CN109396374A - A kind of novel sheet billet continuous casting cutting method - Google Patents
A kind of novel sheet billet continuous casting cutting method Download PDFInfo
- Publication number
- CN109396374A CN109396374A CN201811510797.4A CN201811510797A CN109396374A CN 109396374 A CN109396374 A CN 109396374A CN 201811510797 A CN201811510797 A CN 201811510797A CN 109396374 A CN109396374 A CN 109396374A
- Authority
- CN
- China
- Prior art keywords
- cutting
- cut
- meters
- green body
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
- B22D11/163—Controlling or regulating processes or operations for cutting cast stock
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Metal Rolling (AREA)
- General Factory Administration (AREA)
Abstract
The invention discloses a kind of novel sheet billet continuous casting cutting methods, it is related to sheet billet continuous casting cutting method technical field the following steps are included: a, primary cutting, judge whether the Cutting Length of the green body in cut-over plan is greater than 6 meters, if it is greater than 6 meters, cutting is completed in primary cutting, if it is less than 6 meters, the female base being combined into greater than 6 meters is merged with subsequent cut-over plan length and executes cutting in primary cutting, is sent into secondary cut after cutting;B, secondary cut receives the green body after once cutting, judges whether the Cutting Length of the green body in cut-over plan meets greater than 2 meters and less than 10 meters, if it is satisfied, the cut-over plan not completed in primary cutting is executed, if conditions are not met, being cut three times;C, it cuts three times, receives the green body after secondary cut, judge whether the cut-over plan in secondary cut is completed, if do not completed, be transferred to offline cutting.Present approach reduces unplanned rate and inventory cycles, improve slab and receive rate, have saved cost.
Description
Technical field
The present invention relates to sheet billet continuous casting cutting technique fields, more particularly to a kind of novel sheet billet continuous casting cutting method.
Background technique
In existing sheet billet continuous casting cutting method, slab Cutting Length is not set, only according to production plan
When successively cutting, and often having 2 meters or 3 meters of short base plan that will produce in production plan, remaining short base cannot
Normal the case where forming female base, and short base is caused to waste, stock-sales ratio is increased, production cost is improved.
Summary of the invention
The technical problem to be solved by the present invention is in existing sheet billet continuous casting cutting method, remaining short base cannot be normal
Female base is formed, and short base is caused to waste.
In order to solve the above technical problems, the present invention provides a kind of novel sheet billet continuous casting cutting method, comprising the following steps:
A, primary cutting, judges whether the Cutting Length of the green body in cut-over plan is greater than 6 meters, primary to cut if it is greater than 6 meters
Cutting is completed, if it is less than 6 meters, the female base being combined into greater than 6 meters is merged with subsequent cut-over plan length and is held in primary cutting
Row cutting, is sent into secondary cut after cutting;
B, secondary cut receives the green body after once cutting, and judges whether the Cutting Length of the green body in cut-over plan is full
Foot is greater than 2 meters and less than 10 meter, if it is satisfied, the cut-over plan not completed in primary cutting is executed, if conditions are not met, carrying out three
Secondary cutting;
C, it cuts three times, receives the green body after secondary cut, judge whether the cut-over plan in secondary cut is completed, if
It does not complete, is transferred to offline cutting, complete cut-over plan.
Technical effect: this cutting method is divided into cutting three times and completes cut-over plan, and primary cutting limits Cutting Length and is greater than 6
Rice, i.e., do not complete the plan for cutting short base in primary cutting, and secondary cut limits Cutting Length and is greater than 2 meters less than 10 meters, i.e.,
The short base plan of cutting not completed in once cutting can be completed in secondary cut, it can be disposably complete on one piece of long green body
At the cutting of the short base of muti-piece, so that the short base composition of muti-piece is greater than 6 meters of long green body, then cutting is concentrated in secondary cut, it is larger
The less remaining short base amount for not meeting production plan of degree, reduces stock-sales ratio, saves cost, in addition, cutting three times
It cuts for judging whether secondary cut completes all cut-over plans, if secondary cut failure causes cut-over plan not complete
At cutting can compare judgement with cut-over plan three times, generate the plan cut offline, and it is offline to notify that operator carries out
Cutting, to complete all cut-over plans, present approach reduces unplanned rate and inventory cycles, improve slab and receive rate, save
Cost, it is unplanned that the method successfully solves the slab cutting as caused by arranging plan and Equipment in production process
And the difficult point that unplanned base inventory cycle is long, secondary cut is arranged, the method successfully avoids because only that one piece or two pieces is short
Scale semifinished product and the limitation of all cutting powers, and the difficulty that can not be produced, improve completion rate of the plan.Cut three times, assign from
The plan of wire cutting solves the unplanned difficulty that system caused by causing secondary cut not complete as Equipment is misjudged
Point.
The technical solution that the present invention further limits is: described to be cut into artificial cutting offline.
Further, in step b, corresponding label, step c are carried out according to cut-over plan to green body in secondary cut
In, it cuts whether judge mark completes corresponding cut-over plan three times, as unfinished, is transferred to offline cutting, completes cut-over plan.
A kind of preceding novel sheet billet continuous casting cutting method in the step b, cuts the overall length of green body less than 12 meters.
The beneficial effects of the present invention are:
(1) whether the judge mark of cutting three times in the present invention completes corresponding cut-over plan, as unfinished, is transferred to and cuts offline
It cuts, completes cut-over plan, solve the unplanned of the misjudgement of system caused by causing secondary cut not complete as Equipment
Difficult point;
(2) overall length of cutting green body of secondary cut is limited in the present invention less than 12 meters, is reduced the pressure of secondary cut, is reduced
The generation of failure rate.
Specific embodiment
A kind of embodiment: novel sheet billet continuous casting cutting method, comprising the following steps:
A, primary cutting, judges whether the Cutting Length of the green body in cut-over plan is greater than 6 meters, primary to cut if it is greater than 6 meters
Cutting is completed, if it is less than 6 meters, the female base being combined into greater than 6 meters is merged with subsequent cut-over plan length and is held in primary cutting
Row cutting, is sent into secondary cut after cutting;
B, secondary cut receives the green body after once cutting, and judges whether the Cutting Length of the green body in cut-over plan is full
Foot is greater than 2 meters and less than 10 meters, and cut the overall length of green body less than 12 meters, does not complete in primary cutting if it is satisfied, executing
Cut-over plan, if conditions are not met, being cut three times;
C, it cuts three times, receives the green body after secondary cut, judge whether the cut-over plan in secondary cut is completed, if
It does not complete, is transferred to offline cutting, complete cut-over plan, wherein be cut into artificial cutting offline.
In step b, corresponding label carried out according to cut-over plan to green body in secondary cut, in step c, is cut three times
Whether judge mark completes corresponding cut-over plan, as unfinished, is transferred to offline cutting, completes cut-over plan.
This cutting method is divided into cutting three times and completes cut-over plan, and primary cutting limits Cutting Length and is greater than 6 meters, i.e., one
Do not complete to cut the plan of short base in secondary cutting, secondary cut limits Cutting Length and is greater than 2 meters less than 10 meters, i.e., in secondary cut
In can complete once cut in do not complete the short base plan of cutting, can disposably on one piece of long green body complete the short base of muti-piece
Cutting so that the short base of muti-piece concentrates cutting, the largely less remaining short base amount for not meeting production plan is reduced
Stock-sales ratio, saves cost, in addition, cut three times for judging whether secondary cut completes all cut-over plans, if
Secondary cut failure causes cut-over plan not completed, and cutting can compare judgement with cut-over plan three times, generates offline
The plan of cutting, notifies operator to be cut offline, to complete all cut-over plans.
In addition to the implementation, the present invention can also have other embodiments.It is all to use equivalent substitution or equivalent transformation shape
At technical solution, fall within the scope of protection required by the present invention.
Claims (4)
1. a kind of novel sheet billet continuous casting cutting method, it is characterised in that: the following steps are included:
A, primary cutting, judges whether the Cutting Length of the green body in cut-over plan is greater than 6 meters, primary to cut if it is greater than 6 meters
Cutting is completed, if it is less than 6 meters, the female base being combined into greater than 6 meters is merged with subsequent cut-over plan length and is held in primary cutting
Row cutting, is sent into secondary cut after cutting;
B, secondary cut receives the green body after once cutting, and judges whether the Cutting Length of the green body in cut-over plan is full
Foot is greater than 2 meters and less than 10 meter, if it is satisfied, the cut-over plan not completed in primary cutting is executed, if conditions are not met, carrying out three
Secondary cutting;
C, it cuts three times, receives the green body after secondary cut, judge whether the cut-over plan in secondary cut is completed, if
It does not complete, is transferred to offline cutting, complete cut-over plan.
2. a kind of novel sheet billet continuous casting cutting method according to claim 1, it is characterised in that: the offline cutting is people
Work cutting.
3. a kind of novel sheet billet continuous casting cutting method according to claim 1, it is characterised in that: in step b, cut secondary
Corresponding label carried out according to cut-over plan to green body when cutting, in step c, cuts whether judge mark completes corresponding cut three times
The plan of cutting is transferred to offline cutting as unfinished, completes cut-over plan.
4. a kind of novel sheet billet continuous casting cutting method according to claim 1, it is characterised in that: in the step b, cutting
The overall length of green body is less than 12 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811510797.4A CN109396374B (en) | 2018-12-11 | 2018-12-11 | Novel slab continuous casting cutting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811510797.4A CN109396374B (en) | 2018-12-11 | 2018-12-11 | Novel slab continuous casting cutting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109396374A true CN109396374A (en) | 2019-03-01 |
CN109396374B CN109396374B (en) | 2021-07-13 |
Family
ID=65458542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811510797.4A Active CN109396374B (en) | 2018-12-11 | 2018-12-11 | Novel slab continuous casting cutting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109396374B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111230408A (en) * | 2019-12-31 | 2020-06-05 | 江苏瑞强能源有限公司 | Continuous forming preparation method and system for anti-blocking block |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02155552A (en) * | 1988-12-06 | 1990-06-14 | Nippon Steel Corp | Method for controlling cutting length in continuous casting equipment |
CN102169564A (en) * | 2011-05-04 | 2011-08-31 | 南京钢铁股份有限公司 | Steel plate production method based on manufacturing execution system (MES) management system |
CN105689672A (en) * | 2014-11-27 | 2016-06-22 | 上海梅山钢铁股份有限公司 | Interactive continuous-cast billet optimized cutting control method |
CN106270432A (en) * | 2015-05-27 | 2017-01-04 | 宝山钢铁股份有限公司 | A kind of slab cutting optimization method based on the conversion of molten steel amount and control system thereof |
CN106269894A (en) * | 2015-05-27 | 2017-01-04 | 鞍钢股份有限公司 | A kind of control method of the automatic predetermined slab plan of continuous casting |
CN108205743A (en) * | 2016-12-16 | 2018-06-26 | 江苏金恒信息科技股份有限公司 | Dynamic slab cuts design method and system |
-
2018
- 2018-12-11 CN CN201811510797.4A patent/CN109396374B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02155552A (en) * | 1988-12-06 | 1990-06-14 | Nippon Steel Corp | Method for controlling cutting length in continuous casting equipment |
CN102169564A (en) * | 2011-05-04 | 2011-08-31 | 南京钢铁股份有限公司 | Steel plate production method based on manufacturing execution system (MES) management system |
CN105689672A (en) * | 2014-11-27 | 2016-06-22 | 上海梅山钢铁股份有限公司 | Interactive continuous-cast billet optimized cutting control method |
CN106270432A (en) * | 2015-05-27 | 2017-01-04 | 宝山钢铁股份有限公司 | A kind of slab cutting optimization method based on the conversion of molten steel amount and control system thereof |
CN106269894A (en) * | 2015-05-27 | 2017-01-04 | 鞍钢股份有限公司 | A kind of control method of the automatic predetermined slab plan of continuous casting |
CN108205743A (en) * | 2016-12-16 | 2018-06-26 | 江苏金恒信息科技股份有限公司 | Dynamic slab cuts design method and system |
Non-Patent Citations (4)
Title |
---|
孙茂杰: "板坯动态切割技术的应用 ", 《现代冶金》 * |
孙茂杰: "板坯动态切割技术的应用", 《现代冶金》 * |
许海洪等: "《冶金企业管理信息化技术》", 31 October 2014, 北京冶金工业出版社 * |
魏巍巍: "板坯连铸切割长度优化系统", 《天津冶金》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111230408A (en) * | 2019-12-31 | 2020-06-05 | 江苏瑞强能源有限公司 | Continuous forming preparation method and system for anti-blocking block |
Also Published As
Publication number | Publication date |
---|---|
CN109396374B (en) | 2021-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109634229A (en) | A kind of intelligent plant manufacturing management system based on big data | |
CN103198827B (en) | Voice emotion correction method based on relevance of prosodic feature parameter and emotion parameter | |
CN104259377B (en) | The integrated automatic press moulding process of chain, chain transition carrier bar and chain transition carrier bar | |
CN109396374A (en) | A kind of novel sheet billet continuous casting cutting method | |
CN116843305B (en) | Building site multi-department coordinated construction management system suitable for building engineering | |
CN107893173A (en) | Special-shaped copper alloy wire processing technology | |
CN104462779A (en) | Online theoretical line loss calculating method based on fast modeling and data quality analyzing | |
CN106521612A (en) | Novel environmental-friendly electrolysis hanger stripping powder | |
CN103861870B (en) | Be with the steel plate rolling method of the flat shape of fascinating | |
CN114444948A (en) | Control system and method for intelligently acquiring and dispatching WPH (WPH) in wafer production line | |
CN105098422B (en) | A kind of integral connector end structure and preparation method thereof | |
CN103715585A (en) | Terminal product processing technology | |
CN107470360B (en) | A kind of think gauge stainless steel strip devices for taking-up and method for coiling | |
CN104930982B (en) | A kind of flame forming plate transverse and longitudinal curvature is molded evaluation method | |
CN204381270U (en) | A kind of shaping anvil block structure for numerical control open die forging base | |
CN209174699U (en) | A kind of brake-shoe stiffening plate punching, the automatic progressive die of blanking | |
CN102139318A (en) | Stamping tool | |
CN106550553B (en) | A kind of production method of the double parallel bore metallized semi-pore of wiring board | |
CN105207268A (en) | Generator set automatic generation control function actuating state online optimization method | |
CN208483187U (en) | Mechanical arm for robot mold | |
CN202910163U (en) | Pipe clamp stamping die | |
CN102873206A (en) | Pipe clamp stamping die | |
CN105598286A (en) | Bending punching mould | |
CN203390082U (en) | Sectional type processing structure of large stamping die frame | |
CN105543686A (en) | Pro/E-based warp knitting machine cam contour curve generation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |