CN106869014A - A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means - Google Patents

A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means Download PDF

Info

Publication number
CN106869014A
CN106869014A CN201710085571.3A CN201710085571A CN106869014A CN 106869014 A CN106869014 A CN 106869014A CN 201710085571 A CN201710085571 A CN 201710085571A CN 106869014 A CN106869014 A CN 106869014A
Authority
CN
China
Prior art keywords
knob
pontes
prefabricated subsection
connecting portion
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710085571.3A
Other languages
Chinese (zh)
Other versions
CN106869014B (en
Inventor
武士婷
亓路宽
段守辉
王少剑
程毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201710085571.3A priority Critical patent/CN106869014B/en
Publication of CN106869014A publication Critical patent/CN106869014A/en
Application granted granted Critical
Publication of CN106869014B publication Critical patent/CN106869014B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Abstract

The present invention discloses a kind of knob Precast Concrete Segmental Bridges bridge pier attachment means, includes from bottom to top:Lower prefabricated subsection, the first pontes, knob portion, second connecting portion are divided, upper prefabricated subsection, the first pontes connects lower prefabricated subsection and knob portion respectively, second connecting portion point connects knob portion and upper prefabricated subsection respectively, and the first pontes and second connecting portion point connect knob portion respectively using turned upside down mode.Using technical scheme, the present invention has the quick bridge construction for building demand suitable for various.

Description

A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means
Technical field
The invention belongs to science of bridge building, more particularly to a kind of knob Precast Concrete Segmental Bridges bridge pier attachment means.
Technical background
With the propulsion that urban transportation and bridge spanning the sea are built, the demand to bridge Fast Construction in limited space progressively increases Plus.And traditional cast-in-place concrete bridge method of construction inevitably need wait concrete coagulation cause the duration more long, and And the endurance quality that cast-in-place concrete quality is influenceed to be difficult to ensure that under rugged environment by site environment.Precast assembly technology is Solve the feasible means of this contradiction.The prefabricating technique of current bridge superstructure has tended to ripe, and bridge substructure The precast assembly technology application of particularly pier stud is less.There are Donghai Bridge, Hangzhou using the case history of the technology at home Gulf bridge etc., is all located at low crack area domain.Because the anti-seismic performance of sections attachment means is still not clear, the technology is limited in height The application of intensity area.
Splice the anti-seismic performance of bridge pier based on sections, domestic and foreign scholars have carried out substantial amounts of research.Research has shown that reasonably Design sections connection can make section assembling bridge pier obtain conventional bridge pier without shock-resistance features, wherein the important point is exactly sections Assembled bridge pier has self certain reset capability.In Japanese Osaka-Kobe earthquake, the Reinforced Concrete Bridge for having about 1/5 damages journey Degree not yet reaches the degree of reconstruction, but cannot be continuing with because residual displacement is excessive.After Osaka-Kobe earthquake, Japan is to bridge Aseismic Design has done strict regulation:And require the maximum displacement under residual displacement and earthquake load together as checking computations to add To among specification.It is particularly valuable as self reset capability today of trend in performance-based seismic design.
Existing precast pier attachment means are substantially all using the unbonded prestressing tendon of each sections of insertion pier stud total length Ensure load-carrying properties of the splicing seams under the horizontal applied forces such as earthquake.And the technology causes that bridge pier will bear extra prestressing force lotus Carry.In order to the concrete for ensureing sections junction when geological process is resisted is unlikely to that by severe crush steel pipe or FRP must be used Material is reinforced to sections or is used high grade special concrete, causes cost higher.And only unbonded prestressing tendon Sections connection energy-dissipating property it is poor, in order to ensure connection energy-dissipating property generally need to ensure a number of power consumption reinforcing bar Through splicing seams, construction is caused more to bother.So the present invention will be related to a kind of attachment means for not using presstressed reinforcing steel.
The content of the invention
The invention is intended to provide a kind of simple structure, knob Precast Concrete Segmental Bridges bridge pier attachment means easy for installation.
To achieve the above object, the present invention is adopted the following technical scheme that:
A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means, include from bottom to top:Lower prefabricated subsection, first connecting portion Divide, knob portion, second connecting portion are divided, upper prefabricated subsection, the first pontes connects lower prefabricated subsection and knob respectively Part, second connecting portion point connects knob portion and upper prefabricated subsection, the first pontes and second connecting portion point respectively Knob portion is connected using turned upside down mode respectively, wherein,
The first pontes includes:First annulus main body, is provided with plectane, in institute on the inwall of the first annulus main body State plectane and be provided with 8 connectors of equidistantly distributed, the connector is " L " shape, and it includes horizontal part and vertical component effect, described Vertical component effect is vertically located on the plectane, and the structure of the second connecting portion point is identical with the first pontes;
The knob portion includes:Second annulus main body, is provided with 8 equidistantly distributeds on the inwall of the second annulus main body Knob part, the knob part is a groove, relative in each horizontal part and second connecting portion point in the first pontes Horizontal part is answered to be buckled between the corresponding tooth of groove two in knob portion using turned upside down mode.
Preferably, the lower prefabricated subsection is concrete filled steel tube, the upper prefabricated subsection is armored concrete, described the One coupling part, second connecting portion point and knob portion are made of Steel material.
The present invention has the following advantages:First, the presstressed reinforcing steel in tradition connection is eliminated, bridge pier no longer bears top simultaneously Structure gravity and vertical prestressing, the pier section of non-attached area are designed simple and convenient without particular design;Revolved between sections Rotating button part can be completed using light instrument, and in-site installation is convenient.Secondly, each sections is prefabricated, can use multi-segmental Repeatedly it is assembled into the bridge pier of various height, practicality and strong applicability.Finally, there is connector and knob during rarely occurred earthquake Small slip occurs between part can be consumed energy, and the not enough defect of precast assembly bridge pier power consumption is compensate for a certain extent.And Can be resetted by turn knob part after unloading.
Brief description of the drawings
Fig. 1 knob Precast Concrete Segmental Bridges bridge pier attachment means schematic diagrames;
Fig. 2 coupling parts schematic diagram;
Fig. 3 knob portion schematic diagrames;
Fig. 4 knob Precast Concrete Segmental Bridges bridge pier example schematics.
Specific embodiment
As shown in Figure 1, 2, 3, the embodiment of the present invention provides a kind of knob Precast Concrete Segmental Bridges bridge pier attachment means, under And on include:Lower prefabricated subsection 1, the first pontes 21, knob portion 3, second connecting portion divide 22, upper prefabricated subsection 4, described Lower prefabricated subsection 1 is concrete filled steel tube, and the upper prefabricated subsection 4 is armored concrete, and the first pontes 21, second connects Socket part point 22 and knob portion 3 are made of Steel material, and the first pontes 21 connects lower prefabricated subsection 1 and knob respectively Part 3, second connecting portion point 22 connects knob portion 3 and upper prefabricated subsection 4 respectively, and the first pontes 21 and second connects Socket part point 22 connects knob portion 3 respectively using turned upside down mode.
The first pontes 21 includes:First annulus main body 51, circle is provided with the inwall of the first annulus main body 51 Plate 6, is provided with 8 connectors of equidistantly distributed 7 on the plectane 6, and the connector 7 is " L " shape, it include horizontal part and Vertical component effect, the vertical component effect is vertically located on the plectane 6, the structure and the first connecting portion of the second connecting portion point 22 Points 21 identical.
The knob portion 3 includes:Second annulus main body 52, between 8 grades are provided with the inwall of the second annulus main body 52 Away from the knob part 8 of distribution, the knob part 8 is a groove, each horizontal part and the second connection in the first pontes 21 Corresponding horizontal part is buckled between the corresponding tooth of groove two in knob portion 3 using turned upside down mode in part 22.
Embodiment 1
As shown in figure 4, embodiment 1 is the precast pier of the secondary splicing of three sections, include from bottom to top:First segment, Two sections and the 3rd sections, wherein,
First segment includes from bottom to top:Basis 60, first time prefabricated subsection 10, the first pontes 21, knob portion 3rd, prefabricated subsection 41 in second connecting portion point 22, first;The lower prefabricated subsection 10, the first pontes 21, knob portion 3, The composition of prefabricated subsection 41 knob Precast Concrete Segmental Bridges bridge pier attachment means in second connecting portion point 22, first, in described first Prefabricated subsection 41 is the upper prefabricated subsection in knob Precast Concrete Segmental Bridges bridge pier attachment means, and first time prefabricated subsection 10 be Concrete filled steel tube, prefabricated subsection 41 is armored concrete in described first.
Second section includes from bottom to top:Prefabricated subsection 41, the first pontes 21, knob portion 3, second connect in first Prefabricated subsection 42 in socket part point 22, second;Prefabricated subsection, the first pontes 21, knob portion 3, second connecting portion in first Divide prefabricated subsection composition knob Precast Concrete Segmental Bridges bridge pier attachment means, the He of prefabricated subsection 41 in described first in 22, second Prefabricated subsection 42 is respectively lower prefabricated subsection and upper prefabricated subsection in knob Precast Concrete Segmental Bridges bridge pier attachment means in second, And prefabricated subsection 42 is armored concrete in described second.
3rd sections includes from bottom to top:Prefabricated subsection 42, the first pontes 21, knob portion 3, second connect in second Socket part point 22, upper prefabricated subsection 40, pier cap 50;Prefabricated subsection 42, the first pontes 21, knob portion 3, second connect in second The composition of prefabricated subsection 40 knob Precast Concrete Segmental Bridges bridge pier attachment means, prefabricated section in described second in socket part point 22, first Section 42 is lower prefabricated subsection in knob Precast Concrete Segmental Bridges bridge pier attachment means, and prefabricated subsection 40 is steel pipe on described first Concrete.
When prefabricated, the steel pipe of first time prefabricated subsection 10 is stretched into basic 60 in first segment, and lays steel plate in bottom 70, then pour basis 60 concrete, first in first segment in prefabricated subsection 41 steel pipe top and the first pontes 21 Bottom welding;Similarly, first in the 3rd sections on the steel pipe of prefabricated subsection 40 stretch into pier cap 50, and in bottom lay steel Plate 70, then pour the concrete of pier cap 50, second in the 3rd sections in prefabricated subsection 42 steel pipe top and the first pontes 21 bottom welding.
During construction, comprise the following steps:
Step 1, lifting first segment
Prefabricated subsection, basis first in first time prefabricated subsection, first and second coupling part, first of lifting first segment And steel plate, then knob portion is lifted, make that each knob part is just stuck in the first pontes or second connecting portion is divided to two connections In space between part, and require to be vertically connected with part alignment;
Step 2, lifting second section
Then prefabricated subsection and first and second coupling part in the second of second section are lifted so that the knob of knob portion Part falls in second connecting portion is divided to two connector spaces, and carries out sag correction, then by turn knob part, makes every up and down Connector is buckled in completely between the tooth of knob part two, then it is mixed toward pouring in the gap of first and second coupling part and knob portion Solidifying soil, is filled to bridge pier external diameter floating, it is ensured that connect specious and useful life longevity, that is, complete once assembled;
Step 3, the 3rd sections of lifting
First and second coupling part of the 3rd sections of same lifting, prefabricated subsection and pier cap on first, are similarly aligned with lifting again And after carrying out sag correction, then turn knob part, the casting concrete in gap, complete second and splice.
By the size of rationally first, second coupling part of design and knob portion, particularly connector and knob part Thickness can make attachment means realize following stress performance.
Vertical axis are transmitted by first and second coupling part and knob portion contact surface using when being acted on frequently occurred earthquake normal Power and moment of flexure, and elastic range can be in;Connector and knob part can occur small under the effect of the special loads such as rarely occurred earthquake Relative slip, can play power consumption effect.Can be resetted by turn knob part after unloading.
Knob Precast Concrete Segmental Bridges bridge pier attachment means of the present invention, feature is as follows:Cancel traditional section assembling bridge pier to connect Presstressed reinforcing steel in connection device.Local stiffening is carried out to join domain in the form of knob splicing.The prefabricated knob at sections Top splice first welds together with steel reinforcement cage, then casting concrete.Centre uses Rotary button component, and first component interlocks splicing Together and angle is controlled, then rotate middle Rotary button component, so as to upper and lower two segment be connected together.Advantage is:First, Prefabricated subsection design is easy, can be completed with direct splicing.When sections is destroyed, connector is replaceable;Secondly, connect during loading Fitting is all higher than the tensile strength of reinforcing bar in the design process, hysteresis loop is tended to full.Again, eliminate tradition connection in Presstressed reinforcing steel, bridge pier no longer simultaneously bear superstructure gravity and vertical prestressing, the pier section of non-attached area need not Particular design.Finally, can be completed using light instrument using knob connection between sections, there is no tensioning vertical prestressing bar etc. Operation, in-site installation is convenient.The present invention has the quick bridge construction for building demand suitable for various.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not done to the present invention, is appointed What, according to technical spirit of the invention, is made within the spirit and principles in the present invention without departing from technical solution of the present invention content Any modification, equivalent variations and modification, be regarded as the technology category of the present invention program, should be included in protection of the invention In the range of.

Claims (2)

1. a kind of knob Precast Concrete Segmental Bridges bridge pier attachment means, it is characterised in that include from bottom to top:Lower prefabricated subsection, The first pontes, knob portion, second connecting portion are divided, upper prefabricated subsection, and the first pontes connects down prefabricated respectively Sections and knob portion, second connecting portion connect knob portion and upper prefabricated subsection point respectively, the first pontes and the Two coupling parts connect knob portion respectively using turned upside down mode, wherein,
The first pontes includes:First annulus main body, is provided with plectane, in the circle on the inwall of the first annulus main body Plate is provided with 8 connectors of equidistantly distributed, and the connector is " L " shape, and it includes horizontal part and vertical component effect, described vertical Portion is vertically located on the plectane, and the structure of the second connecting portion point is identical with the first pontes;
The knob portion includes:Second annulus main body, is provided with 8 rotations of equidistantly distributed on the inwall of the second annulus main body Button part, the knob part is a groove, corresponding water during each horizontal part and second connecting portion are divided in the first pontes Flat portion is buckled between the corresponding tooth of groove two in knob portion using turned upside down mode.
2. knob Precast Concrete Segmental Bridges bridge pier attachment means as claimed in claim 1, it is characterised in that prefabricated section under described Section is concrete filled steel tube, and the upper prefabricated subsection is armored concrete, and the first pontes, second connecting portion are divided and knob Part is made of Steel material.
CN201710085571.3A 2017-02-17 2017-02-17 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment device Expired - Fee Related CN106869014B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710085571.3A CN106869014B (en) 2017-02-17 2017-02-17 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710085571.3A CN106869014B (en) 2017-02-17 2017-02-17 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment device

Publications (2)

Publication Number Publication Date
CN106869014A true CN106869014A (en) 2017-06-20
CN106869014B CN106869014B (en) 2019-04-12

Family

ID=59166723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710085571.3A Expired - Fee Related CN106869014B (en) 2017-02-17 2017-02-17 A kind of knob Precast Concrete Segmental Bridges bridge pier attachment device

Country Status (1)

Country Link
CN (1) CN106869014B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371807A (en) * 2018-09-28 2019-02-22 励吾(厦门)科技有限公司 It is a kind of can quick transformation bridge
CN110258306A (en) * 2019-07-03 2019-09-20 重庆锦森腾建筑工程咨询有限公司 A kind of assembled anti-knock bridge pier

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201031358Y (en) * 2007-01-30 2008-03-05 周永杉 Combined adjustable bridge abutment
KR20080057108A (en) * 2006-12-19 2008-06-24 재단법인 포항산업과학연구원 Assembling-type pier
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
KR20120054972A (en) * 2010-11-22 2012-05-31 고려대학교 산학협력단 Prefabricated hollow-segment type pier
CN203284729U (en) * 2013-06-08 2013-11-13 上海市城市建设设计研究总院 Screwing-type connecting structure of stand column bearing platform and guide rod
CN203947681U (en) * 2014-01-13 2014-11-19 润弘精密工程事业股份有限公司 Steel pipe concrete structure with spiral hoop
CN105908621A (en) * 2016-06-29 2016-08-31 北京工业大学 Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080057108A (en) * 2006-12-19 2008-06-24 재단법인 포항산업과학연구원 Assembling-type pier
CN201031358Y (en) * 2007-01-30 2008-03-05 周永杉 Combined adjustable bridge abutment
CN101429752A (en) * 2007-11-05 2009-05-13 中交一航局第一工程有限公司 Pier column prefabrication splicing building technology
KR20120054972A (en) * 2010-11-22 2012-05-31 고려대학교 산학협력단 Prefabricated hollow-segment type pier
CN203284729U (en) * 2013-06-08 2013-11-13 上海市城市建设设计研究总院 Screwing-type connecting structure of stand column bearing platform and guide rod
CN203947681U (en) * 2014-01-13 2014-11-19 润弘精密工程事业股份有限公司 Steel pipe concrete structure with spiral hoop
CN105908621A (en) * 2016-06-29 2016-08-31 北京工业大学 Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371807A (en) * 2018-09-28 2019-02-22 励吾(厦门)科技有限公司 It is a kind of can quick transformation bridge
CN110258306A (en) * 2019-07-03 2019-09-20 重庆锦森腾建筑工程咨询有限公司 A kind of assembled anti-knock bridge pier

Also Published As

Publication number Publication date
CN106869014B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN102635202B (en) Mix FRP pipe steel reinforced concrete coupled column
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN108049305A (en) The splicing construction and joining method of a kind of precast pier and prefabricated cushion cap
CN103590414B (en) A kind of attachment structure of concrete tubular pile and cushion cap
CN107190635B (en) Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform
CN106869014A (en) A kind of knob Precast Concrete Segmental Bridges bridge pier attachment means
CN103966956B (en) A kind of hood type concrete filled steel tube reinforces single-column Bridge Pier Construction device and construction method
CN209760278U (en) UHPC pile integrated structure without bearing platform
CN107558364A (en) A kind of low drying shrinkage cement-based material bridge deck pavement structure of ultra-tough and construction method
CN104164834B (en) Friction self-locking formula Precast Concrete Segmental Bridges bridge pier linkage
CN110820546A (en) Concrete column high anti-seismic performance assembled connection structure
CN109826222B (en) Structure for reinforcing pile table connection and construction method thereof
CN105350564A (en) Bonding structure of wind turbine foundation steel ring and concrete and construction method
CN211395402U (en) Municipal works road and bridge crack restoration fixed knot constructs
CN210562131U (en) Prestressed concrete solid square pile
CN104775354B (en) A kind of large volume bridge bearing platform structure and construction method
CN207714300U (en) A kind of fabricated ocean engineering concrete architectural structure system
CN103909574B (en) The production technology of large moment of flexure high strength post tensioned steel concurrent and electric pole
CN110258788A (en) A kind of the half dry type connecting node and its construction method of Vierendeel girder and column
CN201190280Y (en) Steel-concrete composite pile joint
CN214783214U (en) Be used for external prestressing force reinforcing apparatus of mountain area highway concrete T roof beam
CN104278621B (en) Pin-connected panel regenerates concrete filled steel tube Y type bridge piers
CN211714733U (en) Structure for assembling concrete tower
CN201362337Y (en) Temporary river-crossing floating pontoon
CN109339040B (en) Prefabricated wedge-shaped pipe wall opening hollow pile and pile splicing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

Termination date: 20220217