CN208039032U - A kind of assembled multi-directional deflection comb plate bridge expansion device - Google Patents

A kind of assembled multi-directional deflection comb plate bridge expansion device Download PDF

Info

Publication number
CN208039032U
CN208039032U CN201820397334.0U CN201820397334U CN208039032U CN 208039032 U CN208039032 U CN 208039032U CN 201820397334 U CN201820397334 U CN 201820397334U CN 208039032 U CN208039032 U CN 208039032U
Authority
CN
China
Prior art keywords
slot hole
tooth plate
fastener inserts
hole nut
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820397334.0U
Other languages
Chinese (zh)
Inventor
刘力源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Naijiu Telescopic Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820397334.0U priority Critical patent/CN208039032U/en
Application granted granted Critical
Publication of CN208039032U publication Critical patent/CN208039032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of assembled multi-directional deflection comb plate bridge expansion device, is patent of invention " a kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method "(201710223561.1)Improvement, provided with the deicing or snow melting device for preventing U-shaped sink freeze damage, using high-strength stress screw rod and the mutual locking mode of band slot hole nut member being welded in fastener inserts, first left and right fastener inserts are accurately positioned and are welded on the anchor rib reserved at bridge expanssion joint notch, whole cast-in-site high-strength concrete again, U-shaped sink is crimped in the angle steel of both sides, recruitment capping plate covers expansion joint and is fixed temporarily rear paving concrete pavement pitch with left and right fastener inserts, after taking down tooling cover board, the absolute altitude regulating course for pouring early strong ultra-high performance concrete one kind carries out live quickly assembling again, it can ensure that flexible tooth plate is concordant with bituminous paving, further shorten the duration, it is cost-effective, it is safe and efficient, environment influence in bridge lower part is greatly reduced.

Description

A kind of assembled multi-directional deflection comb plate bridge expansion device
Technical field
The utility model is related to a kind of assembled multi-directional deflection comb plate bridge expansion devices, belong to science of bridge building Building technology Field.
Background technology
Bridge extension joint is the important connecting component between highway, railroad bridge end, the quality and performance of the device The durability of bed rearrangement bridge will be directly affected.It is another directly to bear since bridge extension joint setting is in beam-ends bridge floor vulnerable area Various natural environment etches influences, and is twisted relatively during use because there is cold and hot flexible, oscillation in the pitch mode tilting, lateral oscillation Equal multi-directional deflections(That is, three direction displacement, flexible and rotation)The problems such as.Therefore, include to the general requirement of the telescopic device:It is anti- Aqueous each component durability that can be in good, capable of expansion and contraction and device is good, especially the overall structure and installation accuracy of telescopic device Design requirement need to be reached, low noise, vibrations are small when being sailed with sharp vehicle, to realize that telescopic device overall operation is good, use the longevity Life is long and easy to maintain.
All it is reserved notch before existing highway bridge telescopic device in-site installation, is embedded with anchor rib on the notch, then stretching Generally C20 concretes is used to be laid with interim expansion joint at contracting slot mouth, then as bridge face is integrally mated formation together on interim expansion joint Lower layer and pavement asphalt, then layers of asphalt at expansion joint is first cut and removed when installing expansion joint, interim expansion joint is cut, clearly It manages beam-ends and exposes anchor rib, then deck expansion installation component is gradually installed.Shortcoming is existing for this kind of mounting means:⑴ Each all pitches mated formation at expansion joint and interim expansion joint are required for cutting and abandon, and effect on environment is unfavorable, pitch And natural resources is largely lost in the needs such as interim expansion joint;(2) cutting and elimination and fill these rubbish and need a large amount of human and material resources And transport power;(3) expansion joint notch seriously affects bridge floor crossed construction safety and benefit;(4) big, bridge floor is influenced on bridge lower part environment A large amount of rubbish are easy to fall in joint of bridge when crossed construction and later stage expansion joint installation cleaning pitch and the interim expansion joint of cleaning Locate on abutment, it is flexible or fall in bridge in the following, be unfavorable for the safety of personnel or vehicle or attachment under bridge to influence bridge, polluted Ground environment under bridge.In addition, existing comb plate bridge expansion device is using the method for bolt anchoring:First pre embedded bolt, nut On flexible panel road surface, the counterbore depth of flexible panel only has 15 ~ 20mm deep, and nut stings flight lead from only 12 ~ 17mm, this kind Shortcoming existing for mounting means is:Under the repeated stock of cargo, nut is easy fatigue and loosens flexible panel, once fall Plate, screw rod is exposed on runway, is easy to blow out, and generates security risk.
On April 7th, 2017 invention disclosed patent " a kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and Installation method "(201710223561.1)It is first to be welded on fastener inserts on the anchor rib that both ends are reserved at bridge expanssion joint, Cast-in-site high-strength concrete makes fastener inserts be respectively linked together with beam-ends at expansion joint again, then tooling cover board is covered flexible Seam, when being laid with pavement asphalt, tooling cover board plate face and both ends are integrally laid with together with road surface, and pitch cuts chiseler again after completing Pitch near capping plate simultaneously takes out cover board and gives over to reuse, then branch's assembling telescopic device and with high in fastener inserts Strong stress screw rod locking.This method is using high-strength stress screw rod and slot hole nut check, and antifatigue impact capacity is strong, installation accuracy It is high.Pitch is saved, human and material resources and transport power needed for on-site cutting and cleaning is reduced, alleviates the influence to environment, construction period It greatly shortens, installation process synchronous with roadmarking can carry out, and can be open to traffic clearance after installation completion.However the technical solution exists In actual mechanical process, when the flexible panel of telescopic device assembles in branch in fastener inserts, since asphalt bridge floor paved The error of objective reality absolute altitude in journey, the gradient leads to flexible panel absolute altitude, the gradient and bituminous paving absolute altitude, the gradient occur to be difficult to Adjust consistent technical barrier and the problem of installation speed need further to be promoted.
Invention content
The purpose of this utility model is to be directed to background technology described problem, " a kind of unit assembled pre- to answer in patent of invention Power Multidirectional displacement bridge expansion device and installation method "(201710223561.1)On the basis of disclosed technical solution further It improves, designs a kind of assembled multi-directional deflection comb plate bridge expansion device and installation method, using high-strength stress screw rod and weldering The mutual locking mode of band slot hole nut member being connected in fastener inserts, left and right fastener inserts first be accurately positioned and be welded on On the anchor rib reserved at bridge expanssion joint notch, all accuracy datas(Absolute altitude, the gradient, the hole heart away from and at that time at a temperature of institute Corresponding beam slit width degree etc.)Determine it is errorless after, then whole cast-in-site high-strength concrete keeps left and right fastener inserts and beam body rigid Property is linked together, and the top of U-shaped sink both sides is crimped on respectively in the angle steel of both sides, then recruitment capping plate cover it is flexible Stitch simultaneously be fixed temporarily with left and right fastener inserts, tooling cover board absolute altitude control the floor portions absolute altitude 10 less than bridge floor pitch ~ 20mm, then paving concrete pavement pitch, then the facing sections of pavement asphalt in expansion joint design width range are cut off, then take down tooling Cover board, pours absolute altitude regulating course on high-strength concrete, and the absolute altitude regulating course includes:Early strong ultra-high performance concrete or ring Oxygen resin mortar or rubber sulphur-cake, using the present apparatus and the process, it can be ensured that after being laid with the flexible tooth plate in left and right, with pitch Road surface is concordant, can save the interim Expansion Joint filler and operational procedure needed at the notch of expansion joint, save construction cost, mitigates Human and material resources and transport power needed for on-site cutting and cleaning, further shorten construction period, in particular improve at expansion joint With the smooth consistency on other road surfaces, while it being also additionally arranged the deicing or snow melting device at U-shaped sink, is beneficial to melt winter knot product Ice cube in U-type groove can effectively prevent U-shaped sink to lead to the hair for being torn the waterproof failures diseases such as destruction too early because of icing It is raw, environment influence in bridge lower part is greatly reduced, the safety of personnel or vehicle or attachment under bridge is conducive to.
The technical solution of the utility model is:A kind of assembled multi-directional deflection comb plate bridge expansion device, including:In opposite directions The flexible tooth plate in a left side for arrangement(1)With the flexible tooth plate in the right side(2), left fastener inserts(12)With right fastener inserts(13), the high-strength spiral shell of stress Bar(3), hydrophobic component, dust preventing component;The hydrophobic component includes:U-shaped sink(7), unequal angle(8);Described dust-proof group Part includes two pieces of stainless steel plates being separately positioned below the left and right flexible tooth plate, is overlapped up and down between two pieces of stainless steel plates Arrangement, positioned at the elastic parts that is arranged with of lower layer's stainless steel plate, elastic parts includes:The L-shaped folding steel plate in section(15); The left flexible tooth plate(1)With the flexible tooth plate in the right side(2)On be evenly distributed at least two row's dormant bolt holes;
The left fastener inserts(12)Including:Along longitudinal direction and column distribution left support part(23), left slot hole nut, the left side Slot hole nut and the left flexible tooth plate(1)On dormant bolt hole site it is corresponding, left slot hole nut-welding is in the left branch Support member(23)On, it is connected by the long bar steel of cross direction profiles between each left slot hole nut, each left support part(23)Right side with A piece unequal angle in lateral arrangement(8)It welds affixed;
The right fastener inserts(13)Including:Along longitudinal direction and column distribution right support(24), right slot hole nut, right slot hole Nut and the right flexible tooth plate(2)On dormant bolt hole site it is corresponding, right slot hole nut-welding is in the right support (24)On, it is connected between each right slot hole nut by being set as the long bar steel of cross direction profiles, each right support(24)Left side It is connected in the angle steel welding of lateral arrangement with one, L-shaped folding steel plate(15)It is welded between right slot hole nut on the right side of facade Connect connected, folding steel plate(15)Horizontal plane left end lower edge and the angle steel upper weld in lateral arrangement it is connected;
The folding steel plate(15)On be provided with the rectangular opening of equidistantly distributed, be welded with rectangle on the edge of each rectangular opening Frame(10), the rectangle frame(10)Inside it is provided with embedded elastic rubber stone roller(9), the elastic rubber stone roller(9)Top be in arc Face, elastic rubber stone roller(9)For holding out against two pieces of stainless steel plates in the flexible tooth plate in a left side(1)With the flexible tooth plate in the right side(2)Lower surface;
The stress high-strength bolt(3)Be passed down through the dormant bolt hole of the left and right flexible tooth plate, respectively with each left length Hole nut and right slot hole nut are screwed on;Stress high-strength bolt(3)It is self-locking type stress high-strength bolt;
The left support part(23)And right support(24)It is one kind in channel steel or angle steel or band steel, and right support (24)Than left support part(23)It is long.
A kind of assembled multi-directional deflection comb plate bridge expansion device as described above, it is characterised in that:The U-shaped sink (7)Upper surface and/or lower surface be provided with deicing or snow melting device, the deicing or snow melting device includes:The warm and humid measurement of environment is single First, U-shaped sink(7)The weather-proof waterproof heating wire of interior installation;The weather-proof waterproof heating wire is connect with external power supply controller, when When ambient temperature and humidity reaches icing critical point, the weather-proof waterproof heating wire of external power supply controller connection continues or intermittence heating. Advantage is:It can prevent U-shaped sink(7)Middle icing leads to U-shaped sink(7)It is torn the waterproof failure of destruction too early Disease occurs, and also avoids generating ice and hangs to fall down and smash bridge down train or pedestrian.
A kind of assembled in situ method of assembled multi-directional deflection comb plate bridge expansion device, includes the following steps:
(1) the notch for clearing up bridge both ends at expansion joint, corrects anchor rib pre-buried in notch(11);By left fastener inserts (12)In left support part(23)It is welded with left side anchor rib, by right fastener inserts(13)In support element(24)It is anchored with right side Muscle welds, need to be according to designed elevation, the gradient, slit width, structure width, constructional depth requirement before welding, will be left by frock clamp Fastener inserts(12)And right fastener inserts(13)Each slot hole nut be accurately positioned, it is ensured that the upper edge absolute altitude etc. of each slot hole nut It is high;
By U-shaped sink(7)Upper edge respectively with the unequal angle positioned at left side(8)And the angle steel positioned at right side is solid Even;Again respectively in left fastener inserts(12)Place's cast high-strength concrete one(6), right fastener inserts(13)Place's cast high-strength concrete Two(6.1), so that left and right fastener inserts is linked together with beam-ends, the high-strength concrete one(6)With high-strength concrete two(6.1)'s The upper edge absolute altitude of cast height≤each slot hole nut;The high-strength concrete either ultra-high performance concrete;
(2) frock clamp, assembly tooling cover board are removed(14), the tooling cover board(14)The left side be machined with double countersunk head Bolt hole, each dormant bolt hole and left fastener inserts(12)The left slot hole nut location of upper setting corresponds to, tooling cover board(14)'s The right is machined with double slotted hole, each slotted hole and right fastener inserts(13)On right slot hole nut location it is corresponding;Spiral shell is used again Bolt is by tooling cover board(14)It is connected with each slot hole nut, when connection ensures tooling cover board(14)Upper surface is than bituminous paving bottom oil At least low 10mm of the design height in face;
(3) it is laid with each layer pitch in road surface, cuts chiseler's capping plate again later(14)The pitch of structure width needed for nearby, takes out Tooling cover board(14);
It is characterized in that, further including following steps:
(4) the full wire screw rod without a head of hexagonal in band identical with left and right slot hole nut number is selected(16)By each full wire without a head Screw rod(16)Lower end is screwed into each slot hole nut, and full wire screw rod without a head(16)Elevation of top and bituminous paving absolute altitude are contour;
(5) respectively in high-strength concrete one(6)With high-strength concrete two(6.1)On pour absolute altitude regulating course, the absolute altitude Regulating course material is:Early strong ultra-high performance concrete or epoxy resin mortar or rubber sulphur one kind in the block, absolute altitude regulating course Thickness is set as 10 ~ 30mm, when absolute altitude regulating course is for adjustment installation or so flexible tooth plate, it is ensured that the flexible tooth plate upper surface in left and right It is concordant with bituminous paving;Rectangle frame(10)It is embedded in elastic rubber stone roller again after interior synchronous perfusion absolute altitude regulating course(9);
(6) two pieces of stainless steel plates of left and right sides of arranged superposed are installed successively, then left flexible tooth plate is installed(1)With right expansion teeth Plate(2);
(7) each full wire screw rod without a head is taken out successively(16), often take out a full wire screw rod without a head(16)Afterwards, it is screwed at once simultaneously Pre-tighten a stress high-strength bolt(3), whole stress high-strength bolts(3)Replace full wire screw rod without a head(16)Afterwards, then one by one it tightens Each stress high-strength bolt(3);Then in the flexible tooth plate in a left side(1)With the flexible tooth plate in the right side(2)Dormant bolt hole in be perfused asphalt mixtures modified by epoxy resin Fat glue;
(8) left flexible tooth plate is poured(1)With the flexible tooth plate in the right side(2)Jointing structure glue between end and road surface(25), complete Whole in-site installations;Jointing structure glue(25)Material is high intensity glue or ultra-high performance concrete.
A kind of assembled in situ method of assembled multi-directional deflection comb plate bridge expansion device as described above, feature exist In:The step (5) ~ (8), or as follows:
(5) successively in each full wire screw rod without a head(16)On be screwed into nut, and adjusting nut upper surface is to full wire screw rod without a head (16)Overhead height is greater than or equal to left flexible tooth plate(1)Or right flexible tooth plate(2)Thickness, then respectively in high-strength concrete one (6)With high-strength concrete two(6.1)On pour absolute altitude regulating course, the absolute altitude regulating course material is:Early strong very-high performance is mixed Solidifying soil or epoxy resin mortar or rubber sulphur one kind in the block, or using the small filler of high density elasticity as the common high-strength of aggregate Concrete, absolute altitude regulating course upper surface absolute altitude are concordant with nut upper surface;Rectangle frame(10)After interior synchronous perfusion absolute altitude regulating course It is embedded in elastic rubber stone roller again(9);
(6) two pieces of stainless steel plates of left and right sides of arranged superposed are installed successively, then left flexible tooth plate is installed(1)With right expansion teeth Plate(2);
(7) high-strength nut is screwed into each full wire screw rod without a head successively(16)It goes up and compresses the flexible tooth plate in each left and right, then will own High-strength nut and each full wire screw rod without a head(16)Welding, then in the flexible tooth plate in a left side(1)With the flexible tooth plate in the right side(2)Dormant bolt Infusion epoxy resin glue in hole;
(8) left flexible tooth plate is poured(1)With the flexible tooth plate in the right side(2)Jointing structure glue between end and road surface(25), complete Whole in-site installations;Jointing structure glue(25)Material is high intensity glue or ultra-high performance concrete.
The utility model advantageous effect is:
(1) use slot hole nut to coordinate high-strength self-locking screw structure, increase screw rod stings flight lead from it is anti-to improve screw rod The mechanical property pulled out improves the antifatigue impact strength in expansion joint, is conducive to improve service life, even if high-strength self-locking screw It snaps in slot hole nut, after can also cutting the screw rod that an openning takes out in slot hole nut, then the high-strength self-locking screw of new clothes, it keeps away Exempt from the plant bolt mode of existing structure, is difficult to plant a new bolt problem again once bolt is broken, and badly overloading Just in case leading to unit board falling under environment, without exposed screw rod on runway, the traffic safeties such as will not cause to blow out,.
(2) technical solutions of the utility model can be by adding absolute altitude regulating course mode, in conjunction with tooling cover board, full wire spiral shell without a head Bar and Work fixture device can accurately modify expansion joint notch absolute altitude, the gradient, slit width, structure width, constructional depth, it is ensured that In-site installation construction precision, operating efficiency is high, can synchronize open to traffic in telescopic device assembly work progress, be applied for all bridge floors Work provides good construction environment, shortens the construction period of entire engineering.
(3) the tooling cover board mated formation at the expansion joint in fastener inserts can prevent rubbish at the notch of expansion joint from revealing, to bridge Environment influence in beam lower part greatly reduces, and is conducive to the safety of personnel or vehicle or attachment under bridge, and tooling cover board is repeatable makes With having saved construction cost.
(4) the human and material resources and transport power needed for on-site cutting and cleaning are significantly reduced.
(5), without exposed screw rod on runway, will not cause quick-fried just in case leading to unit board falling under badly overload environment The traffic safeties such as tire.
(6) deicing or snow melting systems stay or intermittence heating, reaching when icing critical point is in environment temperature, humidity can prevent It only freezes in U-shaped sink, U-shaped sink can be effectively prevent because icing causes the waterproof failure disease for being torn destruction too early to occur, It avoids smashing bridge down train or pedestrian because leak generation ice hangs to fall down.
Description of the drawings
Fig. 1 is a kind of the utility model " assembled multi-directional deflection comb plate bridge expansion device " assembled multi-directional deflection comb Tooth plate bridge extension joint structural schematic diagram;
Fig. 2 is a kind of one group of " assembled multi-directional deflection comb plate bridge expansion device " internal structure schematic diagram;
Fig. 3 is the pre-buried anchor rib schematic diagram of exposing after cleaning left and right side beam-ends;
Fig. 4 is that site welding installs the design sketch after left and right side fastener inserts, and frock clamp does not have picture needed for figure Go out;
Fig. 5 is the design sketch after the U-shaped sink of in-site installation;
Fig. 6 is the design sketch after pouring high-strength concrete;
Fig. 7 is the design sketch installed additional after cover board;
Fig. 8 is to take down cover board, and absolute altitude regulating course, and installation full wire screw rod without a head and bullet are poured on high-strength concrete Property rubber stone roller after design sketch;
Fig. 9 is the design sketch after the two pieces of stainless steel plates in installation left and right;
Figure 10 is the design sketch after the left and right flexible tooth plate of installation;
Figure 11 is two internal structure schematic diagrams of the utility model embodiment;
Figure 12 is good in factory process in advance left and right fastener inserts structural schematic diagram;
Figure 13 is the left and right fastener inserts schematic diagram of second of structure type(Elastic parts is not drawn into figure);
Figure 14 is the left and right fastener inserts schematic diagram of the third structure type(Elastic parts is not drawn into figure).
Description of symbols in figure:
In Fig. 1~14:1-left flexible tooth plate, 2-right flexible tooth plates, 3-stress high-strength bolts, 4-pavement asphalts, 5- Beam-ends concrete, 6-high-strength concretes one, 6.1-high-strength concretes two, 7-U-shaped sinks, 8-unequal angles, 9-elasticity Rubber is cut or polish jade with an emery wheel, 10-rectangle frames, 11-anchor ribs, 12-left fastener inserts, 13-right fastener inserts, 14-tooling cover boards, and 15- Folding steel plate, 16-full wire screw rods without a head, 17-left absolute altitude regulating courses, 18-right absolute altitude regulating courses, 19-right stainless steel plates, 20-left stainless steel plates, 21-slot hole nuts, 22-spirals, 23-left support parts, 24-right supports, 25-jointing knots Structure glue.
Specific implementation mode
The utility model embodiment is described further below in conjunction with attached drawing, the examples of the embodiments are shown in the accompanying drawings Go out, in which the same or similar labels are throughly indicated same or similar element or members with the same or similar functions Part.The embodiments described below with reference to the accompanying drawings are exemplary, it is intended to for explaining the utility model, and should not be understood as Limitations of the present invention, any modification made within the spirit and principle of the utility model, equivalent replacement or change Into etc., it should be included within the right of the utility model, do not addressed in detail in the technical program, be known Technology.
It is a kind of flexible dress of assembled multi-directional deflection fishback bridge of the utility model as shown in Fig. 1,2,4,9,10,12 Set one of embodiment attached drawing, a kind of assembled multi-directional deflection comb plate bridge expansion device includes:It stretches on the left side arranged in opposite directions Contracting tooth plate 1 and right flexible tooth plate 2, left fastener inserts 12 and right fastener inserts 13, stress high-strength bolt 3, hydrophobic component, dust-proof group Part;The hydrophobic component includes:U-shaped sink 7, unequal angle 8, the dust preventing component are described left and right including being separately positioned on Left stainless steel plate 20 below flexible tooth plate and right stainless steel plate 19, arranged superposed up and down between two pieces of stainless steel plates, overlapping Right stainless steel plate 19 be located at the lower section of left stainless steel plate 20, right stainless steel plate 19 is arranged with elastic parts, elastic parts packet It includes:The L-shaped folding steel plate 15 in section;It is evenly distributed with two row's dormant bolts on the left flexible tooth plate 1 and right flexible tooth plate 2 Hole.
With reference to figure 4 and Figure 12, the left fastener inserts 12 include:Along longitudinal direction and column distribution left support part 23, left slot hole Nut, the left slot hole nut is corresponding with the dormant bolt hole site on the left flexible tooth plate 1, and left slot hole nut-welding exists On the left support part 23, it is connected by the screw-thread steel 22 of cross direction profiles between each left slot hole nut, the right side of each left support part 23 End face welded with a unequal angle 8 in lateral arrangement it is affixed, the lower part of each left support part 23 respectively with bridge expanssion joint The existing welding of pre-buried anchor rib 11 of middle left side beam-ends is connected.
The right fastener inserts 13 include:Along longitudinal direction and column distribution right support 24, right slot hole nut, right slot hole nut Corresponding with the dormant bolt hole site on the right flexible tooth plate 2, right slot hole nut-welding is on the right support 24, respectively It is connected between right slot hole nut by being set as the screw-thread steel of cross direction profiles, the left side of each right support 24 is with one in laterally The angle steel welding of arrangement is connected;In the utility model embodiment one, the left support part 23 and right support 24 are angle steel, respectively The lower part of right support 24 respectively in bridge expanssion joint right side beam-ends it is existing pre-buried anchor rib 11 welding be connected.
It welds and is connected between right slot hole nut on the right side of L-shaped 15 facade of folding steel plate, fold the horizontal plane of steel plate 15 Left end lower edge is connected with the angle steel upper weld in lateral arrangement, and folding between 15 lower part of steel plate and right support 24 is also Welding is connected;The rectangular opening for being provided with equidistantly distributed on steel plate 15 is folded, rectangle frame 10 is welded on the edge of each rectangular opening, Embedded elastic rubber stone roller 9 is provided in the rectangle frame 10, the top of the elastic rubber stone roller 9 is in cambered surface, elastic rubber stone roller 9 For holding out against two pieces of stainless steel plates in the lower surface of left flexible tooth plate 1 and right flexible tooth plate 2.
The stress high-strength bolt 3 is passed down through the dormant bolt hole of the left and right flexible tooth plate, respectively with each left slot hole Nut and right slot hole nut are screwed on;Stress high-strength bolt 3 is self-locking type stress high-strength bolt.
Preferably, one kind in the left support part and right support either channel steel or band steel or angle steel, that is to say, that Left and right support element is the combination between identical shaped steel or different shaped steel, specifically use which type of collocation mode can according to it is clear The beam anchor muscle situation managed out flexibly grasps implementation, but finally requires to be each slot hole nut upper edge absolute altitude necessary one after installing It causes.In addition need setting right support longer than left support part, the reason is that the top of right support left end will also be connected and support bullet Folding steel plate 15 in property component.
Preferably, the upper surface or lower surface of the U-shaped sink 7 are provided with deicing or snow melting device, the deicing or snow melting dress Set including:The weather-proof waterproof heating wire installed in the warm and humid measuring unit of environment, U-shaped sink 7;The weather-proof waterproof heating wire with it is outer Portion's power-supply controller of electric connection, when ambient temperature and humidity reaches icing critical point, external power supply controller connects weather-proof waterproof electric heating Silk continues or intermittence heating.It can be frozen in anti-water stopping trough using the U-shaped sink of this kind of structure, U-shaped sink 7 is caused to be torn too early The waterproof failure venereal disease evil for splitting destruction occurs, and also avoids generating ice and hangs to fall down and smash bridge down train or pedestrian.
With reference to figure 1, Fig. 2 and Figure 12, the unequal angle 8 and 23 end of the angle steel welding of left fastener inserts 12 are connected, Another is connected with the angle steel of 8 parallelly distribute on of unequal angle and 24 end of the angle steel welding of right fastener inserts 13.Inequilateral angle Steel 8 and angle steel have a press strip, and the press strip is used to clamp the both sides of U-shaped sink 7, in the utility model embodiment, using self tapping spiral shell It follows closely to clamp U-shaped tank 7, before clamping U-shaped sink 7, waterproof sealing structure glue is first perfused in the upper and lower surface of U-shaped sink 7.
In the utility model embodiment, the slot hole nut length >=50mm, screw thread >=M18 in slot hole nut, institute State screw thread be comprising line in line in national standard or Europe superscript or prefastening, also can be simultaneously with external screw thread or flower in the outer circle of each slot hole nut Line structure, to increase the adhesive strength with concrete.
In Figure 12, the attachment of each slot hole nut and support element includes but not limited to weld, and can also be to be threadedly coupled Or it is connect after being threadedly coupled with being welded with;It is first either screwed into slot hole nut again after tapping after determining standard hole pitch on support element, or It is solid with the slot hole nut external screw thread later by the welded nut at the jewel hole of bottom surface again after standard hole pitch jewel hole on support element Even, or using tapping after support element determines standard hole pitch is thickeied slot hole nut is directly substituted, or presses gauge orifice on support element Slot hole nut is directly substituted away from high-strength nut is welded at the jewel hole of bottom surface again after jewel hole.
In Figure 12, the structure of rectangle frame 10 is either cylindrical, correspondingly, the cylinder is embedded in cylindrical elastomeric rubber Glue is cut or polish jade with an emery wheel.Folding and being provided with the purpose of rectangular opening at placement rectangle frame 10 on steel plate 15 is poured under it when being convenient to site operation The high-strength concrete 2 6.1 in portion.
In the utility model embodiment one, the left side for constituting each assembled multi-directional deflection comb plate bridge expansion device is flexible The width of tooth plate and right flexible tooth plate is at least 1M, and multigroup assembled multi-directional deflection comb plate bridge expansion device is segmented successively to be applied Work, the assembled multi-directional deflection comb plate bridge expansion device for being finally completed entire width of roadway is whole, at anti-collision wall Then actually required width is cut telescopic device.
As shown in figure 11, it is the two of a kind of assembled multi-directional deflection comb plate bridge expansion device embodiment of the utility model Attached drawing, the rectangle frame 10 in figure in elastic parts are completely placed in the rectangular opening for folding steel plate 15, are folded under steel plate at this time Surface is not contacted with right support, and between the left and right sides upper edge of U-shaped sink in Different Plane, advantage is to shorten Interval between the fastener inserts of left and right not only saves material, but also facilitates construction and installation.
It is another structure shape of left fastener inserts and right fastener inserts in the utility model embodiment as shown in figure 13 Formula, wherein what is be connected with the welding of beam anchor muscle is that along longitudinal direction and the shaped steel workpiece or steel-casting of column distribution, the shaped steel adds The both ends of workpiece or steel-casting are machined with slot hole nut, are welded admittedly by spiral between each shaped steel workpiece or steel-casting Even, the right side of the left fastener inserts in position is also welded with the channel steel that can carry elastic parts.
Figure 14 is shown in the utility model embodiment, the third structure type of left fastener inserts and right fastener inserts, Left fastener inserts and right fastener inserts in figure for being connect with stress high-strength bolt 3 are that four be transversely distributed are in strip Shaped steel workpiece or steel-casting, slot hole nut is machined on each shaped steel workpiece or steel-casting, wherein left fastener inserts In two shaped steel workpieces or steel-casting between by reinforcement welding be connected, be located at one, right side shaped steel workpiece or steel-casting The right be also welded with the channel steel that can carry elastic parts.Between two shaped steel workpieces or steel-casting in left fastener inserts It is to be connected by reinforcement welding.
Refer to the attached drawing 1 ~ 10, a kind of scene of assembled multi-directional deflection comb plate bridge expansion device described in the utility model Assembly method, including two embodiments are as follows respectively:
Embodiment one:
(1) the notch for clearing up bridge both ends at expansion joint, corrects anchor rib 11 pre-buried in notch;By left fastener inserts 12 In left support part 23 welded with left side anchor rib, the support element 24 in right fastener inserts 13 is welded with right side anchor rib, weldering It need to be according to designed elevation, the gradient, slit width, structure width, constructional depth requirement, by frock clamp by left fastener inserts 12 before connecing And each slot hole nut of right fastener inserts 13 is accurately positioned, it is ensured that the upper edge absolute altitude of each slot hole nut is contour.
The upper edge of U-shaped sink 7 is connected with positioned at the unequal angle 8 in left side and the angle steel positioned at right side respectively;Again High-strength concrete 1 is poured into a mould at left fastener inserts 12 respectively, high-strength concrete 2 6.1 is poured into a mould at right fastener inserts 13, makes a left side Right fastener inserts are linked together with beam-ends, cast height≤each slot hole of the high-strength concrete 1 and high-strength concrete 2 6.1 The upper edge absolute altitude of nut;The high-strength concrete either ultra-high performance concrete.
(2) frock clamp is removed, and the left side of assembly tooling cover board 14, the tooling cover board 14 is machined with double dormant bolt Hole, each dormant bolt hole is corresponding with the left slot hole nut location being arranged in left fastener inserts 12, the right processing of tooling cover board 14 There are double slotted hole, each slotted hole corresponding with the right slot hole nut location in right fastener inserts 13;Again with bolt by tooling lid Plate 14 and each slot hole nut are connected, when connection ensure 14 upper surface of tooling cover board than bituminous paving bottom pasta design height extremely Few low 10mm.
(3) it is laid with each layer pitch in road surface, the pitch of required structure width near chiseler's capping plate 14 is cut again later, takes out work Capping plate 14.
(4) select the full wire screw rod 16 without a head of hexagonal in identical with left and right slot hole nut number band by each full wire spiral shell without a head 16 lower end of bar is screwed into each slot hole nut, and 16 elevation of top of full wire screw rod without a head and bituminous paving absolute altitude are contour.
(5) absolute altitude regulating course is poured on high-strength concrete 1 and high-strength concrete 2 6.1 respectively, and the absolute altitude is adjusted Layer material be:Early strong ultra-high performance concrete or epoxy resin mortar or rubber sulphur one kind in the block, the thickness of absolute altitude regulating course Be set as 10 ~ 30mm, absolute altitude regulating course for adjust installation left and right stretch tooth plate when, it is ensured that left and right is stretched tooth plate upper surface and drip Green road surface is concordant;It is embedded in elastic rubber stone roller 9 again after synchronous perfusion absolute altitude regulating course in rectangle frame 10.
(6) two pieces of stainless steel plates of left and right sides of arranged superposed are installed successively, then left flexible tooth plate 1 and right flexible tooth plate are installed 2。
(7) each full wire screw rod 16 without a head is taken out successively, after often taking out a full wire screw rod 16 without a head, is screwed into and is pre-tightened at once A piece stress high-strength bolt 3, after whole stress high-strength bolts 3 replace full wire screw rod 16 without a head, then to tighten each stress one by one high-strength Screw rod 3;Then the infusion epoxy resin glue in the dormant bolt hole of left flexible tooth plate 1 and right flexible tooth plate 2.
(8) left flexible tooth plate 1 and right flexible jointing structure glue 25 between 2 end of tooth plate and road surface are poured, is completed all existing Field installation;25 material of jointing structure glue is high intensity glue or ultra-high performance concrete.
Embodiment two:
(1) the notch for clearing up bridge both ends at expansion joint, corrects anchor rib 11 pre-buried in notch;By left fastener inserts 12 In left support part 23 welded with left side anchor rib, the support element 24 in right fastener inserts 13 is welded with right side anchor rib, weldering It need to be according to designed elevation, the gradient, slit width, structure width, constructional depth requirement, by frock clamp by left fastener inserts 12 before connecing And each slot hole nut of right fastener inserts 13 is accurately positioned, it is ensured that the upper edge absolute altitude of each slot hole nut is contour.
The upper edge of U-shaped sink 7 is connected with positioned at the unequal angle 8 in left side and the angle steel positioned at right side respectively;Again High-strength concrete 1 is poured into a mould at left fastener inserts 12 respectively, high-strength concrete 2 6.1 is poured into a mould at right fastener inserts 13, makes a left side Right fastener inserts are linked together with beam-ends, cast height≤each slot hole of the high-strength concrete 1 and high-strength concrete 2 6.1 The upper edge absolute altitude of nut;The high-strength concrete either ultra-high performance concrete.
(2) frock clamp is removed, and the left side of assembly tooling cover board 14, the tooling cover board 14 is machined with double dormant bolt Hole, each dormant bolt hole is corresponding with the left slot hole nut location being arranged in left fastener inserts 12, the right processing of tooling cover board 14 There are double slotted hole, each slotted hole corresponding with the right slot hole nut location in right fastener inserts 13;Again with bolt by tooling lid Plate 14 and each slot hole nut are connected, when connection ensure 14 upper surface of tooling cover board than bituminous paving bottom pasta design height extremely Few low 10mm.
(3) it is laid with each layer pitch in road surface, the pitch of required structure width near chiseler's capping plate 14 is cut again later, takes out work Capping plate 14.
(4) select the full wire screw rod 16 without a head of hexagonal in identical with left and right slot hole nut number band by each full wire spiral shell without a head 16 lower end of bar is screwed into each slot hole nut, and 16 elevation of top of full wire screw rod without a head and bituminous paving absolute altitude are contour.
(5) nut is screwed on each full wire screw rod 16 without a head successively, and adjusting nut upper surface to full wire screw rod 16 without a head pushes up Portion's height is greater than or equal to 2 thickness of left flexible tooth plate 1 or right flexible tooth plate, then respectively in high-strength concrete 1 and high-strength coagulation Absolute altitude regulating course is poured on soil 2 6.1, the absolute altitude regulating course material is:Early strong ultra-high performance concrete or epoxy resin are husky Slurry or rubber sulphur one kind in the block, or using the small filler of high density elasticity as the common high-strength concrete of aggregate, absolute altitude is adjusted Layer upper surface absolute altitude is concordant with nut upper surface;It is embedded in elastic rubber stone roller 9 again after synchronous perfusion absolute altitude regulating course in rectangle frame 10.
(6) two pieces of stainless steel plates of left and right sides of arranged superposed are installed successively, then left flexible tooth plate 1 and right flexible tooth plate are installed 2。
(7) high-strength nut is screwed on each full wire screw rod 16 without a head successively and compresses the flexible tooth plate in each left and right, then will be all high Strong nut is welded with each full wire screw rod 16 without a head, is then perfused in the dormant bolt hole of left flexible tooth plate 1 and right flexible tooth plate 2 Epoxide-resin glue.
(8) left flexible tooth plate 1 and right flexible jointing structure glue 25 between 2 end of tooth plate and road surface are poured, is completed all existing Field installation.25 material of jointing structure glue is high intensity glue or ultra-high performance concrete.
Technical solutions of the utility model coordinate high-strength self-locking screw structure using slot hole nut, and increase screw rod stings flight lead From, the mechanical property of screw rod resistance to plucking is improved, the antifatigue impact strength in expansion joint is improved, is conducive to improve service life, Even if high-strength self-locking screw snaps from slot hole nut, after can also cutting the bolt that an openning takes out in slot hole nut, then newly High-strength self-locking screw is filled, the cultivation bolt mode of existing structure is avoided, is asked once bolt breaks to be difficult to plant a new bolt again Topic.And, without exposed screw rod on runway, it will not cause to blow out just in case leading to unit board falling under badly overload environment Traffic safety, can be accurate in conjunction with tooling cover board, screw rod without a head and Work fixture device by adding absolute altitude regulating course mode Modify expansion joint notch absolute altitude, the gradient, slit width, structure width, constructional depth, it is ensured that in-site installation construction precision, operating efficiency Height, telescopic device, which assembles in work progress, can synchronize open to traffic, and good construction environment is provided for all Roadway Constructions, contract The short construction period of entire engineering.The tooling cover board mated formation at the expansion joint in fastener inserts, can prevent at the notch of expansion joint Rubbish is revealed, and is greatly reduced on the influence of bridge lower part environment, is conducive to the safety of personnel or vehicle or attachment under bridge, and tooling Cover board is reusable, has saved construction cost.Significantly reduce the human and material resources and transport power needed for on-site cutting and cleaning. Environment influence in bridge lower part is greatly reduced, the safety of personnel or vehicle or attachment under bridge is conducive to.Add deicing or snow melting system System continues or intermittence heating, can prevent from freezing in U-shaped sink when environment temperature is low, U-shaped sink can be effectively prevent because freezing The waterproof failure disease for leading to be torn destruction too early occurs, and avoids generating ice hanging to fall down and smashes bridge down train or pedestrian.
In the description of the present invention, it should be understood that term " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", " absolute altitude ", " upper edge ", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", The orientation or positional relationship of the instructions such as "outside" is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing this reality With novel and simplified description, does not indicate or imply the indicated device or element must have a particular orientation, with specific Azimuth configuration and operation, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.The meaning of " plurality " is at least two, such as two in the description of the present invention, It is a, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu Calmly ", the terms such as " connected " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral; It can be mechanical connection, can also be electrical connection;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention unless specifically defined or limited otherwise, fisrt feature is "above" or "below" second feature Can be that the first and second features are in direct contact or the first and second features pass through intermediary mediate contact.Moreover, first is special Sign second feature " on ", " top " and " above " can be fisrt feature and be directly above or diagonally above the second feature, or only Indicate that fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be with It is that fisrt feature is directly under or diagonally below the second feature, or is merely representative of fisrt feature level height and is less than second feature.

Claims (2)

1. a kind of assembled multi-directional deflection comb plate bridge expansion device, including:The flexible tooth plate in a left side arranged in opposite directions(1)It is stretched with the right side Contracting tooth plate(2), left fastener inserts(12)With right fastener inserts(13), stress high-strength bolt(3), hydrophobic component, dust preventing component;Institute Stating hydrophobic component includes:U-shaped sink(7), unequal angle(8);The dust preventing component includes being separately positioned on described left and right stretch Two pieces of stainless steel plates below contracting tooth plate, arranged superposed up and down between two pieces of stainless steel plates, positioned at dividing into for lower layer's stainless steel plate It is equipped with elastic parts;The left flexible tooth plate(1)With the flexible tooth plate in the right side(2)On be evenly distributed at least two row's dormant bolt holes;
The left fastener inserts(12)Including:Along longitudinal direction and column distribution left support part(23), left slot hole nut, the left slot hole Nut and the left flexible tooth plate(1)On dormant bolt hole site it is corresponding, left slot hole nut-welding is in the left support part (23)On, it is connected by the long bar steel of cross direction profiles between each left slot hole nut, each left support part(23)Right side with one In the unequal angle of lateral arrangement(8)It welds affixed;
The right fastener inserts(13)Including:Along longitudinal direction and column distribution right support(24), right slot hole nut, right slot hole nut With the right flexible tooth plate(2)On dormant bolt hole site it is corresponding, right slot hole nut-welding is in the right support(24) On, it is connected between each right slot hole nut by being set as the long bar steel of cross direction profiles, each right support(24)Left side and one Root is connected in the angle steel welding of lateral arrangement, L-shaped folding steel plate(15)It is welded admittedly between right slot hole nut on the right side of facade Even, steel plate is folded(15)Horizontal plane left end lower edge and the angle steel upper weld in lateral arrangement it is connected;
The stress high-strength bolt(3)Be passed down through the dormant bolt hole of the left and right flexible tooth plate, respectively with each left slot hole spiral shell Female and right slot hole nut is screwed on;Stress high-strength bolt(3)It is self-locking type stress high-strength bolt;
The left support part(23)And right support(24)It is one kind in channel steel or angle steel or band steel, and right support(24)Than Left support part(23)It is long;It is characterized in that:
The elastic parts includes:The L-shaped folding steel plate in section(15), the folding steel plate(15)On be provided with equidistantly point The rectangular opening of cloth is welded with rectangle frame on the edge of each rectangular opening(10), the rectangle frame(10)Inside it is provided with embedded elasticity Rubber is cut or polish jade with an emery wheel(9), the elastic rubber stone roller(9)Top be in cambered surface, elastic rubber stone roller(9)For two pieces of stainless steel plates to be held out against The flexible tooth plate in a left side(1)With the flexible tooth plate in the right side(2)Lower surface.
2. a kind of assembled multi-directional deflection comb plate bridge expansion device as described in claim 1, it is characterised in that:It is described U-shaped Sink(7)Upper surface and/or lower surface be provided with deicing or snow melting device, the deicing or snow melting device includes:The warm and humid survey of environment Measure unit, U-shaped sink(7)The weather-proof waterproof heating wire of interior installation;The weather-proof waterproof heating wire connects with external power supply controller It connects, when ambient temperature and humidity reaches icing critical point, the weather-proof waterproof heating wire of external power supply controller connection continues or intermittence Heating.
CN201820397334.0U 2018-03-23 2018-03-23 A kind of assembled multi-directional deflection comb plate bridge expansion device Active CN208039032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820397334.0U CN208039032U (en) 2018-03-23 2018-03-23 A kind of assembled multi-directional deflection comb plate bridge expansion device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820397334.0U CN208039032U (en) 2018-03-23 2018-03-23 A kind of assembled multi-directional deflection comb plate bridge expansion device

Publications (1)

Publication Number Publication Date
CN208039032U true CN208039032U (en) 2018-11-02

Family

ID=63949065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820397334.0U Active CN208039032U (en) 2018-03-23 2018-03-23 A kind of assembled multi-directional deflection comb plate bridge expansion device

Country Status (1)

Country Link
CN (1) CN208039032U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396946A (en) * 2019-07-18 2019-11-01 上海市政工程设计研究总院(集团)有限公司 A kind of bridge extension joint replacing options
CN112064498A (en) * 2020-09-14 2020-12-11 蒋明敏 Comb-shaped bridge expansion joint plate structure and cleaning device thereof
CN113756185A (en) * 2021-09-26 2021-12-07 武汉耐久伸缩工程有限公司 Ultra-shallow comb plate bridge expansion device that buries

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396946A (en) * 2019-07-18 2019-11-01 上海市政工程设计研究总院(集团)有限公司 A kind of bridge extension joint replacing options
CN110396946B (en) * 2019-07-18 2022-08-12 上海市政工程设计研究总院(集团)有限公司 Method for replacing bridge expansion device
CN112064498A (en) * 2020-09-14 2020-12-11 蒋明敏 Comb-shaped bridge expansion joint plate structure and cleaning device thereof
CN113756185A (en) * 2021-09-26 2021-12-07 武汉耐久伸缩工程有限公司 Ultra-shallow comb plate bridge expansion device that buries

Similar Documents

Publication Publication Date Title
CN108385515A (en) A kind of assembled multi-directional deflection comb plate bridge expansion device and installation method
CN208039032U (en) A kind of assembled multi-directional deflection comb plate bridge expansion device
CN108035245B (en) Novel fabricated seamless expansion-contraction devices and its construction method
CN104018425B (en) A kind of quick-replaceable bridge expansion joint installation and installation method thereof
US3880539A (en) Expansion joint and seal
CN107178031A (en) A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device and installation method
CN106436569B (en) A kind of prestressing force bridge floor attachment means and its method for prefabricating and construction method
CN102296546A (en) Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof
CN106988164A (en) Platy ballastless track structure and its construction method
US3977802A (en) Expansion joint and seal
CN110259105A (en) Cantilever Beams and construction method
CN108660910A (en) Precast pier, track support component and its manufacture installation method
CN104452581B (en) A kind of cantilever base spiral shell anchor formula comb plate stretching device
CN107858919A (en) A kind of novel fabricated bridge extension joint
CN109371807B (en) Bridge structure system capable of being rapidly transformed
CN105239503B (en) A kind of six to displacement fishback retractor device
CN110306401A (en) The semi-rigid anti-crack road surface construction method of extremely frigid zones
CN206706564U (en) A kind of unit assembled prestressing force Multidirectional displacement bridge expansion device
CN109797666A (en) A kind of full assembled quick-changing technology method of bridge expanssion joint under guarantor's gating condition
CN110485286B (en) Bridge expansion joint device with adjustable concrete-free height and construction method thereof
CN109797646A (en) A kind of bridge expanssion joint clean method
US4125580A (en) Process for the manufacture of pretensioned carriageway slabs
CN101191324A (en) Exchanging of plate-type rubber supporting on highway bridge abutment by using template positioning method
CN206916609U (en) Regulation support component and track support component for track support component
CN209722718U (en) A kind of list seam bridge expanssion joint rapid-maintenance structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230423

Address after: 430223 Yangguang Chuanggu, Jiangxia Avenue, Jiangxia District, Wuhan City, Hubei Province

Patentee after: WUHAN NAIJIU TELESCOPIC ENGINEERING CO.,LTD.

Address before: 430070 Room 1-2501, Building 7, Block B, Dengjia New City, Maying Road, Hanyang District, Wuhan City, Hubei Province

Patentee before: Liu Liyuan

TR01 Transfer of patent right