CN109469366A - 双交叉空间斜支柱测量放线施工工法 - Google Patents

双交叉空间斜支柱测量放线施工工法 Download PDF

Info

Publication number
CN109469366A
CN109469366A CN201811225389.4A CN201811225389A CN109469366A CN 109469366 A CN109469366 A CN 109469366A CN 201811225389 A CN201811225389 A CN 201811225389A CN 109469366 A CN109469366 A CN 109469366A
Authority
CN
China
Prior art keywords
inclined strut
construction
bed die
section
stub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811225389.4A
Other languages
English (en)
Inventor
赵波涛
杨文斌
张建敏
尹志斌
郝珠
王永星
张慧男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taihang Construction Development Co Ltd
Original Assignee
Shanxi Taihang Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taihang Construction Development Co Ltd filed Critical Shanxi Taihang Construction Development Co Ltd
Priority to CN201811225389.4A priority Critical patent/CN109469366A/zh
Publication of CN109469366A publication Critical patent/CN109469366A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/10Buildings forming part of cooling plants
    • E04H5/12Cooling towers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Abstract

本发明属于双曲线型冷却塔斜支柱的定位放线施工领域,具体为双交叉空间斜支柱测量放线施工工法,包括以下步骤:第一,柱墩施工时,严格控制柱墩顶面四个角的标高,然后在顶部倾斜面上定位斜支柱底面尺寸。第二,将斜支柱顶部四角在地面的投影定位,然后投测到支撑架体上,用棉线拉出底模两条边线,然后铺设底模。第三,安装第一段钢筋模板,浇筑第一段混凝土。第四,对上一段底模进行复核,安装下一段钢筋模板,浇筑混凝土,依次循环施工。本发明解决了斜支柱在空间双向倾斜而导致测量放线操作复杂的施工难点。通过采用整体定位、分段施工的方法,保证了斜支柱在空间位置的准确,对于超长空间斜支柱施工具有指导及借鉴意义。

Description

双交叉空间斜支柱测量放线施工工法
技术领域
本发明属于双曲线型冷却塔斜支柱的定位放线施工领域,具体为双交叉空间斜支柱测量放线施工工法。
背景技术
大型火力发电厂使用的冷却构筑物多采用双曲线型冷却塔,斜支柱作为冷却塔通风筒的支撑结构,在空间是双向倾斜的。现在新建的空冷塔工程建设高度能达到200多米,斜支柱长度达到40多米,由于斜支柱在空间双向倾斜的特点,并且不在同一平面内,所以超长斜支柱定位放线操作复杂,本发明针对超长双交叉空间斜支柱双向倾斜的特点,总结出一套测量放线施工方法。
发明内容
本发明针对超长双交叉空间斜支柱由于在空间双向倾斜而导致的测量放线操作复杂的施工难点,提供了双交叉空间斜支柱测量放线施工工法。
本发明是采用如下的技术方案实现的:双交叉空间斜支柱测量放线施工工法,包括以下步骤:
第一,柱墩施工时,控制柱墩顶部倾斜面四个角的标高,然后在柱墩顶部倾斜面上定位斜支柱底面尺寸;
第二,将斜支柱顶部四角在地面的投影定位,然后投测到支撑架体上,用棉线拉出底模两条边线,然后铺设底模;
第三,安装第一段钢筋、顶模和侧模,浇筑第一段混凝土;
第四,对第一段底模进行复核,安装第二段钢筋、顶模和侧模,浇筑第二段混凝土;
第五,对第二段底模进行复核,安装第三段钢筋、顶模和侧模,浇筑第三段混凝土;依次循环施工,直至浇筑完最后一段混凝土。
针对超长空间斜支柱的特点,采用整体定位、分段施工的方法提高测量精度。整体定位可以避免误差累计,分段施工可以进行多次校验并及时进行纠偏。
本发明解决了斜支柱在空间双向倾斜而导致测量放线操作复杂的施工难点。通过采用整体定位、分段施工的方法,保证了斜支柱在空间位置的准确,对于超长空间斜支柱施工具有指导及借鉴意义。
具体实施方式
双交叉空间斜支柱测量放线施工工法,包括以下步骤:
第一,柱墩施工时,控制柱墩顶部倾斜面四个角的标高,然后在柱墩顶部倾斜面上定位斜支柱底面尺寸;
第二,将斜支柱顶部四角在地面的投影定位,然后投测到支撑架体上,用棉线拉出底模两条边线,然后铺设底模;
第三,安装第一段钢筋、顶模和侧模,浇筑第一段混凝土;
第四,对第一段底模进行复核,安装第二段钢筋、顶模和侧模,浇筑第二段混凝土;
第五,对第二段底模进行复核,安装第三段钢筋、顶模和侧模,浇筑第三段混凝土;依次循环施工,直至浇筑完最后一段混凝土。

Claims (1)

1.双交叉空间斜支柱测量放线施工工法,其特征在于包括以下步骤:
第一,柱墩施工时,控制柱墩顶部倾斜面四个角的标高,然后在柱墩顶部倾斜面上定位斜支柱底面尺寸;
第二,将斜支柱顶部四角在地面的投影定位,然后投测到支撑架体上,用棉线拉出底模两条边线,然后铺设底模;
第三,安装第一段钢筋、顶模和侧模,浇筑第一段混凝土;
第四,对第一段底模进行复核,安装第二段钢筋、顶模和侧模,浇筑第二段混凝土;
第五,对第二段底模进行复核,安装第三段钢筋、顶模和侧模,浇筑第三段混凝土;依次循环施工,直至浇筑完最后一段混凝土。
CN201811225389.4A 2018-10-20 2018-10-20 双交叉空间斜支柱测量放线施工工法 Pending CN109469366A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811225389.4A CN109469366A (zh) 2018-10-20 2018-10-20 双交叉空间斜支柱测量放线施工工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811225389.4A CN109469366A (zh) 2018-10-20 2018-10-20 双交叉空间斜支柱测量放线施工工法

Publications (1)

Publication Number Publication Date
CN109469366A true CN109469366A (zh) 2019-03-15

Family

ID=65663927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811225389.4A Pending CN109469366A (zh) 2018-10-20 2018-10-20 双交叉空间斜支柱测量放线施工工法

Country Status (1)

Country Link
CN (1) CN109469366A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004993A (zh) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 一种超厚底板测量放线施工方法及放线平台

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2674276A1 (fr) * 1991-03-19 1992-09-25 Diver Marins Pour la refrigeration dont la cheminee est constituee d'un voile a nervures porteuses.
CN103397780A (zh) * 2013-08-09 2013-11-20 四川电力建设三公司 空冷塔x型柱施工方法
CN104372967A (zh) * 2014-11-18 2015-02-25 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法
CN205955307U (zh) * 2016-08-23 2017-02-15 中国五洲工程设计集团有限公司 一种钢结构双曲线冷却塔

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2674276A1 (fr) * 1991-03-19 1992-09-25 Diver Marins Pour la refrigeration dont la cheminee est constituee d'un voile a nervures porteuses.
CN103397780A (zh) * 2013-08-09 2013-11-20 四川电力建设三公司 空冷塔x型柱施工方法
CN104372967A (zh) * 2014-11-18 2015-02-25 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法
CN104372967B (zh) * 2014-11-18 2016-08-17 中国电力工程顾问集团西北电力设计院有限公司 一种自然通风冷却塔用斜支柱结构及其施工方法
CN205955307U (zh) * 2016-08-23 2017-02-15 中国五洲工程设计集团有限公司 一种钢结构双曲线冷却塔

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004993A (zh) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 一种超厚底板测量放线施工方法及放线平台
CN110004993B (zh) * 2019-04-22 2024-01-02 上海建工一建集团有限公司 一种超厚底板测量放线施工方法及放线平台

Similar Documents

Publication Publication Date Title
CN105587130B (zh) 一种空间网壳焊接球定位装置及其使用方法
CN208748675U (zh) 一种可调式四管塔基础地脚螺栓固定及调平装置
CN102828470B (zh) 一种斜拉桥主梁拉索套管的定位方法
CN104110140B (zh) 一种网架节点定位调节装置及定位调节方法
CN105113671A (zh) 一种大型贝壳状双曲弧形幕墙施工方法
CN104060839B (zh) 专用于大型场馆金属幕墙钢结构竖向龙骨施工控制方法
CN202849880U (zh) 一种磁悬浮轨排测量调整系统
CN203891058U (zh) 一种固定式塔吊基础预埋地脚螺栓定位工具
CN203247603U (zh) 一种高位地脚螺栓定位装置
CN105544887B (zh) 一种仿唐建筑翼角飞檐的施工方法
CN203440753U (zh) 一种多功能钢筋定位骨架
CN111853347A (zh) 一种基于bim的超前定位直埋锚栓预制管线支架施工工艺
CN103306463B (zh) 一种金属衬里混凝土风道施工方法
CN106223623A (zh) 钢结构箱型拱形屋架安装方法
CN109469366A (zh) 双交叉空间斜支柱测量放线施工工法
CN110565856B (zh) 一种双曲面金属板幕墙快速安装方法
CN202202265U (zh) 索道管三维坐标控制器
CN204531443U (zh) 一种楼板钢筋排布间距控制工具
CN105089276B (zh) 一种应用板面标高控制工具的大面积混凝土板的施工方法
CN103276747B (zh) 大型设备基础导轨一次性高精度预埋施工方法
CN207211784U (zh) 一种预制构件安装钢筋的定位装置
CN203499268U (zh) 一种可回收式高精度地坪标高调节结构
CN103276840B (zh) 核电厂复合楼板模块及其施工方法
CN205637719U (zh) 一种便于连续退火炉安装测量的厂房结构
CN103541545A (zh) 大型弧形结构模板安装控制的方法及其垂直对中装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315