CN109371807A - It is a kind of can quick transformation bridge - Google Patents

It is a kind of can quick transformation bridge Download PDF

Info

Publication number
CN109371807A
CN109371807A CN201811143940.0A CN201811143940A CN109371807A CN 109371807 A CN109371807 A CN 109371807A CN 201811143940 A CN201811143940 A CN 201811143940A CN 109371807 A CN109371807 A CN 109371807A
Authority
CN
China
Prior art keywords
pier shaft
reinforcing bar
universal
long reinforcing
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811143940.0A
Other languages
Chinese (zh)
Other versions
CN109371807B (en
Inventor
吴毅彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liwu (xiamen) Technology Co Ltd
Original Assignee
Liwu (xiamen) Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liwu (xiamen) Technology Co Ltd filed Critical Liwu (xiamen) Technology Co Ltd
Priority to CN201811143940.0A priority Critical patent/CN109371807B/en
Publication of CN109371807A publication Critical patent/CN109371807A/en
Application granted granted Critical
Publication of CN109371807B publication Critical patent/CN109371807B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D12/00Bridges characterised by a combination of structures not covered as a whole by a single one of groups E01D2/00 - E01D11/00
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

It is a kind of can quick transformation bridge, including beam body, bent cap, cushion cap and anti-collision wall, it is characterized in that, further include: height-adjustable pin-connected panel pillarwork, self-leveling type seat structure, expanded joint structure can quickly be adjusted, linear adjustable railing and anticollision wall construction, the height-adjustable pin-connected panel pillarwork is located between bent cap and cushion cap, the beam body is erected on bent cap by self-leveling type seat structure, the quick adjustment expanded joint structure is located at the end of adjacent two beam body, the linear adjustable railing and anticollision wall construction are located at two across anti-collision wall ends, the present invention can be achieved to complete Bridge Reconstruction construction in the short time, change that former bridge vertical curve is linear and head room by mating jacking technique.

Description

It is a kind of can quick transformation bridge
Technical field
The present invention relates to the bridge that can be transformed of one kind, it is espespecially a kind of can quick transformation bridge.
Background technique
In recent years, at the beginning of China city, highway bridge are due to planning, design, construction, lack to later period environment, traffic etc. The long-range consideration of aspect causes to occur during operation since road clearance is insufficient under channel order promotion, bridge, or newly plans bridge Beam and original bridge, which are in harmony, the reasons such as connects, and needs the head room to original bridge, vertical curve linear etc. and is transformed.
And the method that the prior art mostly uses jacking carries out Bridge Reconstruction, former bridge structure is generally cut from pier stud position Afterwards, jacking to design height connects column again, then is transformed, renovates to attached construction of bridge etc..
Above-mentioned renovation technique compared with bridging toughening, rebuild biggish saving cost and time, but rhythm is getting faster Social development, just use at the beginning of the Bridge Design it is a kind of can be with the structural system of quick transformation, fundamentally the saving later period changes The time made is not yet excessively to consider the problems of.
Therefore, the applicant is dedicated to providing a kind of unique structure, operates convenient, reliability and the higher bridge of safety Structural system can be used for being rapidly performed by Bridge Reconstruction, greatly shorten Bridge Reconstruction cost and time.
Summary of the invention
To solve the above-mentioned problems, the present invention provide it is a kind of can quick transformation bridge, including beam body, lid Beam, cushion cap and anti-collision wall, further includes:
One height-adjustable pin-connected panel pillarwork, the height-adjustable pin-connected panel pillarwork includes fixed section pier shaft With variable field pier shaft, the variable pier shaft precast block, by cooperating the connection of different height to adjust the height of variable field pier shaft Degree, to adapt to pier shaft height change;
One self-leveling type seat structure;
One can quickly adjust expanded joint structure;
One linear adjustable railing and anticollision wall construction;
The height-adjustable pin-connected panel pillarwork is located between bent cap and cushion cap, and the beam body passes through self-leveling type branch Holder structure is erected on bent cap, and the quick adjustment expanded joint structure is located at the end in adjacent two beam body, described linear adjustable Railing and anticollision wall construction are located at two across anti-collision wall ends.
The height-adjustable pin-connected panel pillarwork, comprising: fixed section pier shaft and variable field pier shaft, the fixed section pier Status section is prefabricated, the variable pier shaft precast block, preferably, the height-adjustable pin-connected panel pillarwork can including one Become section pier shaft and upper and lower two fixed section pier shafts, the variable field pier shaft is located between upper and lower two fixed section pier shafts, prefabricated After intensity reaches design requirement, scene, which is poured, is spliced to form a complete pillarwork.
The variable field pier shaft include: to socket long reinforcing bar, pier shaft connector, connection regulating part, post-cast strip, the segmentation The prefabricated pier shaft of formula and the segmentation of fixed section pier shaft are prefabricated;
The pier shaft connector includes fixed section preburying part and pier shaft interconnecting piece, and the fixed section preburying part is pre-buried to be anchored at In fixed section pier shaft, pier shaft interconnecting piece is exposed outside, and the pier shaft interconnecting piece is equipped with several first bolts hole, with next interval Fixed section pier shaft on pier shaft connector portion by connection regulating part bolt fix;
The connection regulating part is equipped with several second bolts hole, and second bolt hole is corresponding with the first bolt hole, described The structure for connecting regulating part is one of U-shaped material, plate profile, preferably, the connection regulating part is U-shaped material, the pier Body interconnecting piece is placed in U-lag;
The pier shaft connector is used cooperatively with regulating part is connect, can be with by cooperating the connection regulating part of different height The distance between two pier shaft connectors are adjusted, to adjust the height of variable field pier shaft, effectively to adapt to large range of pier Body height change;
Described pair sockets long reinforcing bar two as one group, including first pair sockets long reinforcing bar and second pair sockets long reinforcing bar, institute It states first pair and sockets long reinforcing bar and second pair sockets long reinforcing bar and be one group and be correspondingly arranged, be equipped in the variable field pier shaft several Group is subject to the design requirement for meeting pier shaft intensity to the quantity for socketing long reinforcing bar to long reinforcing bar is socketed, and first, second pair sockets The tail portion difference weld anchor of long reinforcing bar is solid on the free face of upper and lower fixed section preburying part, and described first, second pair sockets long steel Muscle head is equipped with reversed screw thread, sockets long reinforcing bar head for corresponding first, second pair by screw rod collar nut and is connected, Described first, second pair sockets long reinforcing bar and can reach tightening by turning screw rod collar nut or loosen effect;
The post-cast strip is fixed in pier shaft connector portion with regulating part bolt is connect, and is installed to long reinforcing bar adjustment is socketed It is poured after the completion, the post-cast strip will all be wrapped up to long reinforcing bar, pier shaft connector and connection regulating part is socketed, institute Height-adjustable pin-connected panel pillarwork is stated, it can be by the method rapid shaping of precast assembly, and by socketing long reinforcing bar, pier Body connector, connection regulating part, post-cast strip reach bearing capacity requirement in a short time;
Self-leveling type seat structure includes the universal built-in fitting in top surface and universal pre-buried for carrying top surface on support on support The bridge pad of part, the universal built-in fitting in top surface includes spherical crown Universal-head and spherical concave surface pedestal, variable field pier shaft on the support In the state that height changes, the position relative displacement between spherical crown Universal-head and spherical concave surface pedestal is adjusted, to guarantee bridge The pressure of beam support is in horizontal extent.
The bridge pad is for carrying the universal built-in fitting in top surface on support;
The universal built-in fitting in top surface includes spherical crown Universal-head and spherical concave surface pedestal on the support, the spherical crown Universal-head and Spherical concave surface base engagement setting, and the concave surface of concave surface pedestal and the spherical crown surface of spherical crown Universal-head fit, on the support The universal built-in fitting in top surface can be freely rotated in spherical crown Universal-head allowed band, rotational angle amplitude range not less than ± 5°;
The concave surface pedestal is embedded in the corresponding installation site of beam body, and the concave surface pedestal is equipped with fixing threaded hole;
Through-hole is equipped in the spherical crown Universal-head, the through-hole is for wearing fastening bolt, by fastening bolt by spherical crown ten thousand It is fixedly connected to head with spherical concave surface pedestal, the aperture of the through-hole is greater than the diameter of bolt, and the aperture of the through-hole should meet concave surface The adjustment of displacement amplitude that pedestal fastening bolt when moving on spherical crown Universal-head is occurred.
The bridge pad includes one of rubber support, pot bearing;
The self-leveling type seat structure passes through the spherical crown ten thousand when beam body and pier stud bent cap relative attitude change Rotation to head makes support remain horizontal closely connected with upper top surface, prevents horizontal component.
It is described quickly to adjust expanded joint structure, including fashioned iron consolidation built-in fitting, gradient adjustable comb tooth plate, fixing bolt, Pair of pages formula infiltration diversion trench;
Fashioned iron consolidation built-in fitting includes built-in fitting and floor, and at least provided with two floors on built-in fitting, built-in fitting is pre- It is embedded in expansion joint two sides beam body or abutment concrete, the cross-shaped setting of the floor of expansion joint two sides;
The gradient adjustable comb tooth plate is wedge configuration, can be changed according to actual grade and carry out prefabricated, replacement;The gradient Adjustable comb tooth plate is connected and fixed by the floor that the fixing bolt consolidates built-in fitting with fashioned iron, quick release, replacement;
The pair of pages formula infiltration diversion trench includes upper diversion trench and lower diversion trench, and the upper diversion trench and lower diversion trench are distinguished In the beam body of expansion joint two sides, the outer of lower diversion trench is entirely fallen within below the projection of diversion trench, the bridge that will fall at expansion joint Face diameter conductance is flow to except bridge, bent cap pier, prevents water flow from directly washing away component and support;
It is described quickly to adjust expanded joint structure, adjusting expansion joint top surface slope can be reached by replacing gradient adjustable comb tooth plate The effect of degree;
The linear adjustable railing and anticollision wall construction, including anti-collision wall, scalable skeleton, protective plate, railing;
The scalable skeleton, which is characterized in that the scalable skeleton has impact strength and rigidity, and is able to achieve A certain range of flexible and swinging deformation ability;
The scalable skeleton both ends are separately fixed at across the anti-collision wall end in front and back two;
The protective plate is van-type structure, is wrapped in the scalable skeleton periphery, forms enclosed construction, prevent rainwater straight It connects and washes away scalable skeleton;
The railing includes chain bar and column, and the chain bar can be existed by hingedly connecting with column by chain bar free end Sliding adapts to linear, change in displacement in sliding slot, constructs for chain-bar type;
The linear adjustable railing and anticollision wall construction, which is characterized in that the linear adjustable railing and anticollision wall construction By the flexible and swinging deformation ability of scalable skeleton, protective plate and railing in a certain range, in two bridge body phase of front and back After changing to posture, adaptive deformation can be voluntarily adjusted, and continues original collision prevention function;
The post-cast strip concrete uses fast hardening concrete, and the presetting period is less than or equal to 1 hour, and intensity can reach within 4 hours 50% or more design strength.
The height-adjustable pin-connected panel pillarwork can carry out pier stud height adjustment by bridge integral jacking technology;
The self-leveling type seat structure can quickly adjust expanded joint structure, linear adjustable railing and anticollision wall construction and exist After pier stud height adjustment, new structural regime can be formed, reaches bridge use and wants by artificially adjusting or adaptation function It asks.
One kind provided by the invention can quick transformation bridge, the especially design of variable field pier shaft can be with Realize it is following at least one the utility model has the advantages that
1, it after bridge provided by the invention is, it can be achieved that bridge runs for a long time, is promoted to reach channel order, bridge Lower road clearance is insufficient, or new planning bridge and original bridge are in harmony the Bridge Reconstruction for a variety of purposes such as connecing and carrying out, the bridge knot The process of Bridge Reconstruction can be standardized by structure system feature, sequencing and simplification, and the coverage of Bridge Reconstruction is contracted To minimum.
2, it is provided by the invention can quick transformation bridge, it can be achieved that the short time in complete Bridge Reconstruction apply Work, changes that former bridge vertical curve is linear and head room by mating jacking technique.
Detailed description of the invention
Fig. 1 is the contexture schematic diagram of the embodiment of the present invention;
Fig. 2 is the height-adjustable pin-connected panel pillarwork elevation in Fig. 1;
Fig. 3 is the height-adjustable pin-connected panel pillarwork cross-sectional view in Fig. 2;
Fig. 4 is self-leveling type seat structure in Fig. 1;
Fig. 5 is that can quickly adjust expanded joint structure plan view in Fig. 1;
Fig. 6 is that can quickly adjust expanded joint structure cross-section diagram in Fig. 5;
Fig. 7 is linear adjustable railing and anticollision wall construction elevation in Fig. 1;
Fig. 8 is another elevation of the height-adjustable pin-connected panel pillarwork of the embodiment of the present invention;
Fig. 9 is the connection regulating part schematic diagram of the embodiment of the present invention;
Figure 10 is the pier shaft connector schematic diagram of the embodiment of the present invention;
Figure 11 is self-leveling type seat structure variation diagram after the pier stud of the embodiment of the present invention is lifted.
Specific embodiment
The present invention is further illustrated below in conjunction with attached drawing.
To solve the above-mentioned problems, the present invention provide it is a kind of can quick transformation bridge, including beam body, lid Beam, cushion cap and anti-collision wall, further includes:
One height-adjustable pin-connected panel pillarwork 1;
One self-leveling type seat structure 2;
One can quickly adjust expanded joint structure 3;
One linear adjustable railing and anticollision wall construction 4;
The height-adjustable pin-connected panel pillarwork is located between bent cap 52 and cushion cap 51, and the beam body 61 passes through self-regulated Flat seat structure 2 is erected on bent cap 52, and the quick adjustment expanded joint structure 3 is located at the end of adjacent two beam body 61, institute It states linear adjustable railing and anticollision wall construction 4 is located at two across 7 end of anti-collision wall.
The height-adjustable pin-connected panel pillarwork 1, comprising: fixed section pier shaft 111 and variable field pier shaft 113, it is described Fixed section pier shaft is segmented prefabricated, the variable pier shaft precast block, preferably, the height-adjustable pin-connected panel pillarwork packet Include a variable field pier shaft and upper and lower two fixed section pier shafts, the variable field pier shaft be located at upper and lower two fixed section pier shafts it Between, after prefabricated intensity reaches design requirement, scene, which is poured, is spliced to form a complete pillarwork.
The variable field pier shaft include: to socket long reinforcing bar 12, pier shaft connector 13, connection regulating part 14, post-cast strip 15;
The pier shaft connector 13 includes fixed section preburying part 131 and pier shaft interconnecting piece 132, the fixed section preburying part 131 it is pre-buried be anchored in fixed section pier shaft, pier shaft interconnecting piece 132 is exposed outside, the pier shaft interconnecting piece be equipped with several first Bolt hole 133;
The connection regulating part 14 is equipped with several second bolts hole 141, and second bolt hole is corresponding with the first bolt hole, Preferably, the connection regulating part is U-shaped material, the pier shaft interconnecting piece 132 is placed in the U-lag of connection regulating part;
The pier shaft connector is used cooperatively with regulating part is connect, can be with by cooperating the connection regulating part of different height The distance between two pier shaft connectors are adjusted, to adjust the height of variable field pier shaft, effectively to adapt to large range of pier Body height change;
Described pair sockets long reinforcing bar 12 two as one group, including first pair sockets long reinforcing bar 121 and second pair sockets long steel Muscle 122, described first pair sockets long reinforcing bar and second pair sockets long reinforcing bar and be one group and be correspondingly arranged, in the variable field pier shaft Equipped with several groups to long reinforcing bar is socketed, it is subject to the design requirement for meeting pier shaft intensity to the quantity for socketing long reinforcing bar, first, Two pairs of tail portion difference weld anchors for socketing long reinforcing bar are solid on the free face of upper and lower fixed section preburying part, and described first, second pair Long reinforcing bar head is socketed equipped with reversed screw thread, long steel bar end is socketed for corresponding first, second pair by screw rod collar nut 123 Portion is connected, and described first, second pair sockets long reinforcing bar and can reach tightening by turning screw rod collar nut or loosen effect;
The self-leveling type seat structure includes: the universal built-in fitting 21 in top surface and bridge pad 22, the bridge on support Support is for carrying the universal built-in fitting in top surface on support;
The universal built-in fitting 21 in top surface includes spherical crown Universal-head 24 and spherical concave surface pedestal 23, the spherical crown ten thousand on the support To head and spherical concave surface base engagement setting, and the concave surface 231 of concave surface pedestal and the spherical crown surface 241 of spherical crown Universal-head are affixed It closes, the universal built-in fitting in top surface can be freely rotated in spherical crown Universal-head allowed band on the support, rotational angle amplitude Range is not less than ± 5 °;
The concave surface pedestal is embedded in the corresponding installation site of beam body, and the concave surface pedestal is equipped with fixing threaded hole 232;
Through-hole 242 is equipped in the spherical crown Universal-head, the through-hole is for wearing fastening bolt, by fastening bolt by spherical crown Universal-head is fixedly connected with spherical concave surface pedestal, and the aperture of the through-hole is greater than the diameter of bolt, and the aperture of the through-hole should meet recessed The adjustment of displacement amplitude that pedestal fastening bolt when moving on spherical crown Universal-head in face is occurred.
Firstly, lower fixed section pier shaft 112 is poured into an integrated entity with cushion cap 51, when casting, by the fixation of pier shaft connector 13 The pre-buried end face for being anchored at lower fixed section pier shaft 112 of section preburying part 131, also, pier shaft interconnecting piece 132 is exposed outside, similarly, on When fixed section pier shaft 111 is poured, its one end also in pre-buried anchoring pier shaft connector 13 fixed section preburying part 131, also, pier Body interconnecting piece 132 is exposed outside, and after the upper and lower casting of two fixed section pier shafts 111,112 hardening, intensity reaches design requirement, will be upper Fixed section pier shaft 111 is supported on the surface of lower fixed section pier shaft 112, is correspondingly arranged upper and lower two pier shaft interconnecting pieces 132;
Secondly, two connection regulating parts 14 are located at the two sides of upper and lower two pier shaft interconnecting pieces 132 relatively, and pier shaft is connected Socket part 132 is stuck in the U-lag 142 of connection regulating part 14, passes through the first bolt hole 133 and the second bolt hole 141 with bolt 16 The connection regulating part 14 of two sides and upper and lower two pier shaft interconnecting pieces 132 are fixed as one, the first all bolt hole 133 and Two bolts hole 141 are all fastened with bolt 16;
Then, one group first is consolidated to socketing 121, second pairs of tail portions for socketing long reinforcing bar 122 of long reinforcing bar and distinguish weld anchor On the free face of upper and lower fixed section preburying part 131, first pair sockets 121, second pairs of long reinforcing bar and sockets long 122 head of reinforcing bar Equipped with reversed screw thread, long reinforcing bar head is socketed for corresponding first, second pair by screw rod collar nut 123 and is connected, institute Stating first, second pair and socketing long reinforcing bar can reach tightening by turning screw rod collar nut or loosens effect, according to design requirement, Multiple groups are equipped in variable pier shaft to long reinforcing bar is socketed, to meet the intensity of pier shaft;
It is finally post-cast strip, tool is modeled between upper and lower fixed section pier shaft, sockets long reinforcing bar, fixed section built-in fitting, pier shaft All packet is in mold for connector and connection regulating part, and then, the concrete perfusion in mold, post-cast strip concrete is using fast hard Concrete, the presetting period be less than or equal to 1 hour, 4 hours intensity can reach 50% or more design strength, will to socket long reinforcing bar, Pier shaft connector and connection regulating part all wrap up, by one complete pier of upper and lower fixed section pier shaft and variable field pier shaft Column.
Bridge pad 22 is installed on bent cap 52, concave surface pedestal 23 is anchored to the supporting part of beam body, the supporting part and beam Body support installation site is corresponding, and fastening bolt 243 is passed through through-hole 242, concave surface pedestal 23 is connect with spherical crown Universal-head 24, Since through-hole 242 and aperture are greater than the diameter of fastening bolt 243, fastening bolt 243 has mobile space in through-hole, by spherical crown ten thousand To first 24 bottom surface be adjusted to 22 end face same plane of bridge pad, make the universal built-in fitting in top surface on beam body support 22 and support 21 remain horizontal closely connected, then, fastening bolt 243 is fixed, are fixed with the bridge of the universal built-in fitting 21 in top surface on support It is erected on bridge pad 22.
After the completion of bridge erection, expansion joint is equipped between adjacent two bridge 61, in expansion joint two sides beam body or abutment coagulation Pre-buried fashioned iron consolidates built-in fitting 31 respectively in native, then floor 35 is fixed on consolidation built-in fitting 31, a consolidation built-in fitting 31 Multiple floors 35 are equipped with, each floor is equipped with gradient adjustable comb tooth plate 32, which passes through fixed spiral shell Bolt 33 and floor 35 are fixed, and the floor of expansion joint two sides is in dentation cross-over design, which is wedge configuration, can Prefabricated, replacement, quick release, replacement are carried out according to actual grade variation, the lower section of floor is equipped with pair of pages formula infiltration diversion trench 34, which includes upper diversion trench and lower diversion trench, and the upper diversion trench and lower diversion trench are distinguished in the beam body of expansion joint two sides, The outer of lower diversion trench is entirely fallen within below the projection of diversion trench, and lower diversion trench accepts the runoff overflowed from upper diversion trench, will The deck runoff fallen at expansion joint is guided to except bridge, bent cap pier, prevents water flow from directly washing away component and support.
It is described quickly to adjust expanded joint structure, adjusting expansion joint top surface slope can be reached by replacing gradient adjustable comb tooth plate The effect of degree.
The two sides of bridge floor be equipped with linear adjustable railing and anti-collision wall, the linear adjustable railing include scalable skeleton 41, Protective plate 42, railing 43, scalable 41 both ends of skeleton are separately fixed at end of the front and back two across anti-collision wall 7, described to stretch Contracting skeleton has impact strength and rigidity, and is able to achieve a certain range of flexible and swinging deformation ability, the protective plate 42 be van-type structure, is wrapped in the scalable skeleton periphery, forms enclosed construction, prevent rainwater from directly washing away scalable bone Frame, the railing include chain bar 43 and column 44, and the chain bar 43 can pass through chain bar free end by hingedly connecting with column 44 431 slide the linear, change in displacement of adaptation in sliding slot 432.
Linear adjustable railing and anticollision wall construction pass through scalable skeleton, protective plate and railing in a certain range flexible Adaptive deformation can be voluntarily adjusted, and continue original after two bridge body relative attitudes changes in front and back with swinging deformation ability Collision prevention function.
Present bridge when not being able to satisfy current requirement or safety problem demand lifting bridge needs that pier shaft is asked to be lifted Rise transformation, adaptation step are as follows:
Step 1: loosening the fastening bolt 243 between concave surface pedestal 23 and spherical crown Universal-head 24, fixation supports pier stud Upper fixed section pier shaft 111, upper fixed section pier shaft falls after preventing post-cast strip from removing;
Step 2: removal variable field pier shaft 113 can concrete on post-cast strip 15, make pier shaft connector 13, connection is adjusted It saves part 14 and is all exposed to long reinforcing bar 12 is socketed;
Step 3: the bolt on pier shaft interconnecting piece 132 and connection regulating part 14 is removed, makes to connect regulating part and pier shaft connects Socket part 132 separates, and turns to the screw rod collar nut for socketing long reinforcing bar, makes first, second pair to socket long reinforcing bar separation;
Step 4: upper fixed section pier shaft 111 is lifted to presetting height, adjustment concave surface pedestal 23 and spherical crown Universal-head 24 Position so that the universal built-in fitting 21 in top surface and bridge pad 22 is remained horizontal by the rotation of spherical crown Universal-head It is closely connected, prevent horizontal component;
Step 5: it is previously fabricated with the connection regulating part that is consistent of design rising height, after the connection regulating part and lifting Upper and lower 132 height of pier shaft interconnecting piece is adapted, and passes through the first bolt hole and the second bolt hole with bolt, new connection is adjusted Part and upper and lower pier shaft interconnecting piece 132 fasten, make upper and lower pier shaft interconnecting piece 132 with connect regulating part and be linked together again, turn Screw rod collar nut adjusts first, second pair and sockets long reinforcing bar, and the fixed section preburying part 131 of upper and lower fixed section pier shaft is tensed, If the adjustment of screw rod collar nut is not able to satisfy the requirement of lifting, just cut off original all to socketing long reinforcing bar, weight It newly arranges and welds first, second pair of anchoring and socket long reinforcing bar, then tense first, second pair by screw rod collar nut and socket length Reinforcing bar;
Step 6: being poured post-cast strip again, long reinforcing bar, fixed section built-in fitting, pier shaft connector and connection will be socketed and adjusted All packet is in mold for part, then, the concrete perfusion in mold.
Step 7: to self-leveling type seat structure, can quickly adjust expanded joint structure, linear adjustable railing and anti-collision wall structure It makes after pier stud height adjustment, can form new structural regime by artificially adjusting or adaptation function, reach bridge use It is required that.
Disclosed above is only specific embodiments of the present invention, the embodiment be only it is clearer illustrate used in the present invention, And not limitation of the invention, the changes that any person skilled in the art can think of should all be fallen in protection scope.

Claims (9)

1. one kind can quick transformation bridge, including beam body, bent cap, cushion cap and anti-collision wall, which is characterized in that also wrap It includes:
One height-adjustable pin-connected panel pillarwork, the height-adjustable pin-connected panel pillarwork include fixed section pier shaft and can Become section pier shaft, the variable pier shaft precast block comes by cooperating the connection of different height to adjust the height of variable field pier shaft Adapt to pier shaft height change;
One self-leveling type seat structure;
One can quickly adjust expanded joint structure;
One linear adjustable railing and anticollision wall construction;
The height-adjustable pin-connected panel pillarwork is located between bent cap and cushion cap, and the beam body passes through self-leveling type support knot Framework is located on bent cap, and the quick adjustment expanded joint structure is located at the end of adjacent two beam body, the linear adjustable railing with Anticollision wall construction is located at two across anti-collision wall ends.
2. as described in claim 1 can quick transformation bridge, it is characterised in that: the height-adjustable assembly Formula pillarwork, the height-adjustable pin-connected panel pillarwork include a variable field pier shaft and upper and lower two fixed section piers Body, the variable field pier shaft is located between upper and lower two fixed section pier shafts, live by it after prefabricated intensity reaches design requirement Casting is spliced to form a complete pillarwork.
3. as claimed in claim 1 or 2 can quick transformation bridge, it is characterised in that: the variable field pier shaft Include: to socket long reinforcing bar, pier shaft connector, connection regulating part, post-cast strip, the prefabricated pier shaft of segmented includes, described solid It is prefabricated to determine the segmentation of section pier shaft;
The pier shaft connector includes fixed section preburying part and pier shaft interconnecting piece, and the fixed section preburying part is pre-buried to be anchored at fixation In section pier shaft, pier shaft interconnecting piece is exposed outside, and the pier shaft interconnecting piece is equipped with several first bolts hole;
The connection regulating part is equipped with several second bolts hole, and second bolt hole is corresponding with the first bolt hole, the connection The structure of regulating part is one of U-shaped material, plate profile, and the connection regulating part is U-shaped material, the pier shaft interconnecting piece accommodating In in U-lag;
The post-cast strip is fixed in pier shaft connector portion with regulating part bolt is connect, and is installed to long reinforcing bar adjustment is socketed After poured, the post-cast strip will to socket long reinforcing bar, pier shaft connector and connection regulating part be all wrapped in;
The described pair of both ends for socketing long reinforcing bar are connect with fixed section preburying part respectively.
4. as described in claim 1 can quick transformation bridge, it is characterised in that: self-leveling type seat structure packet Include the universal built-in fitting in top surface on support and the bridge pad for carrying the universal built-in fitting in top surface on support, top surface on the support Universal built-in fitting includes that spherical crown Universal-head and spherical concave surface pedestal adjust ball in the state that variable field pier shaft height changes The position between Universal-head and spherical concave surface pedestal is preced with to guarantee the pressure of bridge pad in horizontal extent.
5. as claimed in claim 4 can quick transformation bridge, it is characterised in that:
The spherical crown Universal-head and spherical concave surface base engagement setting, and the spherical crown of the concave surface of concave surface pedestal and spherical crown Universal-head Face fits, and the universal built-in fitting in top surface can be freely rotated in spherical crown Universal-head allowed band on the support, angle of rotation It spends amplitude range and is not less than ± 5 °;
The concave surface pedestal is embedded in the corresponding installation site of beam body, and the concave surface pedestal is equipped with fixing threaded hole;
Through-hole is equipped in the spherical crown Universal-head, the through-hole is for wearing fastening bolt, by fastening bolt by spherical crown Universal-head It is fixedly connected with spherical concave surface pedestal, the aperture of the through-hole is greater than the diameter of bolt, and the aperture of the through-hole should meet concave surface pedestal The adjustment of displacement amplitude that fastening bolt is occurred when moving on spherical crown Universal-head.
6. as described in claim 1 can quick transformation bridge, it is characterised in that:
It is described quickly to adjust expanded joint structure, including fashioned iron consolidation built-in fitting, gradient adjustable comb tooth plate, fixing bolt, pair of pages Formula infiltration diversion trench;
Fashioned iron consolidation built-in fitting includes built-in fitting and floor, and at least provided with two floors on built-in fitting, built-in fitting is embedded in Expansion joint two sides beam body, the cross-shaped setting of the floor of expansion joint two sides;
The gradient adjustable comb tooth plate is wedge configuration;
The pair of pages formula infiltration diversion trench includes upper diversion trench and lower diversion trench, and the upper diversion trench and lower diversion trench stretch respectively It stitches in the beam body of two sides, the outer of lower diversion trench is entirely fallen within below the projection of diversion trench.
7. as described in claim 1 can quick transformation bridge, it is characterised in that: the linear adjustable railing with Anticollision wall construction, including anti-collision wall, scalable skeleton, protective plate, railing;
The scalable skeleton both ends are separately fixed at across the anti-collision wall end in front and back two;
The protective plate is van-type structure, is wrapped in the scalable skeleton periphery, forms enclosed construction, prevent rainwater from directly rushing Brush scalable skeleton;
The railing includes chain bar and column, and the chain bar with column by hingedly connecting.
8. as claimed in claim 3 can quick transformation bridge, it is characterised in that:
The post-cast strip concrete uses fast hardening concrete, and the presetting period is less than or equal to 1 hour, and intensity can reach design within 4 hours 50% or more intensity.
9. as claimed in claim 3 can quick transformation bridge, it is characterised in that: described pair sockets long reinforcing bar two Root is one group, including first pair sockets long reinforcing bar and second pair sockets long reinforcing bar, and described first pair sockets long reinforcing bar and second pair Socketing long reinforcing bar is one group and to be correspondingly arranged, and several groups is equipped in the variable field pier shaft to socketing long reinforcing bar, first, second pair The tail portion difference weld anchor for socketing long reinforcing bar is solid on the free face of upper and lower fixed section preburying part, and described first, second pair sockets Long reinforcing bar head is equipped with reversed screw thread, sockets long reinforcing bar head for corresponding first, second pair by screw rod collar nut and docks Connection, described first, second pair sockets long reinforcing bar and can reach tightening by turning screw rod collar nut or loosen effect.
CN201811143940.0A 2018-09-28 2018-09-28 Bridge structure system capable of being rapidly transformed Active CN109371807B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811143940.0A CN109371807B (en) 2018-09-28 2018-09-28 Bridge structure system capable of being rapidly transformed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811143940.0A CN109371807B (en) 2018-09-28 2018-09-28 Bridge structure system capable of being rapidly transformed

Publications (2)

Publication Number Publication Date
CN109371807A true CN109371807A (en) 2019-02-22
CN109371807B CN109371807B (en) 2021-03-26

Family

ID=65403041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811143940.0A Active CN109371807B (en) 2018-09-28 2018-09-28 Bridge structure system capable of being rapidly transformed

Country Status (1)

Country Link
CN (1) CN109371807B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021022671A1 (en) * 2019-08-07 2021-02-11 湖南联智桥隧技术有限公司 Device for preventing pier deviation of high-pier bridge having large longitudinal slope
CN113529562A (en) * 2021-07-20 2021-10-22 中国路桥工程有限责任公司 Bridge facility for preventing geological disasters and construction method
GB2595919A (en) * 2020-06-11 2021-12-15 Atg Access Ltd A barrier arrangement

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020041798A (en) * 2002-05-09 2002-06-03 영 제 박 The method of construction in a more than three span continous composite girder bridges with a lifting up and down inner supports, simultaneously
DE202005004628U1 (en) * 2005-03-22 2005-07-07 Menke, Bernold Support mast consists of metal vertically installed pillar with open profile cross section, and extension section fastened to pillar with height adjustment capability
CN2871629Y (en) * 2005-01-21 2007-02-21 林万生 Transparent overhead bridge for pedestrians
CN200949208Y (en) * 2005-07-21 2007-09-19 项利兵 Column type lifting bridge pier
CN102286924A (en) * 2011-06-30 2011-12-21 石家庄市环城公路建设指挥部办公室 Bridge construction method with inverted procedures
CN202482777U (en) * 2011-12-29 2012-10-10 广东冠粤路桥有限公司 Novel temporary solidification system for bridge construction
CN202989755U (en) * 2012-08-09 2013-06-12 龙炳煌 Integral-casting and fabricated prestressing force bridge structure
CN203782557U (en) * 2014-04-23 2014-08-20 侯继文 Novel adjustable expansion joint device for bridge
CN205188802U (en) * 2015-10-27 2016-04-27 西京学院 Large -scale self -interacting support for truss
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN106120568A (en) * 2016-08-18 2016-11-16 德州市公路工程总公司 Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN206233091U (en) * 2016-11-09 2017-06-09 武汉理工大学 A kind of bridge pad self-adjusting balance device
CN106869014A (en) * 2017-02-17 2017-06-20 北京工业大学 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means
CN206396629U (en) * 2016-12-26 2017-08-11 河北省交通规划设计院 A kind of Fast Installation fishback retractor device
CN207331436U (en) * 2017-08-01 2018-05-08 洛阳双瑞特种装备有限公司 A kind of bridge height adjusts system

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020041798A (en) * 2002-05-09 2002-06-03 영 제 박 The method of construction in a more than three span continous composite girder bridges with a lifting up and down inner supports, simultaneously
CN2871629Y (en) * 2005-01-21 2007-02-21 林万生 Transparent overhead bridge for pedestrians
DE202005004628U1 (en) * 2005-03-22 2005-07-07 Menke, Bernold Support mast consists of metal vertically installed pillar with open profile cross section, and extension section fastened to pillar with height adjustment capability
CN200949208Y (en) * 2005-07-21 2007-09-19 项利兵 Column type lifting bridge pier
CN102286924A (en) * 2011-06-30 2011-12-21 石家庄市环城公路建设指挥部办公室 Bridge construction method with inverted procedures
CN202482777U (en) * 2011-12-29 2012-10-10 广东冠粤路桥有限公司 Novel temporary solidification system for bridge construction
CN202989755U (en) * 2012-08-09 2013-06-12 龙炳煌 Integral-casting and fabricated prestressing force bridge structure
CN203782557U (en) * 2014-04-23 2014-08-20 侯继文 Novel adjustable expansion joint device for bridge
CN205188802U (en) * 2015-10-27 2016-04-27 西京学院 Large -scale self -interacting support for truss
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN106049259A (en) * 2016-06-16 2016-10-26 安徽省交通规划设计研究总院股份有限公司 Bridge integrally-assembled pier and construction method
CN106120568A (en) * 2016-08-18 2016-11-16 德州市公路工程总公司 Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN206233091U (en) * 2016-11-09 2017-06-09 武汉理工大学 A kind of bridge pad self-adjusting balance device
CN206396629U (en) * 2016-12-26 2017-08-11 河北省交通规划设计院 A kind of Fast Installation fishback retractor device
CN106869014A (en) * 2017-02-17 2017-06-20 北京工业大学 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means
CN207331436U (en) * 2017-08-01 2018-05-08 洛阳双瑞特种装备有限公司 A kind of bridge height adjusts system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021022671A1 (en) * 2019-08-07 2021-02-11 湖南联智桥隧技术有限公司 Device for preventing pier deviation of high-pier bridge having large longitudinal slope
GB2595919A (en) * 2020-06-11 2021-12-15 Atg Access Ltd A barrier arrangement
GB2595919B (en) * 2020-06-11 2023-04-12 Atg Access Ltd A barrier arrangement
CN113529562A (en) * 2021-07-20 2021-10-22 中国路桥工程有限责任公司 Bridge facility for preventing geological disasters and construction method

Also Published As

Publication number Publication date
CN109371807B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN109371807A (en) It is a kind of can quick transformation bridge
CN108035245B (en) Novel fabricated seamless expansion-contraction devices and its construction method
CN104674945B (en) Tree-like steel pipe column structure and construction method thereof
CN106702910A (en) Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes
CN109162157A (en) The construction method of track girder
CN101525871B (en) Multifunctional complete cantilever form and concrete pouring method thereby
CN110565539B (en) Swivel bridge with shock absorption and isolation functions and construction method thereof
CN102767137A (en) Anti-seismic large deformation expansion device of comb plate
CN109914260A (en) Four, double ribs encircle vaulted beam method without steel truss is twisted
CN109235265A (en) System for track girder of constructing
CN105239503B (en) A kind of six to displacement fishback retractor device
CN213233158U (en) Swivel beam arrangement for crossing compound routes
CN102251481A (en) Railway pier layered construction method and construction device
CN208072181U (en) A kind of spherical bearing positioning device
CN208039032U (en) A kind of assembled multi-directional deflection comb plate bridge expansion device
CN106121144B (en) A kind of spacing bearing of concrete staircase damping
CN110468714A (en) Overlength joins lateral closure construction method after unequal span asymmetric continuous bridge is first indulged
CN106677133B (en) Large-scale more rib Prefabricated aqueduct template deformation-preventing supporting devices and construction method
CN113756561A (en) Novel cantilever scaffold building method for high-assembly-rate building
CN109592580A (en) Large-tonnage tower crane super large load attached wall structure method for rapidly mounting in a kind of strong wind atmosphere
KR100443809B1 (en) Fabricated arch tunnel and construction method thereof
CN110565537B (en) Swivel bridge with shock insulation function and construction method thereof
KR100842062B1 (en) The steel composite rahmen bridge construction technique for which preflexion steel girder was used
CN203924352U (en) Section steel concrete steel column base
CN108755395B (en) A kind of spherical bearing installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 361015 room 322a, south of venture building, Venture Park, Xiamen Torch hi tech Zone, Xiamen City, Fujian Province

Applicant after: Liwu (Xiamen) Technology Co.,Ltd.

Address before: 361012 room 322a, south of venture building, Venture Park, Xiamen Torch hi tech Zone, Xiamen City, Fujian Province

Applicant before: LIWU (XIAMEN) TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant