CN108205743A - Dynamic slab cuts design method and system - Google Patents
Dynamic slab cuts design method and system Download PDFInfo
- Publication number
- CN108205743A CN108205743A CN201611174150.XA CN201611174150A CN108205743A CN 108205743 A CN108205743 A CN 108205743A CN 201611174150 A CN201611174150 A CN 201611174150A CN 108205743 A CN108205743 A CN 108205743A
- Authority
- CN
- China
- Prior art keywords
- slab
- cut
- information
- plan
- continuous casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 39
- 238000009749 continuous casting Methods 0.000 claims abstract description 66
- 238000005520 cutting process Methods 0.000 claims abstract description 47
- 238000004519 manufacturing process Methods 0.000 claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims description 28
- 239000010959 steel Substances 0.000 claims description 28
- 230000005540 biological transmission Effects 0.000 claims description 7
- 230000008520 organization Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000003860 storage Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000011664 signaling Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009628 steelmaking Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Factory Administration (AREA)
Abstract
The present invention provides dynamic slabs to cut design method and system, including:The production sequence information that ERP system is sent is received, original cut-over plan is generated according to production sequence information;The converter actual achievement information dynamic that two level continuous casting system is sent is received, according to original cut-over plan and converter actual achievement information dynamic generation slab cut-over plan information;Slab cut-over plan information is sent to two level continuous casting system, so that two level continuous casting system performs slab cut-over plan information;Receive the slab cutting actual achievement information that two level continuous casting system is sent.The present invention has broken the binding relationship of original heat slab cut-over plan and heat (batch) number, it solves and performs the inconvenience brought to plan since heat tap is unstable, the executive plan as unit of enterprise number is formd, improves organization of production level, reduces remaining base cutting loss.
Description
Technical field
The present invention relates to steel-making information technology fields, and design method and system are cut more particularly, to dynamic slab.
Background technology
At present, steel plant continuous casting level two generally performs slab cut-over plan as unit of heat.Due to converter heat
Tap is unstable, when molten steel amount practical in a stove<When planning molten steel amount, it can cause to plan the non-output of slab, be ordered to meet
It is single to need, will also scheduled production again, arranged to plan, organization of production brings problems;When molten steel amount practical in a stove>Plan steel
During water, the unplanned remaining base of output, the relevant costs such as stock buildup, transport and cutting can be caused.
Under the increasingly personalized environment of the market demand, the characteristics of multi items, small lot is presented in user's order, existing three-level
MES system is substantially according to order establishment slab, charging plan, is influenced by factors such as scattered, the restriction of production conditions of order,
Every stove molten steel amount of plan is necessarily caused to there is fluctuation, is also difficult to avoid that even if production department tries to integrate.Due to steel mill be by
Carry out tissue production according to fixed tap, while the tap of converter also will appear fluctuation in the actual production process, and continuous casting
Machine cuts slab with heat unit according to slab plan, and problem is occurred as soon as when practical molten steel amount is mismatched with plan, plans
Implementation rate is low.
For this problem, unplanned remaining base amount how is reduced, molten steel is made all to produce slab according to plan as possible, improves meter
Implementation rate is drawn to be a problem to be solved.
Invention content
In view of this, the purpose of the present invention is to provide dynamic slab cutting design method and system, original stove has been broken
The binding relationship of secondary slab cut-over plan and heat (batch) number, solve due to heat tap it is unstable to plan perform bring it is many
Inconvenience forms the executive plan as unit of enterprise number, improves organization of production level, reduces remaining base cutting loss.
In a first aspect, an embodiment of the present invention provides dynamic slabs to cut design method, the method includes:
The production sequence information that ERP system is sent is received, and original cut-over plan is generated according to the production sequence information;
The converter actual achievement information dynamic that two level continuous casting system is sent is received, and according to the original cut-over plan and described turn
Stove actual achievement information dynamic generation slab cut-over plan information;
The slab cut-over plan information is sent to the two level continuous casting system, so that the two level continuous casting system performs
The slab cut-over plan information;
Receive the slab cutting actual achievement information that the two level continuous casting system is sent.
With reference to first aspect, an embodiment of the present invention provides the first possible embodiment of first aspect, wherein, institute
It states and is included according to the original cut-over plan and the converter actual achievement information dynamic generation slab cut-over plan information:
Include the plate of multigroup enterprise number according to the original cut-over plan and the converter actual achievement information dynamic generation
Base cut-over plan information, wherein, the enterprise number is the heat group between heat and between pouring time, and the heat group is in an institute
It states and pours in secondary, and including adjacent multiple heats.
The possible embodiment of with reference to first aspect the first, an embodiment of the present invention provides second of first aspect
Possible embodiment, wherein, the method further includes:
The slab that heat in the enterprise number is produced is identical steel grade and same thickness, and the adjacent plate
The width of base meets on-line width adjustment range.
Second of possible embodiment with reference to first aspect, an embodiment of the present invention provides the third of first aspect
Possible embodiment, wherein, the enterprise number includes multiple serial numbers, described to be sent to the slab cut-over plan information
The two level continuous casting system, so that the two level continuous casting system performs the slab cut-over plan information and includes:
The slab cut-over plan information is sent to two level continuous casting system, so that the two level continuous casting system is according to every group
The serial number in the enterprise number performs the slab cut-over plan information.
The third possible embodiment with reference to first aspect, an embodiment of the present invention provides the 4th kind of first aspect
Possible embodiment, wherein, the slab cutting actual achievement information includes plan slab number, practical slab number and the plan
The correspondence of slab number and the practical slab number, wherein, the plan slab number is is cut as unit of the heat
The hypothesis cutting actual achievement cut, the practical slab number is the practical cutting actual achievement cut as unit of the enterprise number.
Second aspect, an embodiment of the present invention provides dynamic slabs to cut design system, including:
First generation unit, for receiving the production sequence information of ERP system transmission, and according to the production sequence information
Generate original cut-over plan;
Second generation unit, for receiving the converter actual achievement information dynamic of two level continuous casting system transmission, and according to the original
Beginning cut-over plan and the converter actual achievement information dynamic generation slab cut-over plan information;
The slab cut-over plan information is sent to the two level continuous casting system by transmitting element, so that two cascade
Casting system performs the slab cut-over plan information;
Receiving unit receives the slab cutting actual achievement information that the two level continuous casting system is sent.
With reference to second aspect, an embodiment of the present invention provides the first possible embodiment of second aspect, wherein, institute
The second generation unit is stated to include:
The slab for including multigroup enterprise number according to the original scheme information and the converter actual achievement information dynamic generation is cut
Plan information is cut, wherein, the enterprise number is the heat group between heat and between pouring time, and the heat group is poured described in one
In secondary, and including adjacent multiple heats.
With reference to the first possible embodiment of second aspect, an embodiment of the present invention provides second of second aspect
Possible embodiment, wherein, second generation unit further includes:
The slab that heat in the enterprise number is produced is identical steel grade and same thickness, and the adjacent plate
The width of base meets on-line width adjustment range.
With reference to second aspect, an embodiment of the present invention provides the third possible embodiment of second aspect, wherein, institute
Transmitting element is stated to include:
The slab cut-over plan information is sent to two level continuous casting system, so that the two level continuous casting system is according to every group
The serial number in the enterprise number performs the slab cut-over plan information.
With reference to second aspect, an embodiment of the present invention provides the 4th kind of possible embodiment of second aspect, wherein, institute
It states slab cutting actual achievement information and includes plan slab number, practical slab number and the plan slab number and the practical slab number
Correspondence, wherein, the plan slab number be that actual achievement, the reality are cut in the hypothesis cut as unit of the heat
Border slab number is the practical cutting actual achievement cut as unit of the enterprise number.
The present invention provides dynamic slab cutting design methods and system, the MES system of steel mill to send out first according to ERP system
The production sequence information sent generates original cut-over plan, and receives the converter actual achievement information dynamic of two level continuous casting system transmission, from
And generate slab cut-over plan information;Secondly, slab cut-over plan information is sent to two level continuous casting system by MES system, so that
Two level continuous casting system performs slab cut-over plan information;Finally, the slab cutting actual achievement information that two level continuous casting system is sent is received.
The present invention has broken the binding relationship of original heat slab cut-over plan and heat (batch) number, solve due to heat tap it is unstable to
Plan performs the inconvenience brought, and forms the executive plan as unit of enterprise number, improves organization of production level, reduces
Remaining base cutting loss.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification
It obtains it is clear that being understood by implementing the present invention.The purpose of the present invention and other advantages are in specification, claims
And specifically noted structure is realized and is obtained in attached drawing.
For the above objects, features and advantages of the present invention is enable to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate
Appended attached drawing, is described in detail below.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 cuts design method flow chart for dynamic slab provided in an embodiment of the present invention;
Fig. 2 is that the plan provided in an embodiment of the present invention based on enterprise number performs schematic diagram;
Fig. 3 cuts design method signaling diagram for dynamic slab provided in an embodiment of the present invention;
Fig. 4 cuts design system structure diagram for dynamic slab provided in an embodiment of the present invention.
Icon:
The first receiving units of 10-;20- generation units;30- transmitting elements;The second receiving units of 40-.
Specific embodiment
Purpose, technical scheme and advantage to make the embodiment of the present invention are clearer, below in conjunction with attached drawing to the present invention
Technical solution be clearly and completely described, it is clear that described embodiment be part of the embodiment of the present invention rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Lower all other embodiments obtained, shall fall within the protection scope of the present invention.
At present, conticaster when cutting slab, when practical molten steel amount and is planned not with heat unit according to slab plan
The problem of plan implementation rate is low is occurred as soon as during matching, based on this, dynamic slab provided in an embodiment of the present invention cuts design method
And system, break the binding relationship of original heat slab cut-over plan and heat (batch) number, solve due to heat tap it is unstable to
Plan performs the inconvenience brought, and forms the executive plan as unit of enterprise number, improves organization of production level, reduces
Remaining base cutting loss.
For ease of understanding the present embodiment, first to the dynamic slab cutting method disclosed in the embodiment of the present invention into
Row is discussed in detail.
Fig. 1 cuts design method flow chart for dynamic slab provided in an embodiment of the present invention.
With reference to Fig. 1, executive agent is the three-level MES system of steel mill.
The dynamic slab cutting method includes the following steps:
Step S101 receives the production sequence information that ERP system is sent, and original according to the production sequence information generation
Cut-over plan;
Step S102 receives the converter actual achievement information dynamic that two level continuous casting system is sent, and is counted according to the original cutting
It draws and the converter actual achievement information dynamic generation slab cut-over plan information;
The slab cut-over plan information is sent to the two level continuous casting system by step S103, so that two cascade
Casting system performs the slab cut-over plan information;
Step S104 receives the slab cutting actual achievement information that the two level continuous casting system is sent.
Specifically, when molten steel is cast into continuous casting billet, one pour time in can include multiple heats.It is poured at one in secondary, if
Make into formulate cut-over plan by heat group cut-over plan is formulated according to heat, i.e., formulate cut-over plan according to plan number, that is,
Expand the object unit that cut-over plan performs, the hit rate of cut-over plan will be improved, reduce the quantum of output of unplanned remaining base.
Exemplary embodiment according to the present invention is cut according to original cut-over plan and converter actual achievement information dynamic generation slab
Plan information is cut to include:
The slab cut-over plan for including multigroup enterprise number according to original cut-over plan and converter actual achievement information dynamic generation is believed
Breath, wherein, enterprise number is the heat group between heat and between pouring time, in heat group is poured time at one, and including adjacent
Multiple heats.
Exemplary embodiment according to the present invention, method further include:
The slab that heat in enterprise number is produced is identical steel grade and same thickness, and the width of adjacent slab
Meet on-line width adjustment range.
Specifically, time metastable situation of tap is poured based on steel mill, is given birth to when converter actual achievement information dynamic generates
Into slab cut-over plan, while enterprise number is generated, enterprise number is between the unit poured time between heat, needs what is illustrated
Be, one pour time in can include multiple enterprise numbers, but an enterprise number centainly comes from and pours time.Also, with the plate in enterprise number
Base meets that steel grade is identical with thickness, and adjacent width of plate slab meets on-line width adjustment range, and here, on-line width adjustment range refers to ensureing
The width difference of two boards base is no more than a smaller value, if it exceeds then undesirable, it is impossible to which arrangement carries out slab together
Cut-over plan.MES works out continuous casting steel billet cut-over plan as unit of enterprise number according to conditions above, and conticaster number is cut according to plan
Cut slab.Break the binding relationship of original heat slab cut-over plan and heat (batch) number, solve due to practical molten steel amount with plan not
The problems that dispensing plan execution is brought.
As shown in figure 4, enterprise number includes multiple serial numbers, the slab is cut for exemplary embodiment according to the present invention
It cuts plan information and is sent to two level continuous casting system, so that two level continuous casting system performs slab cut-over plan information and includes:
Slab cut-over plan information is sent to two level continuous casting system, so that two level continuous casting system is according in every group of enterprise number
Serial number perform slab cut-over plan information.
Exemplary embodiment according to the present invention, slab cutting actual achievement information include plan slab number, practical slab number with
And the correspondence of plan slab number and practical slab number, wherein, plan slab number is the vacation cut as unit of heat
Surely actual achievement is cut, practical slab number is the practical cutting actual achievement cut as unit of enterprise number.
It specifically, will as shown in figure 4, after continuous casting level two performs cutting task according to slab cut-over plan information
Generate slab cutting actual achievement information.In the slab cutting actual achievement fed back in continuous casting level two to three-level MES system, increase plan
The correspondence of slab number and practical slab number carries out the tracking of order process amount convenient for MES system.It in addition, need to be in continuous casting two level
The function of execution cut-over plan of the exploitation as unit of enterprise number, is cut with the slab that three-level MES system is coordinated to assign in system
Plan information completes cut-over plan.
In addition, when converter later process is abnormal, such as disconnected situations such as pouring, three-level MES system meeting basis obtain in real time
The actual achievements adjustment slab cut-over plan and enterprise number obtained.After enterprise number generates, scheduling can be according to practical condition
The sequence adjustment of enterprise number is carried out, merges, split.
Fig. 2 is that the plan provided in an embodiment of the present invention based on enterprise number performs schematic diagram.
With reference to Fig. 2, what the leftmost side identified " enterprise number/sequence " one is classified as three-level MES system under two level continuous casting system
The slab cut-over plan reached, 212040051/1~212040051/11 be one group of enterprise number, 212040052/1~
212040052/4 is another group of enterprise number, and the sequence after "/" is the serial number included in each enterprise number.As seen from the figure,
212040051 this group of enterprise numbers include 01~heat of heat, 03 3 heats, that is to say, that enterprise number is more than heat
Heat group, but due to different enterprise numbers can come from it is same pour time, enterprise number pours secondary less than one.Right side identifies " meter
Draw slab number " and " practical slab number " two row be two level continuous casting system perform cut-over plan after to three-level MES system feedback
Information, " plan slab number " are referred to methods of the MES to this batch of sequence information by the prior art, i.e., are cut as unit of heat
The hypothesis cutting actual achievement cut;" practical slab number " is the practical cutting reality cut as unit of enterprise number by this programme
Achievement, two level continuous casting system feed back the correspondence of the two to MES.
In same enterprise number, such as 212040051 this group of enterprise numbers, slab plan number performs successively in sequence.
Plan slab number and practical slab number are compared as can be seen that the practical tap of heat 01<When planning tap, heat 02 is automatic
It performs the unfinished plan of heat 01, therefore the heat 02/01 in slab cutting actual achievement information is by premise, and works as
After 212040051 this group of enterprise numbers are finished, it can be seen that molten steel tap<Plan molten steel tap, just occur at this time
The situation that residue plan slab is not carried out.If slab cut-over plan is performed as unit of heat, due to converter heat tap not
The phenomenon that stablizing, the non-output of appearance plan slab or the unplanned remaining base of output be likely to after each charging plan, because
This performs slab cut-over plan as unit of enterprise number can make molten steel all produce slab according to plan as possible, and the plan of raising performs
Rate.
Fig. 3 is dynamic slab cutting method signaling diagram provided in an embodiment of the present invention.
With reference to Fig. 3, executive agent is the three-level MES system of steel mill.
Step S201 receives the production sequence information that ERP system is sent;
Step S202 generates original cut-over plan according to production sequence information;
Step S203 receives the converter actual achievement information dynamic that two level continuous casting system is sent;
Step S204, according to original cut-over plan and converter actual achievement information dynamic generation slab cut-over plan information;
Slab cut-over plan information is sent to two level continuous casting system by step S205, so that two level continuous casting system performs plate
Base cut-over plan information;
Step S206 receives the slab cutting actual achievement information that two level continuous casting system is sent.
The present invention provides dynamic slab cutting method, method includes:The production sequence information that ERP system is sent is received,
Original cut-over plan is generated according to production sequence information;The converter actual achievement information dynamic that two level continuous casting system is sent is received, according to
Original cut-over plan and converter actual achievement information dynamic generation slab cut-over plan information;Slab cut-over plan information is sent to two
Grade continuous casting system, so that two level continuous casting system performs slab cut-over plan information;The slab that two level continuous casting system is sent is received to cut
Cut actual achievement information.The present invention has broken the binding relationship of original heat slab cut-over plan and heat (batch) number, solves since heat goes out
Steel amount is unstable to perform the inconvenience brought to plan, forms the executive plan as unit of enterprise number, improves production
Tissue is horizontal, reduces remaining base cutting loss.
Fig. 4 cuts design system structure diagram for dynamic slab provided in an embodiment of the present invention.
With reference to Fig. 4, which includes:
First generation unit 10, for receiving the production sequence information of ERP system transmission, and according to production sequence information life
Into original cut-over plan;
Second generation unit 20, for receiving the converter actual achievement information dynamic of two level continuous casting system transmission, and according to original
Cut-over plan and converter actual achievement information dynamic generation slab cut-over plan information;
Transmitting element 30, for slab cut-over plan information to be sent to two level continuous casting system, so that two level continuous casting system
Perform slab cut-over plan information;
Receiving unit 40 receives the slab cutting actual achievement information that two level continuous casting system is sent.
Exemplary embodiment according to the present invention, the second generation unit include:
The slab cut-over plan for including multigroup enterprise number according to original cut-over plan and converter actual achievement information dynamic generation is believed
Breath, wherein, enterprise number is the heat group between heat and between pouring time, and heat group described in one in pouring time, and including phase
Adjacent multiple heats.
Exemplary embodiment according to the present invention, the second generation unit further include:
The slab that heat in enterprise number is produced is identical steel grade and same thickness, and the width of adjacent slab
Meet on-line width adjustment range.
Exemplary embodiment according to the present invention, transmitting element include:
Slab cut-over plan information is sent to two level continuous casting system, so that two level continuous casting system is according in every group of enterprise number
Serial number perform slab cut-over plan information.
Exemplary embodiment according to the present invention, slab cutting actual achievement information include plan slab number, practical slab number with
And the correspondence of plan slab number and practical slab number, wherein, plan slab number is the vacation cut as unit of heat
Surely actual achievement is cut, practical slab number is the practical cutting actual achievement cut as unit of enterprise number.
Dynamic slab diced system provided in an embodiment of the present invention, the dynamic slab cutting method provided with above-described embodiment
With identical technical characteristic, so can also solve the technical issues of identical, reach identical technique effect.
The dynamic slab cutting design method and the computer program product of system that the embodiment of the present invention is provided, including depositing
The computer readable storage medium of program code is stored up, the instruction that said program code includes can be used for performing previous methods implementation
Method described in example, specific implementation can be found in embodiment of the method, and details are not described herein.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description
With the specific work process of device, the corresponding process in preceding method embodiment can be referred to, details are not described herein.
In addition, in the description of the embodiment of the present invention unless specifically defined or limited otherwise, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can
To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
If the function is realized in the form of SFU software functional unit and is independent product sale or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially in other words
The part contribute to the prior art or the part of the technical solution can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, is used including some instructions so that a computer equipment (can be
People's computer, server or network equipment etc.) perform all or part of the steps of the method according to each embodiment of the present invention.
And aforementioned storage medium includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic disc or CD.
In the description of the present invention, it should be noted that term " first ", " second ", " third " are only used for description purpose,
And it is not intended that instruction or hint relative importance.
Finally it should be noted that:Embodiment described above, only specific embodiment of the invention, to illustrate the present invention
Technical solution, rather than its limitations, protection scope of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair
It is bright to be described in detail, it will be understood by those of ordinary skill in the art that:Any one skilled in the art
In the technical scope disclosed by the present invention, it can still modify to the technical solution recorded in previous embodiment or can be light
It is readily conceivable that variation or equivalent replacement is carried out to which part technical characteristic;And these modifications, variation or replacement, do not make
The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover the protection in the present invention
Within the scope of.Therefore, protection scope of the present invention described should be subject to the protection scope in claims.
Claims (10)
1. a kind of dynamic slab cuts design method, which is characterized in that the method includes:
The production sequence information that ERP system is sent is received, and original cut-over plan is generated according to the production sequence information;
The converter actual achievement information dynamic that two level continuous casting system is sent is received, and real according to the original cut-over plan and the converter
Achievement information dynamic generation slab cut-over plan information;
The slab cut-over plan information is sent to the two level continuous casting system, so that described in two level continuous casting system execution
Slab cut-over plan information;
Receive the slab cutting actual achievement information that the two level continuous casting system is sent.
2. dynamic slab according to claim 1 cuts design method, which is characterized in that described according to the original cutting
Plan and the converter actual achievement information dynamic generation slab cut-over plan information include:
The slab for including multigroup enterprise number according to the original cut-over plan and the converter actual achievement information dynamic generation cuts meter
Information is drawn, wherein, the enterprise number is the heat group between heat and between pouring time, and the heat group is being poured time described in one
It is interior, and including adjacent multiple heats.
3. dynamic slab according to claim 2 cuts design method, which is characterized in that the method further includes:
The slab that heat in the enterprise number is produced is identical steel grade and same thickness, and the adjacent slab
Width meets on-line width adjustment range.
4. dynamic slab according to claim 3 cuts design method, which is characterized in that the enterprise number includes multiple suitable
Serial number, it is described that the slab cut-over plan information is sent to the two level continuous casting system, so that the two level continuous casting system is held
The row slab cut-over plan information includes:
The slab cut-over plan information is sent to two level continuous casting system, so that the two level continuous casting system is according to described in every group
The serial number in enterprise number performs the slab cut-over plan information.
5. dynamic slab according to claim 4 cuts design method, which is characterized in that the slab cuts actual achievement information
Including plan slab number, practical slab number and the correspondence of the plan slab number and the practical slab number, wherein, institute
It is the hypothesis cutting actual achievement cut as unit of the heat to state plan slab number, and the practical slab number is in terms of described
Draw number practical cutting actual achievement cut for unit.
6. a kind of dynamic slab cuts design system, which is characterized in that including:
First generation unit, for receiving the production sequence information of ERP system transmission, and according to the production sequence information generation
Original cut-over plan;
Second generation unit for receiving the converter actual achievement information dynamic of two level continuous casting system transmission, and original is cut according to described
The plan of cutting and the converter actual achievement information dynamic generation slab cut-over plan information;
The slab cut-over plan information is sent to the two level continuous casting system by transmitting element, so that the two level continuous casting system
System performs the slab cut-over plan information;
Receiving unit receives the slab cutting actual achievement information that the two level continuous casting system is sent.
7. dynamic slab according to claim 6 cuts design system, which is characterized in that the second generation unit packet
It includes:
The slab for including multigroup enterprise number according to the original cut-over plan and the converter actual achievement information dynamic generation cuts meter
Information is drawn, wherein, the enterprise number is the heat group between heat and between pouring time, and the heat group is being poured time described in one
It is interior, and including adjacent multiple heats.
8. dynamic slab according to claim 7 cuts design system, which is characterized in that second generation unit is also wrapped
It includes:
The slab that heat in the enterprise number is produced is identical steel grade and same thickness, and the adjacent slab
Width meets on-line width adjustment range.
9. dynamic slab according to claim 1 cuts design system, which is characterized in that the transmitting element includes:
The slab cut-over plan information is sent to two level continuous casting system, so that the two level continuous casting system is according to described in every group
The serial number in enterprise number performs the slab cut-over plan information.
10. dynamic slab according to claim 1 cuts design system, which is characterized in that the slab cutting actual achievement letter
Breath includes planning slab number, practical slab number and the correspondence of the plan slab number and the practical slab number, wherein,
The plan slab number is the hypothesis cutting actual achievement cut as unit of the heat, and the practical slab number is with described
Enterprise number is the practical cutting actual achievement that unit is cut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611174150.XA CN108205743A (en) | 2016-12-16 | 2016-12-16 | Dynamic slab cuts design method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611174150.XA CN108205743A (en) | 2016-12-16 | 2016-12-16 | Dynamic slab cuts design method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108205743A true CN108205743A (en) | 2018-06-26 |
Family
ID=62601811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611174150.XA Pending CN108205743A (en) | 2016-12-16 | 2016-12-16 | Dynamic slab cuts design method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108205743A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109396374A (en) * | 2018-12-11 | 2019-03-01 | 南京钢铁股份有限公司 | A kind of novel sheet billet continuous casting cutting method |
CN112077273A (en) * | 2020-09-18 | 2020-12-15 | 马鞍山钢铁股份有限公司 | Plate blank quality judgment and evaluation system and method with variable pulling speed |
CN112712246A (en) * | 2020-12-25 | 2021-04-27 | 包头钢铁(集团)有限责任公司 | Method for centralized batch production of falling plate blanks |
CN115041653A (en) * | 2022-06-10 | 2022-09-13 | 湖南华菱涟源钢铁有限公司 | Continuous casting actual performance generation method, device, equipment and computer storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634839A (en) * | 2009-08-14 | 2010-01-27 | 武汉钢铁(集团)公司 | Continuous casting and continuous rolling integration control method |
EP2428288A1 (en) * | 2010-09-08 | 2012-03-14 | Siemens VAI Metals Technologies GmbH | Method for producing steel bands using continuous casting or semi-continuous casting |
CN105243512A (en) * | 2015-11-06 | 2016-01-13 | 湖南千盟物联信息技术有限公司 | Dynamic scheduling method of steelmaking operation plan |
CN105353733A (en) * | 2015-11-09 | 2016-02-24 | 湖南千盟物联信息技术有限公司 | Steel-making production process intelligent scheduling method |
-
2016
- 2016-12-16 CN CN201611174150.XA patent/CN108205743A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101634839A (en) * | 2009-08-14 | 2010-01-27 | 武汉钢铁(集团)公司 | Continuous casting and continuous rolling integration control method |
EP2428288A1 (en) * | 2010-09-08 | 2012-03-14 | Siemens VAI Metals Technologies GmbH | Method for producing steel bands using continuous casting or semi-continuous casting |
CN105243512A (en) * | 2015-11-06 | 2016-01-13 | 湖南千盟物联信息技术有限公司 | Dynamic scheduling method of steelmaking operation plan |
CN105353733A (en) * | 2015-11-09 | 2016-02-24 | 湖南千盟物联信息技术有限公司 | Steel-making production process intelligent scheduling method |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109396374A (en) * | 2018-12-11 | 2019-03-01 | 南京钢铁股份有限公司 | A kind of novel sheet billet continuous casting cutting method |
CN112077273A (en) * | 2020-09-18 | 2020-12-15 | 马鞍山钢铁股份有限公司 | Plate blank quality judgment and evaluation system and method with variable pulling speed |
CN112077273B (en) * | 2020-09-18 | 2022-03-01 | 马鞍山钢铁股份有限公司 | Plate blank quality judgment and evaluation system and method with variable pulling speed |
CN112712246A (en) * | 2020-12-25 | 2021-04-27 | 包头钢铁(集团)有限责任公司 | Method for centralized batch production of falling plate blanks |
CN112712246B (en) * | 2020-12-25 | 2023-02-21 | 包头钢铁(集团)有限责任公司 | Method for centralized batch production of falling plate blanks |
CN115041653A (en) * | 2022-06-10 | 2022-09-13 | 湖南华菱涟源钢铁有限公司 | Continuous casting actual performance generation method, device, equipment and computer storage medium |
CN115041653B (en) * | 2022-06-10 | 2024-01-26 | 湖南华菱涟源钢铁有限公司 | Continuous casting performance generation method, device, equipment and computer storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108205743A (en) | Dynamic slab cuts design method and system | |
WO2017088674A1 (en) | Steelmaking batch grouping and production scheduling method for whole process production | |
CN102651114B (en) | Plate blank and contract transferring and matching method for improving utilization rate of plate blanks of iron and steel enterprise | |
Long et al. | Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown | |
CN106991543B (en) | Allocation system and allocation method | |
CN108776862B (en) | Intelligent scheduling method supporting splitting of process task quantity | |
CN105243512A (en) | Dynamic scheduling method of steelmaking operation plan | |
CN106991544B (en) | Allocation system and allocation method | |
JP2008293475A (en) | Steel tapping frame arrangement planning device, method, and program, and computer readable storage medium | |
EP2610696A1 (en) | Process design/production planning device | |
CN109426989A (en) | A kind of subscription process method provides method for reserving service and equipment | |
Moengin et al. | Model of integrated production-inventory-distribution system: The case of billet steel manufacturing | |
CN106647674A (en) | Knowledge representation-based steel production scheduling model matching method | |
CN106203750A (en) | A kind of method and device of resource distribution | |
JP5516156B2 (en) | Cast knitting apparatus and cast knitting method | |
CN108985537A (en) | A kind of steel smelting-continuous casting production plan rearrangement method based on rough set rule digging | |
CN106269894B (en) | Control method for continuous casting automatic predetermined slab plan | |
CN101710903A (en) | Method, system and platform for publishing information | |
JP4492332B2 (en) | Cast knitting apparatus and cast knitting method | |
JP6904157B2 (en) | Operation schedule creation method, equipment and programs | |
JP2012155591A (en) | Production plan creation device and production plan creation method | |
CN114862225A (en) | Method and system for determining continuous casting frequency plan | |
Sun et al. | Crane scheduling of steel-making and continuous casting process using the mixed-timed petri net modelling via CPLEX optimization | |
CN103731362A (en) | Distant medical service seeking system with flow control module | |
Sun et al. | An effective approach for the scheduling of refining process with uncertain iterations in steel-making and continuous casting process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180626 |