CN201955459U - 10kV distribution network line fault simulation test platform - Google Patents

10kV distribution network line fault simulation test platform Download PDF

Info

Publication number
CN201955459U
CN201955459U CN201020593458.XU CN201020593458U CN201955459U CN 201955459 U CN201955459 U CN 201955459U CN 201020593458 U CN201020593458 U CN 201020593458U CN 201955459 U CN201955459 U CN 201955459U
Authority
CN
China
Prior art keywords
unit
simulation
simulation unit
line
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020593458.XU
Other languages
Chinese (zh)
Inventor
李成榕
陈维江
齐波
梅素真
郭卫东
张立刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC CO Ltd
North China Electric Power University
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC CO Ltd
North China Electric Power University
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC CO Ltd, North China Electric Power University, Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical QINGDAO HUADIAN HIGH VOLTAGE ELECTRIC CO Ltd
Priority to CN201020593458.XU priority Critical patent/CN201955459U/en
Application granted granted Critical
Publication of CN201955459U publication Critical patent/CN201955459U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The utility model discloses a 10kV distribution network line fault simulation test platform. A neutral point resistor comprises a low-voltage three-phase power supply, a low-voltage switch, a booster transformer, a bus simulation unit, a bus voltage measurement unit, a line current measurement unit, a distribution line simulation unit, a line fault simulation unit, a grounding transformer simulation unit, an arc suppression coil simulation unit, a neutral point resistor unit and a controller unit. Through the platform, the condition of actual 10kV distribution network equipment and the running condition of a line can be really simulated, valid check and test of function and reliability of the distribution network line fault diagnosis equipment are realized, and the running reliability of the distribution network line fault diagnosis equipment is ensured.

Description

10kV配电网线路故障模拟试验平台10kV Distribution Network Line Fault Simulation Test Platform

技术领域technical field

本实用新型属于配电设备技术领域,具体涉及一种10kV配电网线路故障模拟试验平台。The utility model belongs to the technical field of power distribution equipment, in particular to a 10kV power distribution network circuit fault simulation test platform.

背景技术Background technique

10kV配电网线路直接与用户接触,其运行可靠性尤为重要。目前众多科研单位已经研制了多种单相接地故障选线装置、故障指示定位装置以及故障隔离装置等配电网线路故障诊断设备,并且在配电网中大量应用。但是,在这些设备出厂前,如何切实有效的检验设备的功能以及可靠性,是设备研制厂商和使用单位所面临的问题。目前,配电网线路故障诊断设备的出厂检验通常都是在小型、低压的模型装置上进行,即通过小型低压变压器、继电器及电子元器件的相互配合来模拟真实配电网中的运行情况或故障状态,但是低压模拟装置由于耐压(<400V)和通流能力(<1A)的限制,很难真正模拟10kV配电网实际的设备情况和线路的运行情况(10kV配电网的额定运行电压为12kV,电流一般>30A),难以实现配电网线路故障诊断设备功能及可靠性的有效检验和测试。10kV distribution network lines are in direct contact with users, so its operational reliability is particularly important. At present, many scientific research institutes have developed a variety of single-phase ground fault line selection devices, fault indication and positioning devices, fault isolation devices and other distribution network line fault diagnosis equipment, and have been widely used in distribution network. However, before these devices leave the factory, how to effectively test the functions and reliability of the devices is a problem faced by the device developers and users. At present, the factory inspection of distribution network line fault diagnosis equipment is usually carried out on small, low-voltage model devices, that is, through the cooperation of small low-voltage transformers, relays and electronic components to simulate the operation of the real distribution network or However, due to the limitation of withstand voltage (<400V) and current capacity (<1A) of the low-voltage simulation device, it is difficult to truly simulate the actual equipment conditions and line operation of the 10kV distribution network (the rated operation of the 10kV distribution network The voltage is 12kV, the current is generally >30A), and it is difficult to realize the effective inspection and testing of the function and reliability of the distribution network line fault diagnosis equipment.

实用新型内容Utility model content

本实用新型的目的是提供一种可真正模拟10kV配电网运行状态的配电网线路故障模拟试验平台,以真实的模拟10kV配电网实际设备的情况和线路运行的情况,实现配电网线路故障诊断设备功能及可靠性的有效检验和测试,从而 保证配电网线路故障诊断设备的运行可靠性。The purpose of this utility model is to provide a distribution network line fault simulation test platform that can truly simulate the operating state of a 10kV distribution network, and to truly simulate the conditions of the actual equipment and line operation of the 10kV distribution network to realize the distribution network Effective inspection and testing of the function and reliability of line fault diagnosis equipment, so as to ensure the operation reliability of distribution network line fault diagnosis equipment.

为实现上述目的,本实用新型提供了一种10kV配电网线路故障模拟试验平台,包括:低压三相电源1、低压开关2、升压变压器3、母线模拟单元4、母线电压测量单元5、线路电流测量单元6、配电线路模拟单元7、线路故障模拟单元8、接地变压器模拟单元9、消弧线圈模拟单元10、中性点电阻器单元11以及控制器单元12;In order to achieve the above purpose, the utility model provides a 10kV distribution network line fault simulation test platform, including: a low-voltage three-phase power supply 1, a low-voltage switch 2, a step-up transformer 3, a bus simulation unit 4, a bus voltage measurement unit 5, Line current measurement unit 6, distribution line simulation unit 7, line fault simulation unit 8, grounding transformer simulation unit 9, arc suppression coil simulation unit 10, neutral point resistor unit 11 and controller unit 12;

低压开关2连接于低压三相电源1和升压变压器3的低压绕组之间;The low-voltage switch 2 is connected between the low-voltage three-phase power supply 1 and the low-voltage winding of the step-up transformer 3;

母线模拟单元4分别连接升压变压器3、母线电压测量单元5、线路电流测量单元6、接地变压器模拟单元9;The bus simulation unit 4 is respectively connected to the step-up transformer 3, the bus voltage measurement unit 5, the line current measurement unit 6, and the grounding transformer simulation unit 9;

线路电流测量单元6、配电线路模拟单元7与线路故障模拟单元8依次连接;The line current measurement unit 6, the power distribution line simulation unit 7 and the line fault simulation unit 8 are sequentially connected;

接地变压器模拟单元9分别与弧线圈模拟单元10、中性点电阻器单元11连接;The grounding transformer simulation unit 9 is connected to the arc coil simulation unit 10 and the neutral point resistor unit 11 respectively;

控制器单元12分别与控制低压开关2、线路故障模拟单元8、消弧线圈模拟单元10、中性点电阻器单元11、母线电压测量单元5、线路电流测量单元6连接。The controller unit 12 is respectively connected with the control low-voltage switch 2 , the line fault simulation unit 8 , the arc suppression coil simulation unit 10 , the neutral point resistor unit 11 , the bus voltage measurement unit 5 , and the line current measurement unit 6 .

低压三相电源1、低压开关2、升压变压器3、母线模拟单元4、母线电压测量单元5、线路电流测量单元6、配电线路模拟单元7、线路故障模拟单元8、接地变压器模拟单元9之间以三相电缆或者金属排相互联结。Low-voltage three-phase power supply 1, low-voltage switch 2, step-up transformer 3, bus simulation unit 4, bus voltage measurement unit 5, line current measurement unit 6, distribution line simulation unit 7, line fault simulation unit 8, grounding transformer simulation unit 9 They are connected with each other by three-phase cables or metal bars.

消弧线圈模拟单元10、中性点电阻器单元11与接地变压器模拟单元9之间以单相电缆或者金属排相互联结。The arc suppressing coil simulation unit 10, the neutral point resistor unit 11 and the grounding transformer simulation unit 9 are connected to each other by single-phase cables or metal bars.

控制器单元12与低压开关2、母线电压测量单元5、线路电流测量单元6、线路故障模拟单元8、消弧线圈模拟单元10、中性点电阻器单元11之间以信号电缆相互联结。The controller unit 12 is connected with the low-voltage switch 2, the bus voltage measurement unit 5, the line current measurement unit 6, the line fault simulation unit 8, the arc suppression coil simulation unit 10, and the neutral point resistor unit 11 with signal cables.

配电线路模拟单元7内部由10kV高压电容器构成。The distribution line simulation unit 7 is internally composed of 10kV high-voltage capacitors.

线路故障模拟单元8含有开关装置以及故障阻抗模拟装置,并且两者之间串连。The line fault simulation unit 8 includes a switch device and a fault impedance simulation device, and the two are connected in series.

本实用新型所描述的一种10kV配电网线路故障模拟试验平台,以实际的10kV配电网设备为基础,真实的模拟了10kV配电网实际设备的情况和线路运行的情况,实现配电网线路故障诊断设备功能及可靠性的有效检验和测试,从而保证配电网线路故障诊断设备的运行可靠性。A 10kV distribution network line fault simulation test platform described in the utility model is based on the actual 10kV distribution network equipment, and truly simulates the situation of the actual equipment of the 10kV distribution network and the operation of the line to realize power distribution. Effective inspection and testing of the function and reliability of fault diagnosis equipment for distribution network lines, so as to ensure the operational reliability of fault diagnosis equipment for distribution network lines.

附图说明Description of drawings

此处所说明的附图用来提供对本实用新型的进一步理解,构成本申请的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The drawings described here are used to provide a further understanding of the utility model and constitute a part of the application. The schematic embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute improper limitations to the utility model. In the attached picture:

图1为本实用新型中10kV配电网线路故障模拟试验平台的结构示意图。Fig. 1 is a structural schematic diagram of a 10kV distribution network line fault simulation test platform in the utility model.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本实用新型。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

根据本实用新型的实施例,提供了一种10kV配电网线路故障模拟试验平台。According to the embodiment of the utility model, a 10kV distribution network line fault simulation test platform is provided.

如图1所示,本实用新型包括:低压三相电源1、低压开关2、升压变压器3、母线模拟单元4、母线电压测量单元5、线路电流测量单元6、配电线路模拟单元7、线路故障模拟单元8、接地变压器模拟单元9、消弧线圈模拟单元10、中性点电阻器单元11以及控制器单元12。As shown in Figure 1, the utility model includes: a low-voltage three-phase power supply 1, a low-voltage switch 2, a step-up transformer 3, a bus simulation unit 4, a bus voltage measurement unit 5, a line current measurement unit 6, a power distribution line simulation unit 7, Line fault simulation unit 8 , grounding transformer simulation unit 9 , arc suppression coil simulation unit 10 , neutral point resistor unit 11 and controller unit 12 .

优选地,低压三相电源1、低压开关2、升压变压器3、母线模拟单元4、母线电压测量单元5、线路电流测量单元6、配电线路模拟单元7、线路故障模 拟单元8、接地变压器模拟单元9之间以三相电缆或者金属排相互联结;Preferably, a low-voltage three-phase power supply 1, a low-voltage switch 2, a step-up transformer 3, a bus simulation unit 4, a bus voltage measurement unit 5, a line current measurement unit 6, a power distribution line simulation unit 7, a line fault simulation unit 8, a grounding The transformer simulation units 9 are connected to each other by three-phase cables or metal bars;

优选地,消弧线圈模拟单元10、中性点电阻器单元11与接地变压器模拟单元9之间以单相电缆或者金属排相互联结;Preferably, the arc suppression coil simulation unit 10, the neutral point resistor unit 11 and the grounding transformer simulation unit 9 are connected to each other with a single-phase cable or a metal bar;

优选地,控制器单元12与低压开关2、母线电压测量单元5、线路电流测量单元6、线路故障模拟单元8、消弧线圈模拟单元10、中性点电阻器单元11之间以信号电缆相互联结;Preferably, the controller unit 12, the low-voltage switch 2, the bus voltage measurement unit 5, the line current measurement unit 6, the line fault simulation unit 8, the arc suppression coil simulation unit 10, and the neutral point resistor unit 11 are interconnected by signal cables coupling;

优选地,母线电压测量单元5、线路电流测量单元6、配电线路模拟单元7、线路故障模拟单元8、接地变压器模拟单元9、消弧线圈模拟单元10、中性点电阻器单元11均以10kV真实设备为基础;Preferably, the bus voltage measurement unit 5, the line current measurement unit 6, the distribution line simulation unit 7, the line fault simulation unit 8, the grounding transformer simulation unit 9, the arc suppression coil simulation unit 10, and the neutral point resistor unit 11 all use 10kV real equipment as the basis;

优选地,低压开关2连接于低压三相电源1和升压变压器3的低压绕组之间,用于实现升压变压器3输入电源的开合;Preferably, the low-voltage switch 2 is connected between the low-voltage three-phase power supply 1 and the low-voltage winding of the step-up transformer 3 for switching on and off the input power of the step-up transformer 3;

优选地,母线模拟单元4连接有升压变压器3、母线电压测量单元5、线路电流测量单元6、接地变压器模拟单元9;Preferably, the bus simulation unit 4 is connected with a step-up transformer 3, a bus voltage measurement unit 5, a line current measurement unit 6, and a grounding transformer simulation unit 9;

优选地,配电线路模拟单元7与母线模拟单元4之间通过线路电流测量单元6相互连接;Preferably, the distribution line simulation unit 7 and the bus simulation unit 4 are connected to each other through the line current measurement unit 6;

优选地,配电线路模拟单元7内部由10kV高压电容器构成;Preferably, the distribution line simulation unit 7 is internally composed of 10kV high-voltage capacitors;

优选地,线路故障模拟单元8含有开关装置以及故障阻抗模拟装置,并且两者之间串连;Preferably, the line fault simulation unit 8 includes a switch device and a fault impedance simulation device, and the two are connected in series;

优选地,控制器单元12分别与控制低压开关2、线路故障模拟单元8、消弧线圈模拟单元10、中性点电阻器单元11、母线电压测量单元5、线路电流测量单元6连接。控制器单元用于控制低压开关2、线路故障模拟单元8、消弧线圈模拟单元10、中性点电阻器单元11的投切状态,并且通过母线电压测量单元5、线路电流测量单元6、实现母线模拟电源5电压的测量和配电线路模拟单元7电流的测量。Preferably, the controller unit 12 is connected to the control low-voltage switch 2 , the line fault simulation unit 8 , the arc suppression coil simulation unit 10 , the neutral point resistor unit 11 , the bus voltage measurement unit 5 , and the line current measurement unit 6 . The controller unit is used to control the switching state of the low-voltage switch 2, the line fault simulation unit 8, the arc suppression coil simulation unit 10, and the neutral point resistor unit 11, and through the bus voltage measurement unit 5 and the line current measurement unit 6, realize Measurement of the voltage of the bus simulation power supply 5 and the measurement of the current of the distribution line simulation unit 7 .

本实用新型的最佳实施方式已参考附图详细描述出,本领域技术人员可依据本技术方案进行修改与变换,这样的修改与变换均落在本实用新型保护范围之内。The best implementation mode of the utility model has been described in detail with reference to the accompanying drawings, and those skilled in the art can make modifications and transformations according to the technical solution, and such modifications and transformations all fall within the protection scope of the utility model.

Claims (6)

1.一种10kV配电网线路故障模拟试验平台,其特征在于,包括:低压三相电源(1)、低压开关(2)、升压变压器(3)、母线模拟单元(4)、母线电压测量单元(5)、线路电流测量单元(6)、配电线路模拟单元(7)、线路故障模拟单元(8)、接地变压器模拟单元(9)、消弧线圈模拟单元(10)、中性点电阻器单元(11)以及控制器单元(12);1. A 10kV distribution network line fault simulation test platform, characterized in that it comprises: a low-voltage three-phase power supply (1), a low-voltage switch (2), a step-up transformer (3), a bus simulation unit (4), and a bus voltage Measurement unit (5), line current measurement unit (6), distribution line simulation unit (7), line fault simulation unit (8), grounding transformer simulation unit (9), arc suppression coil simulation unit (10), neutral A point resistor unit (11) and a controller unit (12); 低压开关(2)连接于低压三相电源(1)和升压变压器(3)的低压绕组之间;The low-voltage switch (2) is connected between the low-voltage three-phase power supply (1) and the low-voltage winding of the step-up transformer (3); 母线模拟单元(4)分别连接升压变压器(3)、母线电压测量单元(5)、线路电流测量单元(6)、接地变压器模拟单元(9);The bus simulation unit (4) is respectively connected to the step-up transformer (3), the bus voltage measurement unit (5), the line current measurement unit (6), and the grounding transformer simulation unit (9); 线路电流测量单元(6)、配电线路模拟单元(7)与线路故障模拟单元(8)依次连接;The line current measurement unit (6), the power distribution line simulation unit (7) and the line fault simulation unit (8) are sequentially connected; 接地变压器模拟单元(9)分别与弧线圈模拟单元(10)、中性点电阻器单元(11)连接;The grounding transformer simulation unit (9) is respectively connected with the arc coil simulation unit (10) and the neutral point resistor unit (11); 控制器单元(12)分别与控制低压开关(2)、线路故障模拟单元(8)、消弧线圈模拟单元(10)、中性点电阻器单元(11)、母线电压测量单元(5)、线路电流测量单元(6)连接。The controller unit (12) is respectively connected with the control low-voltage switch (2), the line fault simulation unit (8), the arc suppression coil simulation unit (10), the neutral point resistor unit (11), the bus voltage measurement unit (5), The line current measurement unit (6) is connected. 2.如权利要求1所述的模拟试验平台,其特征在于,低压三相电源(1)、低压开关(2)、升压变压器(3)、母线模拟单元(4)、母线电压测量单元(5)、线路电流测量单元(6)、配电线路模拟单元(7)、线路故障模拟单元(8)、接地变压器模拟单元(9)之间以三相电缆或者金属排相互联结。2. simulation test platform as claimed in claim 1, is characterized in that, low-voltage three-phase power supply (1), low-voltage switch (2), step-up transformer (3), bus simulation unit (4), bus voltage measurement unit ( 5), the line current measurement unit (6), the power distribution line simulation unit (7), the line fault simulation unit (8), and the grounding transformer simulation unit (9) are connected to each other by three-phase cables or metal bars. 3.如权利要求1所述的模拟试验平台,其特征在于,消弧线圈模拟单元(10)、中性点电阻器单元(11)与接地变压器模拟单元(9)之间以单相电缆或者金属排相互联结。3. The simulated test platform as claimed in claim 1, characterized in that a single-phase cable or The metal rows are interconnected. 4.如权利要求1所述的模拟试验平台,其特征在于,控制器单元(12)与低压开关(2)、母线电压测量单元(5)、线路电流测量单元(6)、线路故障模拟单元(8)、消弧线圈模拟单元(10)、中性点电阻器单元(11)之间以信号电缆相互联结。4. simulation test platform as claimed in claim 1, is characterized in that, controller unit (12) and low-voltage switch (2), busbar voltage measurement unit (5), line current measurement unit (6), line fault simulation unit (8), the arc suppression coil simulation unit (10), and the neutral point resistor unit (11) are connected with each other by signal cables. 5.如权利要求1所述的模拟试验平台,其特征在于,配电线路模拟单元(7)内部由10kV高压电容器构成。5. The simulation test platform according to claim 1, characterized in that, the distribution line simulation unit (7) is internally composed of 10kV high-voltage capacitors. 6.如权利要求1所述的模拟试验平台,其特征在于,线路故障模拟单元(8)含有开关装置以及故障阻抗模拟装置,并且两者之间串连。6. The simulation test platform according to claim 1, characterized in that, the line fault simulation unit (8) includes a switch device and a fault impedance simulation device, and the two are connected in series.
CN201020593458.XU 2010-11-02 2010-11-02 10kV distribution network line fault simulation test platform Expired - Fee Related CN201955459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020593458.XU CN201955459U (en) 2010-11-02 2010-11-02 10kV distribution network line fault simulation test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020593458.XU CN201955459U (en) 2010-11-02 2010-11-02 10kV distribution network line fault simulation test platform

Publications (1)

Publication Number Publication Date
CN201955459U true CN201955459U (en) 2011-08-31

Family

ID=44499567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020593458.XU Expired - Fee Related CN201955459U (en) 2010-11-02 2010-11-02 10kV distribution network line fault simulation test platform

Country Status (1)

Country Link
CN (1) CN201955459U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364355A (en) * 2011-10-12 2012-02-29 华北电力大学 Test device for performance of overhead line fault indicator
CN102435970A (en) * 2011-09-14 2012-05-02 广西电网公司电力科学研究院 Test scheme for line selection function of small-current ground system single-phase ground fault line selection device
CN102508081A (en) * 2011-11-18 2012-06-20 航天科工深圳(集团)有限公司 Distribution network fault simulating method and device and distribution network system
CN102522820A (en) * 2011-11-29 2012-06-27 陕西电力科学研究院 Testing method of synchronous coordination for primary station injection and secondary injection of distribution automation system
CN102879669A (en) * 2012-09-17 2013-01-16 航天科工深圳(集团)有限公司 Failure current simulation device and working method thereof
CN102982712A (en) * 2012-11-30 2013-03-20 重庆市电力公司教育培训中心 Earth simulator for simulating fault training device of power distribution network
CN103592536A (en) * 2013-10-30 2014-02-19 李景禄 Laboratory simulation test method of control parameters of dynamical earthing method for power distribution network neutral point
CN104101799A (en) * 2014-06-11 2014-10-15 国家电网公司 Modular distribution network dynamic simulation and terminal test integration system
CN104111434A (en) * 2014-07-16 2014-10-22 云南电力试验研究院(集团)有限公司电力研究院 Detection method for fault indicator of physical simulating model
CN104483643A (en) * 2014-11-27 2015-04-01 华中科技大学 Modeling method of fault indicator detection platform based on physical simulation of distribution network
CN104931845A (en) * 2015-06-21 2015-09-23 云南电力试验研究院(集团)有限公司 10kV overhead line artificial grounding fault testing device and application method
CN106680751A (en) * 2016-11-18 2017-05-17 云南电网有限责任公司电力科学研究院 Power distribution network automation terminal equipment detection system
CN108318772A (en) * 2017-01-17 2018-07-24 中国电力科学研究院 Distribution line short circuit and earth fault analog simulation pilot system and test method
CN113030636A (en) * 2021-02-26 2021-06-25 国网河南省电力公司电力科学研究院 Active intervention type arc suppression device test system
WO2022099796A1 (en) * 2020-11-16 2022-05-19 贵州电网有限责任公司 10 kv distribution network equivalent test low voltage simulation system and simulation method therefor

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102435970A (en) * 2011-09-14 2012-05-02 广西电网公司电力科学研究院 Test scheme for line selection function of small-current ground system single-phase ground fault line selection device
CN102364355A (en) * 2011-10-12 2012-02-29 华北电力大学 Test device for performance of overhead line fault indicator
CN102508081A (en) * 2011-11-18 2012-06-20 航天科工深圳(集团)有限公司 Distribution network fault simulating method and device and distribution network system
CN102508081B (en) * 2011-11-18 2013-10-09 航天科工深圳(集团)有限公司 Distribution network fault simulating method and device and distribution network system
CN102522820A (en) * 2011-11-29 2012-06-27 陕西电力科学研究院 Testing method of synchronous coordination for primary station injection and secondary injection of distribution automation system
CN102522820B (en) * 2011-11-29 2014-07-02 陕西电力科学研究院 Testing method of synchronous coordination for primary station injection and secondary injection of distribution automation system
CN102879669B (en) * 2012-09-17 2015-05-20 航天科工深圳(集团)有限公司 Failure current simulation device and working method thereof
CN102879669A (en) * 2012-09-17 2013-01-16 航天科工深圳(集团)有限公司 Failure current simulation device and working method thereof
CN102982712A (en) * 2012-11-30 2013-03-20 重庆市电力公司教育培训中心 Earth simulator for simulating fault training device of power distribution network
CN102982712B (en) * 2012-11-30 2014-08-13 重庆市电力公司教育培训中心 Earth simulator for simulating fault training device of power distribution network
CN103592536B (en) * 2013-10-30 2016-04-13 李景禄 The laboratory simulation test method of power network neutral point dynamic earth fault method controling parameters
CN103592536A (en) * 2013-10-30 2014-02-19 李景禄 Laboratory simulation test method of control parameters of dynamical earthing method for power distribution network neutral point
CN104101799A (en) * 2014-06-11 2014-10-15 国家电网公司 Modular distribution network dynamic simulation and terminal test integration system
CN104101799B (en) * 2014-06-11 2017-04-26 国家电网公司 Modular distribution network dynamic simulation and terminal test integration system
CN104111434A (en) * 2014-07-16 2014-10-22 云南电力试验研究院(集团)有限公司电力研究院 Detection method for fault indicator of physical simulating model
CN104483643A (en) * 2014-11-27 2015-04-01 华中科技大学 Modeling method of fault indicator detection platform based on physical simulation of distribution network
CN104483643B (en) * 2014-11-27 2017-05-10 华中科技大学 Modeling method based on detection platform of fault indicator for physical simulation of power distribution network
CN104931845A (en) * 2015-06-21 2015-09-23 云南电力试验研究院(集团)有限公司 10kV overhead line artificial grounding fault testing device and application method
CN106680751A (en) * 2016-11-18 2017-05-17 云南电网有限责任公司电力科学研究院 Power distribution network automation terminal equipment detection system
CN108318772A (en) * 2017-01-17 2018-07-24 中国电力科学研究院 Distribution line short circuit and earth fault analog simulation pilot system and test method
WO2022099796A1 (en) * 2020-11-16 2022-05-19 贵州电网有限责任公司 10 kv distribution network equivalent test low voltage simulation system and simulation method therefor
CN113030636A (en) * 2021-02-26 2021-06-25 国网河南省电力公司电力科学研究院 Active intervention type arc suppression device test system
CN113030636B (en) * 2021-02-26 2022-04-08 国网河南省电力公司电力科学研究院 An active intervention type arc suppression device test system

Similar Documents

Publication Publication Date Title
CN201540676U (en) A comprehensive automatic training device for factory power supply
CN105761569B (en) 10Kv distribution transformer analogue simulation systems
CN104410159B (en) Power grid black start overall process checking method based on real-time digital simulation
CN102798775A (en) Large-current impact generation system and test method thereof
CN201364372Y (en) Wire connection device and polarity test system and transformation ratio test system comprising same
CN202917090U (en) Dynamic simulation substation sand table device
CN206057453U (en) A kind of transformator loading test platform topological structure based on high voltage converter
CN203520719U (en) 10kV power distribution device real voltage simulation current closed-loop full-true training system
CN205263212U (en) Select testing arrangement that closes a floodgate mutually
CN209232242U (en) Modular distribution line physical simulation experiment device
CN111754835A (en) A metering troubleshooting training cabinet
CN201601102U (en) Electronic low voltage distribution transformer fuse box
CN105823969B (en) A kind of partial discharge of transformer defects simulation device
CN209086424U (en) Singlephase earth fault test platform for electric energy metering device performance detection
CN109324306B (en) GIS equipment current transformer error testing system and construction method thereof
CN203432994U (en) Phase sequence conversion device of three-phase alternating current tester
CN201918730U (en) UHV DC converter station DC field
CN107870311A (en) A detection system and detection method for a hybrid current transformer
CN201751858U (en) Test loop
CN205657374U (en) Solid insulation boundary switch cabinet
CN214475888U (en) Electric power simulation operation system
CN104794967B (en) High-voltage electric energy measurement is installed and wiring analysis comprehensive training device
CN2930032Y (en) Novel high voltage switch cabinet
CN209070051U (en) PT broken string and singlephase earth fault simulator
CN207781030U (en) A kind of the high and low pressure side winding and core insulation fault simulator of transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20131102