CN109469056A - Sanitary filling field laying assembled anchor structure - Google Patents
Sanitary filling field laying assembled anchor structure Download PDFInfo
- Publication number
- CN109469056A CN109469056A CN201811620249.7A CN201811620249A CN109469056A CN 109469056 A CN109469056 A CN 109469056A CN 201811620249 A CN201811620249 A CN 201811620249A CN 109469056 A CN109469056 A CN 109469056A
- Authority
- CN
- China
- Prior art keywords
- reinforced plastic
- glass reinforced
- laying
- shell
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/002—Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/006—Sealing of existing landfills, e.g. using mining techniques
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
Abstract
The present invention relates to a kind of sanitary filling field laying novel fabricated anchor structures, belong to environmental technology field.Laying is provided in the side slope of refuse landfill, the laying is specially the geotextile of intermediate antiseepage film and two sides, glass reinforced plastic is set at the side slope top or halfpace and anchors shell, it is fixed in anchoring groove by precast concrete pile, the laying fold is fixed in glass reinforced plastic anchoring shell in laterally inserted anchoring body.Glass reinforced plastic anchoring body is trapezoidal, centre setting apertured partition, top setting rubble.The anchor structure uses prefabricated assembled construction, and component can be standardized production, has concurrently and collects guide percolate function.
Description
Technical field
The present invention relates to urban refuse sanitary landfill laying anchor structures, belong to environmental technology field.
Background technique
With the development of national economy, the raising of the level of urbanization, the yield of domestic waste is in increase sharply.
There are mainly three types of final disposal methods for domestic waste: sanitary landfills, compost and burning.Wherein sanitary landfills is the current world
Upper most common technology of garbage disposal.It is on the basis of scientific addressing, using necessary place protective treatment means and conjunction
The landfill structure of reason, farthest to reduce and eliminate influence of the rubbish to environment, especially to underground water body pollution.In recent years
Come, large MSW landfill is being built in succession in many cities.
In urban health landfill yard, the dirt of underground water is caused to prevent that Leachate site from permeating the ground, it is necessary to setting liner
System.During landfill, rubbish is that hierarchical block is filled, and due to the continuous accumulation of rubbish, constantly compresses and fills out
The effect of working truck is buried, pulling force will be formed in laying, and liner system may be made to lose original effect, in order to prevent
This phenomenon occurs, and anchorage zone generally is arranged at the platform of the top of side slope or segmentation side slope.
The anchoring of refuse landfill pad layer generally uses groove anchoring system, mostly uses rectangular section, by geomembrane with
Protection fabric edge fold is poured with cement concrete in the trench to be fixed.This conventional groove anchoring system work progress
In need to carry out consolidation process to trenched side-wall and bottom surface, project amount is larger, and concreting, health duration are longer on laying,
And concrete anchor solid lower liner layer is such as destroyed, maintenance and reinforcement is difficult.Therefore it is deposited in terms of functionality is with practical performance
In certain limitation.
Summary of the invention
Goal of the invention: the present invention proposes a kind of sanitary filling field laying novel fabricated anchor structure.Be able to solve or
Improve the problems such as conventional groove anchoring system project amount is big, long in time limit, maintenance and reinforcement is difficult.
Technical solution:
Sanitary filling field laying assembled anchor structure, it is characterised in that: the structure setting is in the side slope of refuse landfill;
Including the laying being covered in side slope;
The laying includes the geotextile layer of intermediate antiseepage film and two sides;
The side slope middle section is provided with halfpace;
Glass reinforced plastic anchoring shell is embedded at the halfpace;The laying, which is turned down, to be anchored in shell into glass reinforced plastic and pastes with inner wall
It closes;
The glass reinforced plastic anchoring shell is trapezoid cross section, and base angle is fillet, and top is parallel to the edge of halfpace;
Be provided with glass reinforced plastic anchoring body in glass reinforced plastic anchoring shell, laying be clipped in glass reinforced plastic anchoring shell and glass reinforced plastic anchoring body it
Between;
The glass reinforced plastic anchoring body bosom position is provided with horizontal apertured partition, fills rubble above apertured partition.
Hole bottom for placing glass reinforced plastic anchoring shell is provided with vertical concrete deadman;Glass reinforced plastic anchoring shell passes through expansion
Bolt and rubber sheet gasket are fixed on concrete deadman top.
The glass reinforced plastic anchoring shell is up-narrow and down-wide, bottom width 1000mm, high 800mm;Bottom belt is fluted, is expanding screw
Bolt bolt cap provides space, keeps glass reinforced plastic anchoring shell inner bottom surface without bump.
The glass reinforced plastic anchoring body be trapezoidal, bottom width 880mm, upper width 600mm, ballast grain sizes range 5~
20mm。
Concrete deadman, the long 2.5m of stake, diameter 20cm, bottom is taper, and upper end is equipped with preformed hole.
The glass reinforced plastic anchors thickness of the shell 25mm.The glass reinforced plastic anchors body thickness 15mm.
Advantage and effect:
Sanitary filling field laying novel fabricated anchor structure proposed by the present invention, can be used prefabrication, assembled in situ formula
Construction, component are standardized production, working efficiency can be improved, shorten the construction period.Under the premise of meeting anchorage technology requirement, energy
Enough solve the problems such as conventional groove anchoring system project amount is big, long in time limit, maintenance and reinforcement is difficult.In addition, health of the invention is filled out
A laying novel fabricated anchor structure is buried, other than anchoring function, has concurrently and collects guide percolate function, landfill can be improved
Field percolate treatment effeciency, keeps landfill yard integral layout more scientific and reasonable, safe and reliable.
Detailed description of the invention:
Fig. 1 sanitary filling field laying assembled anchor structure schematic diagram;
Fig. 2 glass reinforced plastic anchors shell detail drawing;
Fig. 3 glass reinforced plastic anchoring body detail drawing;
It is marked in figure:
1 side slope;2 antiseepage films;3 geotextile layers;4 halfpaces;5 glass reinforced plastics anchor shell;6 expansion bolts;7 rubber sheet gaskets;8 is mixed
Solidifying soil anchoring pile;9 glass reinforced plastic anchoring bodys;10 apertured partitions.
Specific embodiment:
The present invention is described further with reference to the accompanying drawing: as shown in Figure 1, the trench at side slope top or halfpace
Slot squeezes into concrete deadman prefabricated in advance in channel bottom, and glass reinforced plastic anchoring shell is then passed through expansion bolt and rubber
Glue gasket is fixed on concrete deadman upper end.It is flat that anchoring shell side grooves are backfilled to top surface one.By backing layer material lower layer geotechnique
Fabric, anti-seepage geomembrane, upper layer geotextile successively turn down in glass reinforced plastic anchoring shell, install glass by laterally inserted mode
Steel anchoring body, inserts rubble in anchoring body on apertured partition.
As shown in Figure 2 and Figure 3, anchoring shell and anchoring body are glass-reinforced plastic material, have intensity height, corrosion resistant advantage.Two
Person's section configuration be all it is trapezoidal, it is up-narrow and down-wide, anchor shell bottom width 1000mm, high 800m, anchoring body bottom width 880mm,
Upper width 600mm, is combined closely by the two and relatively unrotatable feature fixes laying.
The glass reinforced plastic anchors thickness of the shell 25mm.The glass reinforced plastic anchors body thickness 15mm.
Glass reinforced plastic anchoring shell bottom belt is fluted, provides space for expansion bolt bolt cap, keeps anchoring shell inner bottom surface flat
Whole no bump, does not influence the installation of anchoring body.Apertured partition is set among glass reinforced plastic anchoring body, and rubble, partial size are filled up in top
5~20mm of range, percolate are penetrated into inside anchoring body by metalling, and pump drainage in place enters conveyance conduit, and final
Carry out purified treatment.
The long 2.5m of concrete deadman, diameter 20cm, bottom is taper convenient for construction piling, and upper end is equipped with preformed hole, is convenient for
Expansion bolt insertion.Along anchoring shell, longitudinally row's spacing can determine concrete deadman according to factors such as laying stress sizes.
Claims (7)
1. sanitary filling field laying assembled anchor structure, it is characterised in that: side slope of the structure setting in refuse landfill
(1) on;Including the laying being covered on side slope (1);
The laying includes the geotextile layer (3) of intermediate antiseepage film (2) and two sides;
Side slope (1) middle section is provided with halfpace (4);
Glass reinforced plastic anchoring shell (5) is embedded at the halfpace (4);The laying is turned down into glass reinforced plastic anchoring shell (5)
And it is bonded with inner wall;
Glass reinforced plastic anchoring shell (5) is trapezoid cross section, and base angle is fillet, and top is parallel to the edge of halfpace (4);
It is provided with glass reinforced plastic anchoring body (9) in glass reinforced plastic anchoring shell (5), laying is clipped in glass reinforced plastic anchoring shell (5) and glass reinforced plastic
Between anchoring body (9);
Glass reinforced plastic anchoring body (9) the bosom position is provided with horizontal apertured partition (10), above apertured partition (10)
Fill rubble.
2. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: for placing glass
The hole bottom of steel anchoring shell (5) is provided with vertical concrete deadman (8);Glass reinforced plastic anchor shell (5) by expansion bolt (6) and
Rubber sheet gasket (7) is fixed on concrete deadman (8) top.
3. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: the glass reinforced plastic anchor
Gu shell (5) is up-narrow and down-wide, bottom width 1000mm, high 800mm;Bottom belt is fluted, provides sky for expansion bolt (6) bolt cap
Between, keep glass reinforced plastic anchoring shell (5) inner bottom surface without bump.
4. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: the glass reinforced plastic anchor
Solid (9) is trapezoidal, bottom width 880mm, upper width 600mm, 5~20mm of ballast grain sizes range.
5. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: concrete deadman
(8), the long 2.5m of stake, diameter 20cm, bottom are taper, and upper end is equipped with preformed hole.
6. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: the glass reinforced plastic anchor
Shell Gu (5) thickness 25mm.
7. sanitary filling field laying assembled anchor structure according to claim 1, it is characterised in that: the glass reinforced plastic anchor
Solid (9) thickness 15mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811620249.7A CN109469056B (en) | 2018-12-28 | 2018-12-28 | Sanitary landfill liner layer assembled anchoring structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811620249.7A CN109469056B (en) | 2018-12-28 | 2018-12-28 | Sanitary landfill liner layer assembled anchoring structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109469056A true CN109469056A (en) | 2019-03-15 |
CN109469056B CN109469056B (en) | 2023-09-29 |
Family
ID=65678099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811620249.7A Active CN109469056B (en) | 2018-12-28 | 2018-12-28 | Sanitary landfill liner layer assembled anchoring structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109469056B (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101936013A (en) * | 2010-09-07 | 2011-01-05 | 中国市政工程西北设计研究院有限公司 | Base rock side slope middle seepage preventing layer anchoring structure of steep and hard rock double-layer seepage preventing structure |
CN104652581A (en) * | 2015-01-27 | 2015-05-27 | 北京锄禾环保技术有限公司 | Multi-stage slope anchoring structure for realizing rainwater and sewage separation |
-
2018
- 2018-12-28 CN CN201811620249.7A patent/CN109469056B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101936013A (en) * | 2010-09-07 | 2011-01-05 | 中国市政工程西北设计研究院有限公司 | Base rock side slope middle seepage preventing layer anchoring structure of steep and hard rock double-layer seepage preventing structure |
CN104652581A (en) * | 2015-01-27 | 2015-05-27 | 北京锄禾环保技术有限公司 | Multi-stage slope anchoring structure for realizing rainwater and sewage separation |
Also Published As
Publication number | Publication date |
---|---|
CN109469056B (en) | 2023-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103526770B (en) | A kind of construction method of high antiseepage anti-floating pile raft structure | |
CN102995599B (en) | Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal | |
CN110158389A (en) | A kind of light soil road structure and its construction method | |
WO2019214701A1 (en) | Modular soil pressure applying and molding device and soft soil foundation treatment method | |
CN109629609A (en) | Utilize the landfill pad layer anchor structure of rice hull ash concrete | |
CN109778625A (en) | A kind of express highway roadbed structure that dregs class building castoff fills | |
CN109371763A (en) | A kind of phreatic high is low to fill out shallow cut subgrade in swelling soil zone construction method | |
CN113073656B (en) | Soil protection structure between support piles and construction method thereof | |
CN209482302U (en) | Sanitary filling field laying assembled anchor structure | |
CN107780436B (en) | Geogrid Reinforced Earth Retaining Wall and construction method based on architecture sediment | |
CN201436323U (en) | Drainage structure of dynamic compaction foundation | |
CN111648383A (en) | Internal drainage method for loess high-fill side slope | |
CN113818300B (en) | Sponge city ecological roadbed structure based on original road and construction method thereof | |
CN216040465U (en) | Ecological roadbed structure in sponge city based on original road | |
CN202755438U (en) | Integrative structure with functions of anchoring, drainage and flood interception in refuse landfill | |
CN113323017B (en) | Construction method of side wall fertilizer groove foam concrete backfill system | |
CN109469056A (en) | Sanitary filling field laying assembled anchor structure | |
CN114457855A (en) | Sunken horizontal seepage-proofing and perpendicular seepage-proofing integrated configuration | |
LU504723B1 (en) | Anchoring structure of landfill liner cushion layer using rice husk ash concrete | |
CN218116000U (en) | Composite roadbed structure | |
CN109653217B (en) | Sanitary landfill cushion layer gravity type anchoring structure | |
CN114525818B (en) | Construction method of combined impermeable body with horizontal impermeable and vertical impermeable functions | |
CN216194662U (en) | Connecting structure of foundation treatment pile and rainwater pipeline under racetrack roadbed | |
CN114439049B (en) | Combined seepage-proofing body for preventing and controlling solid waste pile pollution and restoring ecology | |
CN211873105U (en) | Sanitary landfill liner layer buckle belt type anchoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |