete and lower pilot hole in upper pilot hole
Concrete removes the support construction after all solidifying.This method between bridge plate and bridge pier by rubber bar due to being connected
And it is provided with gap, so that there is vibration isolating effect between bridge plate driving.In which be arranged up and down clasp joint bar and also on
Lower clasp joint bar is that hingedly, can either facilitate insertion that can guarantee reliable fixation again and prevent to move up and down, rubber bar
It can effectively prevent translating to be threaded through in lower upright.Clasp joint bar is cast in concrete, so that for metal not
It can corrode, to play the role of prolonging the service life.
Preferably, upper limit potential head is arranged in the first step also on the extension bar of rising to the bait, in the upper of the rubber bar
Vertical bar is positioned in setting on end face, extension bar clasp joint upper limit potential head when on the upper pilot hole ring cover of rising to the bait is located at
It rises to the bait on side of the extension bar far from upper pilot hole ring cover, the extension bar of rising to the bait holds up upper limit potential head and is connected to the upper positioning
Extension bar of rising to the bait described in when on vertical bar be downwardly inclined and generate the torque turned downward and extension bar of rising to the bait it is directed downwardly projection be all located at institute
It states on rubber bar, and being brought together into upper limit potential head by grabbing all upper fixations in the 4th step and abut on upper positioning vertical bar
The extension bar that will rise to the bait is worn in upper pilot hole through upper pilot hole ring cover;Extension bar of rising to the bait in 5th step generates under the action of self-weight
It rotates and snaps on pilot hole ring cover.Convenience when rubber bar is assembled together with bridge plate is good.Upper clasp joint
Bar can fall down automatically after protruding into upper pilot hole.
Preferably, being arranged on upper steel construction end plate also on the upper surface of the rubber bar in the first step, pass through
The extension bar of rising to the bait is hinged on the upper steel construction end plate and is realized hinged with the rubber bar.
Preferably, the upper positioning vertical bar is also connected on the upper steel construction end plate, the upper positioning vertical bar is risen to the bait
Extension bar and upper limit potential head are all metal structure, so that rising to the bait extension bar and upper limit potential head is formed in the 6th step and assembles in injection
The muscle of concrete in hole.Bonding strength is good.It solves the problems, such as to form armored concrete in upper pilot hole.
Preferably, upper pilot hole sidewall portion reinforced frame is arranged in the hole wall of the upper pilot hole and in the upper assembly
Upper hole cover reinforced frame is set in the ring cover of hole to improve the hole wall of upper pilot hole and the structural strength of upper pilot hole ring cover;?
Upper pilot hole sidewall portion reinforced frame is set in the hole wall of the lower pilot hole and lower opening is set in the lower pilot hole ring cover
Cover reinforced frame is to improve the hole wall of lower pilot hole and the structural strength of lower pilot hole ring cover.
Preferably, lower limit potential head is arranged in the first step also on the lower clasp joint bar, under the rubber bar
Lower positioning vertical bar is set on end face, and the lower clasp joint pike pole connects lower limit potential head when on the lower pilot hole ring cover and is located at
On side of the lower clasp joint bar far from lower pilot hole ring cover;The lower clasp joint bar turns to lower limit potential head and is connected to the lower positioning
When on vertical bar, the center of gravity of the lower clasp joint bar be located across the upright plane of hinged shaft of the lower clasp joint bar with rubber bar far under
The upward projection of the side of positioning vertical bar, lower clasp joint bar is all located on the rubber bar;The lower clasp joint bar is ferromagnet,
The lower pilot hole ring cover is equipped with the permanent magnet of annular;Lower limit is brought together by grabbing all lower fixations in second step
Head abuts on lower positioning vertical bar and grabs lower fixation and wear in lower pilot hole through lower pilot hole ring cover;It rises to the bait in 5th step
Extension bar generates rotation under the suction-operated of the permanent magnet of the annular to snap on lower pilot hole ring cover.
Preferably, steel construction end plate under being arranged also on the lower end surface of the rubber bar in the first step, under described
Clasp joint bar is hinged on the lower steel construction end plate and realizes hinged with the rubber bar.Rubber bar is same
Convenience when bridge pier is assembled together is good.Lower clasp joint bar can fall down into automatically lower pilot hole annular after protruding into upper pilot hole
It covers.
Preferably, the upper positioning vertical bar is also connected on the upper steel construction end plate, the upper positioning vertical bar and upper
Spacing head is all metal structure so that rise to the bait extension bar and upper limit potential head be formed in injected in the 6th step it is mixed in lower pilot hole
Coagulate the muscle of soil.It can be improved bonding strength, solve the problems, such as to form armored concrete in lower pilot hole.
Preferably, bridge plate portion plug hole and bridge plate portion gas vent are equipped in the first step on the upper pilot hole, it is described
Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface, on the lower pilot hole be equipped with bridge pier portion plug hole and
Bridge pier portion gas vent;Bridge pier portion plug hole is passed through to concrete is injected in upper pilot hole by bridge plate portion plug hole in 6th
To injecting concrete in lower pilot hole.Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface, can be with bridge plate
It constructs for platform, it is convenient when construction.
Preferably, the rubber bar between the upper pilot hole ring cover for interference fit, the rubber branch
Strut is with being interference fit between the lower pilot hole ring cover, to prevent the concrete injected in upper pilot hole in the 6th step
The concrete for leaking out and being injected in lower pilot hole out of upper pilot hole ring cover is leaked out out of lower pilot hole ring cover.
The present invention has an advantage that can be to carrying out vibration isolation between bridge plate and driving;Lateral resisting ability is good;Metalwork pours
It builds in concrete, it is not easy to generate corrosion damage.
Detailed description of the invention
The schematic diagram of state when Fig. 1 is the progress vibration isolation of embodiment a pair of bridge plate bridge pier.
The schematic diagram of another state when Fig. 2 is the progress vibration isolation of embodiment a pair of bridge plate bridge pier.
Fig. 3 is the schematic diagram for the bridge plate bridge pier junction structure that embodiment one is produced.
Fig. 4 is the schematic diagram for the bridge plate bridge pier junction structure that embodiment two is produced
In figure: bridge plate 1, upper pilot hole 11, upper pilot hole ring cover 13, upper pilot hole sidewall portion reinforced frame 14, upper hole cover steel
Ledges 15, bridge plate portion plug hole 16, bridge plate portion gas vent 17, bridge pier 2, lower pilot hole 21, lower pilot hole ring cover 23, upper assembly
Hole sidewall portion reinforced frame 24, lower opening cover reinforced frame 25, bridge pier portion plug hole 26, bridge pier portion gas vent 27, rubber bar 3,
Upper steel construction end plate 31, upper positioning vertical bar 311, extension bar 32 of rising to the bait, on ship and resell on another market 321, upper limit potential head 322, lower steel construction end plate 33,
Lower positioning vertical bar 331, lower clasp joint bar 34, under ship and resell on another market 341, lower limit potential head 342, the hinged shaft by lower clasp joint bar with rubber bar
Upright plane S1, annular permanent magnet 35, upper pilot hole Concrete Filled body 36, lower pilot hole Concrete Filled body 37, gap
S2。
Specific embodiment
The present invention will be further described below with reference to the accompanying drawings and embodiments.
Embodiment one, referring to figure 1, figure 2 and figure 3, a kind of bridge plate bridge pier connection method of prefabricated bridge,
The first step is arranged on the lower end surface of bridge plate 1 and goes up pilot hole 11, integrally formed with upper pilot hole in the opening of upper pilot hole
Ring cover 13, interior be equipped in upper pilot hole sidewall portion reinforced frame 14 and upper pilot hole ring cover of the hole wall of upper pilot hole are equipped with upper hole
Cover reinforced frame 15, to improve the hole wall of upper pilot hole and the structural strength of upper pilot hole ring cover.Upper pilot hole is equipped with bridge plate
Portion's plug hole 16 and bridge plate portion gas vent 17.Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface.In bridge pier 2
Upper surface on lower pilot hole 21 is set, integrally formed with lower pilot hole ring cover 23 in the opening of lower pilot hole.Lower pilot hole
Hole wall in be equipped in upper pilot hole sidewall portion reinforced frame 24 and lower pilot hole ring cover and be equipped with lower opening cover reinforced frame 25, to mention
The structural strength of the hole wall of relative superiority or inferiority pilot hole and lower pilot hole ring cover.Lower pilot hole is equipped with bridge pier portion plug hole 26 and bridge pier portion
Gas vent 27.Rubber bar 3 is made, vulcanizes on the upper surface of rubber bar 3 and is fixed on steel construction end plate 31.Upper steel
The center of structure end plate is equipped with upper positioning vertical bar 311.Upper positioning vertical bar 311 is metal structure.Upper steel construction end plate is equipped with
Several rise to the bait extension bars 32 circumferentially distributed along upper steel construction end plate.Extension bar of rising to the bait 321 is hinged on steel construction by above shipping and reselling on another market
It is hinged with rubber bar on end plate.Extension bar of rising to the bait is metal structure.Extension bar of rising to the bait is equipped with upper limit potential head 322.
Upper limit potential head is metal structure.It rises to the bait extension bar clasp joint when state (i.e.) in Fig. 2 upper limit potential head when on upper pilot hole ring cover
On side of the extension bar far from upper pilot hole ring cover of rising to the bait.Extension bar of rising to the bait holds up upper limit potential head and is connected to positioning vertical bar
When state () in Fig. 1 extension bar of rising to the bait is downwardly inclined when upper and extension bar of rising to the bait projection directed downwardly is all located at the rubber bar
On.Vulcanization is fixed on lower steel construction end plate 33 on the lower end surface of rubber bar 3.The center of lower steel construction end plate is equipped with down
Position vertical bar 331.Lower positioning vertical bar 331 is metal structure.Lower steel construction end plate is equipped with several along lower steel construction end plate week
To the lower clasp joint bar 34 of distribution.Lower clasp joint bar ship and resell on another market under 341 be hinged on lower steel construction end plate with rubber bar cut with scissors
It is connected together.Lower clasp joint bar is that the ferromagnetic iron material in metal structure is made.Lower clasp joint bar is equipped with lower limit potential head 342.
Lower limit potential head is metal structure.When state (i.e.) in Fig. 2 lower limit potential head when lower clasp joint bar is overlapped on pilot hole ring cover
On side of the lower clasp joint bar far from upper pilot hole ring cover.Lower clasp joint bar holds up upper limit potential head and is connected to lower positioning vertical bar
The center of gravity of clasp joint bar is located across the upright plane of hinged shaft of the lower clasp joint bar with rubber bar under when state () in Fig. 1 when upper
The side far from lower positioning vertical bar of S1, the projection of lower clasp joint bar upward are all located on rubber bar.
Second step is brought together into after lower limit potential head abuts on lower positioning vertical bar by grabbing all lower fixations by lower fixation
It grabs and wears in lower pilot hole through lower pilot hole ring cover to which the lower end of rubber bar is worn the lower assembly orifice ring
In shape lid.It is interference fit between rubber bar and lower pilot hole ring cover.
Bridge plate is liftably fixed on above bridge pier by third step by support construction, is carried out specifically by jack
Support.
4th step is brought together into after upper limit potential head abuts on upper positioning vertical bar by grabbing all upper fixations by upper fixation
It grabs and wears in upper pilot hole through upper pilot hole ring cover to which the upper end of rubber bar is worn upper pilot hole ring cover
It is interior.Rubber bar is same as above between pilot hole ring cover as interference fit.
5th step, adjustment bridge plate and bridge pier between gap be overlapped on lower pilot hole ring cover to the lower clasp joint bar and
The extension bar of rising to the bait is overlapped on pilot hole ring cover.Extension bar of rising to the bait in the step overturns under gravity and snaps into
On pilot hole ring cover, by being adsorbed with magnet to lower clasp joint bar on the upper surface of bridge pier so that the generation of lower clasp joint bar turns
It moves to snap on lower pilot hole ring cover.
6th step, through upper pouring hole in upper pilot hole casting concrete and will rise to the bait extension bar with bridge plate be fixed together from
And to rise to the bait extension bar holding clasp joint on the upper pilot hole ring cover.Through lower pouring hole in lower pilot hole casting concrete
And lower clasp joint bar is fixed together with bridge pier so that lower clasp joint bar keeps clasp joint on the lower pilot hole ring cover.
7th step tears support construction open after the concrete in the concrete and lower pilot hole in upper pilot hole all solidifies
It removes.
Embodiment two, with the difference of embodiment one are as follows:
Referring to fig. 4, lower pilot hole ring cover is equipped with permanent magnet 35.Descend clasp joint bar in the permanent magnet of the annular in 5th step
Rotation is generated under suction-operated to snap on lower pilot hole ring cover.It has been to adsorb and produce without artificial separately that magnet
Raw overturning, improves convenience when construction.
Claims (10)
1. a kind of bridge plate bridge pier connection method of prefabricated bridge, which is characterized in that the first step fills in setting on the lower end surface of bridge plate
Distribution is assembled under being arranged on the upper surface of bridge pier integrally formed with upper pilot hole ring cover in the opening of the upper pilot hole
Hole makes rubber bar, the rubber bar integrally formed with lower pilot hole ring cover in the opening of the lower pilot hole
Upper end be hinged with several extension bars of rising to the bait, lower end is hinged with several lower clasp joint bars;Second step, by the lower end of the rubber bar
It wears in the lower pilot hole ring cover;Bridge plate is liftably fixed on above bridge pier by third step by support construction;The
Four steps wear the upper end of the rubber bar in the upper pilot hole ring cover;5th step, adjustment bridge plate and bridge pier it
Between gap be overlapped on lower pilot hole ring cover to the lower clasp joint bar and the extension bar of rising to the bait is overlapped on upper pilot hole annular
It covers;6th step, in the upper pilot hole casting concrete and the extension bar of rising to the bait is fixed together with bridge plate to making
The extension bar that must rise to the bait keep clasp joint on the upper pilot hole ring cover, the casting concrete in the lower pilot hole and will be described under
Clasp joint bar is fixed together with bridge pier so that lower clasp joint bar keeps clasp joint on the lower pilot hole ring cover;7th step,
The support construction is removed after the concrete in the concrete and lower pilot hole in upper pilot hole all solidifies.
2. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that also described in the first step
It rises to the bait and upper limit potential head is set on extension bar, position vertical bar, the extension bar of rising to the bait in setting on the upper surface of the rubber bar
Clasp joint upper limit potential head when on the upper pilot hole ring cover is located at side of the extension bar far from upper pilot hole ring cover of rising to the bait
On, the extension bar of rising to the bait hold up when upper limit potential head is connected on the upper positioning vertical bar described in extension bar of rising to the bait be downwardly inclined and produce
The torque and extension bar of rising to the bait that life turns downward projection directed downwardly are all located on the rubber bar, by making to own in the 4th step
Upper fixation grab be brought together into upper limit potential head abut to positioning vertical bar on and the extension bar that will rise to the bait is worn through upper pilot hole ring cover
In upper pilot hole;Extension bar of rising to the bait in 5th step generates rotation under the action of self-weight and snaps on pilot hole ring cover.
3. the bridge plate bridge pier connection method of prefabricated bridge according to claim 2, which is characterized in that also described in the first step
Upper steel construction end plate is set on the upper surface of rubber bar, by the way that the extension bar of rising to the bait is hinged on the upper steel construction end plate
Above realize hinged with the rubber bar.
4. the bridge plate bridge pier connection method of prefabricated bridge according to claim 3, which is characterized in that the upper positioning vertical bar
It is connected on the upper steel construction end plate, the upper positioning vertical bar rises to the bait extension bar and upper limit potential head is all metal structure, to make
It must rise to the bait extension bar and upper limit potential head is formed in the muscle of the concrete injected in upper pilot hole in the 6th step.
5. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that in the upper pilot hole
Upper pilot hole sidewall portion reinforced frame is set in hole wall and upper hole cover reinforced frame is set in the upper pilot hole ring cover to mention
The structural strength of the hole wall of pilot hole and upper pilot hole ring cover on height;Upper pilot hole is set in the hole wall of the lower pilot hole
Sidewall portion reinforced frame and be arranged in the lower pilot hole ring cover lower opening cover reinforced frame with the hole wall of pilot hole under improving and
The structural strength of lower pilot hole ring cover.
6. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that also described in the first step
Lower limit potential head is set on lower clasp joint bar, positions vertical bar, the lower clasp joint bar under being arranged on the lower end surface of the rubber bar
Clasp joint lower limit potential head when on the lower pilot hole ring cover is located at side of the lower clasp joint bar far from lower pilot hole ring cover
On;The lower clasp joint bar turns to lower limit potential head when being connected on the lower positioning vertical bar, and the center of gravity of the lower clasp joint bar is located at
The upward throwing of the side far from lower positioning vertical bar of the upright plane of hinged shaft by lower clasp joint bar with rubber bar, lower clasp joint bar
Shadow is all located on the rubber bar;The lower clasp joint bar is ferromagnet, and the lower pilot hole ring cover is equipped with annular
Permanent magnet;It is brought together into and lower limit potential head abuts on lower positioning vertical bar by grabbing all lower fixations by lower fixation in second step
It grabs and is worn in lower pilot hole through lower pilot hole ring cover;Lower clasp joint bar is made in the absorption of the permanent magnet of the annular in 5th step
It rotates to snap on lower pilot hole ring cover with lower generation.
7. the bridge plate bridge pier connection method of prefabricated bridge according to claim 6, which is characterized in that also described in the first step
Steel construction end plate down is set on the lower end surface of rubber bar, and the lower clasp joint bar is hinged on the lower steel construction end plate and reality
It is now hinged with the rubber bar.
8. the bridge plate bridge pier connection method of prefabricated bridge according to claim 7, which is characterized in that the upper positioning vertical bar
It is connected on the upper steel construction end plate, the upper positioning vertical bar and upper limit potential head are all metal structure, so that upper clasp joint
Bar and upper limit potential head are formed in the muscle of the concrete injected in lower pilot hole in the 6th step.
9. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that in the first step on described
Pilot hole is equipped with bridge plate portion plug hole and bridge plate portion gas vent, bridge plate portion plug hole and bridge plate portion gas vent all penetrating bridges
Plate upper surface is equipped with bridge pier portion plug hole and bridge pier portion gas vent on the lower pilot hole;It is poured in 6th by bridge plate portion
Orifice is given in lower pilot hole by bridge pier portion plug hole to concrete is injected in upper pilot hole and injects concrete.
10. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that the rubber bar
With being interference fit between the upper pilot hole ring cover, the rubber bar was between the lower pilot hole ring cover
It is full of cooperation, to prevent the concrete injected in upper pilot hole in the 6th step from leaking out and inject to descend to fill out of upper pilot hole ring cover
Concrete in distribution is leaked out out of lower pilot hole ring cover.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811513892.XA CN109487677B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
CN202010569143.XA CN111676803B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811513892.XA CN109487677B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010569143.XA Division CN111676803B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109487677A true CN109487677A (en) | 2019-03-19 |
CN109487677B CN109487677B (en) | 2021-02-12 |
Family
ID=65709794
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010569143.XA Active CN111676803B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
CN201811513892.XA Active CN109487677B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010569143.XA Active CN111676803B (en) | 2018-12-11 | 2018-12-11 | Bridge plate pier connection method of prefabricated bridge |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN111676803B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06221357A (en) * | 1993-01-25 | 1994-08-09 | Bridgestone Corp | Laminated rubber body lined with rubber |
JPH08209626A (en) * | 1995-02-07 | 1996-08-13 | Nitta Ind Corp | Bridge falling preventing device for bridge |
CN102206930A (en) * | 2007-02-15 | 2011-10-05 | 尹学军 | Split type vibration isolating device and application thereof |
CN204435219U (en) * | 2015-02-09 | 2015-07-01 | 中交公路养护工程技术有限公司 | A kind of for the shock-absorbing bridge support between bridge pier and bridge |
CN107151976A (en) * | 2017-06-16 | 2017-09-12 | 北京交达铁工科技有限公司 | Separate type tenon component, elastoplasticity girder falling stopping means and its installation method |
CN108824172A (en) * | 2018-09-05 | 2018-11-16 | 沈阳建筑大学 | Bridge rubber pad limits energy-consuming device |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4010924A (en) * | 1974-09-09 | 1977-03-08 | S.S.B. (Aerial Fixings) Limited | Attachment for brickwork |
NO20003781L (en) * | 2000-07-24 | 2002-05-07 | Aluminova As | Device for end bracket for joining building profiles |
JP3690395B2 (en) * | 2003-02-27 | 2005-08-31 | 株式会社竹中工務店 | Joint structure of support pile and structure |
CN203238774U (en) * | 2013-04-24 | 2013-10-16 | 河南天丰节能板材科技股份有限公司 | Roof connecting beam, connecting structure of wall body and roof and modularized integrated house |
KR101448386B1 (en) * | 2013-05-22 | 2014-10-08 | 한양대학교 산학협력단 | Vibration control device of scissors toggle type having hinge friction damper |
CN104878854A (en) * | 2015-04-14 | 2015-09-02 | 华南理工大学建筑设计研究院 | Prefabricated shear wall horizontal abutted seam buckle welding built-up connection device |
CN204626658U (en) * | 2015-05-05 | 2015-09-09 | 郭一雪 | A kind of column of double curved glass curtain wall and beam connecting structure |
CN105839521A (en) * | 2016-05-20 | 2016-08-10 | 西安中交土木科技有限公司 | Bridge polyurethane lamination isolation bearing and construction method thereof |
CN107620386B (en) * | 2017-10-23 | 2019-08-23 | 南京百西思建筑科技有限公司 | The mounting structure and construction method of shock isolating pedestal in existing building base isolation reinforcement |
-
2018
- 2018-12-11 CN CN202010569143.XA patent/CN111676803B/en active Active
- 2018-12-11 CN CN201811513892.XA patent/CN109487677B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06221357A (en) * | 1993-01-25 | 1994-08-09 | Bridgestone Corp | Laminated rubber body lined with rubber |
JPH08209626A (en) * | 1995-02-07 | 1996-08-13 | Nitta Ind Corp | Bridge falling preventing device for bridge |
CN102206930A (en) * | 2007-02-15 | 2011-10-05 | 尹学军 | Split type vibration isolating device and application thereof |
CN204435219U (en) * | 2015-02-09 | 2015-07-01 | 中交公路养护工程技术有限公司 | A kind of for the shock-absorbing bridge support between bridge pier and bridge |
CN107151976A (en) * | 2017-06-16 | 2017-09-12 | 北京交达铁工科技有限公司 | Separate type tenon component, elastoplasticity girder falling stopping means and its installation method |
CN108824172A (en) * | 2018-09-05 | 2018-11-16 | 沈阳建筑大学 | Bridge rubber pad limits energy-consuming device |
Also Published As
Publication number | Publication date |
---|---|
CN109487677B (en) | 2021-02-12 |
CN111676803A (en) | 2020-09-18 |
CN111676803B (en) | 2021-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208701729U (en) | A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap | |
CN110004791A (en) | A kind of prestressing without bondn assembled road and its construction method | |
CN109487677A (en) | The bridge plate bridge pier connection method of prefabricated bridge | |
CN206768845U (en) | Prefabricated cushion cap foundation and its mounting structure | |
CN104110353B (en) | Antidumping blower foundation ring structure and construction method thereof | |
CN109594833A (en) | Prefabricated concrete structure Interlayer seismic isolation method | |
CN208105023U (en) | Assembling type girder bridge | |
CN201883746U (en) | Base of movable high-voltage wire pole | |
CN109895239A (en) | A kind of assembly concrete stair delay platform beam slab and its method of construction | |
CN108316341A (en) | Prefabrication type High-Rise Pile Cap Foundation and its construction method | |
CN109487678A (en) | The bridge plate bridge pier connection structure of prefabricated bridge | |
CN106351124A (en) | Bridge construction method | |
CN204825975U (en) | Novel pressure seat well of integral type seals structure | |
CN105442855B (en) | A kind of high-precision buried equipment, method of large scale embedded board | |
CN209523213U (en) | Assembled independent foundation | |
CN108708388B (en) | Tower foundation and preparation method thereof | |
CN206385526U (en) | A kind of highway subgrade broken stone pile | |
JP3848917B2 (en) | Hybrid structure box construction method | |
CN109837838A (en) | A kind of construction method of steel reinforced concrete box beam | |
CN208830334U (en) | A kind of cofferdam small dike rubber bath rubber antiskid fixed structure | |
CN208455871U (en) | A kind of concrete assembled construction wall | |
CN208965576U (en) | A kind of fixed connection structure of timber structure suspension column and basis | |
CN202323875U (en) | Nodular cast iron pillar shell bollard with single retaining ledge | |
CN206655223U (en) | A kind of prefabricated workpiece | |
CN214994019U (en) | Universal tower crane foundation pre-embedded structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210121 Address after: 053000 room 1815, 18 / F, unit 1, building 3, Hongtai Dongdu International Garden (CBD. Dongdu) community, Taocheng District, Hengshui City, Hebei Province Applicant after: Hengshui Yunling road and Bridge Engineering Co.,Ltd. Address before: No. 004, group 8, Xihu village, Xiapu Town, Tongshan County, Xianning City, Hubei Province Applicant before: Zheng Qionghua |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |