CN109440570A - A kind of construction method and stone dam preventing the erosion of hillside fields farm road - Google Patents

A kind of construction method and stone dam preventing the erosion of hillside fields farm road Download PDF

Info

Publication number
CN109440570A
CN109440570A CN201811436042.4A CN201811436042A CN109440570A CN 109440570 A CN109440570 A CN 109440570A CN 201811436042 A CN201811436042 A CN 201811436042A CN 109440570 A CN109440570 A CN 109440570A
Authority
CN
China
Prior art keywords
stone dam
stone
hillside fields
dam
farm road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811436042.4A
Other languages
Chinese (zh)
Other versions
CN109440570B (en
Inventor
王宇
赵占军
沈海鸥
李洪丽
韩兴
张春燕
刘健
李春丽
宋金红
车晓翠
叶青
王识然
张琪
赵强
李昊伦
隋振民
冯君
王岩松
高远
钟云飞
任明
刘建祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Agricultural University
Original Assignee
Jilin Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Agricultural University filed Critical Jilin Agricultural University
Priority to CN201811436042.4A priority Critical patent/CN109440570B/en
Publication of CN109440570A publication Critical patent/CN109440570A/en
Application granted granted Critical
Publication of CN109440570B publication Critical patent/CN109440570B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Cultivation Of Plants (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of construction method for preventing hillside fields farm road from corroding and stone dams, belong to Subgrade soil erosion control technical field, pass through exploration hillside fields farm road ratio of slope drop, groove is excavated on the farm road of hillside fields and fills stone dam or prefabricated stone dam is directly set, it is acted on using the protective reinforcing of stone dam, prevents road surface incision, retain silt in stone dam upstream face, runoff decrease flow velocity forms drop energy dissipating in the back side of stone dam.

Description

A kind of construction method and stone dam preventing the erosion of hillside fields farm road
Technical field
The invention belongs to Subgrade soil erosion control technical field more particularly to it is a kind of prevent hillside fields farm road corrode Construction method and stone dam.
Background technique
For the hillside fields farm road for soil property, general two sides easily are rolled to form rut trace by farm machinery without pumping equipment, In place of so that hillside fields farm road is become runoff gathering, erosion intensity aggravation in road surface generates erosion groove, not only influences normal agricultural Machinery is current, and nibbles two sides farmland.
Phase at the end of the 20th century has started the research work of hillside fields farm road erosion, and primary study road erosion both at home and abroad Mechanism, fewer for the research for how preventing and treating the erosion of hillside fields farm road, data is shown, Liu Yao army etc. has studied 3 kinds of vegetation Influence of the reforestation practices to soil road slope erosion, Liu Xueying etc. have studied Loess Region hillside Plant Road corrosion protection benefit, Zheng's generation is clear etc. to have studied loess plateau hillside type of production Plant Road anti-corrosive mechanism and technology, and the research of the above several scholars is substantially It is all the prevention and treatment that road erosion is inquired into from plant measures angle, Technique Popularizing is not strong, in the biggish region of catchment area, due to Field road comes that water is big, and water velocity is fast, and scouring force is strong, and road surface erosion control difficulty is larger.
It is typically all non-paved road, that is, agricultural land soil by simple suppression or often in China hillside fields farm road The farm machinery of property rolls the road to be formed, and road is generally lower than two sides farmland, and since both sides of the road are without gutter, rain Seasonal rainfall enters road surface by confluence effect, and water flow is rushed naughty road surface formation road surface and corroded, serious to form erosion groove, shadow along road surface Ring road.Present invention aim to address road surface normal erosions, rush and wash in a pan this ecological environment problem of road surface.
Such as Chinese Patent Application No. are as follows: a kind of road maintenance processing method of the patent disclosure of CN201710139139.8, It include: the patrol task instruction for receiving first terminal and sending, patrol task instruction includes marking in three-dimensional geographic information system The inspection process and road component identification sets marked in inspection section mark, Building Information Model BIM, patrol task is instructed and is sent out It send to second terminal, so that second terminal is instructed according to patrol task carries out inspection, obtains disease integrated information, receive second eventually The disease integrated information sent is held, according to disease integrated information, the corresponding BIM information of target road component is obtained, according to disease Integrated information and the corresponding BIM information of target road component carry out Disease Analysis, obtain corresponding disease maintenance plan.In addition, A kind of road maintenance processing unit and system are also provided.In addition, also providing a kind of road maintenance processing unit and system.But it should Invent and can not be suitable for the erosion control of hillside fields farm road.
Summary of the invention
The purpose of the present invention is provide a kind of construction party for preventing hillside fields farm road from corroding in view of the deficiencies of the prior art Method and stone dam, for solving the erosion control of hillside fields farm road.
The construction method for preventing hillside fields farm road from corroding, includes the following steps:
Step 1: the hillside fields farm road gradient is surveyed using whole station type electronic distance meter, any two measuring point spacing is less than 5m, Record the inflection point coordinate and inflection point spacing of hillside fields farm road slope change;
Step 2: at the inflection point of the slope change of record, along hillside fields farm road laterally excavate groove, ditch groove depth 50cm, Wide 50cm, trench length is 40cm longer than the width of hillside fields farm road, and two sides are respectively wider than road surface 20cm;Along hillside fields farm road It is longitudinal that every 10~100m, one groove is set;
Step 3: geotextiles are laid in groove, geotextiles are laid with respectively along channel bottom and inner wall, and two sides are higher by groove Inner wall 5cm;
Step 4: according to the size of groove, weaving cuboid gabion, aperture 8*12cm, gabion upper opening;
Step 5: in the trench by gabion placement, the stone that partial size is greater than 20cm, filling height and stone are filled in gabion Cage flushes;The gravel of 2~5cm of diameter is filled into stone gap again, forms stone dam;
Step 6: increasing 15cm respectively at the position that stone dam both ends are wider than road surface 20cm, so that stone dam is formed both ends high central low U-shaped interface;
Step 7: gabion upper opening being closed, earthing is tamped around stone dam, and stone dam surface is above ground level to be less than or equal to 5cm;
Further, in step 2, channel excavation is perpendicular to horizontal plane.
Further, in step 2, when the hillside fields farm road gradient is >=0 ° and < 5 °, trench spacing 70m;
Further, the hillside fields farm road gradient >=5 ° and at≤25 °, 10~50m is arranged in trench spacing;
Further, in step 2, it is greater than at 5 ° in hillside fields farm road slope change, increases by 1 groove of setting.
Further, the stone dam in step 5 is replaced using prefabricated stone dam.
The stone dam for preventing hillside fields farm road from corroding, including end stone dam and middle part stone dam, end stone dam are transversal The pentagon cylinder at 3 right angles is contained in face, and the top of end stone dam is equipped with inclined-plane, and middle part stone dam is cuboid, end stone dam bottom Portion is equipped with lateral end stone dam through-hole, and middle part stone dam bottom is equipped with lateral middle part stone dam through-hole;Stone dam connects in the middle part of at least two Connect setting, middle part stone dam both ends are respectively set end stone dam, and the inclined-plane of end stone dam is towards inside;The end stone dam of end stone dam The middle part stone dam through-hole of through-hole and middle part stone dam is consecutively provided in same direction and penetrates through.
Further, end stone dam and middle part stone dam are all made of cement and pour.
Further, the shape of through holes of end stone dam and middle part stone dam is cylindrical body.
Further, the top of end stone dam, the following, left side, the right length are respectively 20cm, 40cm, 65cm, 45cm, With a thickness of 40cm;The radius of end stone dam through-hole is 12.5cm, apart from bottom surface 7.5cm.
Further, the length and width of middle part stone dam is 40cm, is highly 45cm, and the radius of middle part stone dam through-hole is 12.5cm, apart from bottom surface 7.5cm.
The beneficial effects of the present invention are:
1, the stone dam of the present invention for preventing hillside fields farm road from corroding serves as the interim datum plane of erosion on road surface with stone dam, prevents Only road surface incision retains silt in stone dam upstream face, and runoff decrease flow velocity forms drop energy dissipating in the back side of stone dam.
2, the stone dam of the present invention for preventing hillside fields farm road from corroding is higher by earth's surface 5cm, can guarantee Pedestrians and vehicles just Normal open row.
3, the stone dam of the present invention for preventing hillside fields farm road from corroding makes hillside fields farm road have row in "U" shaped Water function.
4, the stone dam of the present invention for preventing hillside fields farm road from corroding, lateral end is equipped in the bottom of its end stone dam The bottom of portion's stone dam through-hole, middle part stone dam is equipped with lateral middle part stone dam through-hole, reduces stone dam materials, mitigates weight, saves material Expect cost and transportation cost;Enhance the compression strength of stone dam, while constituting a culvert pipe structure, both sides of the road water passes through culvert pipe Circulation, avoids both sides of the road water flow transversal flow road, prevents road surface from being destroyed by rush of water by lateral current.
Detailed description of the invention
Fig. 1 is the end stone dam overall structure diagram of the stone dam of the present invention for preventing hillside fields farm road from corroding;
Fig. 2 is A direction view in Fig. 1;
Fig. 3 is B direction view in Fig. 1;
Fig. 4 is the middle part stone dam overall structure diagram of the stone dam of the present invention for preventing hillside fields farm road from corroding;
Fig. 5 is C direction view in Fig. 4;
Fig. 6 is D direction view in Fig. 4;
Fig. 7 is the schematic perspective view of the stone dam of the present invention for preventing hillside fields farm road from corroding;
Fig. 8 is the installation condition schematic diagram of the stone dam of the present invention for preventing hillside fields farm road from corroding.
In figure: the end 1- stone dam, the end 11- stone dam through-hole, the middle part 2- stone dam, the middle part 21- stone dam through-hole, 3- soil, 4- Groove.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings of the specification.
The construction method for preventing hillside fields farm road from corroding, includes the following steps:
As shown in figure 8, step 1: being dropped using the whole station type electronic distance meter exploration hillside fields farm road ratio of slope, any two survey Point spacing is less than 5m, records the inflection point and inflection point spacing of hillside fields farm road slope change;
Step 2: at the inflection point of the slope change of record, laterally excavating groove 4 along hillside fields farm road, groove 4 is deep 50cm, wide 50cm, 4 length of groove is 40cm longer than the width of hillside fields farm road, and two sides are respectively wider than road surface 20cm;Along hillside fields agriculture One groove 4 is set every 10~100m with road is longitudinal;
Step 3: geotextiles are laid in groove 4, geotextiles are laid with respectively along 4 bottom of groove and inner wall, and two sides are higher by ditch 4 inner wall 5cm of slot;
Step 4: according to the size of groove 4, weaving cuboid gabion (not shown), aperture 8*12cm, gabion top Opening;
Step 5: gabion being placed in groove 4, the stone that partial size is greater than 20cm, filling height and stone are filled in gabion Cage flushes;The gravel of 2~5cm of diameter is filled into stone gap again, forms stone dam;
Step 6: increasing 15cm respectively at the position that stone dam both ends are wider than road surface 20cm, so that stone dam is formed both ends high central low U-shaped interface;
Step 7: gabion upper opening being closed, earthing is tamped around stone dam, and stone dam surface is above ground level to be less than or equal to 5cm;
Further, in step 2, groove 4 is excavated perpendicular to horizontal plane.
Further, in step 2, when the hillside fields farm road gradient is >=0 ° and < 5 °, trench spacing 70m;
Further, the hillside fields farm road gradient >=5 ° and at≤25 °, 10~50m is arranged in trench spacing;Preferably, slope The ground farm road gradient >=5 ° and at 10 ° of <, 50m is arranged in trench spacing;The hillside fields farm road gradient >=10 ° and at 15 ° of <, ditch 30m is arranged in separation;The hillside fields farm road gradient >=15 ° and at 20 ° of <, 20m is arranged in trench spacing;The hillside fields farm road gradient At >=20 ° and < 25 °, 10m is arranged in trench spacing;
Further, in step 2, it is greater than at 5 ° in hillside fields farm road slope change, increases by 1 groove of setting.
Further, the stone dam in step 5 is replaced using prefabricated stone dam.
As shown in FIG. 1 to FIG. 8, the stone dam for preventing hillside fields farm road from corroding, including end stone dam 1 and middle part stone dam 2, end stone dam 1 is the pentagon cylinder that 3 right angles are contained in cross section, and the top of end stone dam 1 is equipped with inclined-plane, middle part stone dam 2 For cuboid, stone dam 1 bottom in end is equipped with lateral end stone dam through-hole 11, and stone dam 2 bottom in middle part is equipped with lateral middle part stone Bank through-hole 21;End stone dam 1 is respectively set in the connection of stone dam 2 setting, 2 both ends of middle part stone dam in the middle part of at least two, end stone dam 1 Inclined-plane is towards inside;The end stone dam through-hole 11 of end stone dam 1 and the middle part stone dam through-hole 21 of middle part stone dam 2 are consecutively provided in In same direction and penetrate through.
Further, end stone dam 1 and middle part stone dam 2 are all made of cement and pour.
Further, the shape of through holes of end stone dam 1 and middle part stone dam 2 is cylindrical body.
Further, the top of end stone dam 1, the following, left side, the right length are respectively 20cm, 40cm, 65cm, 45cm, With a thickness of 40cm;The radius of end stone dam through-hole 11 is 12.5cm, apart from bottom surface 7.5cm.
Further, the length and width of middle part stone dam 2 is 40cm, is highly 45cm, and the radius of middle part stone dam through-hole 21 is 12.5cm, apart from bottom surface 7.5cm.
The present invention is not limited to above-mentioned embodiments, without departing from the essence of the present invention, art technology Any deformation, improvement, the replacement that personnel are contemplated that each fall within protection scope of the present invention.

Claims (10)

1. a kind of construction method for preventing hillside fields farm road from corroding, which comprises the steps of:
Step 1: surveying the hillside fields farm road gradient using whole station type electronic distance meter, any two measuring point spacing is less than 5m, record The inflection point coordinate and inflection point spacing of hillside fields farm road slope change;
Step 2: at the inflection point of the slope change of record, laterally excavating groove along hillside fields farm road, ditch groove depth 50cm is wide 50cm, trench length is 40cm longer than the width of hillside fields farm road, and two sides are respectively wider than road surface 20cm;Vertical along hillside fields farm road To every 10~100m, one groove is set;
Step 3: geotextiles are laid in groove, geotextiles are laid with respectively along channel bottom and inner wall, and two sides are higher by trench wall 5cm;
Step 4: according to the size of groove, weaving cuboid gabion, aperture 8*12cm, gabion upper opening;
Step 5: in the trench by gabion placement, the stone that partial size is greater than 20cm is filled in gabion, filling height is neat with gabion It is flat;The gravel of 2~5cm of diameter is filled into stone gap again, forms stone dam;
Step 6: increasing 15cm respectively at the position that stone dam both ends are wider than road surface 20cm, stone dam is made to form the low U of both ends high central Shape interface;
Step 7: gabion upper opening being closed, earthing is tamped around stone dam, and stone dam surface is above ground level to be less than or equal to 5cm.
2. a kind of construction method for preventing hillside fields farm road from corroding according to claim 1, which is characterized in that the step In rapid 2, channel excavation is perpendicular to horizontal plane.
3. a kind of construction method for preventing hillside fields farm road from corroding according to claim 1, which is characterized in that the step In rapid 2, when the hillside fields farm road gradient is >=0 ° and < 5 °, trench spacing 70m;The hillside fields farm road gradient >=5 ° and≤25 ° When, 10~50m is arranged in trench spacing.
4. a kind of construction method for preventing hillside fields farm road from corroding according to claim 1, which is characterized in that the slope Ground farm road slope change is greater than at 5 °, increases by 1 groove of setting.
5. a kind of construction method for preventing hillside fields farm road from corroding according to claim 1, which is characterized in that the step Stone dam in rapid 5 is replaced using prefabricated stone dam.
6. a kind of stone dam for preventing hillside fields farm road from corroding, which is characterized in that including end stone dam and middle part stone dam, end stone Bank is the pentagon cylinder that 3 right angles are contained in cross section, and the top of end stone dam is equipped with inclined-plane, and middle part stone dam is cuboid, end Portion stone dam bottom is equipped with lateral end stone dam through-hole, and middle part stone dam bottom is equipped with lateral middle part stone dam through-hole;In at least two The connection setting of portion's stone dam, middle part stone dam both ends are respectively set end stone dam, and the inclined-plane of end stone dam is towards inside;End stone dam The middle part stone dam through-hole of end stone dam through-hole and middle part stone dam is consecutively provided in same direction and penetrates through.
7. a kind of stone dam for preventing hillside fields farm road from corroding according to claim 6, which is characterized in that the end stone Bank and middle part stone dam are all made of cement and pour.
8. a kind of stone dam for preventing hillside fields farm road from corroding according to claim 6, which is characterized in that the end stone The shape of through holes of bank and middle part stone dam is cylindrical body.
9. a kind of stone dam for preventing hillside fields farm road from corroding according to claim 6, which is characterized in that the end stone The top of bank, the following, left side, the right length are respectively 20cm, 40cm, 65cm, 45cm, with a thickness of 40cm;End stone dam through-hole Radius be 12.5cm, apart from bottom surface 7.5cm.
10. a kind of stone dam for preventing hillside fields farm road from corroding according to claim 6, which is characterized in that the middle part The length and width of stone dam is 40cm, is highly 45cm, and the radius of middle part stone dam through-hole is 12.5cm, apart from bottom surface 7.5cm.
CN201811436042.4A 2018-11-28 2018-11-28 Construction method for preventing agricultural road erosion on sloping field and stone ridge Active CN109440570B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811436042.4A CN109440570B (en) 2018-11-28 2018-11-28 Construction method for preventing agricultural road erosion on sloping field and stone ridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811436042.4A CN109440570B (en) 2018-11-28 2018-11-28 Construction method for preventing agricultural road erosion on sloping field and stone ridge

Publications (2)

Publication Number Publication Date
CN109440570A true CN109440570A (en) 2019-03-08
CN109440570B CN109440570B (en) 2024-02-06

Family

ID=65555776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811436042.4A Active CN109440570B (en) 2018-11-28 2018-11-28 Construction method for preventing agricultural road erosion on sloping field and stone ridge

Country Status (1)

Country Link
CN (1) CN109440570B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8900276U1 (en) * 1989-01-11 1989-12-21 Weinzierl GmbH & Co. Kies und Beton KG, 8070 Ingolstadt Paving stone
CN1138121A (en) * 1995-05-01 1996-12-18 黄益铉 Paving method of water-permeable concrete
RU2317369C1 (en) * 2006-05-29 2008-02-20 Татьяна Юрьевна Хаширова Method for river bank consolidation
CN104126343A (en) * 2014-07-14 2014-11-05 中国科学院东北地理与农业生态研究所 Double-ridge area water and soil conservation method
CN209307800U (en) * 2018-11-28 2019-08-27 吉林农业大学 A kind of stone dam for preventing hillside fields farm road from corroding

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8900276U1 (en) * 1989-01-11 1989-12-21 Weinzierl GmbH & Co. Kies und Beton KG, 8070 Ingolstadt Paving stone
CN1138121A (en) * 1995-05-01 1996-12-18 黄益铉 Paving method of water-permeable concrete
RU2317369C1 (en) * 2006-05-29 2008-02-20 Татьяна Юрьевна Хаширова Method for river bank consolidation
CN104126343A (en) * 2014-07-14 2014-11-05 中国科学院东北地理与农业生态研究所 Double-ridge area water and soil conservation method
CN209307800U (en) * 2018-11-28 2019-08-27 吉林农业大学 A kind of stone dam for preventing hillside fields farm road from corroding

Also Published As

Publication number Publication date
CN109440570B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN207003475U (en) Eco-friendly barrier wall structure for covering layer slope
CN106358479A (en) Open trench-concealed conduit combined water discharging and salt reducing method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN103397614A (en) Stone cage check dam used for mountainous area erosion gully control
CN103116001A (en) Method for observing preferential flows in arid and semi-arid alpine regions
CN103548440A (en) Capillary drainage type buried pipe drainage method under shallow buried condition
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN102373675A (en) Fabricated culvert member and construction method thereof
CN209307800U (en) A kind of stone dam for preventing hillside fields farm road from corroding
CN204898465U (en) Ecological drainage facility of permafrost region dish
CN106836243A (en) A kind of sponge greenery patches of suitable mountain topography and its building method
CN106545068A (en) A kind of method of the soil water reservoir capacity control of ionic type rare earth ore in-situ solvent extraction method abandoned mine land
CN109440570A (en) A kind of construction method and stone dam preventing the erosion of hillside fields farm road
CN111691528B (en) Natural disaster risk prevention system
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN209816577U (en) Coastal soft soil foundation riverside embankment widening structure
CN103981838B (en) A kind of bank protection construction method
CN114164845A (en) Water interception and drainage system for underground water-containing sloping field and implementation method thereof
CN207537994U (en) The underground erosion control wall construction of trraning pole is set
CN106012951A (en) Method for constructing reservoir away from karst caves in limestone areas and constructed reservoir structure
CN107794902B (en) Beach photovoltaic plant construction method
CN105544332B (en) A kind of processing structure and its construction method of coastal soft base
CN219034734U (en) Tunnel portal structure before tunnel entrance end slide-resistant pile pouring
CN213897176U (en) Multifunctional composite slope supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant