CN109445397A - Intelligent numerical control design of workshop verifies system - Google Patents
Intelligent numerical control design of workshop verifies system Download PDFInfo
- Publication number
- CN109445397A CN109445397A CN201811610689.4A CN201811610689A CN109445397A CN 109445397 A CN109445397 A CN 109445397A CN 201811610689 A CN201811610689 A CN 201811610689A CN 109445397 A CN109445397 A CN 109445397A
- Authority
- CN
- China
- Prior art keywords
- numerical control
- data
- intelligent numerical
- workshop
- mould group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013461 design Methods 0.000 title claims abstract description 80
- 238000004519 manufacturing process Methods 0.000 claims abstract description 78
- 238000012544 monitoring process Methods 0.000 claims abstract description 55
- 238000012795 verification Methods 0.000 claims abstract description 27
- 238000000034 method Methods 0.000 claims abstract description 22
- 238000004891 communication Methods 0.000 claims abstract description 18
- 238000009826 distribution Methods 0.000 claims abstract description 11
- 238000000605 extraction Methods 0.000 claims description 11
- 238000012546 transfer Methods 0.000 claims description 10
- 239000000284 extract Substances 0.000 claims description 3
- 238000007726 management method Methods 0.000 description 10
- 238000013480 data collection Methods 0.000 description 8
- 238000012942 design verification Methods 0.000 description 6
- 241000196324 Embryophyta Species 0.000 description 4
- 230000009977 dual effect Effects 0.000 description 3
- 238000003754 machining Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 241001269238 Data Species 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000006855 networking Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005094 computer simulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41885—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32339—Object oriented modeling, design, analysis, implementation, simulation language
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses intelligent numerical control design of workshop to verify system, belong to numerically-controlled machine tool manufacture and design field, including the processing center with database, comparing verifying mould group and communication unit, and be arranged in workshop, the monitoring collection mould group for acquiring intelligent numerical control device data, the monitoring collection mould group is connected with communication unit and with processing center data communication;The database includes the distribution of model, classification, place workshop and production procedure data of several intelligent numerical control equipment;Comparing verifying mould group intelligent numerical control equipment included in intelligent numerical control design of workshop data to be verified for identification, and call in database and/or the data of monitoring collection mould group, it is compared and analyzed with the intelligent numerical control device data for being included in intelligent numerical control design of workshop and exports verification result.
Description
Technical field
The invention belongs to numerically-controlled machine tool manufacture and design fields, and in particular to intelligent numerical control design of workshop verifying system
System.
Background technique
Digital factory (DF) is the product that modern digital manufacturing technology is combined with computer simulation technique, is had simultaneously
Its distinct feature.Its appearance gives basic manufacturing industry to be filled with new vitality, mainly as communication product design and product system
Bridge between making.Digital factory is based on the related data of product lifecycle, right in computer virtual environment
Entire production process is emulated, is evaluated and optimized, and further expands to the novel organization of production of entire product life cycle
Mode.
And numerically-controlled machine tool has the characteristics that height intelligent automation, is component part important in modern digital chemical plant,
It in the establishment in modern digital chemical plant, will not necessarily lack the use to numerically-controlled machine tool, and existing factory is carried out in order to realize
Production capacity upgrading, intellectualized reconstruction would have to consider layout type and control logic etc. during introducing numerically-controlled machine tool
Problem, but for the transformation factory to be upgraded of current operating state maturation, if selected for upgrading temporarily
It stops production, the special delivery time is replaced installation and debugging, then substantially must due to various factors such as environment, technology
It so will appear and need to delay the plenty of time the case where being debugged, directly affect production efficiency, also, be directed to a new transformation
Upgrading plan, whether layout designs meet the requirements, can achieve the desired results and for factory it is practical there is also which can
For the place of adjustment, these require verification experimental verification to define, and for practical purposes, it is impossible to it takes and carries out in the factory in fact
The strategy slowly verified and adjusted again after the Layout changing of border, it is necessary to which finding one kind can be in the premise for not influencing actual production
Under, the method verified in advance under the requirement closest to actual motion.
Summary of the invention
The present invention in view of the above shortcomings of the prior art, provides one kind under the premise of not influencing actual production, can
The intelligent numerical control design of workshop required closest to actual motion verifies system.
The purpose of the present invention is what is be achieved through the following technical solutions:
Intelligent numerical control design of workshop verifies system, it is characterised in that: including with database, comparing verifying mould group and communication
The processing center of unit, and be arranged in workshop, the monitoring collection mould group for acquiring intelligent numerical control device data, the prison
Control acquisition mould group is connected with communication unit and with processing center data communication;
The database includes the distribution of model, classification, place workshop and production procedure data of several intelligent numerical control equipment;
Comparing verifying mould group intelligence number included in intelligent numerical control design of workshop data to be verified for identification
Equipment is controlled, and is called in database and/or the data of monitoring collection mould group, with the intelligence for being included in intelligent numerical control design of workshop
Numerical control device data compare and analyze and export verification result.
Comparing verifying mould group includes that data input pin, feature extraction unit, data transfer unit, analytical unit
And data output end;The data of the intelligent numerical control design of workshop data to be verified, database and monitoring collection mould group from
Data input pin input, the feature extraction unit identify and extract the intelligence in intelligent numerical control design of workshop data to be verified
Energy numerical control device data are simultaneously supplied to analytical unit, and the data transfer the number in unit called data library and monitoring collection mould group
Intelligent numerical control device data in is simultaneously supplied to analytical unit, and feature extraction unit and data are transferred list by the analytical unit
The data of member compare matching, and export verification result by data output end.
Feature extraction unit and data are transferred unit and compare matched intelligent numerical control device data meter by the analytical unit
The production efficiency of corresponding intelligent numerical control equipment is calculated, and by production efficiency according to intelligence in intelligent numerical control design of workshop to be verified
The sequence arrangement that numerical control device is distributed in workshop is sentenced if sequence from small to large is presented in the production efficiency of each intelligent numerical control equipment
Fixed intelligent numerical control design of workshop to be verified meets production requirement, is otherwise judged to not meeting.
The comparing verifying mould group is additionally provided with for the channel to Database Feedback data, if comparing is verified
Mould group identifies the intelligent numerical control equipment for not saving data in intelligent numerical control design of workshop data to be verified containing lane database,
It is then that new equipment and the data feedback that collects monitoring collection mould group are carried out to database by the intelligent numerical control device flag
It saves.
The monitoring collection mould group includes camera unit, and is used for and each monitoring unit of intelligent numerical control equipment in workshop
The acquisition unit of data communication, the monitoring unit include counter, limit inductor, timer and flow monitoring unit.
The verification method of this intelligent numerical control design of workshop verifying system, which is characterized in that including designing input step, number
According to identification step, data collection steps and design verification step;
The design input step inputs the intelligent numerical control design of workshop scheme to be verified for including intelligent numerical control facility information
To processing center;
The data identification step identifies that all intelligent numerical controls for including in intelligent numerical control design of workshop scheme to be verified are set
Standby model, and with matched in the data of the intelligent numerical control equipment stored in database, call matching result one in database
The intelligent numerical control facility information of cause is remembered the facility information of intelligent numerical control equipment unsaved in database as new added data item
Enter in database, the data of unsaved intelligent numerical control equipment are charged in corresponding data item in parallel-connection network called data library;
The data collection steps, according to the recognition result of data identification step, the intelligent numerical control stored in called data library is set
Standby data, the monitoring data of the monitoring collection mould group in workshop where parallel-connection network calls intelligent numerical control equipment;
The design verification step, according in data identification step intelligent numerical control facility information and data collection steps in
Whether full the data for monitoring and transferring calculate each intelligent numerical control equipment room creation data in intelligent numerical control design of workshop to be verified
Sufficient production requirement.
The design input step is that the PC with input system being arranged by processing center will be set with intelligent numerical control
The intelligent numerical control design of workshop protocol of standby information is input to processing center.
The intelligent numerical control facility information includes the distributing position number of device model, classification, quantity and equipment in workshop
According to.
The database includes the distribution of model, classification, place workshop and the production procedure number of several intelligent numerical control equipment
According to.
The production procedure data include the counting in the production efficiency and intelligent numerical control equipment of intelligent numerical control equipment
The data that device, limit inductor, timer and flow monitoring unit record in process of production.
The design verification step calculates each intelligent numerical control equipment room production number in intelligent numerical control design of workshop to be verified
According to whether meeting the method for production requirement and include the following steps:
According to the intelligent numerical control number of devices identified in data identification step, monitoring in called data acquisition step and transfer
Data calculate design quantity intelligent numerical control equipment production efficiency, and by production efficiency according to intelligent numerical control to be verified
The sequence arrangement that intelligent numerical control equipment is distributed in workshop in design of workshop, if the production efficiency of each intelligent numerical control equipment is presented from small
Then determine that intelligent numerical control design of workshop to be verified meets production requirement to big sequence, is otherwise judged to not meeting.
It further include database update step, the intelligent numerical control equipment institute for calling of networking in data base call data collection steps
Workshop monitoring acquisition mould group monitoring data and be compared with the intelligent numerical control device data of storage corresponding in database, repair
Just and update.
The technical program has the beneficial effect that:
The intelligent numerical control design of workshop of the technical program verifies system, using On-line matching, data call and implements data prison
The engagement means of survey carry out digital simulation verifying to the intelligent numerical control design of workshop for needing to verify feasibility, possess and have recorded respectively
The database of the production maintenance datas such as model, classification, the distribution of place workshop and the production procedure data of class intelligent numerical control equipment, number
It can identify intelligent numerical control equipment involved in intelligent numerical control design of workshop according to comparison mould group and call in database and remember
The data of the correspondence equipment of load and also have prison for acquiring intelligent numerical control device data as the assignment of simulated experiment
Control acquisition mould group can network acquires the monitoring of the correspondence intelligent numerical control equipment to come into operation in each plant site in real time
Data can also have and answer convenient for timely updating and correcting the data in database to further increase sampling accuracy
The ability of continuous self study in.
Analytical unit is by the production efficiency of intelligent numerical control equipment according to number intelligent in intelligent numerical control design of workshop to be verified
The sequence arrangement that control equipment is distributed in workshop, i.e., carry out corresponding position sequence for the actual production efficiency data of each equipment, if
The sequence that the production efficiency of each intelligent numerical control equipment is presented from small to large then determines that intelligent numerical control design of workshop to be verified meets
Production requirement, process is arranged preceding production efficiency of equipment and is lower than posterior equipment, such as the production efficiency of previous equipment is 10
A/hour, the latter are 12/hour, ensure that each equipment room will not generate production because of efficiency variance in production procedure
Product accumulation influences production line operation, is otherwise judged to not meeting production requirement.
The intelligent numerical control design of workshop verification method of the technical program carries out design scheme to be verified by directly defeated
Enter, is then automatically performed by system to the identification of equipment, database data calling and comparison and Workshop Production in design scheme
Real-time monitoring data is transferred, and is counted to these data according to the distribution sequence of intelligent numerical control equipment, quantity etc. in design scheme
Whether under current design can smoothly realize production, can or can not generate that production efficiency is unmatched to ask in each equipment room if calculating
Topic, and calculate whether whole production efficiency meets expection.
Detailed description of the invention
It is of the invention aforementioned and be detailed description below and become more apparent upon when reading in conjunction with the following drawings, in attached drawing:
Fig. 1 is intelligent numerical control design of workshop verifying a kind of structural schematic diagram of preferred embodiment of system of the present invention;
Fig. 2 is a kind of logical schematic of preferred embodiment of verification method of the present invention;
Fig. 3 is the example diagram of present invention intelligent numerical control design of workshop scheme to be verified.
Specific embodiment
It is further illustrated below by several specific embodiments and realizes the object of the invention technical solution, need to illustrate
It is that claimed technical solution includes but is not limited to following embodiment.
Embodiment 1
As a kind of most basic embodiment of the invention, such as Fig. 1 discloses intelligent numerical control design of workshop verifying system, including
Processing center with database, comparing verifying mould group and communication unit, and be arranged in workshop, for acquiring intelligence
The monitoring collection mould group of numerical control device data, the monitoring collection mould group with communication unit and with processing center data communication
It is connected;The database includes the distribution of model, classification, place workshop and production procedure data of several intelligent numerical control equipment;
Intelligent numerical control included in intelligent numerical control design of workshop data to be verified is set comparing verifying mould group for identification
It is standby, and call in database and/or the data of monitoring collection mould group, with the intelligent numerical control for being included in intelligent numerical control design of workshop
Device data compares and analyzes and exports verification result.Using On-line matching, data call and the knot for implementing data monitoring
Conjunction means carry out digital simulation verifying to the intelligent numerical control design of workshop for needing to verify feasibility, possess and have recorded all kinds of intelligence
The database of the production maintenance datas such as model, classification, the distribution of place workshop and the production procedure data of numerical control device, comparing
Verifying mould group can identify intelligent numerical control equipment involved in intelligent numerical control design of workshop and call pair recorded in database
It answers the data of equipment as the assignment of simulated experiment, and also there is the monitoring collection for acquiring intelligent numerical control device data
Mould group can network acquisition is being come into operation in each plant site in real time correspondence intelligent numerical control equipment monitoring data with
Sampling accuracy is further increased, while can also be had in the application not convenient for timely updating and correcting the data in database
The ability of disconnected self study.
Embodiment 2
As a kind of preferred embodiment of the present invention, such as Fig. 1 discloses intelligent numerical control design of workshop verifying system, including band
There is the processing center of database, comparing verifying mould group and communication unit, and is arranged in workshop, for acquiring intelligent number
Control device data monitoring collection mould group, the monitoring collection mould group with communication unit and with processing center data communication phase
Even;The database includes the distribution of model, classification, place workshop and production procedure data of several intelligent numerical control equipment;Institute
Comparing verifying mould group intelligent numerical control equipment included in intelligent numerical control design of workshop data to be verified for identification is stated,
And call in database and/or the data of monitoring collection mould group, it is set with the intelligent numerical control for being included in intelligent numerical control design of workshop
Standby data compare and analyze and export verification result.
Comparing verifying mould group includes that data input pin, feature extraction unit, data transfer unit, analytical unit
And data output end;The data of the intelligent numerical control design of workshop data to be verified, database and monitoring collection mould group from
Data input pin input, the feature extraction unit identify and extract the intelligence in intelligent numerical control design of workshop data to be verified
Energy numerical control device data are simultaneously supplied to analytical unit, and the data transfer the number in unit called data library and monitoring collection mould group
Intelligent numerical control device data in is simultaneously supplied to analytical unit, and feature extraction unit and data are transferred list by the analytical unit
Member compares matching, and exports verification result by data output end.
Feature extraction unit and data are transferred unit and compare matched intelligent numerical control device data meter by the analytical unit
The production efficiency of corresponding intelligent numerical control equipment is calculated, and by production efficiency according to intelligence in intelligent numerical control design of workshop to be verified
The sequence arrangement that numerical control device is distributed in workshop is sentenced if sequence from small to large is presented in the production efficiency of each intelligent numerical control equipment
Fixed intelligent numerical control design of workshop to be verified meets production requirement, is otherwise judged to not meeting.
The comparing verifying mould group is additionally provided with for the channel to Database Feedback data, if comparing is verified
Mould group identifies the intelligent numerical control equipment for not saving data in intelligent numerical control design of workshop data to be verified containing lane database,
It is then that new equipment and the data feedback that collects monitoring collection mould group are carried out to database by the intelligent numerical control device flag
It saves.
The monitoring collection mould group includes camera unit, and is used for and each monitoring unit of intelligent numerical control equipment in workshop
The acquisition unit of data communication, the monitoring unit include counter, limit inductor, timer and flow monitoring unit.
Such as Fig. 2, the verification method of this intelligent numerical control design of workshop verifying system, which is characterized in that inputted including design
Step, data identification step, data collection steps and design verification step;
The design input step inputs the intelligent numerical control design of workshop scheme to be verified for including intelligent numerical control facility information
To processing center;Preferably, such as Fig. 3, four verification experimental verification platforms are set up, to Machine tool box body manufacturing based on digital workshop standard (grass
Case) system architecture, requirement of interconnecting, production unit and integrated requirement, cutter, fixture, gauge management, mark system and object
Streaming system requirement, management function, visualization requirements and data dictionary (intelligent production management, intelligent object in corresponding embodiment
Flow management, intelligent numerical control equipment, the hardware construction of industry internet interface and software are built) carry out experimental verification.Specific standards
Verification experimental verification platform is as follows:
(1), the verification experimental verification platform of intelligent numerical control equipment: main verifying equipment operating data and warning message acquisition, equipment pipe
Reason;
(2), the verification experimental verification platform of Intelligent logistics management: main verifying material fluid recognition and management;
(3), the verification experimental verification platform of intelligent production management: main proving program and tool management, logistics management, cutter dispatching,
Planning management and planned dispatching;
(4), the verification experimental verification platform of industry internet: main verifying manufacturing execution system and upper layer software (applications) (ERP, PDM, CAPP)
It interconnects, interconnects with hardware such as intelligent numerical control equipments, interconnects with physical-distribution intelligent equipment (stereo garage).
In specific design scheme, identification is included
2 sets of FMS flexible manufacturing systems, respectively by the horizontal Machining centers of 4 630mm × 630mm and 4 800mm × 800mm
Composition;
1 inversion type numerically controlled lathe integrates loading and unloading robot and material storing system;
2 precise horizontal machining centers, 1 TH6363A and 1 THMC6350 integrate material stocking system;
1 five face machining center of RB-3NM numerical control gantry dual stage face (manually matching feeding);
2 sets of FMS flexible manufacturing systems and 2 precise horizontal machining center processing districts respectively configure a set of monitoring camera;
It is inverted numerical control lathe and five face machining center of numerical control gantry dual stage face is monitored by region cradle head camera.
Four production areas (two flexible manufacturing systems, three single machine productions, five face machining centers of numerical control gantry dual stage face
Four regions) respectively configure a set of terminal, a set of monitoring large-size screen monitors, a set of ANDON alarm system.
The data identification step identifies all intelligent numbers for including in intelligent numerical control design of workshop scheme to be verified
Control device model, and with matched in the data of the intelligent numerical control equipment stored in database, call database in match knot
The consistent intelligent numerical control facility information of fruit, using the facility information of intelligent numerical control equipment unsaved in database as newly-increased data
In item data-in library, the data of unsaved intelligent numerical control equipment charge to corresponding data item in parallel-connection network called data library
In;
The data collection steps, according to the recognition result of data identification step, the intelligent numerical control stored in called data library is set
Standby data, the monitoring data of the monitoring collection mould group in workshop where parallel-connection network calls intelligent numerical control equipment;
The design verification step, according in data identification step intelligent numerical control facility information and data collection steps in
Whether full the data for monitoring and transferring calculate each intelligent numerical control equipment room creation data in intelligent numerical control design of workshop to be verified
Sufficient production requirement.
The design input step is that the PC with input system being arranged by processing center will be set with intelligent numerical control
The intelligent numerical control design of workshop protocol of standby information is input to processing center.
The intelligent numerical control facility information includes the distributing position number of device model, classification, quantity and equipment in workshop
According to.
The database includes the distribution of model, classification, place workshop and the production procedure number of several intelligent numerical control equipment
According to.
The production procedure data include the counting in the production efficiency and intelligent numerical control equipment of intelligent numerical control equipment
The data that device, limit inductor, timer and flow monitoring unit record in process of production.
The design verification step calculates each intelligent numerical control equipment room production number in intelligent numerical control design of workshop to be verified
According to whether meeting the method for production requirement and include the following steps:
According to the intelligent numerical control number of devices identified in data identification step, monitoring in called data acquisition step and transfer
Data calculate design quantity intelligent numerical control equipment production efficiency, and by production efficiency according to intelligent numerical control to be verified
The sequence arrangement that intelligent numerical control equipment is distributed in workshop in design of workshop, if the production efficiency of each intelligent numerical control equipment is presented from small
Then determine that intelligent numerical control design of workshop to be verified meets production requirement to big sequence, is otherwise judged to not meeting.
It further include database update step, the intelligent numerical control equipment institute for calling of networking in data base call data collection steps
Workshop monitoring acquisition mould group monitoring data and be compared with the intelligent numerical control device data of storage corresponding in database, repair
Just and update.
Claims (5)
1. intelligent numerical control design of workshop verifies system, it is characterised in that: including verifying mould group with database, comparing and leading to
The processing center of unit is interrogated, and is arranged in workshop, the monitoring collection mould group for acquiring intelligent numerical control device data, it is described
Monitoring collection mould group is connected with communication unit and with processing center data communication;
The database includes the distribution of model, classification, place workshop and production procedure data of several intelligent numerical control equipment;
Comparing verifying mould group intelligence number included in intelligent numerical control design of workshop data to be verified for identification
Equipment is controlled, and is called in database and/or the data of monitoring collection mould group, with the intelligence for being included in intelligent numerical control design of workshop
Numerical control device data compare and analyze and export verification result.
2. intelligent numerical control design of workshop as described in claim 1 verifies system, it is characterised in that: the comparing verifies mould
Group transfers unit, analytical unit and data output end including data input pin, feature extraction unit, data;It is described to be verified
The data of intelligent numerical control design of workshop data, database and monitoring collection mould group are inputted from data input pin, and the feature mentions
It takes unit to identify and extracts the intelligent numerical control device data in intelligent numerical control design of workshop data to be verified and be supplied to point
Unit is analysed, the data transfer the intelligent numerical control device data in the data of unit called data library and monitoring collection mould group simultaneously
It is supplied to analytical unit, the data that feature extraction unit and data transfer unit are compared matching by the analytical unit, and
Verification result is exported by data output end.
3. intelligent numerical control design of workshop as claimed in claim 2 verifies system, it is characterised in that: the analytical unit is by feature
Extraction unit and data transfer unit and compare the production that matched intelligent numerical control device data calculates corresponding intelligent numerical control equipment
Efficiency, and production efficiency is arranged according to intelligent numerical control equipment in intelligent numerical control design of workshop to be verified in the sequence that workshop is distributed
Column determine intelligent numerical control design of workshop to be verified if sequence from small to large is presented in the production efficiency of each intelligent numerical control equipment
Meet production requirement, is otherwise judged to not meeting.
4. intelligent numerical control design of workshop as described in claim 1 verifies system, it is characterised in that: the comparing verifies mould
Group is additionally provided with for the channel to Database Feedback data, if comparing verifying mould group identifies intelligent numerical control to be verified
It does not save the intelligent numerical control equipment of data in design of workshop data containing lane database, is then new by the intelligent numerical control device flag
Equipment simultaneously saves the data feedback that monitoring collection mould group collects to database.
5. intelligent numerical control design of workshop as described in claim 1 verifies system, it is characterised in that: the monitoring collection mould group packet
Camera unit is included, and for the acquisition unit with each monitoring unit data communication of intelligent numerical control equipment in workshop, the prison
Controlling unit includes counter, limit inductor, timer and flow monitoring unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811610689.4A CN109445397B (en) | 2018-12-27 | 2018-12-27 | Intelligent numerical control workshop design verification system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811610689.4A CN109445397B (en) | 2018-12-27 | 2018-12-27 | Intelligent numerical control workshop design verification system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109445397A true CN109445397A (en) | 2019-03-08 |
CN109445397B CN109445397B (en) | 2021-08-27 |
Family
ID=65538266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811610689.4A Active CN109445397B (en) | 2018-12-27 | 2018-12-27 | Intelligent numerical control workshop design verification system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109445397B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113188495A (en) * | 2021-05-07 | 2021-07-30 | 西安医学院 | Dimension out-of-tolerance intelligent verification system applied to preparation of single crystal blade mould shell |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014154553A1 (en) * | 2013-03-26 | 2014-10-02 | Siemens Aktiengesellschaft | System and method for handling plant engineering data |
CN104091027A (en) * | 2014-07-17 | 2014-10-08 | 中国科学院自动化研究所 | Visual workshop layout optimization method and system |
CN104808627A (en) * | 2015-04-20 | 2015-07-29 | 海安县申菱电器制造有限公司 | Workshop layout method of discrete manufacturing system |
CN108121216A (en) * | 2017-12-26 | 2018-06-05 | 哈工大机器人(合肥)国际创新研究院 | A kind of automated workshop Virtual Debugging method based on digital factory |
-
2018
- 2018-12-27 CN CN201811610689.4A patent/CN109445397B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014154553A1 (en) * | 2013-03-26 | 2014-10-02 | Siemens Aktiengesellschaft | System and method for handling plant engineering data |
CN104091027A (en) * | 2014-07-17 | 2014-10-08 | 中国科学院自动化研究所 | Visual workshop layout optimization method and system |
CN104808627A (en) * | 2015-04-20 | 2015-07-29 | 海安县申菱电器制造有限公司 | Workshop layout method of discrete manufacturing system |
CN108121216A (en) * | 2017-12-26 | 2018-06-05 | 哈工大机器人(合肥)国际创新研究院 | A kind of automated workshop Virtual Debugging method based on digital factory |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113188495A (en) * | 2021-05-07 | 2021-07-30 | 西安医学院 | Dimension out-of-tolerance intelligent verification system applied to preparation of single crystal blade mould shell |
CN113188495B (en) * | 2021-05-07 | 2024-03-26 | 西安医学院 | Intelligent verification system for dimension out-of-tolerance for preparing single crystal blade mould shell |
Also Published As
Publication number | Publication date |
---|---|
CN109445397B (en) | 2021-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109726234B (en) | Integrated circuit test informatization management system based on industrial Internet | |
CN104483842B (en) | One kind regulation and control one automation main website comparison method | |
CN103577926B (en) | A kind of method that realizes the calculating in real time of large scale electric network theory wire loss and high accuracy | |
CN110336375A (en) | A kind of processing method and system of power system monitor warning information | |
CN109978096A (en) | A kind of electrode automated production and Warehouse Management System | |
CN102820707B (en) | Topological automatic identification system for distribution network | |
CN105809260A (en) | Method for intelligently generating monitoring information point list of dispatching automation system | |
CN104076770A (en) | production line monitoring method and system | |
CN104407576A (en) | Realization method for general type production and manufacturing unit and control system thereof | |
CN102239453A (en) | Resources configuration automation system for relocation of production facilities and method thereof | |
CN107450501A (en) | A kind of manufacturing execution system for being applied to automate filling workshop | |
CN109146253A (en) | A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking | |
CN110516939A (en) | Warehouse homework dispatches system | |
CN111429030B (en) | Autonomous mobile robot integrated scheduling system and integrated scheduling method | |
CN109683923B (en) | Method and system for checking configuration file version of power distribution automation system | |
CN105761008A (en) | Intelligent production management method for signal equipment maintenance | |
CN208506582U (en) | A kind of flexible production control system in dynamic regulation production path | |
CN109445397A (en) | Intelligent numerical control design of workshop verifies system | |
CN109962529A (en) | A kind of on-line monitoring of electrical secondary equipment and O&M device | |
CN109901830A (en) | A kind of symbol arranging method and system for scada system development | |
Kaczmarczyk et al. | Revisiting the role of manufacturing execution systems in Industry 4.0 | |
CN112506155A (en) | PC component production simulation and intelligent control system | |
CN105527920A (en) | B/S-based numerical control machine tool fault diagnosis system | |
CN109669421A (en) | A kind of intelligent numerical control design of workshop verification method | |
CN102053580B (en) | Control method and the design construction system of electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |