CN109426688A - Architectural engineering secondary structure construction control method based on BIM technology - Google Patents

Architectural engineering secondary structure construction control method based on BIM technology Download PDF

Info

Publication number
CN109426688A
CN109426688A CN201710771246.2A CN201710771246A CN109426688A CN 109426688 A CN109426688 A CN 109426688A CN 201710771246 A CN201710771246 A CN 201710771246A CN 109426688 A CN109426688 A CN 109426688A
Authority
CN
China
Prior art keywords
model
constructional column
pipeline
electromechanical
secondary structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710771246.2A
Other languages
Chinese (zh)
Inventor
陈路曼
陈瑞
田恒星
任书安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710771246.2A priority Critical patent/CN109426688A/en
Publication of CN109426688A publication Critical patent/CN109426688A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of architectural engineering secondary structure construction control method based on BIM technology, includes the following steps: one, establishes BIM model, guarantees the consistent of model and drawing in modeling process, optimizes therein pipeline in the case where meeting specification and arrange;Two, according to the constructional column in CAD plan view, collar tie beam position, it is arranged into civil engineering model;Three, civil engineering model and electromechanical model are integrated, constructional column is found out and electromechanical pipeline collides position, constructional column of problems is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, the position that electromechanical pipeline hole is reserved in secondary structure wall is determined;Four, utilize the model of laying bricks of Sketch up software optimization corner difference size and material.The present invention reduces the generation of pipeline and constructional column collision situation, optimization corner unlike material wall row's stock mould type, the generation for the phenomenon that avoids doing over again.

Description

Architectural engineering secondary structure construction control method based on BIM technology
Technical field
The present invention relates to a kind of secondary structure construction control methods, specifically the architectural engineering two based on BIM technology Secondary structure construction control method.
Background technique
In architectural engineering basement secondary structure work progress, pipeline and constructional column can collide situation, phenomenon of doing over again Often occur, working efficiency is low.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of architectural engineering secondary structure based on BIM technology is provided and is applied Work control method, reduces the generation of pipeline and constructional column collision situation, and optimizes corner unlike material wall row's stock mould type, keeps away Exempt to do over again the generation of phenomenon.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of architectural engineering secondary structure construction control method based on BIM technology, it is characterised in that it includes the following steps:
Step 1 is established BIM model and is named to component name, guarantees the consistent of model and drawing in modeling process Property, electromechanical speciality model first optimizes the arrangement of therein pipeline in the case where meeting specification, reduces the collision of this profession;
Step 2 is arranged into civil engineering according to the constructional column in secondary structure masonry scheme in CAD plan view, collar tie beam position In model;
Step 3 integrates civil engineering model and electromechanical model, finds out constructional column and electromechanical pipeline collides position, to of problems Constructional column is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, determines secondary knot The position at electromechanical pipeline hole is reserved in structure wall;
Step 4 is convenient for site operation using the model of laying bricks of Sketch up software optimization corner difference size and material.
The beneficial effects of the present invention are: the present invention can provide accurately in secondary structure work progress on site Secondary structure wall hole reserves size and constructional column plane and position is arranged, for avoiding phenomenon of doing over again during site operation Generation have practical significance.
Specific embodiment
A kind of architectural engineering secondary structure construction control method based on BIM technology, includes the following steps:
1) it establishes BIM model and component name is named, the electronic edition drawing referring to provided by owner carries out overmolded work, It is should ensure that in model component name in this step containing essential informations such as dimension information, material informations.Meanwhile the plane of wall Position and absolute altitude setting must be accurate.The size of electromechanical pipeline, spatial position should also meet specification, especially solve Certainly after internal pipeline collision, pipeline absolute altitude must meet design requirement.
2) constructional column in masonry scheme and collar tie beam position are carried out by technology department according to drawing explanation and code requirement Setting should meet scheme requirement in the constructional column and collar tie beam building course being converted into BIM model.
3) civil engineering model and electromechanical model are integrated.It must guarantee that model absolute altitude is consistent in integration process, especially in monomer Engineering compared in entry since monomer height must be adjusted according to different datum grades there are different datum grades.Integrated Models Collision detection is carried out by Navisworks software later, emphasis checks that pipeline and constructional column and lintel collide position, To adjusting constructional column position there are collision position or being adjusted to pipeline position, to avoid collision.Secondary structure exists The position of reserved opening determine it is errorless after dimension of opening mark is carried out to it.
4) to the wall of different sizes and material, model of laying bricks is simulated using Sketch up software, facilitates site operation.

Claims (1)

1. a kind of architectural engineering secondary structure construction control method based on BIM technology, it is characterised in that it includes the following steps:
Step 1 is established BIM model and is named to component name, guarantees the consistent of model and drawing in modeling process Property, electromechanical speciality model first optimizes the arrangement of therein pipeline in the case where meeting specification, reduces the collision of this profession;
Step 2 is arranged into civil engineering according to the constructional column in secondary structure masonry scheme in CAD plan view, collar tie beam position In model;
Step 3 integrates civil engineering model and electromechanical model, finds out constructional column and electromechanical pipeline collides position, to of problems Constructional column is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, determines secondary knot The position at electromechanical pipeline hole is reserved in structure wall;
Step 4 is convenient for site operation using the model of laying bricks of Sketch up software optimization corner difference size and material.
CN201710771246.2A 2017-08-31 2017-08-31 Architectural engineering secondary structure construction control method based on BIM technology Pending CN109426688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710771246.2A CN109426688A (en) 2017-08-31 2017-08-31 Architectural engineering secondary structure construction control method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710771246.2A CN109426688A (en) 2017-08-31 2017-08-31 Architectural engineering secondary structure construction control method based on BIM technology

Publications (1)

Publication Number Publication Date
CN109426688A true CN109426688A (en) 2019-03-05

Family

ID=65505297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710771246.2A Pending CN109426688A (en) 2017-08-31 2017-08-31 Architectural engineering secondary structure construction control method based on BIM technology

Country Status (1)

Country Link
CN (1) CN109426688A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967073A (en) * 2020-07-01 2020-11-20 中国建筑一局(集团)有限公司 BIM-based secondary structure construction method
CN114491777A (en) * 2022-04-06 2022-05-13 中建五局第三建设有限公司 Construction guidance method based on rapidly-built BIM model
CN115168962A (en) * 2022-07-20 2022-10-11 中国建筑西南设计研究院有限公司 Constructional column ring beam design method and device, computer equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093061A (en) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 Complex pipeline collision optimization method of subway electromechanical engineering
CN105808835A (en) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 Method for assembling pipelines of electromechanical system based on BIM (Building Information Modeling)
CN107066750A (en) * 2017-04-26 2017-08-18 中天建设集团有限公司天津分公司 A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093061A (en) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 Complex pipeline collision optimization method of subway electromechanical engineering
CN105808835A (en) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 Method for assembling pipelines of electromechanical system based on BIM (Building Information Modeling)
CN107066750A (en) * 2017-04-26 2017-08-18 中天建设集团有限公司天津分公司 A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967073A (en) * 2020-07-01 2020-11-20 中国建筑一局(集团)有限公司 BIM-based secondary structure construction method
CN114491777A (en) * 2022-04-06 2022-05-13 中建五局第三建设有限公司 Construction guidance method based on rapidly-built BIM model
CN115168962A (en) * 2022-07-20 2022-10-11 中国建筑西南设计研究院有限公司 Constructional column ring beam design method and device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN105781064A (en) Floor tile laying construction method based on building information modeling (BIM)
CN109426688A (en) Architectural engineering secondary structure construction control method based on BIM technology
CN111627099B (en) Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology
CN110287513A (en) A kind of built-in fitting construction method based on BIM technology
CN106320707A (en) Full projection paying-off method
CN105956257A (en) BIM-based aluminum alloy template deep design method
CN108416162A (en) A kind of construction method of the spiral formula reinforced concrete structure based on BIM
CN110297459A (en) Trimming Die manufacturing method, computer readable storage medium and CNC Trimming Die produce lathes
CN104820730A (en) Method for resolving conflict between ordinary steel bar and prestressed pipeline based on BIM (Building Information Modeling)
CN109829223A (en) A kind of Large Underground pipe gallery design method based on BIM
CN107451358A (en) A kind of building method of the curved wall based on BIM
CN110990937A (en) Method for creating integrated wall component model with hole based on steel bar formwork
CN109162407B (en) Automatic obstacle avoidance method for reinforcing steel bars in crossed area of reinforced concrete member based on artificial potential field method
Gentry et al. BIM schema for masonry units and walls
CN110781546B (en) BIM-based parametrizable embedded part family establishing method
CN108647468A (en) A kind of row's of building by laying bricks or stones brick method based on BIM technology
CN107451356A (en) A kind of outer-wall building method based on BIM
CN111535482A (en) Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method
CN112836271B (en) Automatic design method and device for hanging plate of high-rise residence based on Revit model
CN110866295A (en) Three-dimensional modeling method and device for building
CN105844016B (en) A method of the proposed building quantity of acquisition based on buildings model cutting
CN107724689B (en) Construction engineering steel structure measurement construction method
CN113280703A (en) Drilling and blasting construction tunnel overbreak and underexcavation control method based on BIM technology
CN114357561A (en) BIM-based deepening design method for space curved surface cast-in-place slab
CN105071302A (en) Junction box concealed burying accurate positioning method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190305