CN109371914A - 一种便于后期改建的泄水渠结构 - Google Patents
一种便于后期改建的泄水渠结构 Download PDFInfo
- Publication number
- CN109371914A CN109371914A CN201811592807.3A CN201811592807A CN109371914A CN 109371914 A CN109371914 A CN 109371914A CN 201811592807 A CN201811592807 A CN 201811592807A CN 109371914 A CN109371914 A CN 109371914A
- Authority
- CN
- China
- Prior art keywords
- discharge channel
- period
- early period
- later period
- reconstruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/02—Making or lining canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/08—Details, e.g. gates, screens
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Water Treatment By Electricity Or Magnetism (AREA)
- Revetment (AREA)
Abstract
本发明涉及一种用于市政水环境工程便于后期改建的泄水渠结构,同时涉及该泄水渠结构改建的修建方法。本发明在前期泄水渠过流前,在改建接头段处堆筑前期粘土草袋围堰,用于前期泄水渠过流时挡水。在前期泄水渠过流期间,完成后期泄水渠下游段修建。后期泄水渠下游段完建后,即可拆除前期粘土草袋围堰,在前期泄水渠下游段的上游侧堆筑后期封堵粘土草袋围堰挡水,此时水流通过后期泄水渠过流。在后期封堵粘土草袋围堰的保护下,修建用于后期挡水的封堵体。本发明通过提前修建改建接头段,通过前期粘土草袋围堰挡水,可以实现不用断流,即可完成后期泄水渠的修建。
Description
技术领域
本发明涉及一种用于市政水环境工程便于后期改建的泄水渠结构,同时涉及该泄水渠结构改建的修建方法,属于市政、水环境及水利水电工程领域。
背景技术
在市政、水利水电工程中,为了节约投资,泄水建筑物常采用采用永临结合的方式,即施工期泄水建筑物,通过改建后用作永久泄水建筑物。在改建过程中,需要断流把水引至其他通道,保证改建过程中干地施工。在小型的市政、水环境及水利水电工程中,由于施工期通常只布置一条泄水通道,若需要改建施工期临时泄水建筑物,则另需要布置其他泄水通道,这无疑会增加一定工程造价,同时会增加施工的难度及影响施工进度。
发明内容
本发明解决的技术问题是:提供一种用于市政水环境工程便于后期改建的泄水渠结构,同时提供一种该泄水渠结构改建的修建方法,可使得在不影响正常泄流的情况下,需要改建前期泄水渠作为后期泄水渠时,改建施工过程中不断流。
本发明解决其技术问题所采用的技术方案是:在前期泄水渠与后期泄水渠相交的部位先修建一改建接头段,并在改建接头段内、前期泄水渠下游分别设置有可拆除的粘土草袋围堰控制水流,达到不影响正常泄流的情况下,完成泄水渠结构改建工作。
该结构的过流包括利用前期泄水渠过流与改建后利用后期泄水渠过流两个阶段。
在前期泄水渠过流时,泄水渠具体结构为:包括前期泄水渠,前期泄水渠的中部侧壁连接有改建接头段,改建接头段内设置有可拆除的前期粘土草袋围堰。
改建接头段将前期泄水渠分隔为前期泄水渠上游段、前期泄水渠下游段,后期泄水渠上游段与前期泄水渠上游段为共用段,后期改建时,泄水渠具体结构为:后期泄水渠下游段连接于改建接头段的下游端;在前期泄水渠下游段的上游侧设置有可拆除的后期封堵粘土草袋围堰,前期泄水渠下游段在后期封堵粘土草袋围堰的下游侧设置有封堵体。
优选地,前期泄水渠中部具有弯道,改建接头段连接于弯道处、且连接于弯道内壁为凹形的一侧。
对于上述泄水渠结构改建的修建方法,具体施工步骤为:
一、修建前期泄水渠及改建接头段,改建接头段连通于前期泄水渠的中部侧壁,前期泄水渠过流前,在改建接头段内堆筑好前期粘土草袋围堰挡水,水流从前期泄水渠过流;
二、前期泄水渠过流期间,修建后期泄水渠下游段,并将其连接于改建接头段的下游端;拆除前期粘土草袋围堰,并在前期泄水渠下游段的上游侧堆筑后期封堵粘土草袋围堰,水流通过后期泄水渠过流,在后期封堵粘土草袋围堰挡水保护下,在后期封堵粘土草袋围堰的下游侧修建封堵体;封堵体完建后,拆除后期封堵粘土草袋围堰,形成集沙池,修建完成。
本发明的有益效果是:后期泄水渠下游段完建后,即可拆除前期粘土草袋围堰,在前期泄水渠下游段的上游侧堆筑后期封堵粘土草袋围堰挡水,此时水流通过后期泄水渠过流。在后期封堵粘土草袋围堰的保护下,修建用于后期挡水的封堵体。
采用的前期粘土草袋围堰及后期封堵粘土草袋围堰具有易于堆筑、适宜挡水及防渗的特点,同时方便后期机械拆除。
封堵体完建后,拆除后期封堵粘土草袋围堰,后期泄水渠改建完成。改建接头段连接于弯道处、且连接于弯道内壁为凹形的一侧,可以利用弯道水流特点作为后期泄水渠的集沙池,利用弯道内壁凹侧流速大、在弯道上顺时针横向次生环流把水流中推移质推到集沙池里面,减少推移质对泄水渠的冲磨。
附图说明
图1为本发明的工序一结构示意图;
图2为本发明的工序二结构示意图;
图3为本发明的工序三结构示意图;
图4为本发明的工序四结构示意图;
图5为图2的A-A断面图;
图6为图2的B-B断面图;
图7为图3的C-C断面图。
图中标记为:1-前期泄水渠,11-前期泄水渠上游段,12-前期泄水渠下游段,2-改建接头段,3-前期粘土草袋围堰,4-后期泄水渠上游段,5-后期泄水渠下游段,6-后期封堵粘土草袋围堰,7-封堵体,8-集沙池。
具体实施方式
下面结合附图及实施例对本发明作进一步说明,图中箭头所示方向为水流方向。
本发明中泄水渠结构的过流包括利用前期泄水渠过流与改建后利用后期泄水渠过流两个阶段。
如图1所示,在前期泄水渠1过流时,泄水渠具体结构为:包括前期泄水渠1,前期泄水渠1的中部侧壁连接有改建接头段2,改建接头段2内设置有可拆除的前期粘土草袋围堰3。
在修建前期泄水渠1的时候,同时修建好一定长度的改建接头段2,改建接头段2的长度以能布置前期粘土草袋围堰3为原则,并保留适当长度方便修建后期泄水渠下游段5与改建接头段2连接起来。
如图2至图7所示,改建接头段2将前期泄水渠1分隔为前期泄水渠上游段11、前期泄水渠下游段12,后期泄水渠上游段4与前期泄水渠上游段11为共用段,后期改建后,后期泄水渠下游段5连接于改建接头段2的下游端;在前期泄水渠下游段12的上游侧设置有可拆除的后期封堵粘土草袋围堰6,前期泄水渠下游段12在后期封堵粘土草袋围堰6的下游侧设置有封堵体7。
优选地,前期泄水渠1中部具有弯道,改建接头段2连接于弯道处、且连接于弯道内壁为凹形的一侧。这样可以利用弯道水流特点作为后期泄水渠的集沙池8,利用弯道内壁凹侧流速大、在弯道上顺时针横向次生环流把水流中推移质推到集沙池8里面,减少推移质对泄水渠的冲磨。
对于上述泄水渠结构改建的修建方法,具体施工步骤为:
一、如图1所示,修建前期泄水渠1及改建接头段2,改建接头段2连通于前期泄水渠1的中部侧壁,前期泄水渠1过流前,在改建接头段2内堆筑好前期粘土草袋围堰3挡水,水流从前期泄水渠1过流;
二、如图2所示,前期泄水渠1过流期间,修建后期泄水渠下游段5,并将其连接于改建接头段2的下游端;如图3所示,拆除前期粘土草袋围堰3,并在前期泄水渠下游段12的上游侧堆筑后期封堵粘土草袋围堰6,水流通过后期泄水渠过流,在后期封堵粘土草袋围堰6挡水保护下,在后期封堵粘土草袋围堰6的下游侧修建封堵体7;如图4所示,封堵体7完建后,拆除后期封堵粘土草袋围堰6,形成集沙池8,修建完成。
Claims (5)
1.一种便于后期改建的泄水渠结构,包括前期泄水渠(1),其特征在于:前期泄水渠(1)的中部侧壁连接有改建接头段(2),改建接头段(2)内设置有可拆除的前期粘土草袋围堰(3)。
2.如权利要求1所述的一种便于后期改建的泄水渠结构,其特征在于:改建接头段(2)将前期泄水渠(1)分隔为前期泄水渠上游段(11)、前期泄水渠下游段(12),后期泄水渠上游段(4)与前期泄水渠上游段(11)为共用段,后期泄水渠下游段(5)连接于改建接头段(2)的下游端;在前期泄水渠下游段(12)的上游侧设置有可拆除的后期封堵粘土草袋围堰(6),前期泄水渠下游段(12)在后期封堵粘土草袋围堰(6)的下游侧设置有封堵体(7)。
3.如权利要求1或2所述的一种便于后期改建的泄水渠结构,其特征在于:前期泄水渠(1)中部具有弯道,改建接头段(2)连接于弯道处、且连接于弯道内壁为凹形的一侧。
4.泄水渠结构改建的修建方法,其特征在于步骤为:
一、修建前期泄水渠(1)及改建接头段(2),改建接头段(2)连通于前期泄水渠(1)的中部侧壁,前期泄水渠(1)过流前,在改建接头段(2)内堆筑好前期粘土草袋围堰(3)挡水,水流从前期泄水渠(1)过流;
二、前期泄水渠(1)过流期间,修建后期泄水渠下游段(5),并将其连接于改建接头段(2)的下游端;拆除前期粘土草袋围堰(3),并在前期泄水渠下游段(12)的上游侧堆筑后期封堵粘土草袋围堰(6),水流通过后期泄水渠过流,在后期封堵粘土草袋围堰(6)挡水保护下,在后期封堵粘土草袋围堰(6)的下游侧修建封堵体(7);封堵体(7)完建后,拆除后期封堵粘土草袋围堰(6),修建完成。
5.如权利要求4所述的泄水渠结构改建的修建方法,其特征在于:前期泄水渠(1)中部具有弯道,改建接头段(2)连接于弯道处、且连接于弯道内壁为凹形的一侧;拆除后期封堵粘土草袋围堰(6)后,形成集沙池(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811592807.3A CN109371914B (zh) | 2018-12-25 | 2018-12-25 | 一种便于后期改建的泄水渠结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811592807.3A CN109371914B (zh) | 2018-12-25 | 2018-12-25 | 一种便于后期改建的泄水渠结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109371914A true CN109371914A (zh) | 2019-02-22 |
CN109371914B CN109371914B (zh) | 2023-09-26 |
Family
ID=65372210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811592807.3A Active CN109371914B (zh) | 2018-12-25 | 2018-12-25 | 一种便于后期改建的泄水渠结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109371914B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113106919A (zh) * | 2021-04-23 | 2021-07-13 | 白乌日娜 | 一种水利工程用沟渠临时截流制作装置 |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1076234A (zh) * | 1992-03-12 | 1993-09-15 | 余书超 | 防止刚性护面渠道冻胀破坏的方法 |
CN2301476Y (zh) * | 1997-02-15 | 1998-12-23 | 香港乐华系统有限公司 | 具有榫-槽接头端的预制u-型混凝土渠件 |
CN2680728Y (zh) * | 2002-11-01 | 2005-02-23 | 王顺桥 | 限江河漂浮物自进收集网兜的斜向滑道装置 |
CN1888322A (zh) * | 2006-08-02 | 2007-01-03 | 四川大学 | 导流洞改建为有压突扩掺气泄洪洞的方法 |
JP2007154451A (ja) * | 2005-12-01 | 2007-06-21 | C I Kasei Co Ltd | 水路構造及びその施工方法 |
KR20070099078A (ko) * | 2006-04-03 | 2007-10-09 | 원 회 양 | 방파제의 개축공법 및 그 방파제 |
KR20080009251A (ko) * | 2007-12-24 | 2008-01-28 | 김기호 | '∪' 형 콘크리트 블록으로 만든 수로의 친생태환경적수로로의 개선 방법 |
CN101280557A (zh) * | 2008-05-23 | 2008-10-08 | 水利部交通部电力工业部南京水利科学研究院 | 导流洞改建为射流内消能竖井泄洪洞的方法 |
CN101307595A (zh) * | 2008-07-09 | 2008-11-19 | 葛洲坝集团第一工程有限公司 | 大型渡槽预应力施工方法 |
TW201020374A (en) * | 2008-11-25 | 2010-06-01 | Jounjan Construction Material Ltd | River remediation method utilizing artificial scour-resistant riverbed and structure thereof |
CN102002925A (zh) * | 2010-11-17 | 2011-04-06 | 黄河水利委员会黄河水利科学研究院 | 多沙河流河工动床模型人工转折方法及人工转折导流槽 |
WO2012022435A1 (de) * | 2010-08-17 | 2012-02-23 | Technische Universität München | Schachtkraftwerk mit dammtafel |
CN104018474A (zh) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | 施工支洞回填改建检修支洞的方法 |
CN105155484A (zh) * | 2015-06-23 | 2015-12-16 | 四川大学 | 将临时导流洞改建为永久泄洪设施的方法 |
CN205475125U (zh) * | 2016-02-26 | 2016-08-17 | 叶兴 | 多级自溃土工合成材料土石非常溢洪道 |
CN106400746A (zh) * | 2016-10-20 | 2017-02-15 | 长江勘测规划设计研究有限责任公司 | 渠道衬砌修复旁通管输水及围堰截断式基坑及方法 |
DE102016104656A1 (de) * | 2016-03-14 | 2017-09-14 | BIONIK GmbH - Innovative Technik für die Umwelt | Verfahren zur Messung von Überlaufmengen in Überlaufsystemen |
CN107893402A (zh) * | 2017-11-15 | 2018-04-10 | 黄河勘测规划设计有限公司 | 水库导流洞改建放空洞的方法 |
EP3361005A1 (de) * | 2017-02-14 | 2018-08-15 | Mair Wilfried GmbH / Srl | Bachverbauung |
CN108411865A (zh) * | 2018-04-02 | 2018-08-17 | 中国电建集团中南勘测设计研究院有限公司 | 一种导流泄水建筑物的施工方法 |
CN209353295U (zh) * | 2018-12-25 | 2019-09-06 | 中国电建集团成都勘测设计研究院有限公司 | 一种便于后期改建的泄水渠结构 |
-
2018
- 2018-12-25 CN CN201811592807.3A patent/CN109371914B/zh active Active
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1076234A (zh) * | 1992-03-12 | 1993-09-15 | 余书超 | 防止刚性护面渠道冻胀破坏的方法 |
CN2301476Y (zh) * | 1997-02-15 | 1998-12-23 | 香港乐华系统有限公司 | 具有榫-槽接头端的预制u-型混凝土渠件 |
CN2680728Y (zh) * | 2002-11-01 | 2005-02-23 | 王顺桥 | 限江河漂浮物自进收集网兜的斜向滑道装置 |
JP2007154451A (ja) * | 2005-12-01 | 2007-06-21 | C I Kasei Co Ltd | 水路構造及びその施工方法 |
KR20070099078A (ko) * | 2006-04-03 | 2007-10-09 | 원 회 양 | 방파제의 개축공법 및 그 방파제 |
CN1888322A (zh) * | 2006-08-02 | 2007-01-03 | 四川大学 | 导流洞改建为有压突扩掺气泄洪洞的方法 |
KR20080009251A (ko) * | 2007-12-24 | 2008-01-28 | 김기호 | '∪' 형 콘크리트 블록으로 만든 수로의 친생태환경적수로로의 개선 방법 |
CN101280557A (zh) * | 2008-05-23 | 2008-10-08 | 水利部交通部电力工业部南京水利科学研究院 | 导流洞改建为射流内消能竖井泄洪洞的方法 |
CN101307595A (zh) * | 2008-07-09 | 2008-11-19 | 葛洲坝集团第一工程有限公司 | 大型渡槽预应力施工方法 |
TW201020374A (en) * | 2008-11-25 | 2010-06-01 | Jounjan Construction Material Ltd | River remediation method utilizing artificial scour-resistant riverbed and structure thereof |
WO2012022435A1 (de) * | 2010-08-17 | 2012-02-23 | Technische Universität München | Schachtkraftwerk mit dammtafel |
CN102002925A (zh) * | 2010-11-17 | 2011-04-06 | 黄河水利委员会黄河水利科学研究院 | 多沙河流河工动床模型人工转折方法及人工转折导流槽 |
CN104018474A (zh) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | 施工支洞回填改建检修支洞的方法 |
CN105155484A (zh) * | 2015-06-23 | 2015-12-16 | 四川大学 | 将临时导流洞改建为永久泄洪设施的方法 |
CN205475125U (zh) * | 2016-02-26 | 2016-08-17 | 叶兴 | 多级自溃土工合成材料土石非常溢洪道 |
DE102016104656A1 (de) * | 2016-03-14 | 2017-09-14 | BIONIK GmbH - Innovative Technik für die Umwelt | Verfahren zur Messung von Überlaufmengen in Überlaufsystemen |
CN106400746A (zh) * | 2016-10-20 | 2017-02-15 | 长江勘测规划设计研究有限责任公司 | 渠道衬砌修复旁通管输水及围堰截断式基坑及方法 |
EP3361005A1 (de) * | 2017-02-14 | 2018-08-15 | Mair Wilfried GmbH / Srl | Bachverbauung |
CN107893402A (zh) * | 2017-11-15 | 2018-04-10 | 黄河勘测规划设计有限公司 | 水库导流洞改建放空洞的方法 |
CN108411865A (zh) * | 2018-04-02 | 2018-08-17 | 中国电建集团中南勘测设计研究院有限公司 | 一种导流泄水建筑物的施工方法 |
CN209353295U (zh) * | 2018-12-25 | 2019-09-06 | 中国电建集团成都勘测设计研究院有限公司 | 一种便于后期改建的泄水渠结构 |
Non-Patent Citations (7)
Title |
---|
L.T.CHIN , 郭佩珍: "旧渠系的改建", 水土保持科技情报, no. 01 * |
冯世民;: "临沂市河东区葛沟灌区渠首拦河坝改建工作探索", 黑龙江科技信息, no. 27 * |
张超;陈世全;龙军飞;李玉珠;吴显伟;: "大渡河双江口水电站施工导流规划与设计", 水利规划与设计, no. 10 * |
沈刚;: "新老线结合的灌区渠道防渗改建工程施工技术", 水利技术监督 * |
王守训: "张村电站渠首桩板坝的失事和改建", 水力发电, no. 07 * |
邢燕;: "西湖水库溢洪道改建设计方案", 山西水利, no. 11 * |
韩凤君: "杂木河渠首枢纽改建设计", 甘肃水利水电技术, no. 04 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113106919A (zh) * | 2021-04-23 | 2021-07-13 | 白乌日娜 | 一种水利工程用沟渠临时截流制作装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109371914B (zh) | 2023-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108729932A (zh) | 隧道衬砌结构立体防排水系统 | |
CN106049390B (zh) | 一种适用于河道治理工程的沉砂拦污一体化装置 | |
CN209353295U (zh) | 一种便于后期改建的泄水渠结构 | |
CN109371914A (zh) | 一种便于后期改建的泄水渠结构 | |
CN208748963U (zh) | 一种灌浆套筒组件 | |
CN107489181A (zh) | 一种河道清淤专用设备 | |
CN106638486A (zh) | 高心墙堆石坝防渗墙与廊道分期施工方法 | |
CN108411865A (zh) | 一种导流泄水建筑物的施工方法 | |
CN105952473A (zh) | 泄水降压的管片衬砌结构 | |
CN213952129U (zh) | 一种用于截河型尾矿库涌水地段的尾矿坝 | |
CN201710794U (zh) | 一种新型双腔冲洗引流管 | |
CN213572255U (zh) | 一种市政工程排水明渠施工固定装置 | |
CN207452820U (zh) | 一种防冲水利堤坝 | |
CN203226939U (zh) | 排便清肠控污管袋系统 | |
CN105839603B (zh) | 水电中闸室补气结构 | |
CN201627258U (zh) | 大型混凝土施工仓面排水装置 | |
CN207597336U (zh) | 峡谷区高坝沟水处理工程的布置结构 | |
CN107574792A (zh) | 一种坝基输水底涵高水头封堵结构及其施工方法 | |
CN110500116B (zh) | 一种主动泄水抗浮管片及衬砌结构 | |
CN107044140A (zh) | 平面止浆垫涌水口控流装置以及施工工艺 | |
CN206408636U (zh) | 一种止水排水结构 | |
CN208763663U (zh) | 一种具有隧洞封堵堵头基础结构的隧洞和隧洞封堵堵头 | |
CN208718678U (zh) | 一种新型盾构机双液同步注浆系统 | |
CN208604660U (zh) | 河道污水自动处理装置 | |
CN106351253A (zh) | 新式水利工程挡土墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |