CN109469319A - A kind of towering polymorphic structure system Core Walls Structure climbing form equipment - Google Patents
A kind of towering polymorphic structure system Core Walls Structure climbing form equipment Download PDFInfo
- Publication number
- CN109469319A CN109469319A CN201811645743.9A CN201811645743A CN109469319A CN 109469319 A CN109469319 A CN 109469319A CN 201811645743 A CN201811645743 A CN 201811645743A CN 109469319 A CN109469319 A CN 109469319A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- fixed
- rotatably connected
- towering
- riser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 18
- 238000005192 partition Methods 0.000 claims description 18
- 229910000975 Carbon steel Inorganic materials 0.000 claims description 3
- 239000010962 carbon steel Substances 0.000 claims description 3
- 230000001737 promoting effect Effects 0.000 abstract description 3
- 230000006641 stabilisation Effects 0.000 abstract description 2
- 238000011105 stabilization Methods 0.000 abstract description 2
- 238000005266 casting Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001256 tonic effect Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
Abstract
The invention discloses a kind of towering polymorphic structure system Core Walls Structure climbing form equipment, including loading plate, riser is fixed on one week side wall in the loading plate, spacing are equipped with multiple limiting slots on one week side wall in the riser etc., and the opposing sidewalls in limiting slot penetrate through setting, limit plate is installed in the limiting slot, the opposite side of multiple limit plates is fixed with first sleeve jointly, the side upper end of the first sleeve is rotatably connected to multiple first rotating bars, the lower end of multiple first rotating bars is rotatably connected to the second rotating bar, the lower end of multiple second rotating bars is rotated in the upper end of riser.The present invention can be such that first sleeve and second sleeve steadily rises, consequently facilitating stabilization is poured, structure is simple, facilitate and is operated, the concrete after pouring is detected convenient for staff, and then can find the problem and handle in time, is conducive to the quality for promoting final products.
Description
Technical field
The present invention relates to technical field of buildings more particularly to a kind of towering polymorphic structure system Core Walls Structure climbing form equipment.
Background technique
Control tower or control tower are a kind of air transportation control facilities being set in airport, for supervising and controlling
The place of takeoff and landing.Core Walls Structure is exactly the center portion in building, is gone along with sb. to guard him by elevator shaft, stair, ventilation shaft, cable shaft etc.
Central core tube is formed, an outter frame inner cylinder structure is formed with peripheral frame, is poured with armored concrete.Such structure extremely has
Conducive to structure stress, and there is extremely excellent shock resistance.It is the mainstream structure type that super high-rise building is widely used in the world.Together
When, the superiority of this structure, which also resides in, can strive for use space spacious as far as possible, make various ancillary service spaces to plane
Centralized in, make the optimal daylighting position of function of tonic chord volume exclusion, and reach that sight is good, the convenient and fast effect of internal transportation,
To be conducive to promote working efficiency.
Approach tower Core Walls Structure needs to overcome many technological difficulties in building, is first exactly the section shape of control tower Core Walls Structure
Shape is circle, and different with conventional vertical plane wall in building, difficulty is larger, generally uses slding form operation and guide rail
Formula climbing formwork for construction is implemented, but structure is complicated for both forms of construction work, it has not been convenient to use, be unfavorable for quickly being poured, also not
It is convenient that concrete after pouring molding is detected, for this purpose, we have proposed a kind of towering polymorphic structure system Core Walls Structures to mention
Mould equipment solves the above problems.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of towering polymorphic structure body proposed
It is Core Walls Structure climbing form equipment.
To achieve the goals above, present invention employs following technical solutions:
A kind of towering polymorphic structure system Core Walls Structure climbing form equipment, including loading plate, it is solid on one week side wall in the loading plate
Surely there is riser, spacing are equipped with multiple limiting slots on one week side wall in the riser etc., and the opposing sidewalls in limiting slot are passed through
Logical setting, is equipped with limit plate in the limiting slot, and the opposite side of multiple limit plates is fixed with first sleeve jointly, and described the
The side upper end of one sleeve is rotatably connected to multiple first rotating bars, and the lower end of multiple first rotating bars is rotatably connected to second
Rotating bar, the lower end of multiple second rotating bars are rotated in the upper end of riser, and the upper end of the loading plate is rotatably connected to multiple
First oil cylinder, the piston-rod end of multiple first oil cylinders are rotatably connected on the side of multiple second rotating bars respectively, and described first
Upper end side in sleeve is equidistantly fixed with multiple cross bars, and the opposite side of multiple cross bars is fixed with second sleeve jointly, institute
It states sliding sleeve in second sleeve and is connected to multiple third inserted links, the lower end of the loading plate is equipped with positioning device, the positioning device
It is equipped with partition, the lower end of the partition is equipped with lifting device, and the lifting device is equipped with bottom plate, and the bottom plate is equipped with limit
Position device.
Preferably, the positioning device includes multiple support rods for being equidistantly fixed on loading plate lower end, and partition is fixed
In the lower end of multiple support rods, the side of the partition is fixed on the side of riser, and sliding sleeve is connected to multiple on the riser
One inserted link, one end of first inserted link are rotatably connected to the second connecting rod, and one end of second connecting rod is rotatably connected to U
Template, common rotation is connected with first connecting rod in the opposing sidewalls in the U-shaped board, and multiple first connecting rods are separately fixed at
The side of multiple support rods, the lower end of the loading plate are equipped with multiple sliding slots, are mounted on sliding block, multiple sliding blocks in multiple sliding slots
Lower end be respectively and fixedly provided with third oil cylinder, the piston-rod end of multiple third oil cylinders is separately fixed at the upper end of multiple U-shaped boards.
Preferably, the lifting device includes the first push rod for being rotatably connected on multiple partition lower ends two sides, and described first
The lower end of push rod is rotatably connected to the second push rod, and the lower end common rotation of multiple second push rods is connected with bottom plate, and described second pushes away
The side of bar is rotatably connected to the second oil cylinder, and the piston-rod end of second oil cylinder is rotatably connected on the side of the first push rod.
Preferably, the limiting device includes the fixed plate for being fixed on bottom plate upper end side, and the upper end of the fixed plate is passed through
Multiple second inserted links are equipped with, sliding sleeve is connected to vertical bar on second inserted link, and the upper end of the bottom plate is equipped with multiple blind holes, more
The lower end of a vertical bar extends respectively in multiple blind holes.
Preferably, the length of the third inserted link is greater than the length of cross bar.
Preferably, the first sleeve and second sleeve are all made of carbon steel and are made.
Compared with prior art, the beneficial effects of the present invention are:
1, by the first oil cylinder, the cooperation of the first rotating bar, the second rotating bar and limit plate, conveniently make first sleeve and second set
The steady lifting of cylinder, solves the problems, such as inconvenient to use, has achieved the purpose that be convenient for pouring, to facilitate staff couple
Concrete after pouring is detected, and then convenient for finding the problem and being handled in time, promotes the quality of final products;
2, it is convenient for making so that convenient smoothly gone up and down by the cooperation of positioning device, lifting device and limiting device
Mould, stable structure facilitate staff to operate, and promote working efficiency and quality;
In conclusion the present invention can be such that first sleeve and second sleeve steadily rises, consequently facilitating stabilization is poured, structure letter
It is single, facilitate and operated, the concrete after pouring is detected convenient for staff, and then can find the problem and locate in time
Reason is conducive to the quality for promoting final products.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of internal structure of towering polymorphic structure system Core Walls Structure climbing form equipment proposed by the present invention;
Fig. 2 is a kind of top view of towering polymorphic structure system Core Walls Structure climbing form equipment proposed by the present invention;Fig. 3 mentions for the present invention
Enlarged drawing at a kind of B of towering polymorphic structure system Core Walls Structure climbing form equipment out;Fig. 4 is that one kind proposed by the present invention is towering different
Enlarged drawing at the A of shape structural system Core Walls Structure climbing form equipment.
In figure: 1 cross bar, 2 first sleeves, 3 limit plates, 4 first rotating bars, 5 second rotating bars, 6 first oil cylinders, 7 first
Push rod, 8 second oil cylinders, 9 second push rods, 10 bottom plates, 11 second sleeves, 12 risers, 13 limiting slots, 14 first inserted links, 15 second
Inserted link, 16 third inserted links, 17 loading plates, 18 vertical bars, 19 fixed plates, 20 blind holes, 21 sliding blocks, 22 sliding slots, 23 third oil cylinders, 24
Strut, 25 first connecting rods, 26 U-shaped boards, 27 second connecting rods, 28 partitions.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-4, a kind of towering polymorphic structure system Core Walls Structure climbing form equipment, including loading plate 17, in loading plate 17
One week side wall on be fixed with riser 12, spacing are equipped with multiple limiting slots 13, and limiting slot on one week side wall in riser 12 etc.
Opposing sidewalls in 13 penetrate through setting, and limit plate 3 is equipped in limiting slot 13, and the opposite side of multiple limit plates 3 is jointly solid
Surely there is first sleeve 2, limit plate 3 steadily moves in limiting slot 13, so that first sleeve 2 is facilitated smoothly to be gone up and down, the
The side upper end of one sleeve 2 is rotatably connected to multiple first rotating bars 4, and the lower end of multiple first rotating bars 4 is rotatably connected to
Second rotating bar 5, the lower end of multiple second rotating bars 5 are rotated in the upper end of riser 12, and the upper end of loading plate 17 is rotatablely connected
There are multiple first oil cylinders 6, the piston-rod end of multiple first oil cylinders 6 is rotatably connected on the side of multiple second rotating bars 5 respectively,
First oil cylinder 6 is flexible to push the second rotating bar 5 to rotate, the rotation of the second rotating bar 5 so as to rotate the first rotating bar 4, into
And first sleeve 2 can be pushed to rise, then facilitate adjusting height;Upper end side in first sleeve 2 is equidistantly fixed with multiple
Cross bar 1, the opposite side of multiple cross bars 1 are fixed with second sleeve 11 jointly, and first sleeve 2 and second sleeve 11 are all made of carbon
Steel is made, and by cross bar 1 to facilitate first sleeve 2 and second sleeve 11 to rise jointly, and then facilitates to first sleeve 2 and the
Casting concrete in two sleeves 11 promotes working efficiency and quality;Sliding sleeve is connected to multiple third inserted links 16 in second sleeve 11,
The length of third inserted link 16 is greater than the length of cross bar 1, and the second inserted link 16 divides two layers, to facilitate to form hole, and then convenient for into
Row smoothly rises, and the lower end of loading plate 17 is equipped with positioning device, is conveniently fixed, and positioning device is equipped with partition 28, every
The lower end of plate 28 is equipped with lifting device, and convenient for promoting lifting efficiency, lifting device is equipped with bottom plate 10, and bottom plate 10 is equipped with limit
Device is stablized and is fixed, limits mobile range.
In the present invention, positioning device includes multiple being equidistantly fixed on the support rod 24 of 17 lower end of loading plate, and partition 28
It is fixed on the lower end of multiple support rods 24, the side of partition 28 is fixed on the side of riser 12, and sliding sleeve is connected to more on riser 12
A first inserted link 14, one end of the first inserted link 14 are rotatably connected to the second connecting rod 27, and one end of the second connecting rod 27, which rotates, to be connected
It is connected to U-shaped board 26, common rotation is connected with first connecting rod 25, multiple first connecting rods 25 in the opposing sidewalls in U-shaped board 26
It is separately fixed at the side of multiple support rods 24, when U-shaped board 26 is gone up and down, first connecting rod 25 and the second connecting rod 27 can be pushed
Rotation, it is mobile so as to make the first inserted link 14, and then facilitate and positioned;The lower end of loading plate 17 is equipped with multiple sliding slots 22, more
Sliding block 21 is mounted in a sliding slot 22, the lower end of multiple sliding blocks 21 is respectively and fixedly provided with third oil cylinder 23, multiple third oil cylinders 23
Piston-rod end is separately fixed at the upper end of multiple U-shaped boards 26, and third oil cylinder 23 provides power, goes up and down U-shaped board 26, when U-shaped
Plate 26 can move backward when going up and down, and sliding block 21 steadily moves in sliding slot 22, so that third oil cylinder 23 be facilitated to stablize movement, guarantee
Mobile is steady.In the present invention, lifting device includes the first push rod 7 for being rotatably connected on multiple 28 lower end two sides of partition, and first
The lower end of push rod 7 is rotatably connected to the second push rod 9, and the lower end common rotation of multiple second push rods 9 is connected with bottom plate 10, and second pushes away
The side of bar 9 is rotatably connected to the second oil cylinder 8, and the piston-rod end of the second oil cylinder 8 is rotatably connected on the side of the first push rod 7,
Second oil cylinder 8 is flexible, and the first push rod 7 and the second push rod 9 can be made to rotate, thus facilitate between regulating base board 10 and partition 28 away from
From, thus facilitate push partition 28 on component lifting, to facilitate carry out molding, be convenient for pouring.
In the present invention, limiting device includes the fixed plate 19 for being fixed on 10 upper end side of bottom plate, and the upper end of fixed plate 19 is passed through
Multiple second inserted links 15 are equipped with, sliding sleeve is connected to vertical bar 18 on the second inserted link 15, and the upper end of bottom plate 10 is equipped with multiple blind holes 20,
The lower end of multiple vertical bars 18 extends respectively in multiple blind holes 20, and vertical bar 18 injects in blind hole 20, is capable of fixing the second inserted link 15, from
And it can facilitate and be gone up and down, and provide stable support to rise.
In the present invention, in use, first sleeve 2 and second sleeve 11 contradict ground, and two third inserted links 16 are injected
It is inconsistent with the side wall in first sleeve 2, the casting concrete into first sleeve 2 and second sleeve 11, vibration, to make coagulation
Native uniformly after band concrete setting, to take out third inserted link 16, the first oil cylinder 6 acts on, and pushes the rotation of the second rotating bar 5, and then make
The rotation of first rotating bar 4 then makes limit plate 3 that first sleeve 2 be driven steadily to rise the second inserted link 15 and injects one of third
It is mobile to push U-shaped board 26 for third oil cylinder 23 in the hole that inserted link 16 is formed, so that the first inserted link 14 be made to inject another by third
In the hole that inserted link 16 is formed, third inserted link 16 is set to contradict the side wall in first sleeve 2 again, and to first sleeve 2 and second
Casting concrete in sleeve 11 after to be solidified, extract third inserted link 16 and the first inserted link 14 pushes away under the action of the second oil cylinder 8
Partition 28 is risen, to make first sleeve 2, second sleeve 11, loading plate 17 and the first inserted link 14 rise, when the first inserted link 14 is corresponding
It after the hole formed by third inserted link 16, is inserted under the action of third oil cylinder 23, the second inserted link 15 removes, and the second oil cylinder 8 is received
Contracting and so on, is built so that the second inserted link 15 conveniently be made to rise and enter in corresponding hole to facilitate, and
Convenient for the concrete situation after observation solidification.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (6)
1. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment, including loading plate (17), it is characterised in that: the loading plate
(17) it is fixed with riser (12) on one week side wall in, spacing are equipped with multiple limits on one week side wall in the riser (12) etc.
Slot (13), and the opposing sidewalls in limiting slot (13) penetrate through setting, are equipped with limit plate (3) in the limiting slot (13), it is more
The opposite side of a limit plate (3) is fixed with first sleeve (2) jointly, the side upper end rotation connection of the first sleeve (2)
There are multiple first rotating bars (4), the lower end of multiple first rotating bars (4) is rotatably connected to the second rotating bar (5), and multiple second
The lower end of rotating bar (5) is rotated in the upper end of riser (12), and the upper end of the loading plate (17) is rotatably connected to multiple first
Oil cylinder (6), the piston-rod end of multiple first oil cylinders (6) is rotatably connected on the side of multiple second rotating bars (5) respectively, described
Upper end side in first sleeve (2) is equidistantly fixed with multiple cross bars (1), and the opposite side of multiple cross bars (1) is fixed jointly
Have second sleeve (11), sliding sleeve is connected to multiple third inserted links (16) on the second sleeve (11), the loading plate (17)
Lower end is equipped with positioning device, and the positioning device is equipped with partition (28), and the lower end of the partition (28) is equipped with lifting device, institute
Lifting device is stated equipped with bottom plate (10), the bottom plate (10) is equipped with limiting device.
2. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment according to claim 1, which is characterized in that described fixed
Position device includes multiple support rods (24) for being equidistantly fixed on loading plate (17) lower end, and partition (28) is fixed on multiple supports
The lower end of bar (24), the side of the partition (28) are fixed on the side of riser (12), and sliding sleeve is connected on the riser (12)
One end of multiple first inserted links (14), first inserted link (14) is rotatably connected to the second connecting rod (27), second connection
One end of bar (27) is rotatably connected to U-shaped board (26), and common rotation is connected with first in the opposing sidewalls in the U-shaped board (26)
Connecting rod (25), multiple first connecting rods (25) are separately fixed at the side of multiple support rods (24), the loading plate (17)
Lower end is equipped with multiple sliding slots (22), is mounted on sliding block (21) in multiple sliding slots (22), and the lower end of multiple sliding blocks (21) is fixed
Have third oil cylinder (23), the piston-rod end of multiple third oil cylinders (23) is separately fixed at the upper end of multiple U-shaped boards (26).
3. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment according to claim 1, which is characterized in that the liter
Falling unit includes the first push rod (7) for being rotatably connected on multiple partitions (28) lower end two sides, and the lower end of first push rod (7) turns
Dynamic to be connected with the second push rod (9), the lower end common rotation of multiple second push rods (9) is connected with bottom plate (10), second push rod
(9) side is rotatably connected to the second oil cylinder (8), and the piston-rod end of second oil cylinder (8) is rotatably connected on the first push rod
(7) side.
4. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment according to claim 1, which is characterized in that the limit
Position device includes the fixed plate (19) for being fixed on bottom plate (10) upper end side, and the upper end of the fixed plate (19) is run through equipped with multiple
Second inserted link (15), sliding sleeve is connected to vertical bar (18) on second inserted link (15), and the upper end of the bottom plate (10) is equipped with multiple
Blind hole (20), the lower end of multiple vertical bars (18) extend respectively in multiple blind holes (20).
5. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment according to claim 1, which is characterized in that described
The length of three inserted links (16) is greater than the length of cross bar (1).
6. a kind of towering polymorphic structure system Core Walls Structure climbing form equipment according to claim 1, which is characterized in that described
One sleeve (2) and second sleeve (11) are all made of carbon steel and are made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811645743.9A CN109469319B (en) | 2018-12-29 | 2018-12-29 | Core tube die lifting equipment of towering special-shaped structure system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811645743.9A CN109469319B (en) | 2018-12-29 | 2018-12-29 | Core tube die lifting equipment of towering special-shaped structure system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109469319A true CN109469319A (en) | 2019-03-15 |
CN109469319B CN109469319B (en) | 2023-10-24 |
Family
ID=65677991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811645743.9A Active CN109469319B (en) | 2018-12-29 | 2018-12-29 | Core tube die lifting equipment of towering special-shaped structure system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469319B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20200299977A1 (en) * | 2017-10-10 | 2020-09-24 | Doka Gmbh | Formwork and method for erection of a concrete structure |
US11359390B2 (en) * | 2016-04-08 | 2022-06-14 | Peri Ag | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1385571A (en) * | 1971-08-12 | 1975-02-26 | Siemens Bauunion Gmbh | Climbing formwork for the production of reinforced concrete walls |
CN205171996U (en) * | 2015-10-13 | 2016-04-20 | 平煤神马建工集团有限公司 | Module system is put forward all to a control tower core section of thick bamboo |
CN106401174A (en) * | 2016-06-02 | 2017-02-15 | 中国建筑第八工程局有限公司 | Creeping formwork system used for construction of variable cross-section core tube and construction method of creeping formwork system |
CN206971719U (en) * | 2017-05-07 | 2018-02-06 | 中交二公局第三工程有限公司 | A kind of construction hydraulic formwork climbing device |
-
2018
- 2018-12-29 CN CN201811645743.9A patent/CN109469319B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1385571A (en) * | 1971-08-12 | 1975-02-26 | Siemens Bauunion Gmbh | Climbing formwork for the production of reinforced concrete walls |
CN205171996U (en) * | 2015-10-13 | 2016-04-20 | 平煤神马建工集团有限公司 | Module system is put forward all to a control tower core section of thick bamboo |
CN106401174A (en) * | 2016-06-02 | 2017-02-15 | 中国建筑第八工程局有限公司 | Creeping formwork system used for construction of variable cross-section core tube and construction method of creeping formwork system |
CN206971719U (en) * | 2017-05-07 | 2018-02-06 | 中交二公局第三工程有限公司 | A kind of construction hydraulic formwork climbing device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11359390B2 (en) * | 2016-04-08 | 2022-06-14 | Peri Ag | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure |
US20220307276A1 (en) * | 2016-04-08 | 2022-09-29 | Peri Se | Self-climbing system, self-climbing unit and method for moving such a self-climbing unit on a concrete building structure |
US20200299977A1 (en) * | 2017-10-10 | 2020-09-24 | Doka Gmbh | Formwork and method for erection of a concrete structure |
US11591811B2 (en) * | 2017-10-10 | 2023-02-28 | Doka Gmbh | Climbing formwork and method for erection of a concrete structure |
Also Published As
Publication number | Publication date |
---|---|
CN109469319B (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209538674U (en) | A kind of towering polymorphic structure system Core Walls Structure climbing form equipment | |
US10435896B2 (en) | Apparatus and method for lifting and sliding a structure attached to the wall | |
CN102661039A (en) | Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN205171996U (en) | Module system is put forward all to a control tower core section of thick bamboo | |
CN102022123B (en) | Integral lining method for tunnel with altered diameter by model board trolley | |
CN104120877B (en) | A kind of hydraulic climbing die block system and climbing form method | |
CN109457951B (en) | Formwork system for collecting and dividing shear wall and construction method thereof | |
US10914083B2 (en) | Wall-climbing concrete form lifting system | |
CN110017019B (en) | Hydraulic climbing formwork system and construction method thereof | |
CN109469319A (en) | A kind of towering polymorphic structure system Core Walls Structure climbing form equipment | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN105839543A (en) | High bridge pier self-lifting outer frame over-form construction technology | |
CN108678365A (en) | From angle hydraulic climbing form frame system | |
CN110805259A (en) | Integral steel platform formwork equipment for synchronous construction and construction method | |
CN211229441U (en) | Concrete pouring platform is built in room | |
CN110748178B (en) | Auxiliary platform for installing shock insulation support and application method thereof | |
CN211250602U (en) | Prefabricated staircase assembled template | |
CN103114572A (en) | Underground diaphragm wall guide wall movable mold frame | |
CN206053965U (en) | A kind of tunnel ditch cable trough construction trolley | |
CN210343366U (en) | Lining cutting platform truck of open cut tunnel side wall construction | |
CN211030511U (en) | Flexible extension formula segment case roof beam centre form | |
CN111021701B (en) | Lifting system for building | |
CN210067423U (en) | Aluminum alloy template hangs mould system | |
CN105003074A (en) | Commercial building construction system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |