CN107893402A - 水库导流洞改建放空洞的方法 - Google Patents
水库导流洞改建放空洞的方法 Download PDFInfo
- Publication number
- CN107893402A CN107893402A CN201711129865.8A CN201711129865A CN107893402A CN 107893402 A CN107893402 A CN 107893402A CN 201711129865 A CN201711129865 A CN 201711129865A CN 107893402 A CN107893402 A CN 107893402A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- valve
- diversion tunnel
- diversion
- emptying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 16
- 230000008676 import Effects 0.000 claims abstract description 11
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 claims abstract description 3
- 238000009412 basement excavation Methods 0.000 abstract 1
- 238000012423 maintenance Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
- E02B9/06—Pressure galleries or pressure conduits; Galleries specially adapted to house pressure conduits; Means specially adapted for use therewith, e.g. housings, valves, gates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种水库导流洞改建放空洞的方法,将拟建的放空洞进口与待改建的导流洞进口邻近布置,并将放空洞进口连接至导流洞边墙,在边墙外侧设置闸阀室安装临时挡水阀,之后将导流洞边墙封闭;大坝施工时,河水从导流洞过流;待水库建设施工完成后,在导流洞进口门槽内放入封堵闸门,然后安装闸阀室后部的钢管至导流洞内,在位于导流洞内的钢管上安装检修阀和工作阀,之后关闭所述工作阀,打开临时挡水阀,在导流洞内位于检修阀和工作阀上游侧施工导流洞封堵段,将导流洞改建为放空洞。本发明优点在于省去了进口塔架,避免了二次开挖导流洞,降低了施工难度和施工投资,经济效益好且缩短了工期。
Description
技术领域
本发明涉及大中型水库放空洞的建造方法,尤其是涉及水库导流洞改建放空洞的方法。
背景技术
在水库建设过程中,需要设置放空洞,以便运行期放空库水检修大坝。为降低投资,通常将施工期临时建筑物导流洞改建为永久放空洞。目前在改建中,通常是开挖导流洞首段隧洞(俗称 “龙抬头” )并设置高出库区水位的进口塔架,因此具有一定的施工难度,特别是对于永久放空洞进口高程与导流洞进口高程相差较小的水库来说,传统的改建方式施工技术要求较高、投资较大且工期较长。
发明内容
本发明目的在于提供一种水库导流洞改建放空洞的方法。
为实现上述目的,本发明采取下述技术方案:
本发明所述水库导流洞改建放空洞的方法,将拟建的放空洞进口与待改建的导流洞进口邻近布置,并将所述放空洞进口连接至所述导流洞边墙,在所述边墙外侧设置闸阀室,在所述闸阀室内安装临时挡水阀,之后将导流洞边墙用钢板封闭;大坝施工时,河水从导流洞过流;待水库建设施工完成后,在导流洞进口门槽内放入封堵闸门,然后安装所述闸阀室后部的钢管,将所述钢管进水口与所述临时挡水阀连通,钢管出水口顺水流延伸至导流洞内,在位于导流洞内的钢管上安装检修阀和工作阀,之后关闭所述工作阀,打开临时挡水阀,在导流洞内位于所述检修阀和工作阀上游侧施工导流洞封堵段,将导流洞改建为放空洞。
本发明优点在于较传统导流洞改建放空洞方式,省去了进口塔架,避免了二次开挖导流洞,降低了施工难度和施工投资,经济效益好且缩短了工期。本发明方法尤其适用于非汛期河水流量较小、水库大坝不高、放空洞进口高程与导流洞进口高程相差较小的情况。
附图说明
图1是按照本发明方法实施的改建后放空洞的结构示意图。
具体实施方式
参照图1所示,本发明所述水库导流洞改建放空洞的方法,将拟建的放空洞进口1与待改建的导流洞进口2邻近布置,并将放空洞进口1通过放空管道12连接至导流洞3边墙,在该边墙外侧设置闸阀室4,在闸阀室4内安装临时挡水阀5并关闭,之后将导流洞3边墙用钢板6封闭;大坝施工时,河水从导流洞3过流;待水库建设施工完成后,在导流洞进口2的门槽内放入封堵闸门7将导流洞进口2封闭,然后安装闸阀室4后部的钢管8,将钢管8进水口与临时挡水阀5连通,钢管8出水口顺水流延伸至导流洞3内,在位于导流洞3内的钢管8上安装检修阀9和工作阀10,之后关闭工作阀10,永久打开临时挡水阀5,在导流洞3内位于检修阀9和工作阀10上游侧施工导流洞封堵段11,将导流洞3改建为放空洞。改建后的放空洞运行时,根据检修需要启、闭检修阀9,根据水库放空要求,适时打开工作阀10。
Claims (1)
1.一种水库导流洞改建放空洞的方法,其特征在于:将拟建的放空洞进口与待改建的导流洞进口邻近布置,并将所述放空洞进口连接至所述导流洞边墙,在所述边墙外侧设置闸阀室,在所述闸阀室内安装临时挡水阀,之后将导流洞边墙用钢板封闭;大坝施工时,河水从导流洞过流;待水库建设施工完成后,在导流洞进口门槽内放入封堵闸门,然后安装所述闸阀室后部的钢管,将所述钢管进水口与所述临时挡水阀连通,钢管出水口顺水流延伸至导流洞内,在位于导流洞内的钢管上安装检修阀和工作阀,之后关闭所述工作阀,打开临时挡水阀,在导流洞内位于所述检修阀和工作阀上游侧施工导流洞封堵段,将导流洞改建为放空洞。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711129865.8A CN107893402A (zh) | 2017-11-15 | 2017-11-15 | 水库导流洞改建放空洞的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711129865.8A CN107893402A (zh) | 2017-11-15 | 2017-11-15 | 水库导流洞改建放空洞的方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107893402A true CN107893402A (zh) | 2018-04-10 |
Family
ID=61805499
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711129865.8A Withdrawn CN107893402A (zh) | 2017-11-15 | 2017-11-15 | 水库导流洞改建放空洞的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107893402A (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109083086A (zh) * | 2018-08-31 | 2018-12-25 | 中国电建集团西北勘测设计研究院有限公司 | 一种水电站高坝紧急状态下的水库放空再蓄水方法 |
| CN109356124A (zh) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | 洞室平交岔口结构 |
| CN109371914A (zh) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | 一种便于后期改建的泄水渠结构 |
| CN115679908A (zh) * | 2022-06-30 | 2023-02-03 | 南方电网调峰调频发电有限公司工程建设管理分公司 | 施工导流与泄洪调节相结合的洞室与闸门设计方法 |
| CN119777330A (zh) * | 2025-03-07 | 2025-04-08 | 长江勘测规划设计研究有限责任公司 | 一种临时生态供水洞结构布置及实施方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH108445A (ja) * | 1996-06-25 | 1998-01-13 | Kawasaki Steel Corp | 管路の布設方法 |
| CN203846465U (zh) * | 2014-05-26 | 2014-09-24 | 中国电建集团成都勘测设计研究院有限公司 | 放空洞或非常泄洪洞布置系统 |
| CN104120692A (zh) * | 2014-07-01 | 2014-10-29 | 浙江省水利水电勘测设计院 | 一洞双层导流、放空洞相结合的施工布置方法 |
| CN204849708U (zh) * | 2015-08-07 | 2015-12-09 | 中国水利水电科学研究院 | 200米以上超高坝水库放空洞 |
| CN205205793U (zh) * | 2015-09-22 | 2016-05-04 | 中国电建集团华东勘测设计研究院有限公司 | 一种利用导流隧洞改建的输水兼放空洞进口结构 |
-
2017
- 2017-11-15 CN CN201711129865.8A patent/CN107893402A/zh not_active Withdrawn
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH108445A (ja) * | 1996-06-25 | 1998-01-13 | Kawasaki Steel Corp | 管路の布設方法 |
| CN203846465U (zh) * | 2014-05-26 | 2014-09-24 | 中国电建集团成都勘测设计研究院有限公司 | 放空洞或非常泄洪洞布置系统 |
| CN104120692A (zh) * | 2014-07-01 | 2014-10-29 | 浙江省水利水电勘测设计院 | 一洞双层导流、放空洞相结合的施工布置方法 |
| CN204849708U (zh) * | 2015-08-07 | 2015-12-09 | 中国水利水电科学研究院 | 200米以上超高坝水库放空洞 |
| CN205205793U (zh) * | 2015-09-22 | 2016-05-04 | 中国电建集团华东勘测设计研究院有限公司 | 一种利用导流隧洞改建的输水兼放空洞进口结构 |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109083086A (zh) * | 2018-08-31 | 2018-12-25 | 中国电建集团西北勘测设计研究院有限公司 | 一种水电站高坝紧急状态下的水库放空再蓄水方法 |
| CN109356124A (zh) * | 2018-11-21 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | 洞室平交岔口结构 |
| CN109356124B (zh) * | 2018-11-21 | 2023-11-21 | 中国电建集团成都勘测设计研究院有限公司 | 洞室平交岔口结构 |
| CN109371914A (zh) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | 一种便于后期改建的泄水渠结构 |
| CN109371914B (zh) * | 2018-12-25 | 2023-09-26 | 中国电建集团成都勘测设计研究院有限公司 | 一种便于后期改建的泄水渠结构 |
| CN115679908A (zh) * | 2022-06-30 | 2023-02-03 | 南方电网调峰调频发电有限公司工程建设管理分公司 | 施工导流与泄洪调节相结合的洞室与闸门设计方法 |
| CN119777330A (zh) * | 2025-03-07 | 2025-04-08 | 长江勘测规划设计研究有限责任公司 | 一种临时生态供水洞结构布置及实施方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203256704U (zh) | 一种用于平面闸门的充水平压装置 | |
| CN209703536U (zh) | 一种水运工程基坑虹吸抽排水组合装置 | |
| CN108797526A (zh) | 用于特高堆石坝的多功能生态供水洞布置结构 | |
| CN205205793U (zh) | 一种利用导流隧洞改建的输水兼放空洞进口结构 | |
| CN208604556U (zh) | 用于特高堆石坝的多功能生态供水洞布置结构 | |
| CN209873729U (zh) | 一种闸门水下冲沙防淤的装置 | |
| CN209875159U (zh) | 土压平衡盾构机螺旋输送机防喷涌装置 | |
| CN202440787U (zh) | 一种河道导流装置 | |
| CN201809751U (zh) | 平面钢闸门止水橡胶保护装置 | |
| CN207512707U (zh) | 一种布设新型抽排系统的消力池 | |
| CN106195363A (zh) | 一种带排气装置式静音软密封止回阀 | |
| CN114703878A (zh) | 一种降水井封堵排水装置及施工方法 | |
| CN202265807U (zh) | 用于导流泄水建筑物的闸室 | |
| CN201103408Y (zh) | 阻火卸压放水排渣装置 | |
| CN204717666U (zh) | 一种蒸汽锅炉给水系统 | |
| CN212835464U (zh) | 一种新型地下围护结构堵漏装置 | |
| CN209429080U (zh) | 闸室内生态放水管结构 | |
| CN207778028U (zh) | 输浆管路减压装置 | |
| CN103161143B (zh) | 一种设置在隐体中的导流洞竖井闸室结构 | |
| CN217584080U (zh) | 一种供汽管道疏水系统 | |
| CN117385802A (zh) | 一种中小型水库倒虹吸输水系统及输水方法 | |
| CN209975479U (zh) | 一种新型输水建筑物 | |
| CN200964580Y (zh) | 一种防淤堵逆止式排水器 | |
| CN212772242U (zh) | 一种混凝土坝独立运行的生态流量管结构 | |
| CN205604193U (zh) | 一种高坝水库放空装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WW01 | Invention patent application withdrawn after publication | ||
| WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180410 |