CN109424200A - The method constructed to metope aluminium-plastic panel is realized in construction projects - Google Patents
The method constructed to metope aluminium-plastic panel is realized in construction projects Download PDFInfo
- Publication number
- CN109424200A CN109424200A CN201710743714.5A CN201710743714A CN109424200A CN 109424200 A CN109424200 A CN 109424200A CN 201710743714 A CN201710743714 A CN 201710743714A CN 109424200 A CN109424200 A CN 109424200A
- Authority
- CN
- China
- Prior art keywords
- metope
- aluminium
- plastic panel
- plate
- rough ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses one kind to realize the method constructed to metope aluminium-plastic panel in construction projects, when metope plank base plate is constructed, answers indoor suspended ceiling keel shoe rigging out, the laying of metope electric wiring could carry out in place;According to line shelves on metope borehole plug wood contract;Rough ground is connect except in addition to the wooden contract, with the curved connection of angle bar, angle bar and rough ground are connected with wood screw with metope;Determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;Install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate;Sideline is answered smooth and point-blank when cutting;With squeegee or undercoat scrubbing brush, while in base and facing back brushing;Aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in the sizing materials of aluminium-plastic panel veneered surfaces with toluene and wipe the stains of plate face.The step of this method, is easy, can be by metope aluminium-plastic panel fixation, and installation effect is good, ensure that service life.
Description
Technical field
The present invention relates to a kind of methods, realize more particularly, to one kind and construct to metope aluminium-plastic panel in construction projects
Method.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.The object of building is big
It was built to the correlation before the Environment Design for including regional planning, urban planning, landscape design etc. synthesis is constructed, community is formed
Journey, the small production to indoor furniture, small articles etc..And its common object is the unit in certain place.
In architecture and the scope of civil engineering, " building ", which refers to the process of, builds building or development capital construction.Generally
For, each construction project can be responsible for pool by project Manager and architect, by contractor at different levels, divide and sentence quotient, engineering Gu
It asks, Quantity Surveyor, the professionals such as structural engineer are responsible for supervision.
Each construction project is successfully completed, effectively plan is required, no matter is designed so that completing whole building
Project require to fully take into account whole building project may bring environmental impact, establish building schedule table, finance
On arrangement, building safety, the transport of construction material and delay in utilization, engineering, prepare tender documents etc..
During the nearly last ten years, China's building trade high speed development, the building trade gross output value rise to from 1,536,200,000,000 in 2001
13,530,300,000,000 yuan in 2012, nearly 9 times of amount of increase, and the high speed development of building trade has also driven the development of related industry, greatly
Width improves the overall national strength in China and the living standard of the people, and for the whole nation, construction well-off society provides wide space.Entirely
Ball construction market about 7.5 trillion dollars of value, the 13.4% of Zhan Quanqiu GDP.The year two thousand twenty is expected, value is up to 12.7 ten thousand
70% will be increased in hundred million dollars, next ten years.To the year two thousand twenty, construction industry will account for the 14.6% of global GDP.Coming 10 years,
The construction industry scale of global emerging market will be enlarged by 1 times, reach 6.7 trillion dollars.China is used as maximum developing country,
Construction market scale in 2013 will be up to 12 trillion yuans by 2015 by 2015 close to 10,000,000,000,000 yuans, the whole world
The megalopolis that 23 populations will occur and be more than 10,000,000, this greatly will push construction industry to globalize, and be traditional construction quotient
Between strategic integration provide chance.In the long run, future 50 years, Chinese city rate will increase to 76% or more, city
95% or more is up to the contribution rate of entire national economy.In the work progress of building, the construction of metope aluminium-plastic panel is one
The critically important work of item, traditional work progress complex procedures in metope aluminium-plastic panel, and also the quality constructed can not be guaranteed,
Often occur falling off or loosening, influence using and it is beautiful.
Summary of the invention
It is an object of the invention to overcome the above-mentioned existing work progress complex procedures in metope aluminium-plastic panel, and construct
Quality can not be guaranteed often occur falling off or loosen, and influence to devise one kind in architectural engineering using the problem with beauty
The step of method that middle realization constructs to metope aluminium-plastic panel, this method, is easy, can pacify metope aluminium-plastic panel fixation
It is good to fill effect, ensure that service life, solves the existing work progress complex procedures in metope aluminium-plastic panel, and the matter constructed
Amount can not be guaranteed often occur falling off or loosen, and be influenced using the problem with beauty.
The purpose of the invention is achieved by the following technical solution: realizing construct to metope aluminium-plastic panel in construction projects
Method, comprising the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place
It can be carried out;
(2) it is required first to mark horizontal absolute altitude on the wall according to construction drawing, pops up stepping line, bored on metope according to line shelves
Stopple wood contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and wood are imperial with metope
Bone is connected with wood screw, with reinforced concrete wall connection setscrew, is connect with brick wall and is connected using through-wall bolt;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, base
Laminate nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must be oblique
To rough ground is goed deep into, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and
There must not be phenomena such as scratch unfilled corner on the facing of aluminium-plastic panel, then proofread simultaneously column number by construction drawing, and tried
Paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big,
Thickness should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel facing
The sizing material of plate surface wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, and maintenance 16 hours, i.e.,
Dismountable support pressing plate.
In conclusion the beneficial effects of the present invention are: easy the step of this method, it can be by metope aluminium-plastic panel fix tightly
Gu installation effect is good, service life ensure that, solve the existing work progress complex procedures in metope aluminium-plastic panel, Er Qieshi
The quality of work can not be guaranteed often occur falling off or loosen, and be influenced using the problem with beauty.
Specific embodiment
Below with reference to embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to
This.
Embodiment:
The method constructed to metope aluminium-plastic panel is realized in construction projects, comprising the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place
It can be carried out;
(2) it is required first to mark horizontal absolute altitude on the wall according to construction drawing, pops up stepping line, bored on metope according to line shelves
Stopple wood contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and wood are imperial with metope
Bone is connected with wood screw, with reinforced concrete wall connection setscrew, is connect with brick wall and is connected using through-wall bolt;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, base
Laminate nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must be oblique
To rough ground is goed deep into, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and
There must not be phenomena such as scratch unfilled corner on the facing of aluminium-plastic panel, then proofread simultaneously column number by construction drawing, and tried
Paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big,
Thickness should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel facing
The sizing material of plate surface wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, and maintenance 16 hours, i.e.,
Dismountable support pressing plate.
The step of this method, is easy, can be by metope aluminium-plastic panel fixation, and installation effect is good, ensure that service life,
It solves the existing work progress complex procedures in metope aluminium-plastic panel, and the quality constructed can not be guaranteed, often occurs
It falls off or loosens, influence using the problem with beauty.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is all according to
According to technology of the invention, method any simple modification substantially to the above embodiments, equivalent variations, the present invention is each fallen within
Protection scope within.
Claims (1)
1. realizing the method constructed to metope aluminium-plastic panel in construction projects, which comprises the following steps:
(1) when metope plank base plate is constructed, indoor suspended ceiling keel shoe rigging out is answered, metope electric wiring is laid in place could be into
Row;
(2) required first to mark horizontal absolute altitude on the wall according to construction drawing, pop up stepping line, according to line shelves on metope borehole plug
The wooden contract is mounted on the wall according to rough ground frame is highly made into;
(3) rough ground is connect except in addition to the wooden contract, every square metre of no less than curved connection of angle bar, angle bar and rough ground are used with metope
Wood screw connection connect with brick wall and connects using through-wall bolt with reinforced concrete wall connection setscrew;
(4) according to panel size and design requirement, determine that the spacing of keel, the wooden contract need brush bitumastic solution preservative treatment;
(5) install keel after, check surfacing with it is vertical, in coverlay can by design requirement selection plank base plate, basal plate
With nine lis of plates or core-board, when installation, should carry out from top to bottom, and basal plate installation can use wood screw, and wood screw must oblique depth
Enter rough ground, screw terminal must be embedded in wooden;
(6) after plank base construction, it is necessary to carry out snap the line according to the drawing size of decorative aluminum plastic plate, gap width etc.;
(7) aluminium-plastic panel is cut according to design drawing first, and sideline is answered smooth and point-blank when cutting, and in aluminium
There must not be phenomena such as scratch unfilled corner on the facing of mould plate, then proofread simultaneously column number by construction drawing, and carry out examination paving;
(8) squeegee or undercoat scrubbing brush are used, while in base and facing back brushing, glue area should not be too big, thickness
Should not be too thin, also should not be too thick, it is desirable that brush thickness is uniform, no sand grains, clast sundries must not leak brush;
(9) aluminium-plastic panel will be cleared up and be rebuild to its surface after pasting, and removing surface is will to remain in aluminium-plastic panel decoration panel table
The sizing material in face wipes the stains of plate face with toluene, after decoration panel is pasted, at 15 DEG C of room temperature or more, conserves 16 hours, i.e., removable
Except support pressing plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710743714.5A CN109424200A (en) | 2017-08-25 | 2017-08-25 | The method constructed to metope aluminium-plastic panel is realized in construction projects |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710743714.5A CN109424200A (en) | 2017-08-25 | 2017-08-25 | The method constructed to metope aluminium-plastic panel is realized in construction projects |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109424200A true CN109424200A (en) | 2019-03-05 |
Family
ID=65499569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710743714.5A Withdrawn CN109424200A (en) | 2017-08-25 | 2017-08-25 | The method constructed to metope aluminium-plastic panel is realized in construction projects |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109424200A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984690A (en) * | 2019-12-23 | 2020-04-10 | 吴露露 | Installation and construction process of aluminum plate stretching net |
-
2017
- 2017-08-25 CN CN201710743714.5A patent/CN109424200A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984690A (en) * | 2019-12-23 | 2020-04-10 | 吴露露 | Installation and construction process of aluminum plate stretching net |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888179A (en) | Facing brick dry-hanging structure and facing brick dry-hanging technology | |
CN104763123B (en) | Unit assembling type installation method of irregular arc-shaped GRG decoration board | |
CN105569251A (en) | Device for split-level ceiling and installation method | |
CN106836718A (en) | Precast floor system and its assembly method | |
CN107630531B (en) | Large-cantilever bare concrete stair and construction method thereof | |
CN206512966U (en) | Precast floor system | |
CN109424200A (en) | The method constructed to metope aluminium-plastic panel is realized in construction projects | |
CN204510816U (en) | The stair template of adjustable angle | |
CN207420088U (en) | A kind of detachable combination cornice for facade rebuilding construction | |
CN108071212A (en) | The technique that metope aluminium-plastic panel construction efficiency is improved in furniture workshop | |
CN108071203A (en) | The technique quickly constructed in furniture construction of hydropower to plank base | |
CN106988514A (en) | A kind of floor installation fitting dustless without nail | |
CN103556799A (en) | Honeycomb aluminum wall floor decorative module and preparing method thereof | |
CN106401176A (en) | Steel-wood combination roof moldboard framework construction method | |
CN101871258B (en) | Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles | |
Leśniak et al. | Selection of Façades Finishing Technology for a Commercial Building Using Multi-Criteria Analysis. | |
CN203891395U (en) | Granite-imitated insulation decorative board | |
CN107700794A (en) | The technique constructed to the antistatic floor of architecture indoor | |
CN106150003A (en) | The mounting structure of the wooden pedal of a kind of cement stairway and be mounted directly method | |
CN105064632A (en) | Three-jaw inverted nail for installing wooden decorated panel, stairway and installation method thereof | |
CN209369153U (en) | A kind of connection structure and the furred ceiling with the connection structure | |
CN109424130A (en) | The technique of plank base construction efficiency is improved in construction | |
CN106567523A (en) | Technique for improving construction quality of antistatic floor in furniture production workshop | |
CN109914812A (en) | A kind of floor leveling construction accessory part and its application method | |
CN204826471U (en) | A three -jaw falls to follow closely for installing wood veneer and stair of using thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190305 |
|
WW01 | Invention patent application withdrawn after publication |