CN109424200A - The method constructed to metope aluminium-plastic panel is realized in construction projects - Google Patents

The method constructed to metope aluminium-plastic panel is realized in construction projects Download PDF

Info

Publication number
CN109424200A
CN109424200A CN201710743714.5A CN201710743714A CN109424200A CN 109424200 A CN109424200 A CN 109424200A CN 201710743714 A CN201710743714 A CN 201710743714A CN 109424200 A CN109424200 A CN 109424200A
Authority
CN
China
Prior art keywords
metope
aluminium
plastic panel
plate
rough ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710743714.5A
Other languages
Chinese (zh)
Inventor
吴洋忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Original Assignee
Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Meiji Real Estate Marketing Planning Co Ltd filed Critical Chengdu Meiji Real Estate Marketing Planning Co Ltd
Priority to CN201710743714.5A priority Critical patent/CN109424200A/en
Publication of CN109424200A publication Critical patent/CN109424200A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses one kind to realize the method constructed to metope aluminium-plastic panel in construction projects, when metope plank base plate is constructed, answers indoor suspended ceiling keel shoe rigging out, the laying of metope electric wiring could carry out in place;According to line shelves on metope borehole plug wood contract;Rough ground is connect except in addition to the wooden contract, with the curved connection of angle bar, angle bar and rough ground are connected with wood screw with metope;Determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;Install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate;Sideline is answered smooth and point-blank when cutting;With squeegee or undercoat scrubbing brush, while in base and facing back brushing;Aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in the sizing materials of aluminium-plastic panel veneered surfaces with toluene and wipe the stains of plate face.The step of this method, is easy, can be by metope aluminium-plastic panel fixation, and installation effect is good, ensure that service life.

Description

The method constructed to metope aluminium-plastic panel is realized in construction projects
Technical field
The present invention relates to a kind of methods, realize more particularly, to one kind and construct to metope aluminium-plastic panel in construction projects Method.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.The object of building is big It was built to the correlation before the Environment Design for including regional planning, urban planning, landscape design etc. synthesis is constructed, community is formed Journey, the small production to indoor furniture, small articles etc..And its common object is the unit in certain place.
In architecture and the scope of civil engineering, " building ", which refers to the process of, builds building or development capital construction.Generally For, each construction project can be responsible for pool by project Manager and architect, by contractor at different levels, divide and sentence quotient, engineering Gu It asks, Quantity Surveyor, the professionals such as structural engineer are responsible for supervision.
Each construction project is successfully completed, effectively plan is required, no matter is designed so that completing whole building Project require to fully take into account whole building project may bring environmental impact, establish building schedule table, finance On arrangement, building safety, the transport of construction material and delay in utilization, engineering, prepare tender documents etc..
During the nearly last ten years, China's building trade high speed development, the building trade gross output value rise to from 1,536,200,000,000 in 2001 13,530,300,000,000 yuan in 2012, nearly 9 times of amount of increase, and the high speed development of building trade has also driven the development of related industry, greatly Width improves the overall national strength in China and the living standard of the people, and for the whole nation, construction well-off society provides wide space.Entirely Ball construction market about 7.5 trillion dollars of value, the 13.4% of Zhan Quanqiu GDP.The year two thousand twenty is expected, value is up to 12.7 ten thousand 70% will be increased in hundred million dollars, next ten years.To the year two thousand twenty, construction industry will account for the 14.6% of global GDP.Coming 10 years, The construction industry scale of global emerging market will be enlarged by 1 times, reach 6.7 trillion dollars.China is used as maximum developing country, Construction market scale in 2013 will be up to 12 trillion yuans by 2015 by 2015 close to 10,000,000,000,000 yuans, the whole world The megalopolis that 23 populations will occur and be more than 10,000,000, this greatly will push construction industry to globalize, and be traditional construction quotient Between strategic integration provide chance.In the long run, future 50 years, Chinese city rate will increase to 76% or more, city 95% or more is up to the contribution rate of entire national economy.In the work progress of building, the construction of metope aluminium-plastic panel is one The critically important work of item, traditional work progress complex procedures in metope aluminium-plastic panel, and also the quality constructed can not be guaranteed, Often occur falling off or loosening, influence using and it is beautiful.
Summary of the invention
It is an object of the invention to overcome the above-mentioned existing work progress complex procedures in metope aluminium-plastic panel, and construct Quality can not be guaranteed often occur falling off or loosen, and influence to devise one kind in architectural engineering using the problem with beauty The step of method that middle realization constructs to metope aluminium-plastic panel, this method, is easy, can pacify metope aluminium-plastic panel fixation It is good to fill effect, ensure that service life, solves the existing work progress complex procedures in metope aluminium-plastic panel, and the matter constructed Amount can not be guaranteed often occur falling off or loosen, and be influenced using the problem with beauty.
The purpose of the invention is achieved by the following technical solution: realizing construct to metope aluminium-plastic panel in construction projects Method, comprising the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place It can be carried out;
(2) it is required first to mark horizontal absolute altitude on the wall according to construction drawing, pops up stepping line, bored on metope according to line shelves Stopple wood contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and wood are imperial with metope Bone is connected with wood screw, with reinforced concrete wall connection setscrew, is connect with brick wall and is connected using through-wall bolt;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, base Laminate nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must be oblique To rough ground is goed deep into, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and There must not be phenomena such as scratch unfilled corner on the facing of aluminium-plastic panel, then proofread simultaneously column number by construction drawing, and tried Paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big, Thickness should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel facing The sizing material of plate surface wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, and maintenance 16 hours, i.e., Dismountable support pressing plate.
In conclusion the beneficial effects of the present invention are: easy the step of this method, it can be by metope aluminium-plastic panel fix tightly Gu installation effect is good, service life ensure that, solve the existing work progress complex procedures in metope aluminium-plastic panel, Er Qieshi The quality of work can not be guaranteed often occur falling off or loosen, and be influenced using the problem with beauty.
Specific embodiment
Below with reference to embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to This.
Embodiment:
The method constructed to metope aluminium-plastic panel is realized in construction projects, comprising the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place It can be carried out;
(2) it is required first to mark horizontal absolute altitude on the wall according to construction drawing, pops up stepping line, bored on metope according to line shelves Stopple wood contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and wood are imperial with metope Bone is connected with wood screw, with reinforced concrete wall connection setscrew, is connect with brick wall and is connected using through-wall bolt;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, base Laminate nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must be oblique To rough ground is goed deep into, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and There must not be phenomena such as scratch unfilled corner on the facing of aluminium-plastic panel, then proofread simultaneously column number by construction drawing, and tried Paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big, Thickness should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel facing The sizing material of plate surface wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, and maintenance 16 hours, i.e., Dismountable support pressing plate.
The step of this method, is easy, can be by metope aluminium-plastic panel fixation, and installation effect is good, ensure that service life, It solves the existing work progress complex procedures in metope aluminium-plastic panel, and the quality constructed can not be guaranteed, often occurs It falls off or loosens, influence using the problem with beauty.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to According to technology of the invention, method any simple modification substantially to the above embodiments, equivalent variations, the present invention is each fallen within Protection scope within.

Claims (1)

1. realizing the method constructed to metope aluminium-plastic panel in construction projects, which comprises the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place could be into Row;
(2) required first to mark horizontal absolute altitude on the wall according to construction drawing, pop up stepping line, according to line shelves on metope borehole plug The wooden contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and rough ground are used with metope Wood screw connection connect with brick wall and connects using through-wall bolt with reinforced concrete wall connection setscrew;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, basal plate With nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must oblique depth Enter rough ground, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and in aluminium There must not be phenomena such as scratch unfilled corner on the facing of mould plate, then proofread simultaneously column number by construction drawing, and carry out examination paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big, thickness Should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel decoration panel table The sizing material in face wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, conserves 16 hours, i.e., removable Except support pressing plate.
CN201710743714.5A 2017-08-25 2017-08-25 The method constructed to metope aluminium-plastic panel is realized in construction projects Withdrawn CN109424200A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710743714.5A CN109424200A (en) 2017-08-25 2017-08-25 The method constructed to metope aluminium-plastic panel is realized in construction projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710743714.5A CN109424200A (en) 2017-08-25 2017-08-25 The method constructed to metope aluminium-plastic panel is realized in construction projects

Publications (1)

Publication Number Publication Date
CN109424200A true CN109424200A (en) 2019-03-05

Family

ID=65499569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710743714.5A Withdrawn CN109424200A (en) 2017-08-25 2017-08-25 The method constructed to metope aluminium-plastic panel is realized in construction projects

Country Status (1)

Country Link
CN (1) CN109424200A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984690A (en) * 2019-12-23 2020-04-10 吴露露 Installation and construction process of aluminum plate stretching net

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984690A (en) * 2019-12-23 2020-04-10 吴露露 Installation and construction process of aluminum plate stretching net

Similar Documents

Publication Publication Date Title
CN105888179A (en) Facing brick dry-hanging structure and facing brick dry-hanging technology
CN104763123B (en) Unit assembling type installation method of irregular arc-shaped GRG decoration board
CN105569251A (en) Device for split-level ceiling and installation method
CN106836718A (en) Precast floor system and its assembly method
CN107630531B (en) Large-cantilever bare concrete stair and construction method thereof
CN206512966U (en) Precast floor system
CN109424200A (en) The method constructed to metope aluminium-plastic panel is realized in construction projects
CN204510816U (en) The stair template of adjustable angle
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN108071212A (en) The technique that metope aluminium-plastic panel construction efficiency is improved in furniture workshop
CN108071203A (en) The technique quickly constructed in furniture construction of hydropower to plank base
CN106988514A (en) A kind of floor installation fitting dustless without nail
CN103556799A (en) Honeycomb aluminum wall floor decorative module and preparing method thereof
CN106401176A (en) Steel-wood combination roof moldboard framework construction method
CN101871258B (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
Leśniak et al. Selection of Façades Finishing Technology for a Commercial Building Using Multi-Criteria Analysis.
CN203891395U (en) Granite-imitated insulation decorative board
CN107700794A (en) The technique constructed to the antistatic floor of architecture indoor
CN106150003A (en) The mounting structure of the wooden pedal of a kind of cement stairway and be mounted directly method
CN105064632A (en) Three-jaw inverted nail for installing wooden decorated panel, stairway and installation method thereof
CN209369153U (en) A kind of connection structure and the furred ceiling with the connection structure
CN109424130A (en) The technique of plank base construction efficiency is improved in construction
CN106567523A (en) Technique for improving construction quality of antistatic floor in furniture production workshop
CN109914812A (en) A kind of floor leveling construction accessory part and its application method
CN204826471U (en) A three -jaw falls to follow closely for installing wood veneer and stair of using thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190305

WW01 Invention patent application withdrawn after publication