CN206512966U - Precast floor system - Google Patents

Precast floor system Download PDF

Info

Publication number
CN206512966U
CN206512966U CN201720177188.6U CN201720177188U CN206512966U CN 206512966 U CN206512966 U CN 206512966U CN 201720177188 U CN201720177188 U CN 201720177188U CN 206512966 U CN206512966 U CN 206512966U
Authority
CN
China
Prior art keywords
keel
ceramic tile
laid
floor board
composite floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720177188.6U
Other languages
Chinese (zh)
Inventor
罗少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Olympic Polytron Technologies Inc
Original Assignee
Guangdong Olympic Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Olympic Polytron Technologies Inc filed Critical Guangdong Olympic Polytron Technologies Inc
Priority to CN201720177188.6U priority Critical patent/CN206512966U/en
Application granted granted Critical
Publication of CN206512966U publication Critical patent/CN206512966U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of precast floor system, and the system has included keel laid, plays keel laid and is supported by first level adjusting part;At least two pieces integrated floors, each integrated floor includes one and installs keel and one piece of ceramic tile composite floor board, and each angle for installing keel is provided with support baseboard, and support baseboard is by the second Level tune modular support;Ceramic tile composite floor board, which is arranged on, to be installed on keel, and a part at least one piece ceramic tile composite floor board is taken and has been placed on keel laid, a part for ceramic tile composite floor board, which is taken, to be placed on the corresponding support baseboard for installing keel of another ceramic tile composite floor board adjacent with the ceramic tile composite floor board.Precast floor system of the present utility model uses dry construction, it is not necessary at the construction field (site) using cement, sand, concrete etc., reduces city environmental pollution, and construction cost is low, efficiency of construction is high.

Description

Precast floor system
Technical field
The utility model is related to construction and decoration field, more particularly, to a kind of precast floor system.
Background technology
At present ground, presently the most common ceramic tile laying side are laid in building, repairs profession construction commonly using ceramic tile Method is wet construction, i.e., mount on the ground ceramic tile using by cement and the husky concrete being mixed into, generally first exist during construction One layer of sand is laid on ground, then concrete is placed on sand, finally ceramic tile mated formation on concrete.Due to whole Construction operation is all to carry out manual paving operation at the scene by bricklayer, therefore often expends a large amount of manpower and materials, and efficiency of construction Lowly.
There is following problem in present wet construction:1st, cement, sand needed for constructing hold during municipal transport Airborne dust is easily dropped and produces, so as to pollute urban environment;2nd, dust, noise, smell, the rubbish of job site generation easily pollute Urban environment;3rd, the manual paving of bricklayer easily produces ceramic tile hollowing phenomenon, influences ceramic tile service life;4th, the manual paving pair of bricklayer The technology dependence of workman is very high, the problems such as paving out-of-flatness, ceramic tile opposite joint do not form straight line easily occurs;5th, the people of construction operation Power cost is high, and efficiency is low;6th, ceramic tile concrete binding paving mode can not solve the acoustic impacts lower floor of floor gap upper strata generation The problem of;7th, with population aging the problems such as, current many young men is added and are unwilling to be engaged in bricklayer occupation, are brought to industry Labour ensures difficult social concern.
Exactly currently widely used wet construction exist more than it is not enough, cause current floor to be mated formation and during house finishing Generally existing time length, the problem of efficiency is low, cost is high.
The content of the invention
Main purpose of the present utility model is to provide a kind of efficiency of construction height and the low precast floor of labor intensive cost System.
To realize above-mentioned main purpose, the precast floor system that the utility model is provided has included keel laid, plays paving Keel are supported by first level adjusting part;At least two pieces integrated floors, each integrated floor include one install keel and One piece of ceramic tile composite floor board, each angle for installing keel is provided with support baseboard, and support baseboard is by the second Level tune Modular support;Ceramic tile composite floor board, which is arranged on, to be installed on keel, and a part at least one piece ceramic tile composite floor board is taken and has been placed on On keel laid, a part for ceramic tile composite floor board takes that to be placed on another ceramic tile composite floor board adjacent with the ceramic tile composite floor board corresponding Installation keel support baseboard on.
From such scheme, mat formation ceramic tile composite floor board when, do not need to use concrete, it is only necessary to will rise keel laid Mat formation on the ground, then polylith integrated floor is mated formation successively, due to the ceramic tile composite floor board of first piece of integrated floor A part, which is taken, to be placed on keel laid, therefore only needs to regulate the horizontal level of keel laid, it can be ensured that first block of ceramic tile The horizontal level of composite floor board.A part for follow-up ceramic tile composite floor board takes the support baseboard for being placed on previous installation keel On, it is hereby ensured that the horizontal level for the ceramic tile composite floor board subsequently mated formation.
It can be seen that, because the assembling construction of floor system need not use concrete, the pollution to city can be greatly reduced, And efficiency of construction is high, can also reduce construction cost.
One preferred scheme is, first level adjusting part include fixed fastener, the first supporting part, the first crab-bolt part with And first adjusting screw rod, fixed fastener has been fastened on keel laid, and the first supporting part is arranged on the lower section of fixed fastener, the first anchor Spigot is arranged on the first supporting part, and the first adjusting screw rod can be screwed in the first crab-bolt part.
As can be seen here, by adjust the first adjusting screw rod of first level adjusting part be screwed into the first crab-bolt part away from From, the horizontal level of first piece of integrated floor can be adjusted, therefore the horizontal level regulation of ceramic tile composite floor board is very simple, and And the technical ability needed to be grasped is also uncomplicated, construction cost can be substantially reduced.
Further scheme is that two buckling parts are provided with fixed fastener, and each buckling parts is provided with a convex tendon;Rise Be provided with a pair of sidewalls of keel laid with convex tendon matching groove, and rise keel laid by least two groups first level adjusting parts Support.
As can be seen here, keel laid will be played using buckling parts to be fixed on first level adjusting part, it is ensured that play keel laid It is fixed.And keel laid is supported using at least two groups first level adjusting parts, not only keel laid can be effectively supported, and Multigroup first level adjusting part can be conveniently adjusted to have adjusted the horizontal level of keel laid.
Further scheme is to rise to be additionally provided with an inserted num on keel laid, and the 3rd adjusting screw rod can screw in embedded spiral shell In female.
It can be seen that, by setting inserted num on keel laid and having adjusted keel laid by the 3rd adjusting screw rod Horizontal level so that the Level tune for playing keel laid is very simple.
Another scheme is that the second Level tune part includes the second supporting part being arranged on support baseboard, and second holds Heavy mail is provided with the second crab-bolt part, and the second adjusting screw rod can be screwed in the second crab-bolt part.
As can be seen here, component is reconciled using the second level the level height of support baseboard is adjusted, so, regulation collection Into floor horizontal level when only need to adjust the position of the second adjusting screw rod, therefore the horizontal level of ceramic tile composite floor board Regulation is very simple, substantially reduces construction cost.
Further scheme is that ceramic tile composite floor board includes adjacent ceramic tile and complex coagulation soil layer, composite concrete Layer is mated formation on keel are installed, and is bonded between ceramic tile composite floor board and installation keel by adhesive, and install keel and ground Between bonded by adhesive, ceramic tile composite floor board and install keel between be fixedly connected by self-tapping screw.
Brief description of the drawings
Fig. 1 is the structure chart of the utility model precast floor system embodiment.
Fig. 2 is schematic enlarged-scale view at A in Fig. 1.
Fig. 3 is the part that keel laid and first level adjusting part are played in the utility model precast floor system embodiment STRUCTURE DECOMPOSITION enlarged drawing.
Fig. 4 is the structure chart of integrated floor in the utility model precast floor system embodiment.
Fig. 5 is the local knot of integrated floor and the second Level tune part in the utility model precast floor system embodiment Structure exploded view.
Fig. 6 is Fig. 5 partial enlarged drawing.
Fig. 7 is schematic enlarged-scale view at B in Fig. 1.
Fig. 8 is schematic enlarged-scale view at C in Fig. 1.
Fig. 9 is multiple structure charts for installing keel in the utility model precast floor system embodiment.
Figure 10 is the structure chart after first piece of integrated floor of mating formation in the utility model precast floor system embodiment.
Figure 11 is the structure chart after second piece of integrated floor of mating formation in the utility model precast floor system embodiment.
Figure 12 is the structure chart after the 3rd piece of integrated floor of mating formation in the utility model precast floor system embodiment.
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment
Precast floor system of the present utility model applies the floor system of the laying floor in building, repairs profession, and And need not use concrete in the assembling process of precast floor system of the present utility model, i.e., carried out without using husky, cement Construction, therefore the construction method of floor system is dry construction, can effectively reduce and The Surroundings in Cities is polluted, and compare Traditional wet construction, assembly method efficiency of construction of the present utility model is very high, and cost is very low.
Referring to Fig. 1, there is precast floor system of the present utility model one to be played keel laid 10 and polylith integrated floor, Such as integrated floor 30, integrated floor 50, integrated floor 60 and integrated floor 70, certainly, Fig. 1 only schematically shows four pieces of collection Into floor, when actually mating formation can according to used in being determined the size of paving ground integrated floor quantity.
Referring to Fig. 2 and Fig. 3, the concrete keel that keel laid 10 is a strip are played, mould can be passed through by concrete It is molded into strip rule side.Certainly, play keel laid 10 to be not necessarily made using composite soil, the metal materials such as steel, aluminium can also be used Material is made, or is made using other composite material section bars.The cross section for playing keel laid 10 is generally rectangular, and is playing paving One end of keel 10 is provided with a circular hole 12, and inserted num 13 is provided with circular hole 12, and adjusting screw rod 14 can screw in embedding Enter in nut 13, the lower end of adjusting screw rod 14 is abutted on the ground, so, by the regulation to adjusting screw rod 14, can be adjusted Play the distance between keel laid 10 and ground.
Play keel laid 10 to be supported by multiple first level adjusting parts 20, each first level adjusting part 20 includes solid Determine fastener 21, the first supporting part 25 and two first adjusting screw rods 27, wherein, fixed fastener 21 can be fastened on keel laid On 10, in the present embodiment, fixed fastener 21 is made up of ABS material, and two buckling parts 23 are provided with fixed fastener 21, often It is provided with one surface of one buckling parts 23 in a convex tendon 24, the present embodiment, two convex tendons 24 are oppositely arranged.Playing paving dragon A groove 11 is respectively arranged with a pair of sidewalls of bone 10, a convex tendon 24 can be fastened in a groove 11, therefore often One convex tendon 24 matches with a groove 11.So, being fixedly connected between fixed fastener and a keel laid 10 is realized. Also, two through holes 22 are provided with fixed fastener 21.
First supporting part 26 is arranged on the lower section of fixed fastener 21, can be made up of steel plate or aluminium sheet or composite panel, It is provided with first supporting part 26 on two the first crab-bolt parts 26, the inwall of each the first crab-bolt part 26 and is equipped with internal thread. Also, the first crab-bolt part 26 passes through fixed fastener 21, specifically, the first crab-bolt part 26 passes through through hole 22.First adjusting screw rod 27 It can screw in the first crab-bolt part 26, and the lower end of the first adjusting screw rod 27 is abutted on the ground.Therefore, by being adjusted to regulation first Section screw rod 27 is screwed into the distance in the first crab-bolt part 26, can adjust the distance between keel laid 10 and ground.It is preferred that, The length of first adjusting screw rod 27 is between 50 millimeters to 100 millimeter.
As it is clear from fig. 2 that play keel laid 10 is supported on ground by multiple first level adjusting parts 20 and adjusting screw rod 13 On, and multiple first level adjusting parts 20 can be set according to the length for playing keel laid 10, such as at interval of 40 centimetres of settings One first level adjusting part 20.So, when having laid keel laid 10, keel laid has been determined according to the par line pre-set 10 horizontal level, the horizontal reference laid as precast floor system.
In the present embodiment, first piece of integrated floor mated formation is integrated floor 30, and a part for integrated floor 30, which is taken, to be placed on Rise on keel laid 10.Also, the structure of each piece of integrated floor is substantially homogeneous same, and integrated floor is introduced with reference to Fig. 4 to Fig. 6 30 structure.Integrated floor 30 is disposed with ceramic tile 31, complex coagulation soil layer 32 and installs keel 33, ceramic tile from top to bottom 31 constitute ceramic tile composite floor board with complex coagulation soil layer 32, and ceramic tile 31 is abutted with complex coagulation soil layer 32.As seen from Figure 4, porcelain Brick 31 and complex coagulation soil layer 32 are equal in magnitude.Complex coagulation soil layer 32 is fixed on installation keel 33, installs the bottom surface of keel 33 Fixed on the ground by adhesive.
In the present embodiment, the gross thickness of ceramic tile composite floor board is between 30 millimeters to 40 millimeters, wherein the thickness of ceramic tile 31 For 12 millimeters, the thickness of complex coagulation soil layer 32 is between 18 millimeters to 28 millimeter.Ceramic tile 31 and complex coagulation soil layer 32 An entirety can be processed into, pastes close between ceramic tile 31 and complex coagulation soil layer 32, hollowing phenomenon will not be formed, and it is flat Whole degree is high, is conducive to mating formation for ceramic tile composite floor board.
The framework that keel 33 are substantially in matrix pattern is installed, mainly by materials such as cement, sand, additives by being sufficiently stirred for, Again by mould molding, qualified products are turned into finally by maintenance, quality inspection.Certainly, install keel 33 can also use steel, aluminium, Composite material section bar etc. is made.
Installing the size of keel 33 needs to be determined according to the size of ceramic tile 31, specifically, the frame for installing keel 33 is smaller In the frame of ceramic tile 31.Installing the thickness of keel 33 can also adjust accordingly according to job site laying height, generally, install The thickness of keel 33 is more than the thickness of ceramic tile 31., it is necessary to be applied on the bottom surface for installing keel 33 when installing keel 33 due to mating formation Adhesive is smeared, therefore, in the present embodiment, the bottom for installing keel 33 is provided with the adhesive material containing groove of 5 millimeters deeps.The present embodiment In, adhesive can be glue for tile, cloud stone glue, cement cream etc., can also use other adhesives.
An angle is provided with an angle for installing keel 33 provided with support baseboard 34, also, support baseboard 34 is by the Two Level tune components 40 are supported.As seen from Figure 6, the second Level tune part 40 includes being arranged on the second of the lower section of support baseboard 34 Supporting part 41, is provided with the second crab-bolt part 42, the inwall of the second crab-bolt part 42 at the middle part of the second supporting part 41 and is provided with interior spiral shell Line.Second adjusting screw rod 43 can be screwed in the second crab-bolt part 42, and the lower end of the second adjusting screw rod 43 is abutted on the ground.Branch The middle part of bottom plate 34 is supportted provided with through hole 36, the second crab-bolt part 42 is located in through hole 36, and the second adjusting screw rod 43 can be from Screwed in through hole 36 in the second crab-bolt part 42.It is preferred that, the length of the second adjusting screw rod 43 is between 50 millimeters to 100 millimeter.
Ceramic tile composite floor board is fixed on installation keel 33, and in the present embodiment, ceramic tile composite floor board passes through many self tapping spiral shells Nail 37 be fixed on installation keel 33 on, i.e., many tapping screws 37 sequentially pass through installation keel 33, complex coagulation soil layer 32 and Ceramic tile 31.Certainly, ceramic tile composite floor board can also be bonded in by adhesive on installation keel 33, therefore, it can compound mixed Solidifying soil layer 32 sets one or more adhesive standing grooves close to the one side for installing keel 33, and adhesive standing groove can be in strip Shape or the shape such as square, circular, and the depth of adhesive standing groove can be between 5 millimeters to 8 millimeters.
Certainly, many support baseboards 35 are additionally provided with first piece of integrated backplane 30, and are provided with support baseboard Through hole 39, as shown in figure 5, the lower section of support baseboard 35 is provided with supporting part 46, supporting part 46 is provided with a crab-bolt part, crab-bolt part Through hole 39 can be passed through, adjusting screw rod 47 can pass through through hole 39 and screw in crab-bolt part, therefore the water of regulation integrated backplane 30 During plane, in addition it is also necessary to which the distance that adjusting screw rod 47 screws in crab-bolt part is adjusted.On the integrated backplane subsequently mated formation, dragon is installed Support baseboard 35 and supporting part 46, adjusting screw rod 47 etc. are not provided with bone.
It is level to realize that each piece of integrated floor subsequently mated formation is kept with the previous piece of integrated floor mated formation, In the present embodiment, a part for the ceramic tile composite floor board on first piece of integrated floor 30 for mating formation, which is taken, to be placed on keel laid 10, And in the integrated floor subsequently mated formation, the ceramic tile composite floor board of the integrated floor only some be located on support baseboard, and phase A part for another piece of adjacent ceramic tile composite floor board, which is taken, to be placed on the support baseboard 34 of the installation keel 33 of previous piece of integrated floor.
Specifically, as illustrated in figs. 7 and 8, in integrated floor 70, ceramic tile 71 and complex coagulation soil layer 72 are only located at integrated On four points one jiao of the support baseboard 74 of the installation keel 73 on floor 70, also, support baseboard 74 is by the second Level tune component 75 supports.Identical, in integrated floor 60, ceramic tile 61 and complex coagulation soil layer 62 are only located at the installation dragon of integrated floor 60 On four points one jiao of the support baseboard 64 of bone 63.And the ceramic tile 71 and a part for complex coagulation soil layer 72 of integrated floor 70 Take and be placed on support baseboard 64, from fig.7, it can be seen that a part for ceramic tile 71 and complex coagulation soil layer 72, which is taken, is placed on support baseboard 64 A quarter angle on.
So, after integrated floor 60 of mating formation, integrated floor 70 is mated formation at ground, by the ceramic tile 71 of integrated floor 70 And complex coagulation soil layer 72 is taken and is placed on support baseboard 64, then regulation positioned at the lower section of support baseboard 74 of integrated floor 70 the Two Level tune components 75, that is, adjust the distance that the second adjusting screw rod is screwed in the second crab-bolt part, so that integrated after mating formation Floor 70 keeps level with integrated floor 60, that is, ensures that the upper surface of ceramic tile 61 and ceramic tile 71 is located in same level.
Referring to Fig. 9, when polylith integrated floor is mated formation on the ground, one piece of integrated floor install keel with it is adjacent another The installation keel adjoining of one piece of integrated floor, for example, the installation keel for installing keel 53 and integrated floor 30 of integrated floor 50 33 are abutted, and the lower left corner of installation keel 53 is connected on the upper right corner for the support baseboard 34 for installing keel 33.
During precast floor system of the present utility model of mating formation, the scope of operation play the behaviour of par line at the construction field (site) first Make, so that it is determined that floor system mat formation after horizontal level, it is then determined that rise a bunk put.Then, mated formation keel laid 10, i.e. root Regulate the level height of keel laid 10 according to par line position set in advance and adjusted and arrive the position parallel with par line. Mated formation keel laid 10 when, it is necessary to rise keel laid 10 bottom surface coat adhesive, by adhesive will rise a keel laid 10 fix On the ground.When having adjusted the horizontal level of keel laid 10, the first adjusting screw rod of first level adjusting part 20 can be adjusted 27 and adjusting screw rod 14.
Then, first piece of integrated floor 30 is installed, adhesive is spread in the bottom surface for installing keel 33 first, according to integrally The orientation of plate 30 mats formation at the edge of integrated floor 30 to rising on keel laid 10, then to the branch for installing keel 33 of integrated floor 30 Second adjusting screw rod 43 of the second Level tune component 40 of the lower section of support bottom plate 34 is adjusted, while being carried out to adjusting screw rod 47 Regulation so that smooth the taking of ceramic tile composite floor board of integrated floor 30 has been placed on keel laid 10.It is pre- due to playing keel laid 10 First adjust to horizontal level, when the ceramic tile composite floor board of integrated floor 30 be adjusted to it is smooth take be placed on keel laid 10 when, The upper surface of ceramic tile 31 is parallel with playing keel laid 10, that is, parallel to par line.As shown in Figure 10.Integrated floor 30 is mated formation Afterwards, a part for ceramic tile 31 and complex coagulation soil layer 32, which is taken, has been placed on keel laid 10, and certainly, ceramic tile composite floor board is mainly Supported by installation keel 33.
Then, mat formation second piece of integrated floor 50, that is, walk and needs are installed successively along the bearing of trend for keel 10 of mating formation taken Be placed on other integrated floors on keel laid 10, mat formation each piece of integrated floor when be required to adjust the integrated floor level Position.As shown in figure 11, a part for the ceramic tile composite floor board of integrated floor 50, which is taken, has been placed on keel laid 10, and a part On the support baseboard 34 for taking the installation keel 33 for being placed on integrated floor 30, when adjusting the horizontal level of integrated floor 50, it can adjust Save the second Level tune component 55 of the lower section of support baseboard 53 of integrated floor 50.Then, follow-up integrated floor of mating formation is continued, Untill a length direction of keel laid 10 is paved with integrated floor.
Then, residue is sequentially completed in the way of heel row integrated floor is taken on the installation keel for put front-seat integrated floor to apply The installation of the integrated floor of work area, as shown in figure 12, mat formation integrated floor 60 when, the ceramic tile composite floor board one of integrated floor 60 Part, which is taken, to be placed on the support baseboard 34 for installing keel 33, when adjusting the horizontal level of integrated floor 60, to integrated floor 60 The the second Level tune component 65 for installing the lower section of support baseboard 64 of keel 63 is adjusted, until the upper surface of integrated floor 60 Untill being located at same level with the upper surface of integrated floor 30.Certainly, in the pavement process of integrated floor, par can be used The integral level that the instruments such as guiding ruler carry out floor system is detected and adjusted in real time.Using assembling side of the present utility model Non- job type personnel can be allowed to pass through on floor in method, work progress.12 hours after all integrated floors are mated formation and finished Joint filling processing is carried out afterwards, finally carries out completing whole construction operations after the hygiene of paving face.
It can be seen that, floor system of the present utility model uses the assembly method of dry construction, compared to a traditional wet construction, Tile laying can be substantially reduced to depend on workman's skill unduly, and improve conventional construction method apoplexy involving the solid organs, random construction Environment, improves the efficiency of construction of tile laying, method of the present utility model can improve efficiency of construction more than 60%, so that significantly Reduce the engineering time.
In addition, the assembly method of floor system solves hollowing present in traditional tile laying by industrialization technology, put down The whole degree quality problem such as not high, opposite joint is uneven, additionally it is possible to the human cost of tile laying more than 60% is reduced, due to playing paving dragon Bone, integrated floor are fabricated in factory and formed, and processing is industrialized in factory can be greatly lowered the materials such as cement, sand Waste, can also reduce the sound interference of floor gap, eliminate noise, dust, rubbish that traditional ceramic tile paving construction is brought etc. Environmental problem.
Finally it is emphasized that the utility model is not limited to above-mentioned embodiment, such as play keel laid, the system of keel is installed The change such as change of the change of producing material material, integrated floor structure and shape should also be included in the guarantor of the utility model claim In the range of shield.

Claims (10)

1. precast floor system, it is characterised in that including
Keel laid is played, described keel laid is supported by first level adjusting part;
At least two pieces integrated floors, each integrated floor includes one and installs keel and one piece of ceramic tile composite floor board, often One angle for installing keel is provided with support baseboard, and the support baseboard is by the second Level tune modular support;
The ceramic tile composite floor board is fixed on the installation keel, and a part at least one piece ceramic tile composite floor board is taken It is placed on described keel laid, a part for the ceramic tile composite floor board, which is taken, is placed on another porcelain adjacent with the ceramic tile composite floor board On the corresponding support baseboard for installing keel of brick composite floor board.
2. precast floor system according to claim 1, it is characterised in that:
The first level adjusting part includes fixed fastener, the first supporting part, the first crab-bolt part and the first adjusting screw rod, institute State fixed fastener be fastened on it is described rise on keel laid, first supporting part is arranged on the lower section of the fixed fastener, described the One crab-bolt part is arranged on first supporting part, and first adjusting screw rod can be screwed in the first crab-bolt part.
3. precast floor system according to claim 2, it is characterised in that:
Two buckling parts are provided with the fixed fastener, each buckling parts is provided with a convex tendon;
It is provided with a pair of sidewalls of described keel laid and the convex tendon matching groove.
4. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
Described keel laid first level adjusting part as described at least two groups is supported.
5. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
An inserted num is additionally provided with described keel laid, the 3rd adjusting screw rod can be screwed in the inserted num.
6. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
The second Level tune part includes setting on the second supporting part being arranged on the support baseboard, second supporting part There is the second crab-bolt part, the second adjusting screw rod can be screwed in the second crab-bolt part.
7. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
The ceramic tile composite floor board includes adjacent ceramic tile and complex coagulation soil layer, and the complex coagulation soil layer is mated formation in the peace On keel.
8. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
Bonded between the ceramic tile composite floor board and the installation keel by adhesive.
9. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
Bonded between the installation keel and the ground by adhesive.
10. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
It is fixedly connected between the ceramic tile composite floor board and the installation keel by self-tapping screw.
CN201720177188.6U 2017-02-24 2017-02-24 Precast floor system Expired - Fee Related CN206512966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720177188.6U CN206512966U (en) 2017-02-24 2017-02-24 Precast floor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720177188.6U CN206512966U (en) 2017-02-24 2017-02-24 Precast floor system

Publications (1)

Publication Number Publication Date
CN206512966U true CN206512966U (en) 2017-09-22

Family

ID=59867762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720177188.6U Expired - Fee Related CN206512966U (en) 2017-02-24 2017-02-24 Precast floor system

Country Status (1)

Country Link
CN (1) CN206512966U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836718A (en) * 2017-02-24 2017-06-13 广东奥景科技股份有限公司 Precast floor system and its assembly method
CN108316605A (en) * 2017-12-30 2018-07-24 浙江亚厦装饰股份有限公司 Make somebody a mere figurehead leveling component and leveling method in ground
CN110857587A (en) * 2018-08-22 2020-03-03 青岛海尔家居集成股份有限公司 Floor overhead system and overhead laying method of floor based on floor overhead system
CN113482281A (en) * 2021-07-05 2021-10-08 杭州守佳健康科技有限公司 Assembled ceramic tile, mounting bracket and ground system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836718A (en) * 2017-02-24 2017-06-13 广东奥景科技股份有限公司 Precast floor system and its assembly method
CN108316605A (en) * 2017-12-30 2018-07-24 浙江亚厦装饰股份有限公司 Make somebody a mere figurehead leveling component and leveling method in ground
CN108316605B (en) * 2017-12-30 2024-03-29 浙江亚厦装饰股份有限公司 Ground overhead leveling assembly and leveling method
CN110857587A (en) * 2018-08-22 2020-03-03 青岛海尔家居集成股份有限公司 Floor overhead system and overhead laying method of floor based on floor overhead system
CN113482281A (en) * 2021-07-05 2021-10-08 杭州守佳健康科技有限公司 Assembled ceramic tile, mounting bracket and ground system
CN113482281B (en) * 2021-07-05 2022-07-19 四川装配家科技有限公司 Assembled ceramic tile, mounting bracket and ground system

Similar Documents

Publication Publication Date Title
CN106836718A (en) Precast floor system and its assembly method
CN206512966U (en) Precast floor system
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
US9909322B1 (en) System and method for installing tile
CN201202281Y (en) Vibrating formwork walling machine
CN106381980A (en) Floor tile paving process
CN108468413A (en) A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering
CN101509312A (en) False floor tile and floor system composed of same
CN104831926B (en) A kind of tenon joint type bulk surface layer flooring method for paving
CN105239701A (en) Construction process of rammed earth wall
CN111236494A (en) MY high-performance spraying and building wall construction method
CN113789933A (en) Ground installation method for overhead building
CN206791311U (en) A kind of prefabricated dropping pit of " Qian " shape
CN206360281U (en) Floor limitting casing and limitting casing component
CN102251653A (en) Composite heat insulation board
CN111663770A (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN206616725U (en) A kind of assembled decorative heat preservation partition plate
CN109057250A (en) Assembled toilet construction method
CN210659110U (en) Assembly type overhead ground installation system of ceramic tile concrete composite board
CN205777313U (en) Locking-type floor tile lays framework
CN210288947U (en) Wall surface installation system for assembled ceramic tile concrete composite board
CN112726937B (en) Take ornamental face tenon fourth of twelve earthly branches assembled to contain spool box structure building block and wall body
CN1827939A (en) Block wall construction method
CN105297875A (en) Construction method of integrated catchwater
CN107288296B (en) Leveling layer based on dry-mixed cement mortar and leveling process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20200224

CF01 Termination of patent right due to non-payment of annual fee