CN109424202A - A kind of secondary assembled wallboard building method - Google Patents

A kind of secondary assembled wallboard building method Download PDF

Info

Publication number
CN109424202A
CN109424202A CN201710789250.1A CN201710789250A CN109424202A CN 109424202 A CN109424202 A CN 109424202A CN 201710789250 A CN201710789250 A CN 201710789250A CN 109424202 A CN109424202 A CN 109424202A
Authority
CN
China
Prior art keywords
wallboard
wall
secondary assembled
building method
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710789250.1A
Other languages
Chinese (zh)
Inventor
严新金
杜双强
赵宗益
王海涛
蒋海
蔺攀
丁丽
马林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dechuan Integrated Architecture Technology Co Ltd
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Original Assignee
Henan Dechuan Integrated Architecture Technology Co Ltd
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Electric Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dechuan Integrated Architecture Technology Co Ltd, China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Electric Engineering Co Ltd filed Critical Henan Dechuan Integrated Architecture Technology Co Ltd
Priority to CN201710789250.1A priority Critical patent/CN109424202A/en
Publication of CN109424202A publication Critical patent/CN109424202A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a kind of secondary assembled wallboard building methods, it is related to technical field of buildings;Its method are as follows: one, field measurement data produce drawing in conjunction with design drawing, house, then draws Revit illustraton of model;Two, prepare secondary assembled wallboard: secondary assembled wallboard includes single or double wallboard wall, wall board connector, constructional column, and secondary wallboard is connected with structural wall, column using steel channel connector;It is vertically connected with part and connects plate up and down;Top link connects top panel;Wallboard realizes wall and wall, wall and the connection on ground using constructional column;Three, factory process is carried out according to the size of wallboard and corresponding quantity;Four, according to wallboard, component number on-site assembly;The present invention carries out element factory processing according to simulation model, realizes the assembled wallboard of on-site consolidation;It can shorten the construction period, improve site operation efficiency;Strength of wall body is improved, noise jamming is reduced, the secondary building wall of building field can be generally applicable to.

Description

A kind of secondary assembled wallboard building method
Technical field:
The present invention relates to a kind of secondary assembled wallboard building methods, belong to technical field of buildings.
Background technique:
Country is wideling popularize, using assembled architecture, realizes the sustainable development of construction.Fabricated construction main body structure Part is prefabricated in the factory, on-site consolidation, the advantage is that the factorial production, standardized work, quality guarantee rate are high, meets national section The development strategy of energy emission reduction and building industrialization solves the height of building energy consumption existing for traditional architecture production method, energy resource The problems such as consumption is big, construction industry scientific and technological content is lower and production efficiency is low.
But existing secondary assembled wallboard is complicated in assembling, and needs to realize and return factory's processing, wastes time, Low efficiency.
Summary of the invention:
In view of the above-mentioned problems, the present invention provides a kind of secondary assembled wallboard building method, it is able to solve existing two The problems such as secondary assembled wallboard is complicated in assembling, and needs to realize and return factory's processing, wastes time, low efficiency.
A kind of secondary assembled wallboard building method of the invention, its method are as follows:
One, field measurement data then draws Revit model in conjunction with design drawing, house production drawing (CAD diagram paper) Figure;
Two, prepare secondary assembled wallboard: secondary assembled wallboard includes single or double wallboard wall, wallboard connection Part, constructional column, wallboard has common wallboard and wire casing wallboard two types and 600mm*80mm* length is adjustable, 600mm*120mm* Secondary wallboard is connected by two kinds of size requirements that length is adjustable using steel channel connector with structural wall, column;It is vertically connected with part connection Upper and lower plate;Top link connects top panel;Wallboard realizes wall and wall, wall and the company on ground using constructional column It connects, enhance wall stability and bonding strength and ensures construction quality;Connection between the wall and component passes through Revit model Carry out typesetting, be laid out in such a way that lateral and vertical wallboard combines, ensure the stability of secondary assembled wall entirety with Flexural strength;
Three, factory process is carried out according to the size of wallboard and corresponding quantity;
Four, according to wallboard, component number on-site assembly.
Preferably, the wallboard can select best wallboard length according to live actual demand, realizes on-demand customization, simplify Field installation steps.
Preferably, the steel channel connector is installed on structure or the prefabricated groove of wallboard, for wallboard and structure, wall Connection between plate and wallboard.
Preferably, the top link: being connected for top panel with structure, fixed top panel increases firm Property;
Preferably, the wallboard connection span is installed between two plates greater than 5m or when reserving hole wallboard needs to reinforce Logical straight trough steel, increases the stability of metope entirety.
Preferably, use side leads to grafting among the constructional column, to guarantee its stability, outside is using on junction steel plate Lower connection.
Preferably, column bottom, top built-in fitting are shifted to an earlier date prefabricated in structure when the constructional column and fixed bottom plate, top plate It makes in column.
Preferably, being connected in constructional column, lateral lintel and structural column joint using vertical and horizontal intercolumniation T-type, L-type connector It connects.
Preferably, the part that is vertically connected with is mounted in the prefabricated groove in wallboard two sides, for the company of wallboard between the upper and lower It connects, the globality of wainscot sheathing in increase.
Compared with prior art, it the invention has the benefit that carrying out element factory processing according to simulation model, realizes existing The assembled assembled wallboard in field;The wallboard can shorten the construction period, and improve site operation efficiency.Using new E CP material, wall is improved Body intensity reduces noise jamming, can be generally applicable to the secondary building wall of building field.
Detailed description of the invention:
Detailed description will be given by the following detailed implementation and drawings by the present invention for ease of explanation,.
Fig. 1 is flow chart of the invention;
Fig. 2 is the schematic diagram of Revit model in the present invention;
Fig. 3 is the structural schematic diagram of the general wallboard of 12cm in the present invention;
Fig. 4 is the structural schematic diagram of the general wallboard of 8cm in the present invention;
Fig. 5 is the structural schematic diagram of 12cm wire casing wallboard in the present invention;
Fig. 6 is the structural schematic diagram of 8cm wire casing wallboard in the present invention;
Fig. 7 is the structural schematic diagram that part is vertically connected in the present invention;
Fig. 8 is the structural schematic diagram of channel steel and two steel plates in the present invention;
Fig. 9 is the structural schematic diagram of "-" type column in the present invention;
Figure 10 is the structural schematic diagram of T-type column in the present invention;
Figure 11 is the structural schematic diagram of L-type column in the present invention;
Figure 12 is the structural schematic diagram of square column in the present invention;
Figure 13 is the structural schematic diagram of top link in the present invention;
Figure 14 is the structural schematic diagram of constructional column connector in the present invention;
Figure 15 is the structural schematic diagram of central sill lateral connector of the present invention;
Figure 16 is the connection schematic diagram that deadlight of the present invention is vertically connected with part;
Figure 17 is the schematic diagram for leading to the connection of straight trough steel in the present invention.
Specific embodiment:
In order to make the objectives, technical solutions and advantages of the present invention clearer, below by shown in the accompanying drawings specific Embodiment describes the present invention.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit model of the invention It encloses.In addition, in the following description, descriptions of well-known structures and technologies are omitted, it is of the invention to avoid unnecessarily obscuring Concept.
As shown in Fig. 1 to Figure 17, present embodiment uses following technical scheme: its method are as follows:
One, field measurement data then draws Revit model in conjunction with design drawing, house production drawing (CAD diagram paper) Figure;
Two, prepare secondary assembled wallboard: secondary assembled wallboard includes single or double wallboard wall, wallboard connection Part, constructional column, wallboard has common wallboard and wire casing wallboard two types and 600mm*80mm* length is adjustable, 600mm*120mm* Secondary wallboard is connected by two kinds of size requirements that length is adjustable using steel channel connector with structural wall, column;It is vertically connected with part connection Upper and lower plate enhances the globality of plate, prevents from toppling over;Logical straight trough steel can satisfy the special item such as large span wall or macroscopic-void Under part, enhance the stability of wall;Top link connects top panel;Wallboard realizes wall and wall, wall using constructional column The connection of body and ground enhances wall stability and bonding strength and ensures construction quality.Crossing beam connection can be enhanced wall Bearing capacity meets the requirement of large area building wall construction quality.Connection between the wall and component is carried out by Revit model Typesetting fully considers bonding strength, bearing capacity between wall, component, the cloth in such a way that lateral and vertical wallboard combines Office, ensures the stability and flexural strength of secondary assembled wall entirety;
Three, factory process is carried out according to the size of wallboard and corresponding quantity;
Four, according to wallboard, component number on-site assembly.
Secondary assembled wallboard, which is built, uses extrusion molding Cement fibre wallboard, realizes that batch production is prefabricated, reduces material damage Consumption rate.The wallboard and component of polymorphic type can be realized different building demands.The wall construction site operation drawing creates revit mould Type customizes wallboard according to actual needs, reduces live rework rate, simplifies on-site assembly process, meet live variability demand.
As shown in Fig. 2 to Figure 17, common ECP wallboard size: 600mm (width) X120mm (thickness) (or 600mm (width) X80mm (thickness)), length 1200-6000mm;
ECP trunking plate and the size of the cover plate: 600mm (width) X 120mm (thickness) (or 600mm (width) X 80mm (thickness)), length 1200-6000mm;
Band slot cover plate;ECP structural column, crossbeam size 120X 120mm, length 1200-6000mm are used for single layer 120mm Thick wall body;
Wall board connector: it side steel channel connector: is installed on structure or the prefabricated groove of wallboard, for wallboard and knot Connection between structure, wallboard and wallboard increases the stability of wallboard.
It is vertically connected with part: being mounted in the prefabricated groove in wallboard two sides, for the connection of wallboard between the upper and lower, increase wall up and down The globality of plate prevents from toppling over.
Top link: being connected for top panel with structure, and fixed top panel increases stability, prevents from toppling over.
Logical straight trough steel: it when wallboard connection span is greater than 5m or reserving hole wallboard needs to reinforce, is installed between two plates logical Straight trough steel increases the stability of metope entirety.
Upper lower prop connection side is logical, steel plate: it is higher for layer height, when having two constructional columns spliced up and down, among constructional column Using the logical grafting in side, to guarantee its stability, outside also can be used junction steel plate and be vertically connected with.
Column bottom, top built-in fitting: this connector is shifted to an earlier date it is prefabricated in constructional column, for constructional column and bottom plate, top plate It is fixed.
Vertical and horizontal intercolumniation T-type, L-type connector: it is mainly used for fixed lateral lintel, in lateral lintel and structural column, constructional column Joint uses this connector, plays support and laterally crosses beam action.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (9)

1. a kind of secondary assembled wallboard building method, it is characterised in that: its method are as follows:
One, field measurement data produces drawing in conjunction with design drawing, house, then draws Revit illustraton of model;
Two, prepare secondary assembled wallboard: secondary assembled wallboard includes single or double wallboard wall, wall board connector, structure Make column, wallboard have common wallboard and wire casing wallboard two types and 600mm*80mm* length is adjustable, 600mm*120mm* length can Two kinds of size requirements are adjusted, secondary wallboard is connected with structural wall, column using steel channel connector;It is vertically connected with part connection upper and lower plates Material;Top link connects top panel;Wallboard realizes wall and wall, wall and the connection on ground using constructional column;The wall Connection between body and component carries out typesetting by Revit model, is laid out in such a way that lateral and vertical wallboard combines, and protects Hinder the stability and flexural strength of secondary assembled wall entirety;
Three, factory process is carried out according to the size of wallboard and corresponding quantity;
Four, according to wallboard, component number on-site assembly.
2. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: the wallboard can basis Live actual demand selects best wallboard length, realizes on-demand customization, simplifies field installation steps.
3. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: the steel channel connector It is installed on structure or the prefabricated groove of wallboard, for the connection between wallboard and structure, wallboard and wallboard.
4. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: the top link It is connected for top panel with structure, fixed top panel increases stability.
5. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: wallboard connection across Degree installs logical straight trough steel between two plates, increases the stability of metope entirety greater than 5m or when reserving hole wallboard needs to reinforce.
6. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: among the constructional column Using the logical grafting in side, to guarantee its stability, outside is vertically connected with using junction steel plate.
7. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: the constructional column and bottom When plate, top plate are fixed, column bottom, top built-in fitting are shifted to an earlier date prefabricated in constructional column.
8. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: in constructional column, transverse direction Lintel is connect with structural column joint using vertical and horizontal intercolumniation T-type, L-type connector.
9. a kind of secondary assembled wallboard building method according to claim 1, it is characterised in that: described to be vertically connected with part It is mounted in the prefabricated groove in wallboard two sides, for the connection of wallboard between the upper and lower, the globality of wainscot sheathing in increase.
CN201710789250.1A 2017-09-05 2017-09-05 A kind of secondary assembled wallboard building method Pending CN109424202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710789250.1A CN109424202A (en) 2017-09-05 2017-09-05 A kind of secondary assembled wallboard building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710789250.1A CN109424202A (en) 2017-09-05 2017-09-05 A kind of secondary assembled wallboard building method

Publications (1)

Publication Number Publication Date
CN109424202A true CN109424202A (en) 2019-03-05

Family

ID=65513916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710789250.1A Pending CN109424202A (en) 2017-09-05 2017-09-05 A kind of secondary assembled wallboard building method

Country Status (1)

Country Link
CN (1) CN109424202A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282097A (en) * 2020-11-27 2021-01-29 福建江夏学院 Assembled building anti-seismic structure with good stability

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070171223A1 (en) * 2006-01-26 2007-07-26 Autodesk, Inc. Method for creation of architectural space objects
KR101380127B1 (en) * 2013-08-29 2014-04-02 한국건설기술연구원 Bim system and method using assembly reference plane
CN104947792A (en) * 2015-06-18 2015-09-30 北京大工简筑科技有限公司 Simply-built green light steel fabricated building and installation method
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system
CN106284976A (en) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 A kind of aluminum alloy mould plate based on Revit joins mould method
CN206110471U (en) * 2016-08-30 2017-04-19 泸州银鼎建材有限公司 Compound energy - saving wall panels of light
CN106639317A (en) * 2016-12-23 2017-05-10 浙江省建工集团有限责任公司 Prefabricated building complete set constructing technology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070171223A1 (en) * 2006-01-26 2007-07-26 Autodesk, Inc. Method for creation of architectural space objects
KR101380127B1 (en) * 2013-08-29 2014-04-02 한국건설기술연구원 Bim system and method using assembly reference plane
CN104947792A (en) * 2015-06-18 2015-09-30 北京大工简筑科技有限公司 Simply-built green light steel fabricated building and installation method
CN105649196A (en) * 2016-01-15 2016-06-08 山东乾元泽孚科技股份有限公司 Modularized building system
CN206110471U (en) * 2016-08-30 2017-04-19 泸州银鼎建材有限公司 Compound energy - saving wall panels of light
CN106284976A (en) * 2016-09-27 2017-01-04 中国建筑局(集团)有限公司 A kind of aluminum alloy mould plate based on Revit joins mould method
CN106639317A (en) * 2016-12-23 2017-05-10 浙江省建工集团有限责任公司 Prefabricated building complete set constructing technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
金睿主编: "《建筑施工企业BMI应用基础教程》", 31 May 2016 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282097A (en) * 2020-11-27 2021-01-29 福建江夏学院 Assembled building anti-seismic structure with good stability
CN112282097B (en) * 2020-11-27 2022-05-10 福建江夏学院 Assembled building anti-seismic structure with good stability

Similar Documents

Publication Publication Date Title
CN103124822B (en) Solar energy house top board connected structure
CN106121086A (en) A kind of concrete-filled steel square tubular column of band otic placode and the connecting structure of fabricated shear wall and the practice
CN204282671U (en) A kind of maintenance corridor structure for architecture-integral roof electricity generation system
CN205935315U (en) Light steel composite wall panel module
CN104153462A (en) Staggered floor hanging type prefabricated bay window
CN105625566A (en) Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof
CN109424202A (en) A kind of secondary assembled wallboard building method
CN201202181Y (en) Connection structure for precast concrete board and beam and construction including the same
CN205000229U (en) It assembles concrete box beam to become span festival section with general section size
CN207761103U (en) Prefabricated assembled concrete composite thermo-insulating wall board
CN204626235U (en) A kind of concatenation unit of frame bridge
CN207672944U (en) A kind of exterior wall installs the glass mounting assembly of elevator shaft additional
CN104060841B (en) Large-span steel girder construction method of installation
CN206352348U (en) A kind of attachment structure of steel reinforced concrete board wall and steel reinforced concrete laminated floor slab
CN206267443U (en) A kind of prefabrication and assembly construction concrete structure stair
CN204491883U (en) A kind of assembling energy consumption steel plate shear wall
CN208964324U (en) A kind of full module-assembled elevator shaft
CN101581113B (en) Connecting structure for precast concrete board and beam, construction method and building
CN105275120A (en) Prefabricated light steel concrete plate column structure and construction method thereof
CN104675017B (en) A kind of novel Prestressed Continuous bamboo wooden frame promotes device
CN205604457U (en) Light steel prefabricated house
CN209384442U (en) A kind of double-layered precast facade structure of basement
CN106760179B (en) Pin-connected panel precast wall panel structure equipped with concealed beam
CN206737260U (en) A kind of prefabricated panel and its connecting node
CN203795783U (en) Modified floor structure in thin-walled light steel building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190305

RJ01 Rejection of invention patent application after publication