CN109472478A - Schedule management system and its application method - Google Patents

Schedule management system and its application method Download PDF

Info

Publication number
CN109472478A
CN109472478A CN201811282570.9A CN201811282570A CN109472478A CN 109472478 A CN109472478 A CN 109472478A CN 201811282570 A CN201811282570 A CN 201811282570A CN 109472478 A CN109472478 A CN 109472478A
Authority
CN
China
Prior art keywords
task
project
module
leader
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811282570.9A
Other languages
Chinese (zh)
Inventor
陈锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui One Net Network Technology Co Ltd
Original Assignee
Anhui One Net Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui One Net Network Technology Co Ltd filed Critical Anhui One Net Network Technology Co Ltd
Priority to CN201811282570.9A priority Critical patent/CN109472478A/en
Publication of CN109472478A publication Critical patent/CN109472478A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a kind of schedule management system, the database being arranged on server is included at least: user message table, department information table, mission bit stream table, subtask information table, work day mission bit stream table;Administrator's account is provided in the schedule management system;It is provided in the schedule management system with lower module: division management, personal management, rights management, task management;It is additionally provided in the schedule management system: leader's functional module, project leader's functional module, executor's functional module, the present invention can solve how project process in project management is normally carried out under the conditions of corresponding control, the problem of how project leader and leader conveniently learn daily the development of projects situation, how to improve three aspects of working efficiency and quality by project scheduling management.

Description

Schedule management system and its application method
Technical field
The present invention relates to project management method field, specifically a kind of schedule management system.
Background technique
So-called project management refers to the integrated use knowledge in project activity, technical ability, tool and technology the regular hour, The requirements such as cost, quality get off to realize a series of behaviors of the achievement target of project.And project scheduling management then stress when Between aspect management.Project leader has formulated detailed project process, and project process is how under the conditions of corresponding control It is normally carried out, how project leader and leader conveniently learn daily the development of projects situation, how to pass through project scheduling management Improving three aspects of working efficiency and quality is problem to be solved of the present invention.
The present invention clearly plans the function privilege of each user role, data safety can be allowed to be protected, each role The division of labor is clear, and progress control is tight, and project process is helped to complete according to quantity on time, and project leader is facilitated to carry out project management.
The object of the present invention is to provide a kind of schedule management systems for summary of the invention, to solve project in project management How progress is normally carried out under the conditions of corresponding control, project leader and leader how conveniently to learn daily project into The problem of opening up situation, how three aspects of working efficiency and quality being improved by project scheduling management.
In order to achieve the above object, the technical scheme adopted by the invention is as follows:
A kind of schedule management system, including server are stored for network services and information;It further include Client browse Device;Database is provided on the server, it is characterised in that: the database includes at least following data table: Yong Huxin Cease table, department information table, mission bit stream table, subtask information table, day work mission bit stream table;
Administrator's account is provided in the schedule management system;
It is provided in the schedule management system with lower module: division management, personal management, rights management, task management, Administrator's account has use with the permission of upper module;
The user message table includes one for configuring the field of user role, and the user role includes: leadership role, bears Blame people role and executor role;
It is additionally provided in the schedule management system with lower module:
Leader's functional module, the module are assigned including at least task, and Task Progress checks supervision, report form statistics function;It is described The user of leadership role has the permission using this module;
Project leader's functional module, the module including at least Task Progress table make, task assign, supervise prompting and task into Spend look facility;The user of the responsible person role has the permission using this module;
Executor's functional module, which includes at least progress adjustment, attachment uploads, work remarks and day thing cleaning function;It is described The user of executor role has the permission using this module.
The application method of the schedule management system the following steps are included:
A, Admin Administration
Administrator passes through the typing of division management module and maintenance department's information;
Administrator passes through personal management module typing and maintenance personnel's information;
Administrator passes through authority management module to corresponding personnel assignment permission;
B, leader manages
It is arranged to the Account Logon system of leadership role, assigns a task and tracing task is in progress, specifically include: creation task, The appointed task time started and it is expected that end time, the Project Process file directory to be delivered of remarks finally assigns task negative Blame people;The task notifies related personnel by two kinds of approach of mail and short massage notice;After the task is assigned, leader can be with Check that project task assigns situation, task progress and related data statistics at any time;
C, project leader manages
Project leader is responsible for assigned tasks and tracking and supervising task progress;After responsible person has notice according to step B, system is logged in System, checks task;If there is similar item in system, previous Task Progress calendar can be directly replicated, may be used also after duplication Accordingly to be modified;If without similar item, responsible person needs to formulate detailed Task Progress in systems, including into The period is spent, each period responsible person is specified and delivers part;Task-decomposing is at least one subtask by project leader, and Distribute to corresponding executor;After task is assigned, in each progression time section, project leader can be logical by relevant interface at any time Know that executor is timely completed task;
Project leader is also equipped with adjustment progress and replaces the permission of executor;
D, project implementation people manages
Operational staff fills in daily work log, uploads output file;Executor changes in systems according to task completion status Current task state uploads respective document, remarks relevant information;
E, according to each executor and responsible person's project implementation situation, system calculates project KPI automatically, and leader can modify this KPI。
Compared with the prior art, the beneficial effects of the present invention are embodied in:
In the present invention, project scheduling management can report daily job schedule specific to each day task, can make daily Time be all saturation state for work, improve working efficiency.Project process is directly contacted with personal KPI, can improve work Make enthusiasm, preferably guarantees Project quality management and Project Process management.
Detailed description of the invention
Fig. 1 is present system schematic diagram.
Specific embodiment
As shown in Figure 1, schedule management system of the invention, including server, it is stored for network services and information; It further include client browser;Be provided with database on the server, it is characterised in that: the database include at least with Lower tables of data: user message table, department information table, mission bit stream table, subtask information table, work day mission bit stream table.
Administrator's account is provided in the schedule management system.
It is provided in the schedule management system with lower module: division management, personal management, rights management, task Management, administrator's account have use with the permission of upper module.
The user message table includes one for configuring the field of user role, and the user role includes: leader angle Color, responsible person role and executor role.
It is additionally provided in the schedule management system with lower module:
Leader's functional module, the module are assigned including at least task, and Task Progress checks supervision, report form statistics function;It is described The user of leadership role has the permission using this module;
Project leader's functional module, the module including at least Task Progress table make, task assign, supervise prompting and task into Spend look facility;The user of the responsible person role has the permission using this module;
Executor's functional module, which includes at least progress adjustment, attachment uploads, work remarks and day thing cleaning function;It is described The user of executor role has the permission using this module.
The application method of the schedule management system the following steps are included:
A, Admin Administration
Administrator passes through the typing of division management module and maintenance department's information;
Administrator passes through personal management module typing and maintenance personnel's information;
Administrator passes through authority management module to corresponding personnel assignment permission.
B, leader manages
It is arranged to the Account Logon system of leadership role, assigns a task and tracing task is in progress, specifically include: creation task, The appointed task time started and it is expected that end time, the Project Process file directory to be delivered of remarks finally assigns task negative Blame people;The task notifies related personnel by two kinds of approach of mail and short massage notice;After the task is assigned, leader can be with Check that project task assigns situation, task progress and related data statistics at any time.
C, project leader manages
Project leader is responsible for assigned tasks and tracking and supervising task progress;After responsible person has notice according to step B, system is logged in System, checks task;If there is similar item in system, previous Task Progress calendar can be directly replicated, may be used also after duplication Accordingly to be modified;If without similar item, responsible person needs to formulate detailed Task Progress in systems, including into The period is spent, each period responsible person is specified and delivers part;Task-decomposing is at least one subtask by project leader, and Distribute to corresponding executor;After task is assigned, in each progression time section, project leader can be logical by relevant interface at any time Know that executor is timely completed task;
Project leader is also equipped with adjustment progress and replaces the permission of executor.
D, project implementation people manages
Operational staff fills in daily work log, uploads output file;Executor changes in systems according to task completion status Current task state uploads respective document, remarks relevant information.
E, according to each executor and responsible person's project implementation situation, system calculates project KPI automatically.Leader can repair Change this KPI.
The KPI is the abbreviation of Key Performance Indicator, refers to that KPI Key Performance Indicator is examined.At this In project, KPI is mainly calculated according to project, task, subtask progress.

Claims (2)

1. a kind of schedule management system, including server are stored for network services and information;It further include Client browse Device;Database is provided on the server, it is characterised in that: the database includes at least following data table: Yong Huxin Cease table, department information table, mission bit stream table, subtask information table, day work mission bit stream table;
Administrator's account is provided in the schedule management system;
It is provided in the schedule management system with lower module: division management, personal management, rights management, task management, Administrator's account has use with the permission of upper module;
The user message table includes one for configuring the field of user role, and the user role includes: leadership role, bears Blame people role and executor role;
It is additionally provided in the schedule management system with lower module:
Leader's functional module, the module are assigned including at least task, and Task Progress checks supervision, report form statistics function;It is described The user of leadership role has the permission using this module;
Project leader's functional module, the module including at least Task Progress table make, task assign, supervise prompting and task into Spend look facility;The user of the responsible person role has the permission using this module;
Executor's functional module, which includes at least progress adjustment, attachment uploads, work remarks and day thing cleaning function;It is described The user of executor role has the permission using this module.
2. the application method of schedule management system described in claim 1, comprising the following steps:
A, Admin Administration
Administrator passes through the typing of division management module and maintenance department's information;
Administrator passes through personal management module typing and maintenance personnel's information;
Administrator passes through authority management module to corresponding personnel assignment permission;
B, leader manages
It is arranged to the Account Logon system of leadership role, assigns a task and tracing task is in progress, specifically include: creation task, The appointed task time started and it is expected that end time, the Project Process file directory to be delivered of remarks finally assigns task negative Blame people;The task notifies related personnel by two kinds of approach of mail and short massage notice;After the task is assigned, leader can be with Check that project task assigns situation, task progress and related data statistics at any time;
C, project leader manages
Project leader is responsible for assigned tasks and tracking and supervising task progress;After responsible person has notice according to step B, system is logged in System, checks task;If there is similar item in system, previous Task Progress calendar can be directly replicated, may be used also after duplication Accordingly to be modified;If without similar item, responsible person needs to formulate detailed Task Progress in systems, including into The period is spent, each period responsible person is specified and delivers part;Task-decomposing is at least one subtask by project leader, and Distribute to corresponding executor;After task is assigned, in each progression time section, project leader can be logical by relevant interface at any time Know that executor is timely completed task;
Project leader is also equipped with adjustment progress and replaces the permission of executor;
D, project implementation people manages
Operational staff fills in daily work log, uploads output file;Executor changes in systems according to task completion status Current task state uploads respective document, remarks relevant information;
E, according to each executor and responsible person's project implementation situation, system calculates project KPI automatically.
CN201811282570.9A 2018-10-31 2018-10-31 Schedule management system and its application method Pending CN109472478A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811282570.9A CN109472478A (en) 2018-10-31 2018-10-31 Schedule management system and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811282570.9A CN109472478A (en) 2018-10-31 2018-10-31 Schedule management system and its application method

Publications (1)

Publication Number Publication Date
CN109472478A true CN109472478A (en) 2019-03-15

Family

ID=65666515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811282570.9A Pending CN109472478A (en) 2018-10-31 2018-10-31 Schedule management system and its application method

Country Status (1)

Country Link
CN (1) CN109472478A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110570294A (en) * 2019-08-30 2019-12-13 北京安锐卓越信息技术股份有限公司 Method, device and storage medium for managing settlement
CN110599134A (en) * 2019-10-17 2019-12-20 南京启道咨询管理有限公司 WeChat applet-based bank efficiency control system and control method
CN111131517A (en) * 2020-01-02 2020-05-08 国家电网有限公司 AI assistant system and method
CN111369116A (en) * 2020-02-26 2020-07-03 国网上海市电力公司 Project early-stage and project early-stage management system based on visualization technology
CN111915214A (en) * 2020-08-13 2020-11-10 南京朗赢信息技术有限公司 Management platform and management client for tasting and evaluating grain products
CN111967857A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN111967856A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Government affair project management method and device
CN112348464A (en) * 2020-11-03 2021-02-09 广东电网有限责任公司 Power transmission and transformation project construction preparation stage management system and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110570294A (en) * 2019-08-30 2019-12-13 北京安锐卓越信息技术股份有限公司 Method, device and storage medium for managing settlement
CN110599134A (en) * 2019-10-17 2019-12-20 南京启道咨询管理有限公司 WeChat applet-based bank efficiency control system and control method
CN111131517A (en) * 2020-01-02 2020-05-08 国家电网有限公司 AI assistant system and method
CN111369116A (en) * 2020-02-26 2020-07-03 国网上海市电力公司 Project early-stage and project early-stage management system based on visualization technology
CN111915214A (en) * 2020-08-13 2020-11-10 南京朗赢信息技术有限公司 Management platform and management client for tasting and evaluating grain products
CN111915214B (en) * 2020-08-13 2021-06-08 南京朗赢信息技术有限公司 Management platform and management client for tasting and evaluating grain products
CN111967857A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN111967856A (en) * 2020-08-27 2020-11-20 享云智能网联(北京)科技有限公司 Government affair project management method and device
CN111967857B (en) * 2020-08-27 2024-03-22 享云智能网联(北京)科技有限公司 Management platform system for key work information
CN112348464A (en) * 2020-11-03 2021-02-09 广东电网有限责任公司 Power transmission and transformation project construction preparation stage management system and method

Similar Documents

Publication Publication Date Title
CN109472478A (en) Schedule management system and its application method
CN103425778B (en) A kind of intelligent development platform of database application system
CN110428112A (en) A kind of dual prevention mechanism management system of enterprise based under internet+mode
CN105427091A (en) High-voltage business expansion overall process management and control system of power marketing
CN110598991B (en) Controller scheduling method based on machine learning
CN101951377A (en) Hierarchical authorization management method and device
CN105809352A (en) General aviation business comprehensive management and control system
CN102663543A (en) Scheduling system used for enterprise data unification platform
WO2019015657A1 (en) Attendance tracking configuration method for system
CN109787807A (en) Self service system based on Openstack framework cloud platform workflow
CN107454189A (en) The office automation system of function is arranged with intelligent meeting
CN104537168A (en) Integrated supervisory control simulating training system model data management method for equipment functions
US20040068427A1 (en) Four-dimensional resource allocation system
CN101241567A (en) Background automatic business accomplishing method based on Windows service technology
Maggard et al. Total productive maintenance; TPM that works
Akbar et al. Limitations and measures in outsourcing projects to geographically distributed offshore teams
CN104104535B (en) A kind of unified monitoring and O&M method and device based on strategy
CN109685456A (en) Cloud service event management system
TWI618006B (en) Engineering conference management system and operation method thereof
CN107545191A (en) Positioned at more people's sub-project mechanism of bulleted list
CN113269387A (en) Real-time management system and management method for digital labor force
CN113159470A (en) Project management system based on process driving
CN112734145A (en) Public security duty scheduling system based on integral model algorithm
CN105956765A (en) Personnel management system based on SQL Server
CN107480796A (en) A kind of weak electricity system intelligent Service management platform and its method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190315