CN109372131A - A kind of prefabricated bank platform assembly construction method - Google Patents

A kind of prefabricated bank platform assembly construction method Download PDF

Info

Publication number
CN109372131A
CN109372131A CN201811314741.1A CN201811314741A CN109372131A CN 109372131 A CN109372131 A CN 109372131A CN 201811314741 A CN201811314741 A CN 201811314741A CN 109372131 A CN109372131 A CN 109372131A
Authority
CN
China
Prior art keywords
prefabricated
construction method
concrete block
platform assembly
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811314741.1A
Other languages
Chinese (zh)
Inventor
刘贤才
沈家礼
李勇
胡岚松
张坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Yixing Construction And Installation Engineering Co Ltd
Original Assignee
Hefei Yixing Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Yixing Construction And Installation Engineering Co Ltd filed Critical Hefei Yixing Construction And Installation Engineering Co Ltd
Priority to CN201811314741.1A priority Critical patent/CN109372131A/en
Publication of CN109372131A publication Critical patent/CN109372131A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block

Abstract

The present invention relates to the technical fields of bank platform construction method, more particularly, to a kind of prefabricated bank platform assembly construction method.A kind of prefabricated bank platform assembly construction method, comprising: Step 1: supporting module;Step 2: floor bar is bound;Step 3: installation support frame;Step 4: installing prefabricated Kan Tai;Prefabricated Kan Tai includes the concrete block of rectangular-shape, and waterproof cloth is embedded in concrete block, and waterproof cloth extends along the vertical direction, and close to the wherein one side of concrete block, waterproof cloth is pierced by the downside of concrete block.Step 5: welding reserved steel bar;Step 6: pouring build floor;Step 7: applying water-repellent paint forms waterproof coating;One end that waterproof cloth is pierced by is covered by waterproof coating;Step 8: pouring surface layer.Prefabricated Kan Tai is installed by support frame, prefabricated Kan Tai and floor are combined, prevents the later period from pouring and generates gap infiltration.Waterproof cloth and waterproof coating, which combine, to be connected into complete waterproof surface and further increases waterproof effect.

Description

A kind of prefabricated bank platform assembly construction method
Technical field
The present invention relates to the technical fields of bank platform construction method, more particularly, to a kind of prefabricated bank platform fabricated construction side Method.
Background technique
Kan Tai is generally arranged at the surrounding in toilet and kitchen, for waterproof and dampproof.
Existing Kan Tai mostly uses the secondary mode poured, and cleaning is not in place before pouring and there are construction joints all can after pouring Cause the waterproof performance of Kan Tai bad, the phenomenon that root leakage in root is got damp occurs.
Summary of the invention
The object of the present invention is to provide a kind of prefabricated bank platform assembly construction methods, it is advantageous that waterproof performance is more preferable.
Foregoing invention purpose of the invention has the technical scheme that a kind of prefabricated bank platform assembled is applied Work method, comprising:
Step 1: supporting module;
Step 2: floor bar is bound;
Step 3: installation support frame;
Step 4: installing prefabricated Kan Tai;
Prefabricated Kan Tai includes the concrete block of rectangular-shape, and waterproof cloth is embedded in concrete block, and waterproof cloth extends along the vertical direction, And close to the wherein one side of concrete block, waterproof cloth is pierced by the downside of concrete block.
Step 5: welding reserved steel bar;
Step 6: pouring build floor;
Step 7: applying water-repellent paint forms waterproof coating;
One end that waterproof cloth is pierced by is covered by waterproof coating;
Step 8: pouring surface layer.
By using above-mentioned technical proposal, prefabricated Kan Tai is installed by support frame, by prefabricated Kan Tai and floor knot It is combined together, prevents secondary pour from generating the caused phenomenon that seeps water in gap.Setting waterproof cloth and waterproof coating combine connection It is connected into a complete waterproof surface and further increases waterproof effect.
The present invention is further arranged to: the bottom of the concrete block is equal with concrete block integrally formed with length, wide Degree is greater than the concrete floor of concrete block.
By using above-mentioned technical proposal, concrete floor is set and is embedded in floor, so that the combination of Kan Tai and floor is more It is firm.
The present invention is further arranged to: the waterproof cloth is between the position and concrete floor being pierced by concrete block Spacing is 5mm;When pouring build floor, the upper surface of concrete layer exceeds concrete floor 4mm.
By using above-mentioned technical proposal, setting has said that concrete floor is cast in inside when pouring build floor, and Make the spacing between waterproof cloth and floor upper surface smaller by size design, waterproof cloth applies anti-after being smoothly taped against On water layer.
The present invention is further arranged to: in step 7, first layer water-repellent paint is applied on the floor poured;It will prevent later Water cloth is layered on first layer water-repellent paint, then applies second layer water-repellent paint.
By using above-mentioned technical proposal, combines closely to form sealing surface by two layers of water-repellent paint and waterproof cloth, avoid Waterproof cloth and waterproof coating combine not close caused leakage.
The present invention is further arranged to: each support plate includes billet and the reinforcing bar that is welded below billet both ends Stirrup, the prefabricated Kan Tai installation is on the supporting plate.
By using above-mentioned technical proposal, on the supporting plate by prefabricated Kan Tai installation.
The present invention is further arranged to: multiple location holes is provided on the billet, it is vertical to be embedded in the concrete block Reserved steel bar, the lower end of the reserved steel bar, which passes through location hole and welds with billet, to be connected.
It by using above-mentioned technical proposal, is positioned by location hole and precast reinforced cooperation, reserved steel bar and billet weld Reinforce the fixing of the two connection after even.
The present invention is further arranged to: bending is fitted on reinforcing bar stirrup after the lower end of reserved steel bar passes through billet, and Weld together with reinforcing bar stirrup.
By using above-mentioned technical proposal, connects being welded after precast reinforced lower end bending with reinforcing bar stirrup, further enhance Connection reliability.
The present invention is further arranged to: in step 1, first being installed first row keel and pillar, is installed second row again after fixed Keel and pillar, are successively installed by row, and template is laid with above keel.
By using above-mentioned technical proposal, keel and pillar are gradually installed to be coupled laying template.
The present invention is further arranged to: gluing sponge strip along template and wall seam crossing.
By using above-mentioned technical proposal, by sponge strip sealing off gap, when preventing formwork for placing concrete, spillage occurs Phenomenon.
The present invention is further arranged to: being connected between adjacent pillar by girt, girt is along the high direction of layer Every 1.4m is set together, and the flitch on girt crown wall point pad.
By using above-mentioned technical proposal, the lower end of pillar is fixed by girt, prevents pillar from toppling over.
In conclusion advantageous effects of the invention are as follows:
1. prefabricated Kan Tai is installed by support frame, prefabricated Kan Tai and floor are combined, prevent from secondary pouring production Seep water phenomenon caused by raw gap;
2. combining closely to form sealing surface by two layers of water-repellent paint and waterproof cloth, avoid waterproof cloth and waterproof coating combination not tight Leakage caused by close.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view of embodiment.
Appended drawing reference: 1, template;2, support frame;3, billet;4, reinforcing bar stirrup;5, location hole;6, concrete block;7, it mixes Solidifying soil bottom plate;8, waterproof cloth;9, reserved steel bar;10, floor;11, surface layer.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of prefabricated bank platform assembly construction method, as shown in Figure 1, comprising:
Step 1: supporting module 1;
1 absolute altitude of template is measured, and on the wall board bottom line bullet, then manually rejects extra wall concrete, is picked to the above 10mm of board bottom line. It is installed since end bay side when formwork, first row keel and pillar is first installed, second row keel and pillar are installed again after fixed, Successively install by row.It being connected between adjacent pillar by girt, girt is set together along the every 1.4m in the high direction of layer, and The flitch on girt crown wall point pad.It being laid with template 1 above keel, when to prevent 1 concrete of formwork for placing, spillage occurs Phenomenon glues sponge strip along template 1 and wall seam crossing.
Step 2: 10 reinforcing bar of floor is bound;
Clean wood shavings, the wood fragments, the first-class sundries of conduit in template 1.Stress main reinforcement and distributing reinforcement are pulled in template 1 with chalk Spacing.First put stress main reinforcement by the spacing finished, after put distributing reinforcement, bound point by point at reinforcing bar node.
Step 3: installation support frame 2;
Each support frame 2 includes billet 3 and the reinforcing bar stirrup 4 below 3 both ends of billet.Reinforcing bar stirrup 4 is by φ 12 Reinforcing bar is bent to form, and billet 3 and reinforcing bar stirrup 4 weld and with a thickness of 6 ~ 8mm.Multiple location holes 5, hole are provided on billet 3 Diameter is greater than 4mm.Backing plate absolute altitude pushes up 15mm lower than floor 10 at the top of stirrup, and is higher than 10 upper reinforcement of floor, prevents Kan Tai from damaging by pressure Upper reinforcement, spacing correspond to bank platform embedded ribs spacing.
Step 4: installing prefabricated Kan Tai;
Prefabricated Kan Tai include rectangular-shape concrete block 6 and be located at 6 bottom lengths of concrete block it is equal with concrete block 6, wide Degree is greater than the concrete floor 7 of concrete block 6.Waterproof cloth 8 is embedded in concrete block 6, waterproof cloth 8 extends along the vertical direction, and The spacing of 5-7mm is kept with the wherein one side of concrete block 6.Waterproof cloth 8 is from concrete block 6 apart from concrete floor 75mm's Position is pierced by concrete block 6, and the length that waterproof cloth 8 is pierced by 6 part of concrete block is greater than the height of concrete block 6.Concrete block 6 It is inside embedded with the reserved steel bar 9 of vertical diameter 4mm, the lower end of reserved steel bar 9 is pierced by concrete floor 7.
Prefabricated Kan Tai is transported to scene by flat car for transport of sills, is placed at unwrapping wire positioning by loop wheel machine, reserved steel bar 9 is worn Location hole 5 is crossed, prefabricated Kan Tai is mounted on 2 top of support frame.
Step 5: welding reserved steel bar 9;
Reserved steel bar 9 is passed through and is welded together at billet 3 with billet 3, is fitted in steel after the lower end bending of reserved steel bar 9 On muscle stirrup 4, and weld together with reinforcing bar stirrup 4.
Step 6: pouring build floor 10;
Waterproof cloth 8 is folded to the upside of concrete block 6 and pushes down after-pouring concrete with stone, when casting concrete should be segmented point Layer carries out, and single pours layer height should be special according to concrete supply ability, one-time-concreting side's amount, concrete initial set time, structure Point, reinforcing bar density comprehensively consider decision, generally the 1.25 of vibrator effect partial length times.
It should be inserted using poker vibrator and be pulled out slowly fastly, slotting point wants evenly distributed, and point-by-point mobile, sequence carries out, it must not omit, Accomplish uniform jolt ramming.Mobile spacing is not more than 1.25 times (generally 300~400mm) of the operating radius that vibrates.Vibrate upper one It should be inserted into 5~10cm of lower layer when layer, so that two layer concretes are firmly combined.When vibrating, vibrating spear must not touch reinforcing bar and template 1.The mobile spacing of surface vibrator (or plate vibrator) should ensure that the plate of vibrator covers the side of jolt ramming part Edge.
To the concrete finished has been poured, it should be covered and be watered, and according to concrete construction and the rule of acceptance specification Surely natural curing is carried out.The concrete layer upper surface poured exceeds concrete floor 74mm
Step 7: applying water-repellent paint;
First layer water-repellent paint is applied above the floor 10 poured, first layer water-repellent paint thickness is 0.6mm.It is applied to first layer waterproof After layer is slightly solid, waterproof cloth 8 is layered on first layer water-repellent paint, then applies second layer water-repellent paint, second layer waterproof applies Material with a thickness of 0.6mm.
Step 8: pouring surface layer 11;
It is levelling that mortar surface layer 11 is poured above second layer waterproof coating.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of prefabricated bank platform assembly construction method, characterized in that include:
Step 1: supporting module (1);
Step 2: floor (10) reinforcing bar is bound;
Step 3: installation support frame (2);
Step 4: installing prefabricated Kan Tai;
Prefabricated Kan Tai includes the concrete block (6) of rectangular-shape, is embedded with waterproof cloth (8) in concrete block (6), waterproof cloth (8) edge Vertical direction extends, and close to the wherein one side of concrete block (6), waterproof cloth (8) is pierced by the downside of concrete block (6);
Step 5: welding reserved steel bar (9);
Step 6: pouring build floor (10);
Step 7: applying water-repellent paint forms waterproof coating;
One end that waterproof cloth (8) is pierced by is covered by waterproof coating;
Step 8: pouring surface layer (11).
2. prefabricated bank platform assembly construction method according to claim 1, characterized in that the bottom of the concrete block (6) The portion's concrete floor (7) of, width equal with concrete block (6) greater than concrete block (6) integrally formed with length.
3. prefabricated bank platform assembly construction method according to claim 2, characterized in that the waterproof cloth (8) is from coagulation Spacing in soil block (6) between the position being pierced by and concrete floor (7) is 5mm;When pouring build floor (10), concrete layer it is upper Surface exceeds concrete floor (7) 4mm.
4. prefabricated bank platform assembly construction method according to claim 1, characterized in that in step 7, what is poured First layer water-repellent paint is applied on floor (10);Waterproof cloth (8) is layered on first layer water-repellent paint later, it is anti-then to apply the second layer Water paint.
5. prefabricated bank platform assembly construction method according to claim 1, characterized in that each support plate includes steel pad Plate (3) and the reinforcing bar stirrup (4) being welded below billet (3) both ends, the prefabricated Kan Tai installation is on the supporting plate.
6. prefabricated bank platform assembly construction method according to claim 5, characterized in that be provided on the billet (3) Multiple location holes (5), the concrete block (6) is interior to be embedded with vertical reserved steel bar (9), and the lower end of the reserved steel bar (9) is worn It crosses location hole (5) and is welded with billet (3) and connected.
7. prefabricated bank platform assembly construction method according to claim 6, characterized in that wear the lower end of reserved steel bar (9) Crossing billet (3), bending is fitted on reinforcing bar stirrup (4) afterwards, and is welded together with reinforcing bar stirrup (4).
8. prefabricated bank platform assembly construction method according to claim 1, characterized in that in step 1, first install first Keel and pillar are arranged, after fixed second row keel and pillar is installed again, successively installs by row, is laid with template (1) above keel.
9. prefabricated bank platform assembly construction method according to claim 8, characterized in that along template (1) and wall seam Locate viscous sponge strip.
10. prefabricated bank platform assembly construction method according to claim 8, characterized in that pass through between adjacent pillar Girt connection, girt is set together along the every 1.4m in the high direction of layer, and the flitch on girt crown wall point pad.
CN201811314741.1A 2018-11-06 2018-11-06 A kind of prefabricated bank platform assembly construction method Pending CN109372131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811314741.1A CN109372131A (en) 2018-11-06 2018-11-06 A kind of prefabricated bank platform assembly construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811314741.1A CN109372131A (en) 2018-11-06 2018-11-06 A kind of prefabricated bank platform assembly construction method

Publications (1)

Publication Number Publication Date
CN109372131A true CN109372131A (en) 2019-02-22

Family

ID=65397372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811314741.1A Pending CN109372131A (en) 2018-11-06 2018-11-06 A kind of prefabricated bank platform assembly construction method

Country Status (1)

Country Link
CN (1) CN109372131A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725422A (en) * 2019-10-24 2020-01-24 深圳中技绿建科技有限公司 Precast concrete waterproof construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7082736B2 (en) * 1998-11-04 2006-08-01 Transit Care, Inc. Process for retrofitting an existing bus window having rubber seals with metal members that define a retention space for a sacrificial member
CN103572964A (en) * 2012-08-10 2014-02-12 中国水利水电第二工程局有限公司 Mounting method of precast air duct during construction stage of construction engineering structure
CN207597740U (en) * 2017-11-30 2018-07-10 四川国恒建筑设计有限公司 The water proof structure of gutter in a kind of flat roof deck parapet
CN108487630A (en) * 2018-04-03 2018-09-04 河南省第建筑工程集团有限责任公司 Coagulation earth steps platform prefabrication and assembly construction construction method
CN207974258U (en) * 2018-03-15 2018-10-16 北京建中防水保温工程集团有限公司 Waterproofing of movement joints constructs

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7082736B2 (en) * 1998-11-04 2006-08-01 Transit Care, Inc. Process for retrofitting an existing bus window having rubber seals with metal members that define a retention space for a sacrificial member
CN103572964A (en) * 2012-08-10 2014-02-12 中国水利水电第二工程局有限公司 Mounting method of precast air duct during construction stage of construction engineering structure
CN207597740U (en) * 2017-11-30 2018-07-10 四川国恒建筑设计有限公司 The water proof structure of gutter in a kind of flat roof deck parapet
CN207974258U (en) * 2018-03-15 2018-10-16 北京建中防水保温工程集团有限公司 Waterproofing of movement joints constructs
CN108487630A (en) * 2018-04-03 2018-09-04 河南省第建筑工程集团有限责任公司 Coagulation earth steps platform prefabrication and assembly construction construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725422A (en) * 2019-10-24 2020-01-24 深圳中技绿建科技有限公司 Precast concrete waterproof construction

Similar Documents

Publication Publication Date Title
CN102937027B (en) A kind of construction method of edge top arch and bottom arch of concrete pouring tunnel
CN107326940B (en) basement advanced water stop post-cast strip structure and construction method thereof
CN105649113A (en) Structure and construction method of basement post-cast strip
CN108868063A (en) A kind of method for constructing terrace
CN101832026A (en) Construction method of sole plate post-poured strip form bracing system
CN110747899A (en) Basement waterproof construction method
KR20140047118A (en) Foundation system for bridges
KR100787178B1 (en) Light weight steel frame foundation flooring material and method for construction
CN104372890A (en) Construction method of bare concrete prefabricated box beam with complicated structure
CN102505709A (en) Concrete-formwork-precast foundation construction method
CN108330835A (en) The construction method of setting bracket
CN111074943A (en) Construction method for integrally casting inspection well shaping steel mould in situ
CN108755692A (en) Underground structure concrete casting method
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN204456224U (en) A kind of structure of basement post-pouring zone
CN109610478A (en) A kind of construction method of cable duct
CN110005169A (en) A kind of cracking resistance process with stressed seamless terrace
CN110512524A (en) A kind of bridge pier column safe construction method
CN107035147A (en) A kind of cone bucket concrete pouring construction method
CN102116092A (en) Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks
CN107627436A (en) The production technology and production facility of concrete prefabricated element
CN103161176A (en) Tower crane foundation construction method in main building connected garage
CN109372131A (en) A kind of prefabricated bank platform assembly construction method
CN114319611A (en) Horizontal installation method of rubber water stop
CN106835992A (en) A kind of arcuate structure clear-water concrete construction of cast-in-situ box-beam method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222