CN109406969A CN201811474268.3A CN201811474268A CN109406969A CN 109406969 A CN109406969 A CN 109406969A CN 201811474268 A CN201811474268 A CN 201811474268A CN 109406969 A CN109406969 A CN 109406969A
Authority
CN
China
Prior art keywords
current
lifting device
tank body
test
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811474268.3A
Other languages
Chinese (zh)
Inventor
汲胜昌
高璐
贾云飞
李志兵
刘伟
刘子恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Research Institute Co Ltd CEPRI
Xian Jiaotong University
Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Xian Jiaotong University
Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI, Xian Jiaotong University, Electric Power Research Institute of State Grid Anhui Electric Power Co Ltd filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201811474268.3A priority Critical patent/CN109406969A/en
Publication of CN109406969A publication Critical patent/CN109406969A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/1227Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
    • G01R31/1254Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials of gas-insulated power appliances or vacuum gaps

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses a kind of air insulating device high-voltage great-current Combined Trials system, cable will test the casing short joint at tank body both ends, be allowed to form the current loop of a closure.The cable for being shorted tank body is passed through into punching current lifting device, the secondary winding as current lifting device.The output of power frequency testing transformer is terminated at by conducting wire on one of casing of test tank body, the shell of another output and test tank body is grounded, the primary side of power frequency testing transformer and punching current lifting device also needs to be grounded, since the secondary side of current lifting device is in high potential, the insulation between first winding and secondary winding need to be resistant to the high pressure that is put to the test.The output electric current of current lifting device and the output voltage of transformer pass through respective pressure regulator and adjust.Independently the size of voltage and current can be adjusted, wherein the phase between electric current and voltage reduces the demand to power by phase shifter manual adjustment, can especially bring great convenience to the laboratory of colleges and universities conveniently.

Description

A kind of air insulating device high-voltage great-current Combined Trials system
Technical field
The present invention relates to a kind of electric equipment test systems, combine in particular for the high-voltage great-current of air insulating device Pilot system.
Background technique
Air insulating device includes that gas-insulated combined electric (GIS) and power transfer conduit bus (GIL) etc. are electric system Most important equipment, outstanding advantages of because of its miniaturization, high reliablity, strong through-current capability, application in the power system is increasingly Extensively.However there may be built-in electrical insulation defect and initiation offices in manufacture, transport, installation and operational process for air insulating device Portion's electric discharge, final deterioration cause catastrophe failure.Simultaneously as its leakproofness is tight, compact-sized, load current lower conductor is caused to be sent out It is hot serious, accelerate insulating materials aging, insulation performance is caused to reduce;In addition, some researches show that with the liter of central electrode temperature Height can promote the accumulation of surface Charge so as to cause the raising of insulator surface current potential, dielectric level decline.Therefore, having must The Combined Trials of high pressure and high current are carried out to air insulating device, research temperature includes conductor, insulator etc. to its inside The influence of the flash-over characteristic of component provides important references for the through-flow and insulating Design of air insulating device.
Currently, Scientific Research in University Laboratory is carrying out temperature to air insulating devices such as GIS and GIL due to the power limit of power supply With insulate relevant experimental study when, it is difficult to test loop simultaneously apply high voltage and high current, therefore, often will pressurization and Through-flow process separately carries out.First being passed through certain electric current to center conductor increases its temperature, after temperature rise reaches stable state, removes Power down stream simultaneously accesses voltage source and is ramped up required voltage.This test method can not really simulate air insulating device reality Working condition when border is run.
It for the needs of pilot system, is tested, i.e., is individually exported high voltage and high current using virtual load method, Demand of the test loop to power supply capacity can be significantly reduced.The output that the HV Terminal of booster is connected to current lifting device is returned Road makes big current loop overall work in high-voltage potential, both ensures to make the high voltage of output to depend on booster in this way and exports, is big Electric current is exported depending on current lifting device, and can achieve the purpose that real simulation test product actual condition.
In conclusion the air insulating device high-voltage great-current Combined Trials system based on virtual load method has theoretical base Plinth, operability is high, has good development prospect.
Summary of the invention
Of the invention is to overcome the above-mentioned prior art insufficient, provides a kind of air insulating device high-voltage great-current joint examination Check system, using virtual load method, high voltage and high current is individually exported on the basis of limited power, makes output High voltage depends on booster output, high current is exported depending on current lifting device.
Of the invention adopts the following technical scheme that
A kind of air insulating device high-voltage great-current Combined Trials system, in order to reach while applying high pressure and high current Purpose, pilot system are tested the measurement of tank body, Power Frequency High Voltage Test transformer, punching current lifting device and needs by gas-insulated The composition such as device.Before being tested, the casing short joint at tank body both ends will be tested with cable, the electric current for being allowed to be formed a closure returns Road.The cable for being shorted tank body is passed through into punching current lifting device, the secondary winding as current lifting device.By conducting wire by industrial frequency experiment The output of transformer terminates on one of casing of test tank body, and the shell of another output and test tank body connects The primary side of ground, power frequency testing transformer and punching current lifting device also needs to be grounded, since the secondary side of current lifting device is in high potential, Therefore the insulation between its first winding and secondary winding need to be resistant to the high pressure that is put to the test.Current lifting device output electric current and transformer it is defeated Voltage passes through respective pressure regulator and adjusts out.
Traditional pilot system is limited to power, can not carry out the test of high voltage and high current simultaneously, first through-flow Elevate the temperature and then carry out Insulation Test again, can not truly analog machine actual motion when operating condition.The present invention is limited Power on the basis of, the pilot system built using virtual load method mainly has following advantage:
1) since high voltage and high current independently export, voltage circuit electric current very little, current loop voltage is very low, because Although being applied with high pressure and high current on this test product simultaneously, the electric energy or power of single effective supply lack very little, can reduce in this way Demand to power can especially bring great convenience conveniently to the laboratory of colleges and universities.
2) relative to traditional real Load Method, virtual load method can largely save electric energy.
3) it since high voltage and high current independently export, can independently the size to voltage and current carry out It adjusts, wherein the phase between electric current and voltage is by phase shifter manual adjustment.And the through-flow method of traditional pressurization is needed to adjust and be born The size and property for carrying impedance, in the case where impedance is difficult to adjust using will be very restricted.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Specific embodiment
The virtual load method in electric energy meter calibration field is introduced into the air insulating devices pilot system such as GIS or GIL by the present invention, Apply high voltage and high current on the basis of limited power, while to test product, it can truly simulated test facility Actual operating mode.Traditional pilot system needs the impedance magnitude by changing circuit come the electric current and electricity of regulating loop Pressure, and in pilot system of the present invention, high voltage and high current separately individually export, and can be convenient flexibly to it Output valve is adjusted.Single casing in traditional GIS pilot system is changed to double-jacket tube, it is convenient while carrying out high pressure and through-flow Test.
The pilot system is mainly made of following components:
1) gas-insulated tests tank body, and main body is a bit of GIS bus duct, is coaxially installed with conductor inside pipeline and is used for Through-flow and pressurization, conductor both ends are drawn by two bushings, so that avoiding device ontology generates corona interference.Outside pipeline Shell ground connection avoids generating experimenter dangerous.Bus duct can be divided into several sealed gas chambers by disc insulator, For carrying out the simulation test in laboratory.Contain in addition, tank body can be equipped with observation window, pressure measuring instruments, gas collecting and moisture Measurement interface etc. can carry out individually designed according to different tests demand.
2) Power Frequency High Voltage Test transformer, for power frequency high voltage needed for generating test, secondary side one end of transformer High voltage is loaded on center conductor by ground connection, the other end by bushing.Experimental transformer is adjusted by pressure regulator and is exported High pressure, can pass through electrostatic voltmeter measurement output high-voltage value.
3) punching current lifting device, for high current needed for generating through-flow test, by HT testing transformer when test HV Terminal is connected to the output loop of current lifting device, makes big current loop overall work in high-voltage potential.Simultaneously, it needs to fill Point consider the insulating capacity of current lifting device, the size of the high-voltage value according to added by test loop, the first winding of current lifting device and secondary Winding needs that an equal amount of high pressure can be born.
4) measuring device can open up observation window or terminal board according to test demand, to acquire the examination of needs on pipeline Test information.There is stronger electric field around high-voltage part, big current loop will generate very strong magnetic field, therefore in measuring device The measures such as electric field shielding and magnetic screen are fully considered in selection.
In order to achieve the purpose that while applying high pressure and high current, whole reality is made by Power Frequency High Voltage Test transformer first Circuit is tested generally in high potential, then applies high current to experimental loop using punching current lifting device.It can be with by pressure regulator The size of voltage and current is adjusted respectively.Need to fully consider its insulating capacity when selecting current lifting device, first winding and it is secondary around Group needs that added test voltage can be born.

Claims (3)

1. a kind of air insulating device high-voltage great-current Combined Trials system, which is characterized in that pilot system includes gas-insulated Tank body, Power Frequency High Voltage Test transformer, punching current lifting device are tested, cable will test the casing short joint at tank body both ends, be allowed to shape The current loop being closed at one, the cable for being shorted tank body passes through punching current lifting device, as the secondary winding of current lifting device, power frequency The output of testing transformer terminates on one of casing of test tank body, and another output and the shell of test tank body are equal Ground connection, the output electric current of punching current lifting device and the output voltage of transformer pass through respective pressure regulator and adjust.
2. a kind of air insulating device high-voltage great-current Combined Trials system according to claim 1, which is characterized in that work The primary side of frequency testing transformer and punching current lifting device ground connection, since the secondary side of current lifting device is in high potential, one Insulation between secondary winding and secondary winding need to be resistant to the high pressure that is put to the test.
3. a kind of air insulating device high-voltage great-current Combined Trials system according to claim 1, which is characterized in that examination Testing tank body is a bit of GIS bus duct, conductor is coaxially installed with inside pipeline for through-flow and pressurization, conductor both ends pass through two A bushing is drawn.
CN201811474268.3A 2018-12-04 2018-12-04 A kind of air insulating device high-voltage great-current Combined Trials system Pending CN109406969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811474268.3A CN109406969A (en) 2018-12-04 2018-12-04 A kind of air insulating device high-voltage great-current Combined Trials system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811474268.3A CN109406969A (en) 2018-12-04 2018-12-04 A kind of air insulating device high-voltage great-current Combined Trials system

Publications (1)

Publication Number Publication Date
CN109406969A true CN109406969A (en) 2019-03-01

Family

ID=65457084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811474268.3A Pending CN109406969A (en) 2018-12-04 2018-12-04 A kind of air insulating device high-voltage great-current Combined Trials system

Country Status (1)

Country Link
CN (1) CN109406969A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378446A (en) * 2019-07-16 2019-10-25 圣耀(集团)有限公司 Electric-power safe instruments trial system
CN111413602A (en) * 2020-05-19 2020-07-14 国网江苏省电力有限公司电力科学研究院 GIS equipment insulator combined test system and method
CN111624376A (en) * 2020-04-23 2020-09-04 中国南方电网有限责任公司超高压输电公司检修试验中心 High-current generating device for casing test and using method thereof
CN112485745A (en) * 2020-11-17 2021-03-12 广东电网有限责任公司计量中心 From simulation platform who takes isolator
CN112485624A (en) * 2020-12-10 2021-03-12 广东电网有限责任公司 Partial discharge-free test power supply circuit
CN118191534A (en) * 2024-05-15 2024-06-14 国网吉林省电力有限公司电力科学研究院 Electrical test cavity for simulating GIS internal insulation characteristic under severe cold condition and test method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1670873A (en) * 2005-05-12 2005-09-21 王如璋 High-voltage and high-current two-stage current transformer
CN2922084Y (en) * 2006-06-27 2007-07-11 北京华电云通电力技术有限公司 Multi-current ratio, high-accuracy organic compound insulation dry-type high voltage current mutual inductor
CN202182930U (en) * 2011-08-19 2012-04-04 云南电力试验研究院(集团)有限公司 Voltage current double applying test device used in electrical device
CN102419410A (en) * 2011-08-19 2012-04-18 云南电力试验研究院(集团)有限公司 Voltage/current double-applying testing device for electric device
CN102735977A (en) * 2012-07-12 2012-10-17 四川大学 Electrical-thermal aging device of cable accessories under high voltage and high current and test method thereof
CN202693641U (en) * 2012-07-20 2013-01-23 云南电力试验研究院(集团)有限公司电力研究院 Voltage and current superposed complete power supply device isolated by cable section
CN206505107U (en) * 2016-09-19 2017-09-19 云南电网有限责任公司文山供电局 Voltage x current is double to apply power-supply system
CN206505128U (en) * 2016-09-19 2017-09-19 云南电网有限责任公司文山供电局 Portable mobile Intelligent voltage current double-applying detection device
CN207424182U (en) * 2017-11-22 2018-05-29 云南电网有限责任公司曲靖供电局 A kind of voltage and current is double to apply detection device
CN207780143U (en) * 2018-02-27 2018-08-28 云南电网有限责任公司曲靖供电局 Portable voltage current double-applying pilot system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1670873A (en) * 2005-05-12 2005-09-21 王如璋 High-voltage and high-current two-stage current transformer
CN2922084Y (en) * 2006-06-27 2007-07-11 北京华电云通电力技术有限公司 Multi-current ratio, high-accuracy organic compound insulation dry-type high voltage current mutual inductor
CN202182930U (en) * 2011-08-19 2012-04-04 云南电力试验研究院(集团)有限公司 Voltage current double applying test device used in electrical device
CN102419410A (en) * 2011-08-19 2012-04-18 云南电力试验研究院(集团)有限公司 Voltage/current double-applying testing device for electric device
CN102735977A (en) * 2012-07-12 2012-10-17 四川大学 Electrical-thermal aging device of cable accessories under high voltage and high current and test method thereof
CN202693641U (en) * 2012-07-20 2013-01-23 云南电力试验研究院(集团)有限公司电力研究院 Voltage and current superposed complete power supply device isolated by cable section
CN206505107U (en) * 2016-09-19 2017-09-19 云南电网有限责任公司文山供电局 Voltage x current is double to apply power-supply system
CN206505128U (en) * 2016-09-19 2017-09-19 云南电网有限责任公司文山供电局 Portable mobile Intelligent voltage current double-applying detection device
CN207424182U (en) * 2017-11-22 2018-05-29 云南电网有限责任公司曲靖供电局 A kind of voltage and current is double to apply detection device
CN207780143U (en) * 2018-02-27 2018-08-28 云南电网有限责任公司曲靖供电局 Portable voltage current double-applying pilot system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110378446A (en) * 2019-07-16 2019-10-25 圣耀(集团)有限公司 Electric-power safe instruments trial system
CN111624376A (en) * 2020-04-23 2020-09-04 中国南方电网有限责任公司超高压输电公司检修试验中心 High-current generating device for casing test and using method thereof
CN111624376B (en) * 2020-04-23 2022-05-13 中国南方电网有限责任公司超高压输电公司检修试验中心 High-current generating device for casing test and using method thereof
CN111413602A (en) * 2020-05-19 2020-07-14 国网江苏省电力有限公司电力科学研究院 GIS equipment insulator combined test system and method
CN112485745A (en) * 2020-11-17 2021-03-12 广东电网有限责任公司计量中心 From simulation platform who takes isolator
CN112485624A (en) * 2020-12-10 2021-03-12 广东电网有限责任公司 Partial discharge-free test power supply circuit
CN118191534A (en) * 2024-05-15 2024-06-14 国网吉林省电力有限公司电力科学研究院 Electrical test cavity for simulating GIS internal insulation characteristic under severe cold condition and test method

Similar Documents

Publication Publication Date Title
CN109406969A (en) A kind of air insulating device high-voltage great-current Combined Trials system
CN106093725B (en) High-voltage bushing capacitor core insulation performance testing device
CN201955459U (en) 10kV distribution network line fault simulation test platform
CN104133165A (en) Transformer oilpaper insulation test system
CN208752168U (en) A kind of cable voltage pilot system of variable-frequency series-resonance
CN106896302A (en) GIS device low-voltage conductor surface field strength meter and method
CN111830355A (en) Integrated circuit electromagnetic compatibility test method and simulation test system device thereof
CN107912059A (en) The switching device operating method of switching device, test device and transformer measuring device
CN106856373B (en) Harmonic generation device
Hernandez-Guiteras et al. Determination of the corona inception voltage in an extra high voltage substation connector
CN106771813B (en) A kind of Tesla transformer secondary coil on-off measurement method
CN108802582A (en) A kind of high-voltage cable middle joint Partial Discharge Detection pilot system
CN106249064B (en) Insulate self-recovering type space charge measurement high-field electrode device
CN104502880B (en) A kind of equivalent test circuit of can type capacitor voltage mutual inductor transient characterisitics
CN202678086U (en) High-voltage sulfur hexafluoride (SF6) gas-insulation current transformer having function of monitoring superhigh-frequency partial discharge
CN206002640U (en) A kind of current lifting device
CN214011382U (en) Integrated circuit electromagnetic compatibility simulation test system device
CN114646847A (en) Breakdown field strength test system for inorganic powder medium under different pressures
CN204008865U (en) Pole cup
Jurišić et al. Case study on transformer models for calculation of high frequency transmitted overvoltages
CN102945739A (en) Power-frequency single-phase resonant transformer for calibration and boosting of voltage transformer
CN207832951U (en) A kind of capacitance type potential transformer insulation line monitoring device
CN106291296B (en) A kind of partial discharge of transformer defects simulation device and method
CN106841943B (en) Miniaturized high-capacity pressure-resistant device for GIS test
Liu et al. Design and Development of Combined SF6 Enclosed Gas Insulated Series Resonance Testing Equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190301