CN109487677A - The bridge plate bridge pier connection method of prefabricated bridge - Google Patents

The bridge plate bridge pier connection method of prefabricated bridge Download PDF

Info

Publication number
CN109487677A
CN109487677A CN201811513892.XA CN201811513892A CN109487677A CN 109487677 A CN109487677 A CN 109487677A CN 201811513892 A CN201811513892 A CN 201811513892A CN 109487677 A CN109487677 A CN 109487677A
Authority
CN
China
Prior art keywords
pilot hole
bar
bridge
ring cover
clasp joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811513892.XA
Other languages
Chinese (zh)
Other versions
CN109487677B (en
Inventor
郑琼华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Yunling Road And Bridge Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811513892.XA priority Critical patent/CN109487677B/en
Priority to CN202010569143.XA priority patent/CN111676803B/en
Publication of CN109487677A publication Critical patent/CN109487677A/en
Application granted granted Critical
Publication of CN109487677B publication Critical patent/CN109487677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of bridge plate bridge pier connection method of prefabricated bridge, upper pilot hole is arranged in bridge plate in the first step, and pilot hole under being arranged on bridge pier makes rubber bar;Second step wears the lower end of rubber bar in phase pilot hole;Bridge plate is liftably fixed on above bridge pier by third step;4th step wears the upper end of rubber bar in upper pilot hole;5th step is overlapped on lower clasp joint bar on lower pilot hole ring cover to be overlapped on pilot hole ring cover with extension bar of rising to the bait;6th step, the casting concrete in upper pilot hole, the casting concrete in lower pilot hole;7th step removes the support construction after concrete in the concrete and lower pilot hole in upper pilot hole all solidifies.The present invention provides a kind of bridge plate bridge pier connection method of prefabricated bridge, solve the problems, such as that the vibration isolating effect between existing prefabricated concrete structure interlayer is poor.

Description

The bridge plate bridge pier connection method of prefabricated bridge
Technical field
The present invention relates to the bridge plate bridge pier connection methods of building engineering field more particularly to a kind of prefabricated bridge.
Background technique
Bridge construction highway, high-speed railway and overhead road of city construction in be accent, in bridge construction, bridge plate into There are two types of the modes of row construction: one kind is prefabricated construction, and another kind is cast in situs construction.Prefabricated construction, just It is that bridge plate is resolved into cell cube to make in factory or precasting yard, then transports to the cell cube for constituting bridge plate at bridge place simultaneously It is mounted on bridge pier.The advantages of this kind of method for bridge construction, is: bridge pier and bridge plate can parallel construction, the duration is relatively short;Bridge (boat) current under bridge is influenced in process of construction small.It is existing when being attached to prefabricated bridge plate and bridge pier for by concrete into Row pours together, and there are the deficiencies of junction Lateral resisting ability difference for which, have then been changed to pass through company in order to overcome the problems referred above Joint chair is supported between bridge plate and bridge pier, and attachment base is linked together by bolt with bridge plate and bridge pier, although the connection type Overcome the deficiency of anti-lateral displacement effect difference present in concrete binding mode, but there are bolt it is exposed be easy corrosion outside and It damages short so as to cause service life.All there is the deficiency of vibration isolating effect difference in any way.
Summary of the invention
The present invention provides a kind of bridge plate bridge pier connection methods of prefabricated bridge that anti-lateral displacement vibration isolating effect is good, solve existing Prefabricated assembled bridge plate and bridge pier between vibration isolating effect difference problem.
The above technical problem solves by the following technical programs: a kind of bridge plate bridge pier connection method of prefabricated bridge, It is characterized in that, the first step, the upper pilot hole of setting on the lower end surface of bridge plate, integrally formed with upper in the opening of the upper pilot hole Pilot hole ring cover, pilot hole under being arranged on the upper surface of bridge pier, integrally formed with lower dress in the opening of the lower pilot hole Distribution ring cover makes rubber bar, if the upper end of the rubber bar is hinged with several extension bars of rising to the bait, lower end is hinged with Dry lower clasp joint bar;Second step wears the lower end of the rubber bar in the lower pilot hole ring cover;Third step is led to Support construction is crossed liftably to be fixed on bridge plate above bridge pier;The upper end of the rubber bar is worn institute by the 4th step It states in pilot hole ring cover;Gap between 5th step, adjustment bridge plate and bridge pier is overlapped on lower assembly to the lower clasp joint bar Hole annular is covered to be overlapped on upper pilot hole ring cover with the extension bar of rising to the bait;6th step, poured in the upper pilot hole it is mixed It coagulates soil and the extension bar of rising to the bait is fixed together with bridge plate so that extension bar of rising to the bait keeps clasp joint in the upper assembly orifice ring Shape covers, the casting concrete in the lower pilot hole and the lower clasp joint bar is fixed together with bridge pier so that lower hook Extension bar keeps clasp joint on the lower pilot hole ring cover;7th step, when in the concrete and lower pilot hole in upper pilot hole Concrete removes the support construction after all solidifying.This method between bridge plate and bridge pier by rubber bar due to being connected And it is provided with gap, so that there is vibration isolating effect between bridge plate driving.In which be arranged up and down clasp joint bar and also on Lower clasp joint bar is that hingedly, can either facilitate insertion that can guarantee reliable fixation again and prevent to move up and down, rubber bar It can effectively prevent translating to be threaded through in lower upright.Clasp joint bar is cast in concrete, so that for metal not It can corrode, to play the role of prolonging the service life.
Preferably, upper limit potential head is arranged in the first step also on the extension bar of rising to the bait, in the upper of the rubber bar Vertical bar is positioned in setting on end face, extension bar clasp joint upper limit potential head when on the upper pilot hole ring cover of rising to the bait is located at It rises to the bait on side of the extension bar far from upper pilot hole ring cover, the extension bar of rising to the bait holds up upper limit potential head and is connected to the upper positioning Extension bar of rising to the bait described in when on vertical bar be downwardly inclined and generate the torque turned downward and extension bar of rising to the bait it is directed downwardly projection be all located at institute It states on rubber bar, and being brought together into upper limit potential head by grabbing all upper fixations in the 4th step and abut on upper positioning vertical bar The extension bar that will rise to the bait is worn in upper pilot hole through upper pilot hole ring cover;Extension bar of rising to the bait in 5th step generates under the action of self-weight It rotates and snaps on pilot hole ring cover.Convenience when rubber bar is assembled together with bridge plate is good.Upper clasp joint Bar can fall down automatically after protruding into upper pilot hole.
Preferably, being arranged on upper steel construction end plate also on the upper surface of the rubber bar in the first step, pass through The extension bar of rising to the bait is hinged on the upper steel construction end plate and is realized hinged with the rubber bar.
Preferably, the upper positioning vertical bar is also connected on the upper steel construction end plate, the upper positioning vertical bar is risen to the bait Extension bar and upper limit potential head are all metal structure, so that rising to the bait extension bar and upper limit potential head is formed in the 6th step and assembles in injection The muscle of concrete in hole.Bonding strength is good.It solves the problems, such as to form armored concrete in upper pilot hole.
Preferably, upper pilot hole sidewall portion reinforced frame is arranged in the hole wall of the upper pilot hole and in the upper assembly Upper hole cover reinforced frame is set in the ring cover of hole to improve the hole wall of upper pilot hole and the structural strength of upper pilot hole ring cover;? Upper pilot hole sidewall portion reinforced frame is set in the hole wall of the lower pilot hole and lower opening is set in the lower pilot hole ring cover Cover reinforced frame is to improve the hole wall of lower pilot hole and the structural strength of lower pilot hole ring cover.
Preferably, lower limit potential head is arranged in the first step also on the lower clasp joint bar, under the rubber bar Lower positioning vertical bar is set on end face, and the lower clasp joint pike pole connects lower limit potential head when on the lower pilot hole ring cover and is located at On side of the lower clasp joint bar far from lower pilot hole ring cover;The lower clasp joint bar turns to lower limit potential head and is connected to the lower positioning When on vertical bar, the center of gravity of the lower clasp joint bar be located across the upright plane of hinged shaft of the lower clasp joint bar with rubber bar far under The upward projection of the side of positioning vertical bar, lower clasp joint bar is all located on the rubber bar;The lower clasp joint bar is ferromagnet, The lower pilot hole ring cover is equipped with the permanent magnet of annular;Lower limit is brought together by grabbing all lower fixations in second step Head abuts on lower positioning vertical bar and grabs lower fixation and wear in lower pilot hole through lower pilot hole ring cover;It rises to the bait in 5th step Extension bar generates rotation under the suction-operated of the permanent magnet of the annular to snap on lower pilot hole ring cover.
Preferably, steel construction end plate under being arranged also on the lower end surface of the rubber bar in the first step, under described Clasp joint bar is hinged on the lower steel construction end plate and realizes hinged with the rubber bar.Rubber bar is same Convenience when bridge pier is assembled together is good.Lower clasp joint bar can fall down into automatically lower pilot hole annular after protruding into upper pilot hole It covers.
Preferably, the upper positioning vertical bar is also connected on the upper steel construction end plate, the upper positioning vertical bar and upper Spacing head is all metal structure so that rise to the bait extension bar and upper limit potential head be formed in injected in the 6th step it is mixed in lower pilot hole Coagulate the muscle of soil.It can be improved bonding strength, solve the problems, such as to form armored concrete in lower pilot hole.
Preferably, bridge plate portion plug hole and bridge plate portion gas vent are equipped in the first step on the upper pilot hole, it is described Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface, on the lower pilot hole be equipped with bridge pier portion plug hole and Bridge pier portion gas vent;Bridge pier portion plug hole is passed through to concrete is injected in upper pilot hole by bridge plate portion plug hole in 6th To injecting concrete in lower pilot hole.Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface, can be with bridge plate It constructs for platform, it is convenient when construction.
Preferably, the rubber bar between the upper pilot hole ring cover for interference fit, the rubber branch Strut is with being interference fit between the lower pilot hole ring cover, to prevent the concrete injected in upper pilot hole in the 6th step The concrete for leaking out and being injected in lower pilot hole out of upper pilot hole ring cover is leaked out out of lower pilot hole ring cover.
The present invention has an advantage that can be to carrying out vibration isolation between bridge plate and driving;Lateral resisting ability is good;Metalwork pours It builds in concrete, it is not easy to generate corrosion damage.
Detailed description of the invention
The schematic diagram of state when Fig. 1 is the progress vibration isolation of embodiment a pair of bridge plate bridge pier.
The schematic diagram of another state when Fig. 2 is the progress vibration isolation of embodiment a pair of bridge plate bridge pier.
Fig. 3 is the schematic diagram for the bridge plate bridge pier junction structure that embodiment one is produced.
Fig. 4 is the schematic diagram for the bridge plate bridge pier junction structure that embodiment two is produced
In figure: bridge plate 1, upper pilot hole 11, upper pilot hole ring cover 13, upper pilot hole sidewall portion reinforced frame 14, upper hole cover steel Ledges 15, bridge plate portion plug hole 16, bridge plate portion gas vent 17, bridge pier 2, lower pilot hole 21, lower pilot hole ring cover 23, upper assembly Hole sidewall portion reinforced frame 24, lower opening cover reinforced frame 25, bridge pier portion plug hole 26, bridge pier portion gas vent 27, rubber bar 3, Upper steel construction end plate 31, upper positioning vertical bar 311, extension bar 32 of rising to the bait, on ship and resell on another market 321, upper limit potential head 322, lower steel construction end plate 33, Lower positioning vertical bar 331, lower clasp joint bar 34, under ship and resell on another market 341, lower limit potential head 342, the hinged shaft by lower clasp joint bar with rubber bar Upright plane S1, annular permanent magnet 35, upper pilot hole Concrete Filled body 36, lower pilot hole Concrete Filled body 37, gap S2。
Specific embodiment
The present invention will be further described below with reference to the accompanying drawings and embodiments.
Embodiment one, referring to figure 1, figure 2 and figure 3, a kind of bridge plate bridge pier connection method of prefabricated bridge,
The first step is arranged on the lower end surface of bridge plate 1 and goes up pilot hole 11, integrally formed with upper pilot hole in the opening of upper pilot hole Ring cover 13, interior be equipped in upper pilot hole sidewall portion reinforced frame 14 and upper pilot hole ring cover of the hole wall of upper pilot hole are equipped with upper hole Cover reinforced frame 15, to improve the hole wall of upper pilot hole and the structural strength of upper pilot hole ring cover.Upper pilot hole is equipped with bridge plate Portion's plug hole 16 and bridge plate portion gas vent 17.Bridge plate portion plug hole and bridge plate portion gas vent all penetrate through bridge plate upper surface.In bridge pier 2 Upper surface on lower pilot hole 21 is set, integrally formed with lower pilot hole ring cover 23 in the opening of lower pilot hole.Lower pilot hole Hole wall in be equipped in upper pilot hole sidewall portion reinforced frame 24 and lower pilot hole ring cover and be equipped with lower opening cover reinforced frame 25, to mention The structural strength of the hole wall of relative superiority or inferiority pilot hole and lower pilot hole ring cover.Lower pilot hole is equipped with bridge pier portion plug hole 26 and bridge pier portion Gas vent 27.Rubber bar 3 is made, vulcanizes on the upper surface of rubber bar 3 and is fixed on steel construction end plate 31.Upper steel The center of structure end plate is equipped with upper positioning vertical bar 311.Upper positioning vertical bar 311 is metal structure.Upper steel construction end plate is equipped with Several rise to the bait extension bars 32 circumferentially distributed along upper steel construction end plate.Extension bar of rising to the bait 321 is hinged on steel construction by above shipping and reselling on another market It is hinged with rubber bar on end plate.Extension bar of rising to the bait is metal structure.Extension bar of rising to the bait is equipped with upper limit potential head 322. Upper limit potential head is metal structure.It rises to the bait extension bar clasp joint when state (i.e.) in Fig. 2 upper limit potential head when on upper pilot hole ring cover On side of the extension bar far from upper pilot hole ring cover of rising to the bait.Extension bar of rising to the bait holds up upper limit potential head and is connected to positioning vertical bar When state () in Fig. 1 extension bar of rising to the bait is downwardly inclined when upper and extension bar of rising to the bait projection directed downwardly is all located at the rubber bar On.Vulcanization is fixed on lower steel construction end plate 33 on the lower end surface of rubber bar 3.The center of lower steel construction end plate is equipped with down Position vertical bar 331.Lower positioning vertical bar 331 is metal structure.Lower steel construction end plate is equipped with several along lower steel construction end plate week To the lower clasp joint bar 34 of distribution.Lower clasp joint bar ship and resell on another market under 341 be hinged on lower steel construction end plate with rubber bar cut with scissors It is connected together.Lower clasp joint bar is that the ferromagnetic iron material in metal structure is made.Lower clasp joint bar is equipped with lower limit potential head 342. Lower limit potential head is metal structure.When state (i.e.) in Fig. 2 lower limit potential head when lower clasp joint bar is overlapped on pilot hole ring cover On side of the lower clasp joint bar far from upper pilot hole ring cover.Lower clasp joint bar holds up upper limit potential head and is connected to lower positioning vertical bar The center of gravity of clasp joint bar is located across the upright plane of hinged shaft of the lower clasp joint bar with rubber bar under when state () in Fig. 1 when upper The side far from lower positioning vertical bar of S1, the projection of lower clasp joint bar upward are all located on rubber bar.
Second step is brought together into after lower limit potential head abuts on lower positioning vertical bar by grabbing all lower fixations by lower fixation It grabs and wears in lower pilot hole through lower pilot hole ring cover to which the lower end of rubber bar is worn the lower assembly orifice ring In shape lid.It is interference fit between rubber bar and lower pilot hole ring cover.
Bridge plate is liftably fixed on above bridge pier by third step by support construction, is carried out specifically by jack Support.
4th step is brought together into after upper limit potential head abuts on upper positioning vertical bar by grabbing all upper fixations by upper fixation It grabs and wears in upper pilot hole through upper pilot hole ring cover to which the upper end of rubber bar is worn upper pilot hole ring cover It is interior.Rubber bar is same as above between pilot hole ring cover as interference fit.
5th step, adjustment bridge plate and bridge pier between gap be overlapped on lower pilot hole ring cover to the lower clasp joint bar and The extension bar of rising to the bait is overlapped on pilot hole ring cover.Extension bar of rising to the bait in the step overturns under gravity and snaps into On pilot hole ring cover, by being adsorbed with magnet to lower clasp joint bar on the upper surface of bridge pier so that the generation of lower clasp joint bar turns It moves to snap on lower pilot hole ring cover.
6th step, through upper pouring hole in upper pilot hole casting concrete and will rise to the bait extension bar with bridge plate be fixed together from And to rise to the bait extension bar holding clasp joint on the upper pilot hole ring cover.Through lower pouring hole in lower pilot hole casting concrete And lower clasp joint bar is fixed together with bridge pier so that lower clasp joint bar keeps clasp joint on the lower pilot hole ring cover.
7th step tears support construction open after the concrete in the concrete and lower pilot hole in upper pilot hole all solidifies It removes.
Embodiment two, with the difference of embodiment one are as follows:
Referring to fig. 4, lower pilot hole ring cover is equipped with permanent magnet 35.Descend clasp joint bar in the permanent magnet of the annular in 5th step Rotation is generated under suction-operated to snap on lower pilot hole ring cover.It has been to adsorb and produce without artificial separately that magnet Raw overturning, improves convenience when construction.

Claims (10)

1. a kind of bridge plate bridge pier connection method of prefabricated bridge, which is characterized in that the first step fills in setting on the lower end surface of bridge plate Distribution is assembled under being arranged on the upper surface of bridge pier integrally formed with upper pilot hole ring cover in the opening of the upper pilot hole Hole makes rubber bar, the rubber bar integrally formed with lower pilot hole ring cover in the opening of the lower pilot hole Upper end be hinged with several extension bars of rising to the bait, lower end is hinged with several lower clasp joint bars;Second step, by the lower end of the rubber bar It wears in the lower pilot hole ring cover;Bridge plate is liftably fixed on above bridge pier by third step by support construction;The Four steps wear the upper end of the rubber bar in the upper pilot hole ring cover;5th step, adjustment bridge plate and bridge pier it Between gap be overlapped on lower pilot hole ring cover to the lower clasp joint bar and the extension bar of rising to the bait is overlapped on upper pilot hole annular It covers;6th step, in the upper pilot hole casting concrete and the extension bar of rising to the bait is fixed together with bridge plate to making The extension bar that must rise to the bait keep clasp joint on the upper pilot hole ring cover, the casting concrete in the lower pilot hole and will be described under Clasp joint bar is fixed together with bridge pier so that lower clasp joint bar keeps clasp joint on the lower pilot hole ring cover;7th step, The support construction is removed after the concrete in the concrete and lower pilot hole in upper pilot hole all solidifies.
2. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that also described in the first step It rises to the bait and upper limit potential head is set on extension bar, position vertical bar, the extension bar of rising to the bait in setting on the upper surface of the rubber bar Clasp joint upper limit potential head when on the upper pilot hole ring cover is located at side of the extension bar far from upper pilot hole ring cover of rising to the bait On, the extension bar of rising to the bait hold up when upper limit potential head is connected on the upper positioning vertical bar described in extension bar of rising to the bait be downwardly inclined and produce The torque and extension bar of rising to the bait that life turns downward projection directed downwardly are all located on the rubber bar, by making to own in the 4th step Upper fixation grab be brought together into upper limit potential head abut to positioning vertical bar on and the extension bar that will rise to the bait is worn through upper pilot hole ring cover In upper pilot hole;Extension bar of rising to the bait in 5th step generates rotation under the action of self-weight and snaps on pilot hole ring cover.
3. the bridge plate bridge pier connection method of prefabricated bridge according to claim 2, which is characterized in that also described in the first step Upper steel construction end plate is set on the upper surface of rubber bar, by the way that the extension bar of rising to the bait is hinged on the upper steel construction end plate Above realize hinged with the rubber bar.
4. the bridge plate bridge pier connection method of prefabricated bridge according to claim 3, which is characterized in that the upper positioning vertical bar It is connected on the upper steel construction end plate, the upper positioning vertical bar rises to the bait extension bar and upper limit potential head is all metal structure, to make It must rise to the bait extension bar and upper limit potential head is formed in the muscle of the concrete injected in upper pilot hole in the 6th step.
5. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that in the upper pilot hole Upper pilot hole sidewall portion reinforced frame is set in hole wall and upper hole cover reinforced frame is set in the upper pilot hole ring cover to mention The structural strength of the hole wall of pilot hole and upper pilot hole ring cover on height;Upper pilot hole is set in the hole wall of the lower pilot hole Sidewall portion reinforced frame and be arranged in the lower pilot hole ring cover lower opening cover reinforced frame with the hole wall of pilot hole under improving and The structural strength of lower pilot hole ring cover.
6. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that also described in the first step Lower limit potential head is set on lower clasp joint bar, positions vertical bar, the lower clasp joint bar under being arranged on the lower end surface of the rubber bar Clasp joint lower limit potential head when on the lower pilot hole ring cover is located at side of the lower clasp joint bar far from lower pilot hole ring cover On;The lower clasp joint bar turns to lower limit potential head when being connected on the lower positioning vertical bar, and the center of gravity of the lower clasp joint bar is located at The upward throwing of the side far from lower positioning vertical bar of the upright plane of hinged shaft by lower clasp joint bar with rubber bar, lower clasp joint bar Shadow is all located on the rubber bar;The lower clasp joint bar is ferromagnet, and the lower pilot hole ring cover is equipped with annular Permanent magnet;It is brought together into and lower limit potential head abuts on lower positioning vertical bar by grabbing all lower fixations by lower fixation in second step It grabs and is worn in lower pilot hole through lower pilot hole ring cover;Lower clasp joint bar is made in the absorption of the permanent magnet of the annular in 5th step It rotates to snap on lower pilot hole ring cover with lower generation.
7. the bridge plate bridge pier connection method of prefabricated bridge according to claim 6, which is characterized in that also described in the first step Steel construction end plate down is set on the lower end surface of rubber bar, and the lower clasp joint bar is hinged on the lower steel construction end plate and reality It is now hinged with the rubber bar.
8. the bridge plate bridge pier connection method of prefabricated bridge according to claim 7, which is characterized in that the upper positioning vertical bar It is connected on the upper steel construction end plate, the upper positioning vertical bar and upper limit potential head are all metal structure, so that upper clasp joint Bar and upper limit potential head are formed in the muscle of the concrete injected in lower pilot hole in the 6th step.
9. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that in the first step on described Pilot hole is equipped with bridge plate portion plug hole and bridge plate portion gas vent, bridge plate portion plug hole and bridge plate portion gas vent all penetrating bridges Plate upper surface is equipped with bridge pier portion plug hole and bridge pier portion gas vent on the lower pilot hole;It is poured in 6th by bridge plate portion Orifice is given in lower pilot hole by bridge pier portion plug hole to concrete is injected in upper pilot hole and injects concrete.
10. the bridge plate bridge pier connection method of prefabricated bridge according to claim 1, which is characterized in that the rubber bar With being interference fit between the upper pilot hole ring cover, the rubber bar was between the lower pilot hole ring cover It is full of cooperation, to prevent the concrete injected in upper pilot hole in the 6th step from leaking out and inject to descend to fill out of upper pilot hole ring cover Concrete in distribution is leaked out out of lower pilot hole ring cover.
CN201811513892.XA 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge Active CN109487677B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811513892.XA CN109487677B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge
CN202010569143.XA CN111676803B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811513892.XA CN109487677B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202010569143.XA Division CN111676803B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge

Publications (2)

Publication Number Publication Date
CN109487677A true CN109487677A (en) 2019-03-19
CN109487677B CN109487677B (en) 2021-02-12

Family

ID=65709794

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202010569143.XA Active CN111676803B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge
CN201811513892.XA Active CN109487677B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202010569143.XA Active CN111676803B (en) 2018-12-11 2018-12-11 Bridge plate pier connection method of prefabricated bridge

Country Status (1)

Country Link
CN (2) CN111676803B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06221357A (en) * 1993-01-25 1994-08-09 Bridgestone Corp Laminated rubber body lined with rubber
JPH08209626A (en) * 1995-02-07 1996-08-13 Nitta Ind Corp Bridge falling preventing device for bridge
CN102206930A (en) * 2007-02-15 2011-10-05 尹学军 Split type vibration isolating device and application thereof
CN204435219U (en) * 2015-02-09 2015-07-01 中交公路养护工程技术有限公司 A kind of for the shock-absorbing bridge support between bridge pier and bridge
CN107151976A (en) * 2017-06-16 2017-09-12 北京交达铁工科技有限公司 Separate type tenon component, elastoplasticity girder falling stopping means and its installation method
CN108824172A (en) * 2018-09-05 2018-11-16 沈阳建筑大学 Bridge rubber pad limits energy-consuming device

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4010924A (en) * 1974-09-09 1977-03-08 S.S.B. (Aerial Fixings) Limited Attachment for brickwork
NO20003781L (en) * 2000-07-24 2002-05-07 Aluminova As Device for end bracket for joining building profiles
JP3690395B2 (en) * 2003-02-27 2005-08-31 株式会社竹中工務店 Joint structure of support pile and structure
CN203238774U (en) * 2013-04-24 2013-10-16 河南天丰节能板材科技股份有限公司 Roof connecting beam, connecting structure of wall body and roof and modularized integrated house
KR101448386B1 (en) * 2013-05-22 2014-10-08 한양대학교 산학협력단 Vibration control device of scissors toggle type having hinge friction damper
CN104878854A (en) * 2015-04-14 2015-09-02 华南理工大学建筑设计研究院 Prefabricated shear wall horizontal abutted seam buckle welding built-up connection device
CN204626658U (en) * 2015-05-05 2015-09-09 郭一雪 A kind of column of double curved glass curtain wall and beam connecting structure
CN105839521A (en) * 2016-05-20 2016-08-10 西安中交土木科技有限公司 Bridge polyurethane lamination isolation bearing and construction method thereof
CN107620386B (en) * 2017-10-23 2019-08-23 南京百西思建筑科技有限公司 The mounting structure and construction method of shock isolating pedestal in existing building base isolation reinforcement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06221357A (en) * 1993-01-25 1994-08-09 Bridgestone Corp Laminated rubber body lined with rubber
JPH08209626A (en) * 1995-02-07 1996-08-13 Nitta Ind Corp Bridge falling preventing device for bridge
CN102206930A (en) * 2007-02-15 2011-10-05 尹学军 Split type vibration isolating device and application thereof
CN204435219U (en) * 2015-02-09 2015-07-01 中交公路养护工程技术有限公司 A kind of for the shock-absorbing bridge support between bridge pier and bridge
CN107151976A (en) * 2017-06-16 2017-09-12 北京交达铁工科技有限公司 Separate type tenon component, elastoplasticity girder falling stopping means and its installation method
CN108824172A (en) * 2018-09-05 2018-11-16 沈阳建筑大学 Bridge rubber pad limits energy-consuming device

Also Published As

Publication number Publication date
CN109487677B (en) 2021-02-12
CN111676803A (en) 2020-09-18
CN111676803B (en) 2021-09-14

Similar Documents

Publication Publication Date Title
CN208701729U (en) A kind of offshore wind farm High-Rise Pile Cap Foundation using prefabricated cushion cap
CN110004791A (en) A kind of prestressing without bondn assembled road and its construction method
CN109487677A (en) The bridge plate bridge pier connection method of prefabricated bridge
CN206768845U (en) Prefabricated cushion cap foundation and its mounting structure
CN104110353B (en) Antidumping blower foundation ring structure and construction method thereof
CN109594833A (en) Prefabricated concrete structure Interlayer seismic isolation method
CN208105023U (en) Assembling type girder bridge
CN201883746U (en) Base of movable high-voltage wire pole
CN109895239A (en) A kind of assembly concrete stair delay platform beam slab and its method of construction
CN108316341A (en) Prefabrication type High-Rise Pile Cap Foundation and its construction method
CN109487678A (en) The bridge plate bridge pier connection structure of prefabricated bridge
CN106351124A (en) Bridge construction method
CN204825975U (en) Novel pressure seat well of integral type seals structure
CN105442855B (en) A kind of high-precision buried equipment, method of large scale embedded board
CN209523213U (en) Assembled independent foundation
CN108708388B (en) Tower foundation and preparation method thereof
CN206385526U (en) A kind of highway subgrade broken stone pile
JP3848917B2 (en) Hybrid structure box construction method
CN109837838A (en) A kind of construction method of steel reinforced concrete box beam
CN208830334U (en) A kind of cofferdam small dike rubber bath rubber antiskid fixed structure
CN208455871U (en) A kind of concrete assembled construction wall
CN208965576U (en) A kind of fixed connection structure of timber structure suspension column and basis
CN202323875U (en) Nodular cast iron pillar shell bollard with single retaining ledge
CN206655223U (en) A kind of prefabricated workpiece
CN214994019U (en) Universal tower crane foundation pre-embedded structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210121

Address after: 053000 room 1815, 18 / F, unit 1, building 3, Hongtai Dongdu International Garden (CBD. Dongdu) community, Taocheng District, Hengshui City, Hebei Province

Applicant after: Hengshui Yunling road and Bridge Engineering Co.,Ltd.

Address before: No. 004, group 8, Xihu village, Xiapu Town, Tongshan County, Xianning City, Hubei Province

Applicant before: Zheng Qionghua

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant