- CN109426688A CN109426688A CN201710771246.2A CN201710771246A CN109426688A CN 109426688 A CN109426688 A CN 109426688A CN 201710771246 A CN201710771246 A CN 201710771246A CN 109426688 A CN109426688 A CN 109426688A
- Authority
- CN
- China
- Prior art keywords
- model
- constructional column
- pipeline
- electromechanical
- secondary structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000005516 engineering process Methods 0.000 title claims abstract description 10
- 238000010276 construction Methods 0.000 title claims abstract description 8
- 239000000463 material Substances 0.000 claims abstract description 7
- 239000011449 brick Substances 0.000 claims abstract description 4
- 238000005457 optimization Methods 0.000 abstract 1
- 239000000178 monomer Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of architectural engineering secondary structure construction control method based on BIM technology, includes the following steps: one, establishes BIM model, guarantees the consistent of model and drawing in modeling process, optimizes therein pipeline in the case where meeting specification and arrange;Two, according to the constructional column in CAD plan view, collar tie beam position, it is arranged into civil engineering model;Three, civil engineering model and electromechanical model are integrated, constructional column is found out and electromechanical pipeline collides position, constructional column of problems is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, the position that electromechanical pipeline hole is reserved in secondary structure wall is determined;Four, utilize the model of laying bricks of Sketch up software optimization corner difference size and material.The present invention reduces the generation of pipeline and constructional column collision situation, optimization corner unlike material wall row's stock mould type, the generation for the phenomenon that avoids doing over again.
Description
Technical field
The present invention relates to a kind of secondary structure construction control methods, specifically the architectural engineering two based on BIM technology
Secondary structure construction control method.
Background technique
In architectural engineering basement secondary structure work progress, pipeline and constructional column can collide situation, phenomenon of doing over again
Often occur, working efficiency is low.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of architectural engineering secondary structure based on BIM technology is provided and is applied
Work control method, reduces the generation of pipeline and constructional column collision situation, and optimizes corner unlike material wall row's stock mould type, keeps away
Exempt to do over again the generation of phenomenon.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of architectural engineering secondary structure construction control method based on BIM technology, it is characterised in that it includes the following steps:
Step 1 is established BIM model and is named to component name, guarantees the consistent of model and drawing in modeling process
Property, electromechanical speciality model first optimizes the arrangement of therein pipeline in the case where meeting specification, reduces the collision of this profession;
Step 2 is arranged into civil engineering according to the constructional column in secondary structure masonry scheme in CAD plan view, collar tie beam position
In model;
Step 3 integrates civil engineering model and electromechanical model, finds out constructional column and electromechanical pipeline collides position, to of problems
Constructional column is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, determines secondary knot
The position at electromechanical pipeline hole is reserved in structure wall;
Step 4 is convenient for site operation using the model of laying bricks of Sketch up software optimization corner difference size and material.
The beneficial effects of the present invention are: the present invention can provide accurately in secondary structure work progress on site
Secondary structure wall hole reserves size and constructional column plane and position is arranged, for avoiding phenomenon of doing over again during site operation
Generation have practical significance.
Specific embodiment
A kind of architectural engineering secondary structure construction control method based on BIM technology, includes the following steps:
1) it establishes BIM model and component name is named, the electronic edition drawing referring to provided by owner carries out overmolded work,
It is should ensure that in model component name in this step containing essential informations such as dimension information, material informations.Meanwhile the plane of wall
Position and absolute altitude setting must be accurate.The size of electromechanical pipeline, spatial position should also meet specification, especially solve
Certainly after internal pipeline collision, pipeline absolute altitude must meet design requirement.
2) constructional column in masonry scheme and collar tie beam position are carried out by technology department according to drawing explanation and code requirement
Setting should meet scheme requirement in the constructional column and collar tie beam building course being converted into BIM model.
3) civil engineering model and electromechanical model are integrated.It must guarantee that model absolute altitude is consistent in integration process, especially in monomer
Engineering compared in entry since monomer height must be adjusted according to different datum grades there are different datum grades.Integrated Models
Collision detection is carried out by Navisworks software later, emphasis checks that pipeline and constructional column and lintel collide position,
To adjusting constructional column position there are collision position or being adjusted to pipeline position, to avoid collision.Secondary structure exists
The position of reserved opening determine it is errorless after dimension of opening mark is carried out to it.
4) to the wall of different sizes and material, model of laying bricks is simulated using Sketch up software, facilitates site operation.
Claims (1)
1. a kind of architectural engineering secondary structure construction control method based on BIM technology, it is characterised in that it includes the following steps:
Step 1 is established BIM model and is named to component name, guarantees the consistent of model and drawing in modeling process
Property, electromechanical speciality model first optimizes the arrangement of therein pipeline in the case where meeting specification, reduces the collision of this profession;
Step 2 is arranged into civil engineering according to the constructional column in secondary structure masonry scheme in CAD plan view, collar tie beam position
In model;
Step 3 integrates civil engineering model and electromechanical model, finds out constructional column and electromechanical pipeline collides position, to of problems
Constructional column is modified and is adjusted the constructional column position in CAD plan view, after the completion of pipeline adjustment, determines secondary knot
The position at electromechanical pipeline hole is reserved in structure wall;
Step 4 is convenient for site operation using the model of laying bricks of Sketch up software optimization corner difference size and material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771246.2A CN109426688A (en) | 2017-08-31 | 2017-08-31 | Architectural engineering secondary structure construction control method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771246.2A CN109426688A (en) | 2017-08-31 | 2017-08-31 | Architectural engineering secondary structure construction control method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109426688A true CN109426688A (en) | 2019-03-05 |
Family
ID=65505297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710771246.2A Pending CN109426688A (en) | 2017-08-31 | 2017-08-31 | Architectural engineering secondary structure construction control method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109426688A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111967073A (en) * | 2020-07-01 | 2020-11-20 | 中国建筑一局(集团)有限公司 | BIM-based secondary structure construction method |
CN114491777A (en) * | 2022-04-06 | 2022-05-13 | 中建五局第三建设有限公司 | Construction guidance method based on rapidly-built BIM model |
CN115168962A (en) * | 2022-07-20 | 2022-10-11 | 中国建筑西南设计研究院有限公司 | Constructional column ring beam design method and device, computer equipment and storage medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093061A (en) * | 2013-02-07 | 2013-05-08 | 中铁二十二局集团电气化工程有限公司 | Complex pipeline collision optimization method of subway electromechanical engineering |
CN105808835A (en) * | 2016-03-04 | 2016-07-27 | 上海宝冶集团有限公司 | Method for assembling pipelines of electromechanical system based on BIM (Building Information Modeling) |
CN107066750A (en) * | 2017-04-26 | 2017-08-18 | 中天建设集团有限公司天津分公司 | A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline |
-
2017
- 2017-08-31 CN CN201710771246.2A patent/CN109426688A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093061A (en) * | 2013-02-07 | 2013-05-08 | 中铁二十二局集团电气化工程有限公司 | Complex pipeline collision optimization method of subway electromechanical engineering |
CN105808835A (en) * | 2016-03-04 | 2016-07-27 | 上海宝冶集团有限公司 | Method for assembling pipelines of electromechanical system based on BIM (Building Information Modeling) |
CN107066750A (en) * | 2017-04-26 | 2017-08-18 | 中天建设集团有限公司天津分公司 | A kind of method for solving the arrangement of electrical and mechanical comprehensive pipeline |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111967073A (en) * | 2020-07-01 | 2020-11-20 | 中国建筑一局(集团)有限公司 | BIM-based secondary structure construction method |
CN114491777A (en) * | 2022-04-06 | 2022-05-13 | 中建五局第三建设有限公司 | Construction guidance method based on rapidly-built BIM model |
CN115168962A (en) * | 2022-07-20 | 2022-10-11 | 中国建筑西南设计研究院有限公司 | Constructional column ring beam design method and device, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105781064A (en) | Floor tile laying construction method based on building information modeling (BIM) | |
CN109426688A (en) | Architectural engineering secondary structure construction control method based on BIM technology | |
CN111627099B (en) | Steel structure non-contact actual measurement real quantity method and system based on three-dimensional scanning technology | |
CN110287513A (en) | A kind of built-in fitting construction method based on BIM technology | |
CN106320707A (en) | Full projection paying-off method | |
CN105956257A (en) | BIM-based aluminum alloy template deep design method | |
CN108416162A (en) | A kind of construction method of the spiral formula reinforced concrete structure based on BIM | |
CN110297459A (en) | Trimming Die manufacturing method, computer readable storage medium and CNC Trimming Die produce lathes | |
CN104820730A (en) | Method for resolving conflict between ordinary steel bar and prestressed pipeline based on BIM (Building Information Modeling) | |
CN109829223A (en) | A kind of Large Underground pipe gallery design method based on BIM | |
CN107451358A (en) | A kind of building method of the curved wall based on BIM | |
CN110990937A (en) | Method for creating integrated wall component model with hole based on steel bar formwork | |
CN109162407B (en) | Automatic obstacle avoidance method for reinforcing steel bars in crossed area of reinforced concrete member based on artificial potential field method | |
Gentry et al. | BIM schema for masonry units and walls | |
CN110781546B (en) | BIM-based parametrizable embedded part family establishing method | |
CN108647468A (en) | A kind of row's of building by laying bricks or stones brick method based on BIM technology | |
CN107451356A (en) | A kind of outer-wall building method based on BIM | |
CN111535482A (en) | Aluminum mould construction concrete structure and tool and electromechanical reservation pre-embedding construction method | |
CN112836271B (en) | Automatic design method and device for hanging plate of high-rise residence based on Revit model | |
CN110866295A (en) | Three-dimensional modeling method and device for building | |
CN105844016B (en) | A method of the proposed building quantity of acquisition based on buildings model cutting | |
CN107724689B (en) | Construction engineering steel structure measurement construction method | |
CN113280703A (en) | Drilling and blasting construction tunnel overbreak and underexcavation control method based on BIM technology | |
CN114357561A (en) | BIM-based deepening design method for space curved surface cast-in-place slab | |
CN105071302A (en) | Junction box concealed burying accurate positioning method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190305 |
|
RJ01 | Rejection of invention patent application after publication |