CN104775354B - A kind of large volume bridge bearing platform structure and construction method - Google Patents
A kind of large volume bridge bearing platform structure and construction method Download PDFInfo
- Publication number
- CN104775354B CN104775354B CN201510145076.8A CN201510145076A CN104775354B CN 104775354 B CN104775354 B CN 104775354B CN 201510145076 A CN201510145076 A CN 201510145076A CN 104775354 B CN104775354 B CN 104775354B
- Authority
- CN
- China
- Prior art keywords
- steel
- shaped steel
- transition layer
- layer structure
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 134
- 239000010959 steel Substances 0.000 claims abstract description 134
- 239000004567 concrete Substances 0.000 claims abstract description 60
- 230000007704 transition Effects 0.000 claims abstract description 53
- 230000002787 reinforcement Effects 0.000 claims abstract description 40
- 238000005266 casting Methods 0.000 claims abstract description 28
- 238000000034 method Methods 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 14
- 238000003466 welding Methods 0.000 claims description 11
- 239000004574 high-performance concrete Substances 0.000 claims description 4
- 230000003068 static effect Effects 0.000 claims description 4
- 238000010348 incorporation Methods 0.000 claims description 3
- 238000005493 welding type Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000000465 moulding Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0069—Welding
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0031—Steel; Iron in cast iron form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510145076.8A CN104775354B (en) | 2015-03-31 | 2015-03-31 | A kind of large volume bridge bearing platform structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510145076.8A CN104775354B (en) | 2015-03-31 | 2015-03-31 | A kind of large volume bridge bearing platform structure and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104775354A CN104775354A (en) | 2015-07-15 |
CN104775354B true CN104775354B (en) | 2016-07-06 |
Family
ID=53617097
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510145076.8A Expired - Fee Related CN104775354B (en) | 2015-03-31 | 2015-03-31 | A kind of large volume bridge bearing platform structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104775354B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105821770B (en) * | 2016-04-01 | 2017-05-24 | 上海城建市政工程(集团)有限公司 | Connecting and locating method for multiple tower roots and large-size concrete bearing platform foundation of steel structure main tower |
CN108797550A (en) * | 2018-05-09 | 2018-11-13 | 中交公局第二工程有限公司 | The special-shaped super large cushion cap of pile foundation layout has the construction method of bottom casing |
CN110409609B (en) * | 2019-07-18 | 2020-10-02 | 中交武汉港湾工程设计研究院有限公司 | Pouring method for preventing concrete from cracking in ultra-long interval period |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4544202B2 (en) * | 2006-05-30 | 2010-09-15 | Jfeエンジニアリング株式会社 | Reinforcing structure of rectangular pedestal, reinforcing structure of base of rectangular pedestal, and construction method thereof |
CN101463610A (en) * | 2007-12-20 | 2009-06-24 | 上海市基础工程公司 | Comprehensive processing method for platform big volume concrete and built-in concrete support |
CN101781931B (en) * | 2010-01-21 | 2011-06-29 | 中铁二十局集团有限公司 | Construction method of large-volume concrete bearing platform with one-time pouring in winter |
CN102140801A (en) * | 2010-02-02 | 2011-08-03 | 中交二公局第五工程有限公司 | Cofferdam construction method in construction of deepwater pier bearing platform |
CN102747742B (en) * | 2012-07-24 | 2014-05-21 | 武汉大学 | Construction method for large-volume concrete structure of bridge loading platform |
CN102877420A (en) * | 2012-11-06 | 2013-01-16 | 中铁二十二局哈尔滨铁路建设集团有限责任公司 | Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform |
CN104314011B (en) * | 2014-11-17 | 2016-04-06 | 华北水利水电大学 | A kind of concrete construction method of cushion cap under water |
-
2015
- 2015-03-31 CN CN201510145076.8A patent/CN104775354B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104775354A (en) | 2015-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108103926B (en) | Assembled hollow pier and its construction method based on end plate welding | |
CN205857032U (en) | The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket | |
CN107190635B (en) | Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform | |
CN107245953B (en) | A kind of crossed construction method of multilayer bridge structure | |
CN110080525B (en) | Bidirectional synchronous construction method for high-rise building | |
CN108708267A (en) | Long span assembled Bailey beam bridge and its erection method | |
CN104775354B (en) | A kind of large volume bridge bearing platform structure and construction method | |
CN103726613B (en) | A kind of novel fabricated concrete column | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN105040810B (en) | Suitable for the connecting node of frame supported shear wall structure reverse construction | |
CN206408639U (en) | Assembled steel reinforced concrete composite bridge | |
CN202899481U (en) | Fast-assembled concrete stair | |
CN109853537B (en) | Prestressed pile and construction method thereof | |
CN210067020U (en) | Sub-structure assembled frame structure | |
CN106320184A (en) | Novel fabricated bridge construction method | |
CN205313966U (en) | Bulky bridge cushion cap structure | |
CN207436340U (en) | A kind of Large-span Precast floor construction | |
CN105887918A (en) | Tower crane foundation and construction method thereof | |
CN214994078U (en) | Large-diameter pile column structure for reverse construction method engineering | |
CN115839102A (en) | Wind power tower prestress stiffening type steel concrete high-rise pile cap foundation | |
CN205046668U (en) | Connected node suitable for frame supported shear wall structure reverse construction | |
CN204401462U (en) | For the support of pier prestressed cap beam with extra length Construction Supporting System in water | |
CN103981810A (en) | Steel tube arch main arch splicing and supporting system | |
CN211368652U (en) | Pile platform structure based on thick riprap foundation | |
CN203684528U (en) | Novel assembled concrete column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: Jiang Yanhua Document name: Notification of Passing Examination on Formalities |
|
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Dong Hanjun Inventor after: Dong Mansheng Inventor after: Qin Xiaofeng Inventor after: Li Man Inventor after: Cang Jun Inventor after: Tan Xiaofeng Inventor after: Chen Bin Inventor after: Xu Haijiang Inventor before: Dong Hanjun Inventor before: Qin Xiaofeng Inventor before: Li Man Inventor before: Dong Mansheng Inventor before: Cang Jun Inventor before: Tan Xiaofeng Inventor before: Chen Bin Inventor before: Xu Haijiang |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160222 Address after: 430040 Wuhan, East Lake District, Hubei Jin Lake Road, No. 11 Applicant after: China Communications 2nd Navigational Bureau Address before: Tunxi road in Baohe District of Hefei city in Anhui province No. 193 building 180 room 104 Applicant before: Dong Mansheng |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20170331 |