CN109404380A - 圆柱用大荷载抱箍装置 - Google Patents
圆柱用大荷载抱箍装置 Download PDFInfo
- Publication number
- CN109404380A CN109404380A CN201811186308.4A CN201811186308A CN109404380A CN 109404380 A CN109404380 A CN 109404380A CN 201811186308 A CN201811186308 A CN 201811186308A CN 109404380 A CN109404380 A CN 109404380A
- Authority
- CN
- China
- Prior art keywords
- anchor ear
- semi
- ear device
- cylinder
- circular shape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 210000001015 abdomen Anatomy 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 11
- 230000010485 coping Effects 0.000 abstract description 5
- 238000003032 molecular docking Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 4
- 239000002356 single layer Substances 0.000 description 4
- 239000010410 layer Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B2/00—Friction-grip releasable fastenings
- F16B2/02—Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
- F16B2/06—Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
- F16B2/065—Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种圆柱用大荷载抱箍装置,包括上下层两套半圆环形的抱箍体、承重牛腿、内置橡胶带、竖向连接螺栓和横向连接螺栓。所述半圆环形抱箍体两端焊接所述承重牛腿,内壁紧贴所述橡胶带,在竖直方向上通过竖向连接螺栓将上下层半圆环形抱箍体紧密连接形成一个整体,然后通过横向连接螺栓将两套抱箍体进行对接拧固。这种抱箍装置,在盖梁施工过程中,环抱在盖梁支架下部的圆柱墩上,承担上部支架传递的施工荷载。
Description
技术领域:
本发明涉及桥梁下部结构施工领域,尤其涉及一种圆柱用大荷载抱箍装置。
背景技术:
盖梁施工是桥梁施工的重要分部工程。
在盖梁施工过程中,为有效节约工程成本,拟采用圆柱中横梁施工过程中使用的抱箍进行施工。由于施工过程中一些不可避免的误差,如允许范围内的圆柱倾斜度、圆柱表面不平整度等,造成单层抱箍使用过程中,内置橡胶带使用过程中无法整体紧贴圆柱墩,使得受力面积减小;同时,盖梁施工荷载大,单层抱箍在受力面积较小的情况下,无法满足施工需要,为保证结构受力满足要求,采用双层抱箍形式进行施工。
本发明可以合理有效解决上述问题,同时该装置结构简单、安装方便、可以重复利用。
发明内容:
本发明所要解决的技术问题是:提供一种圆柱用大荷载抱箍装置,旨在解决盖梁施工过程中,单层抱箍承载力不足,无法满足结构受力要求的问题。
为了解决上述技术问题,本发明是通过以下技术方案实现的:一种圆柱用大荷载抱箍装置,包括上下两套半圆环形抱箍体、承重牛腿、内置橡胶带和连接螺栓,所述半圆环形抱箍体两端焊接所述承重牛腿,内壁紧贴一层所述橡胶带,通过所述连接螺栓连接并环抱于圆柱墩设计高程部位,待安装完毕后进行盖梁支架搭设、模板安装等施工。
优选的,所述半圆环形抱箍体内径大于圆柱墩直径,以满足内置橡胶带的安装。
优选的,所述半圆环形抱箍体为上下两层,上下层之间通过螺栓进行连接,形成两套半圆环形抱箍体。
优选的,所述承重牛腿腹部设置交错式圆孔,供高强螺栓对穿拧固。
优选的,所述的橡胶带通过螺丝预紧安装于抱箍体内壁。
本发明的有益之处在于:这种圆柱用大荷载抱箍装置结构简单、成本低廉、安装方便,合理利用了中横梁施工过程中应用的单体抱箍,经有效拼组成双层形式应用于盖梁施工过程中,既能满足盖梁施工的受力需求,又有效节约了工程成本。
附图说明:
下面结合附图对本发明进一步说明。
图1是本发明一种圆柱用大荷载抱箍装置实施例一结构示意图;
图2是本发明一种圆柱用大荷载抱箍装置实施例二结构示意图;
图3是本发明一种圆柱用大荷载抱箍装置实施例三结构示意图;
图4是本发明一种圆柱用大荷载抱箍装置实施例四结构示意图。
图中:1、半圆环形抱箍体;2、承重牛腿;3、内置橡胶带;4、竖向连接螺栓;5、横向连接螺栓;6、安全操作平台;7、圆柱;8盖梁支架及模板。
具体实施方式:
图1至图4所示一种圆柱用大荷载抱箍装置,包括由钢板制成的半圆环形抱箍体1、承重牛腿2、内置橡胶带3、竖向连接螺栓4和横向连接螺栓5,所述抱箍装置通过竖向连接螺栓将上下层抱箍体紧密连接,形成半圆环形抱箍体,然后利用横向连接螺栓对接拧固,安装于对应圆柱7设计高程部位,施工完毕后于其上安装所述盖梁支架及模板8。
其具体安装方式如下:
抱箍装置安装前,于后场将半圆环形抱箍上下叠加,安装竖向连接螺栓,形成一套半圆环形抱箍体。同时,制作安全操作平台并安装于承重牛腿侧,供抱箍装置安装过程中操作人员站立。
圆柱浇筑完成,洒水、保湿养护完毕后,经测量确定抱箍体安装高程,然后利用挂篮将抱箍装置起吊至安装处,通过横向连接螺栓将两套半圆环形抱箍体进行连接,环抱于圆柱墩上,待抱箍装置安装完毕后,进行盖梁支架及模板的安装等后续施工。
这种圆柱用大荷载抱箍装置结构简单、制作方便、安装快捷,同时有效利用了中横梁施工过程中使用的单层抱箍,合理节约了工程成本。
需要强调的是:以上仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (5)
1.一种圆柱用大荷载抱箍装置,包括上下两套半圆环形抱箍体(1)、承重牛腿(2)、内置橡胶带(3)、竖向连接螺栓(4)和横向连接螺栓(5),所述半圆环形抱箍体通过所述连接螺栓连接。
2.根据权利要求1所述的圆柱用大荷载抱箍装置,其特征在于:所述半圆环形抱箍体(1)两端焊接所述承重牛腿(2),其内壁紧贴一层所述的橡胶带(3)。
3.根据权利要求1所述的圆柱用大荷载抱箍装置,其特征在于:所述半圆环形抱箍体(1)分上下两层,上下层之间通过所述竖向连接螺栓(4)进行连接,组合成一套双层半圆环形抱箍体。
4.根据权利要求1所述的圆柱用大荷载抱箍装置,其特征在于:所述的承重牛腿(2)腹部交错布置供螺栓连接的圆孔。
5.根据权利要求1所述的圆柱用大荷载抱箍装置,其特征在于:所述的横向连接螺栓(5)穿过所述承重牛腿(2)腹部圆孔,经拧固将两套半圆环形抱箍体(1)连接环抱于圆柱墩上部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186308.4A CN109404380A (zh) | 2018-10-10 | 2018-10-10 | 圆柱用大荷载抱箍装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186308.4A CN109404380A (zh) | 2018-10-10 | 2018-10-10 | 圆柱用大荷载抱箍装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109404380A true CN109404380A (zh) | 2019-03-01 |
Family
ID=65467686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811186308.4A Pending CN109404380A (zh) | 2018-10-10 | 2018-10-10 | 圆柱用大荷载抱箍装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109404380A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886224A (zh) * | 2019-11-28 | 2020-03-17 | 北京市政路桥管理养护集团有限公司 | 桥梁施工用支撑装置及其使用方法 |
CN111593666A (zh) * | 2020-05-26 | 2020-08-28 | 中交路桥建设有限公司 | 盖梁抱箍安装平台及梁抱箍整体安装工艺 |
CN111622120A (zh) * | 2020-06-01 | 2020-09-04 | 吉林省信合智能工程设备研发制造有限公司 | 一种桥墩抱箍支架及桥梁模架架托搭建方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0765339B2 (ja) * | 1989-03-01 | 1995-07-19 | 清水建設株式会社 | コンクリート柱の構築工法 |
CN2398319Y (zh) * | 1999-11-03 | 2000-09-27 | 王建民 | 一种架桥专用的桥梁临时支撑设备 |
CN103334440A (zh) * | 2013-07-04 | 2013-10-02 | 中国地质大学(北京) | 可拆卸圆形基坑支护装置及设备 |
CN103407904A (zh) * | 2012-12-30 | 2013-11-27 | 上海庞源机械租赁股份有限公司 | 一种用于塔式起重机的抱箍式附墙连接件及其施工方法 |
CN203729209U (zh) * | 2013-12-30 | 2014-07-23 | 中铁大桥局股份有限公司 | 抱箍牛腿 |
CN204589822U (zh) * | 2015-04-30 | 2015-08-26 | 南京铁道职业技术学院 | 一种独柱双悬臂盖梁抱箍施工支撑系统 |
CN207176506U (zh) * | 2017-07-12 | 2018-04-03 | 中交第二航务工程局有限公司 | 双抱箍支撑装置 |
CN207890939U (zh) * | 2017-12-29 | 2018-09-21 | 北京永茂建工机械制造有限公司 | 塔机附着装置连接抱箍 |
-
2018
- 2018-10-10 CN CN201811186308.4A patent/CN109404380A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0765339B2 (ja) * | 1989-03-01 | 1995-07-19 | 清水建設株式会社 | コンクリート柱の構築工法 |
CN2398319Y (zh) * | 1999-11-03 | 2000-09-27 | 王建民 | 一种架桥专用的桥梁临时支撑设备 |
CN103407904A (zh) * | 2012-12-30 | 2013-11-27 | 上海庞源机械租赁股份有限公司 | 一种用于塔式起重机的抱箍式附墙连接件及其施工方法 |
CN103334440A (zh) * | 2013-07-04 | 2013-10-02 | 中国地质大学(北京) | 可拆卸圆形基坑支护装置及设备 |
CN203729209U (zh) * | 2013-12-30 | 2014-07-23 | 中铁大桥局股份有限公司 | 抱箍牛腿 |
CN204589822U (zh) * | 2015-04-30 | 2015-08-26 | 南京铁道职业技术学院 | 一种独柱双悬臂盖梁抱箍施工支撑系统 |
CN207176506U (zh) * | 2017-07-12 | 2018-04-03 | 中交第二航务工程局有限公司 | 双抱箍支撑装置 |
CN207890939U (zh) * | 2017-12-29 | 2018-09-21 | 北京永茂建工机械制造有限公司 | 塔机附着装置连接抱箍 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886224A (zh) * | 2019-11-28 | 2020-03-17 | 北京市政路桥管理养护集团有限公司 | 桥梁施工用支撑装置及其使用方法 |
CN111593666A (zh) * | 2020-05-26 | 2020-08-28 | 中交路桥建设有限公司 | 盖梁抱箍安装平台及梁抱箍整体安装工艺 |
CN111622120A (zh) * | 2020-06-01 | 2020-09-04 | 吉林省信合智能工程设备研发制造有限公司 | 一种桥墩抱箍支架及桥梁模架架托搭建方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109404380A (zh) | 圆柱用大荷载抱箍装置 | |
CN204589822U (zh) | 一种独柱双悬臂盖梁抱箍施工支撑系统 | |
CN103469735B (zh) | 曲线超高型空心柱板式桥墩墩顶实心段模板的安装方法 | |
CN109610920A (zh) | 输电线路单柱钢管塔吊装施工方法 | |
CN111501534A (zh) | 一种装配式震后可更换组合桥墩 | |
CN101693329A (zh) | 用于储油罐的组对焊接装置及方法 | |
CN206143719U (zh) | 混凝土靠船构件安装支撑平台 | |
CN106121144B (zh) | 一种混凝土楼梯减震限位支座 | |
CN208594732U (zh) | 便于拆卸的钢结构塔架悬挑平台 | |
CN104961058B (zh) | 一种双z型支撑钢梁和含其的起重机支撑构件及制作方法 | |
CN108189970B (zh) | 大型lng船b型围护系统支撑装置及其安装方法 | |
CN206501983U (zh) | 一种铝制船用护栏 | |
CN207260375U (zh) | 一种钢板‑混凝土组合剪力墙 | |
CN202519621U (zh) | 用于悬空支撑系统的钢抱箍 | |
CN205677089U (zh) | 具有水平抗震性能的组合柱与基础节点结构 | |
CN204435833U (zh) | 施工平台附墙支座 | |
CN204212137U (zh) | 桁架桩腿结构及其非对称主弦管 | |
CN204642072U (zh) | 一种船舶水平带缆桩结构 | |
CN209873850U (zh) | 一种桩基与桥台柔性连接结构 | |
CN207974137U (zh) | 一种钢管柱承台施工结构 | |
CN203684535U (zh) | 可焊调节型钢筋连接装置 | |
CN106044466A (zh) | 一种电梯用钢结构井道水平的调节装置 | |
CN207063676U (zh) | 摇摆式柱脚 | |
CN205909919U (zh) | 一种汽车衡秤台 | |
CN215329373U (zh) | 一种桥梁桩基钢筋笼下放定位连接的平台设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190301 |