CN104775354B CN201510145076.8A CN201510145076A CN104775354B CN 104775354 B CN104775354 B CN 104775354B CN 201510145076 A CN201510145076 A CN 201510145076A CN 104775354 B CN104775354 B CN 104775354B
Authority
CN
China
Prior art keywords
steel
shaped steel
transition layer
layer structure
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510145076.8A
Other languages
Chinese (zh)
Other versions
CN104775354A (en
Inventor
董汉军
董满生
秦小锋
李满
臧骏
谭啸峰
陈斌
徐海江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510145076.8A priority Critical patent/CN104775354B/en
Publication of CN104775354A publication Critical patent/CN104775354A/en
Application granted granted Critical
Publication of CN104775354B publication Critical patent/CN104775354B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0069Welding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0031Steel; Iron in cast iron form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Abstract

The invention provides a kind of large volume bridge bearing platform structure, including bottom concrete structure, the cushion cap main body xoncrete structure being connected with described bottom concrete structure, also include the transition layer structure being arranged between described bottom concrete structure and described cushion cap main body xoncrete structure, described transition layer structure is steel performance, described transition layer structure includes the steel pile casting of pile foundation, shaped steel, bar-mat reinforcement, it is welded to connect by described shaped steel between described steel pile casting, described bar-mat reinforcement is laid on described shaped steel and welds with described shaped steel, described bar-mat reinforcement welds with described steel pile casting contact position.Present invention also offers the construction method of described transition layer structure and described shaped steel.The present invention is under the premise not changing cushion cap volume, described transition layer structure is set, seeking the support force outside back cover intensity, bonding hypodynamic problem between bottom concrete and pile foundation when solving primary concreting cushion cap concrete, thus being greatly shortened the duration.

Description

A kind of large volume bridge bearing platform structure and construction method
Technical field
The present invention relates to bridge structure technical field, more specifically, particularly to a kind of large volume bridge bearing platform structure and construction method.
Background technology
Main Pier of Bridges cushion cap is usually located at below horizontal plane, main pier bearing platform bottom concrete often adopts underwater grouting to construct, bottom concrete has been built, reach to draw water after designing requirement until intensity, back cover upper surface unconsolidated formation need to be removed, owing to back cover structure adopts construction technique under water, back cover structure upper surface is uneven, before construction bearing platform main body, back cover upper surface is carried out concrete mortar leveling, then installation platform main body reinforcing bar, build cushion cap main body concrete.
Main Pier of Bridges bearing platform construction is the important step of operation at sea, with high content of technology, has a big risk.Main pier bearing platform concrete construction weight is undertaken by back cover structure, restriction due to back cover structural bearing capacity, the existing large volume big more options of main pier bearing platform concreting process divide two layers to build, ground floor concreting weighs less than the back cover structural bearing capacity provided by the bond stress between bottom concrete and pile foundation, and its construction loads is undertaken by back cover structure completely;Reaching design strength more than 70% Deng ground floor concrete strength, start second layer concrete reinforcement colligation, concrete construction, second layer concreting weight is mainly undertaken by ground floor xoncrete structure.
Traditional main pier bearing platform construction in layer technics comparing is ripe, currently, and this technique commonly used in Main Pier of Bridges bearing platform construction, but long in time limit, construction cost is high, is unfavorable for trying to meet the deadline for the project.If selecting one-time-concreting large volume main pier bearing platform concrete will be greatly shortened the duration, saving cost, but during primary concreting cushion cap concrete, the bond stress between bottom concrete and pile foundation is often not enough to bear the concrete weight of main pier bearing platform.
For existing highway bridge Construction Technology of Rider situation, how under the premise not changing Main Pier of Bridges cushion cap volume, optimize suspended deck structure, seek the support force outside back cover bearing capacity, make cushion cap concrete one-time-concreting molding, it is a very important engineering roadblock, is also the technical barrier needing Chinese scholars and engineering circles to pay close attention to.
Summary of the invention
It is contemplated that at least solve one of problems of the prior art.
One of the problems referred to above that the invention solves the problems that are in that, under the premise not changing cushion cap volume, make cushion cap concrete one-time-concreting molding, reduction of erection time, the problem saving cost.
For solving above-mentioned technical problem, the invention provides a kind of large volume bridge bearing platform structure, including bottom concrete structure, the cushion cap main body xoncrete structure being connected with described bottom concrete structure, described suspended deck structure also includes the transition layer structure being arranged between described bottom concrete structure and described cushion cap main body xoncrete structure, described transition layer structure is steel performance, described transition layer structure includes the steel pile casting of pile foundation, shaped steel, bar-mat reinforcement, it is welded to connect by described shaped steel between described steel pile casting, described bar-mat reinforcement is laid on described shaped steel and welds with described shaped steel, described bar-mat reinforcement welds with described steel pile casting contact position.
Further, described transition layer structure also includes covering the concrete on described shaped steel and described bar-mat reinforcement, and the described above concrete thickness of shaped steel end face of described transition layer structure is more than 15cm.
Further, described bar-mat reinforcement is made up of the arrangement of reinforcing bar transverse and longitudinal direction linear array.
Further, described shaped steel is I-steel.
Present invention also offers the construction method of described transition layer structure, the method step includes:
Being welded to connect with shaped steel between the sidewall of a, steel pile casting and described steel jacket box, described steel pile casting, the described above concrete thickness of shaped steel end face is more than 15cm;
Laying described bar-mat reinforcement on b, described shaped steel, described bar-mat reinforcement reinforcing bar transverse and longitudinal direction linear array is arranged, and is welded with shaped steel by described reinforcing bar, and described bar-mat reinforcement, through pile foundation, is connected with the described steel pile casting of pile foundation and pile foundation reinforcement welding;
C, build high performance concrete, form the described transition layer structure of steel performance.
Present invention also offers the construction method of described shaped steel, the method includes:
A, select transition layer structure described shaped steel be I-steel, it is determined that welding type is butt weld;
B, by formula (1) obtain butt weld maximum shear stress τmax
τ max = VS x I x t - - - ( 1 )
In formula (1), V is weld seam group's stress, SXFor cross section static moment, IXFor cross sectional moment of inertia, t is weldment thickness;
C, obtain butt weld maximum load capacity F according to described the maximum shear stress and formula (2)support
FsupportmaxA(2)
In formula (2), A is that section of weld joint amasss;
When factor of safety against sliding when d, primary concreting cushion cap main body concrete is marginal value 1.1, obtain the minima n of shaped steel welding quantity according to described maximum load capacity and formula (3)min
n min = 1.1 N d o w n - N u p 2 F sup p o r t - - - ( 3 )
N in formula (3)downFor the downward load summation of suspended deck structure, NupFor suspended deck structure upwards load summation;
E, determine according to described step d incorporation engineering fact shaped steel welding quantity.
Can accurately determining shaped steel quantity minima by the construction method step of described transition layer structure and described shaped steel, the construction for described transition layer structure and shaped steel provides reliable theory support.In sum, the beneficial effects of the present invention is and provide a kind of large volume bridge bearing platform structure, present invention also offers the construction method of described transition layer structure and described shaped steel, the present invention makes full use of back cover screed-coat and arranges the transition layer structure of steel and mixed combinative structure between described bottom concrete structure and described cushion cap main body xoncrete structure, seek the support force outside back cover structure, make cushion cap concrete one-time-concreting molding;Mutually than before due to the restriction of back cover structural bearing capacity, in cushion cap concreting process, big more options placement layer by layer, long in time limit, and the present invention is greatly shortened the duration, saves cost.
Accompanying drawing explanation
Fig. 1 show the structural representation of a kind of large volume bridge bearing platform structure of the present invention and construction method.
The top view that Fig. 2 show in the present invention transition layer structure and steel jacket box.
The schematic diagram that Fig. 3 show in Fig. 2 bar-mat reinforcement.
Fig. 4 show the schematic diagram of Fig. 2 Shaped Steel.
Number in the figure: 1 steel pile casting, 2 bottom concrete structures, 3 cushion cap main body xoncrete structures, 4 transition layer structures, 5 steel jacket boxes, 6 shaped steel, 7 bar-mat reinforcements.
Detailed description of the invention
The present invention is described in detail below in conjunction with specific embodiment.It should be noted that, what the combination of technical characteristic described in following embodiment or technical characteristic was not construed as isolating, they can be mutually combined thus reaching superior technique effect.
Fig. 1 show the structural representation of a kind of large volume bridge bearing platform structure of the present invention and construction method;
The top view that Fig. 2 show in the present invention transition layer structure and steel jacket box.
As depicted in figs. 1 and 2, the invention provides a kind of large volume bridge bearing platform structure, including bottom concrete structure 2, the cushion cap main body xoncrete structure 3 being connected with described bottom concrete structure 2, described suspended deck structure also includes the transition layer structure 4 being arranged between described bottom concrete structure 2 and described cushion cap main body xoncrete structure 3, described transition layer structure 4 is steel performance, described transition layer structure 4 includes the steel pile casting 1 of pile foundation, shaped steel 6, bar-mat reinforcement 7, it is welded to connect by described shaped steel 6 between described steel pile casting 1, described bar-mat reinforcement 7 is laid on described shaped steel 6 and welds with described shaped steel 6, described bar-mat reinforcement 7 welds with described steel pile casting 1 contact position.
Further, described transition layer structure 4 also includes covering the concrete on described shaped steel 6 and described bar-mat reinforcement 7, and the described shaped steel 6 above concrete thickness of end face of described transition layer structure 4 is more than 15cm.
The schematic diagram that Fig. 3 show in Fig. 2 bar-mat reinforcement.
Further, described bar-mat reinforcement 7 is made up of the arrangement of reinforcing bar transverse and longitudinal direction linear array, as shown in Figure 3.
Fig. 4 show the schematic diagram of Fig. 2 Shaped Steel.
Further, described shaped steel 6 is I-steel, as shown in Figure 4.
Present invention also offers the construction method of described transition layer structure 4, the method step includes:
Being welded to connect with described shaped steel 6 between the sidewall of a, described steel pile casting 1 and described steel jacket box 5, described steel pile casting 1, described shaped steel 6 the above thickness of concrete cover of end face is more than 15cm;
Laying described bar-mat reinforcement 7 on b, described shaped steel 6, described bar-mat reinforcement 7 reinforcing bar transverse and longitudinal direction linear array is arranged, and is welded with shaped steel 6 by described reinforcing bar, and described bar-mat reinforcement 7, through pile foundation, is connected with the described steel pile casting 1 of pile foundation and pile foundation reinforcement welding;
C, build high performance concrete, form the described transition layer structure 4 of steel performance.
Present invention also offers the construction method of described shaped steel 6, the method includes:
A, the described shaped steel 6 selecting described transition layer structure 4 are I-steel, it is determined that welding type is butt weld;
B, by formula (1) obtain butt weld maximum shear stress τmax
τ max = VS x I x t - - - ( 1 )
In formula (1), V is weld seam group's stress, SXFor cross section static moment, IXFor cross sectional moment of inertia, t is weldment thickness;
C, obtain butt weld maximum load capacity F according to described the maximum shear stress and formula (2)support
FsupportmaxA(2)
In formula (2), A is that section of weld joint amasss;
When factor of safety against sliding when d, primary concreting cushion cap main body concrete is marginal value 1.1, obtains shaped steel 6 according to described maximum load capacity and formula (3) and weld the minima n of quantitymin
n min = 1.1 N d o w n - N u p 2 F sup p o r t - - - ( 3 )
N in formula (3)downFor the downward load summation of suspended deck structure, NupFor suspended deck structure upwards load summation;
E, determine that shaped steel 6 welds quantity according to described step d incorporation engineering fact.
Can accurately determining shaped steel 6 quantity minima by the construction method step of described transition layer structure 4 and described shaped steel 6, the construction for described transition layer structure 4 and shaped steel 6 provides reliable theory support.
Embodiment: the single main pier bearing platform of bridge is of a size of 6 × 5.1 × 4.5m binder is formed by connecting by the little cushion cap of 2 size 14.2 × 14.2 × 4.5m and one, the bored concrete pile 18 of the total diameter 2m of single main pier, the briefing adopting the large volume bridge structure of the present invention is as follows:
The present embodiment Central Plains cushion cap structure includes bottom concrete structure 2 and cushion cap main body xoncrete structure 3, arrangement and method for construction is for building cushion cap main body concrete at twice, ground floor builds 2m, and the second layer builds 2.5m, and second layer concrete is built when ground floor concrete strength reaches design strength.
As depicted in figs. 1 and 2, after use the large volume bridge bearing platform structure of the present invention instead, this suspended deck structure includes bottom concrete structure 2, the transition layer structure 4 of steel performance and cushion cap main body xoncrete structure 3, and the transition layer structure 4 of steel performance is between cushion cap main body xoncrete structure 3 and bottom concrete structure 2;Described transition layer structure 4 Shaped Steel 6 is welded to connect with steel pile casting 1, steel jacket box 5 respectively;Bar-mat reinforcement 7 is laid on shaped steel 6, and reinforcing bar transverse and longitudinal direction linear array is arranged, and is welded with shaped steel 6 by reinforcing bar, and bar-mat reinforcement 7 is contacting with pile foundation steel pile casting 1 and pile foundation reinforcement welding through pile foundation;Arrangement and method for construction is one-time-concreting cushion cap main body concrete.
As shown in Figure 1, in the present embodiment, in order to fully excavate the bearing capacity of the transition layer structure 4 of steel performance, outside other than with the 30cm screed-coat of bottom concrete structure 2, also intrinsic cushion cap main body xoncrete structure 3 thickness is reduced to 430cm by 450cm, transition layer structure 4 thickness of design steel performance is 50cm, arranges the transition layer structure 4 of steel performance between bottom concrete structure 2 and cushion cap main body xoncrete structure 3.
In specific embodiment, transition layer structure 4 work progress of steel performance is as follows:
A. as in figure 2 it is shown, be welded to connect with 2~3 root type steel 6 between the present embodiment pile foundation steel pile casting 1 and steel jacket box 5 sidewall, pile foundation steel pile casting 1 and pile foundation steel pile casting 1;Described shaped steel 6 position is low as far as possible, it is ensured that the above concrete thickness of shaped steel 6 end face is more than 15cm;
B. as shown in Figure 3, the present embodiment is laid the II level bar-mat reinforcement 7 of diameter 22mm on transition zone shaped steel 6, reinforcing bar is horizontal, longitudinal pitch is 200mm, and is welded with shaped steel 6 by reinforcing bar, and bar-mat reinforcement 7 is being connected with pile foundation steel pile casting 1 and pile foundation reinforcement welding through pile foundation;
C. build high performance concrete, form the transition layer structure 4 of steel performance.
In the present embodiment, the construction method of the shaped steel 6 of transition layer structure 4 is to carry out according to the following procedure:
1) as shown in Figure 4, the shaped steel 6 selecting transition layer structure 4 is work 25a shaped steel, adopts butt weld welding;
2) the maximum shear stress τ obtaining butt weld is calculated by formula (1)max
τ max = VS x I x t - - - ( 1 )
In formula (1), V is weld seam group's stress, SXFor cross section static moment, IXFor cross sectional moment of inertia, t is weldment thickness;
C, obtain butt weld maximum load capacity F according to described the maximum shear stress and formula (2)support
FsupportmaxA(2)
In formula (2), A is that section of weld joint amasss;
3) factor of safety against sliding when) assuming primary concreting cushion cap main body concrete reaches marginal value 1.1, formula (3) calculate the minima n obtaining shaped steel welding quantitymin
n min = 1.1 N d o w n - N u p 2 F sup p o r t - - - ( 3 )
N in formula (3)downFor the downward load summation of suspended deck structure, NupFor suspended deck structure upwards load summation;
4) according to step 2) and 3), transition layer structure 4 Welder's 25a shaped steel 68 altogether of steel performance in the present embodiment.
As it is shown in figure 1, in the present embodiment, after transition layer structure 4 concrete of steel performance reaches design strength, primary concreting cushion cap main body concrete.
The invention provides a kind of large volume bridge bearing platform structure, simultaneously, present invention also offers the construction method of described transition layer structure 4 and described shaped steel 6, the present invention makes full use of back cover screed-coat, the transition layer structure 4 of steel and mixed combinative structure is set between described bottom concrete structure 2 and described cushion cap main body xoncrete structure 3, seek the support force outside back cover structure, make cushion cap concrete one-time-concreting molding;Mutually than before due to the restriction of back cover structural bearing capacity, in cushion cap concreting process, big more options placement layer by layer, long in time limit, and the present invention is greatly shortened the duration, saves cost.
Although have been presented for some embodiments of the present invention herein, it will be appreciated by those of skill in the art that without departing from the spirit of the invention, it is possible to the embodiments herein is changed.Above-described embodiment is illustrative of, should restriction using the embodiments herein as interest field of the present invention.

Claims (6)

1. a large volume bridge bearing platform structure, including bottom concrete structure, the cushion cap main body xoncrete structure being connected with described bottom concrete structure, it is characterized in that, described suspended deck structure also includes the transition layer structure being arranged between described bottom concrete structure and described cushion cap main body xoncrete structure, described transition layer structure is steel performance, described transition layer structure includes the steel pile casting of pile foundation, shaped steel and bar-mat reinforcement, it is welded to connect by described shaped steel between described steel pile casting, described bar-mat reinforcement is laid on described shaped steel and welds with described shaped steel, described bar-mat reinforcement welds with described steel pile casting contact position.
2. large volume bridge bearing platform structure as claimed in claim 1, it is characterised in that described transition layer structure also includes covering the concrete on described shaped steel and described bar-mat reinforcement, and the described above concrete thickness of shaped steel end face of described transition layer structure is more than 15cm.
3. large volume bridge bearing platform structure as claimed in claim 1, it is characterised in that described bar-mat reinforcement is made up of the arrangement of reinforcing bar transverse and longitudinal direction linear array.
4. the large volume bridge bearing platform structure as described in claim 1-3 any one, it is characterised in that described shaped steel is I-steel.
5. the construction method of a transition layer structure, it is characterised in that the method step includes:
Being welded to connect with shaped steel between the sidewall of a, steel pile casting and steel jacket box, described steel pile casting, the described above concrete thickness of shaped steel end face is more than 15cm;
Laying bar-mat reinforcement on b, described shaped steel, described bar-mat reinforcement reinforcing bar transverse and longitudinal direction linear array is arranged, and is welded with shaped steel by described reinforcing bar, and described bar-mat reinforcement, through pile foundation, is connected with the reinforcement welding of the described steel pile casting of pile foundation and pile foundation;
C, build high performance concrete, form the described transition layer structure of steel performance.
6. the construction method of a shaped steel, it is characterised in that the method step includes:
A, select transition layer structure described shaped steel be I-steel, it is determined that welding type is butt weld;
B, by formula (1) obtain butt weld maximum shear stress τmax
τ max = VS x I x t - - - ( 1 )
In formula (1), V is weld seam group's stress, SxFor cross section static moment, IxFor cross sectional moment of inertia, t is weldment thickness;
C, obtain butt weld maximum load capacity F according to described the maximum shear stress and formula (2)support
FsupportmaxA(2)
In formula (2), A is that section of weld joint amasss;
When factor of safety against sliding when d, primary concreting cushion cap main body concrete is marginal value 1.1, obtain the minima n of shaped steel welding quantity according to described maximum load capacity and formula (3)min
n min = 1.1 N d o w n - N u p 2 F sup p o r t - - - ( 3 )
N in formula (3)downFor the downward load summation of suspended deck structure, NupFor suspended deck structure upwards load summation;
E, determine according to described step d incorporation engineering fact shaped steel welding quantity.
CN201510145076.8A 2015-03-31 2015-03-31 A kind of large volume bridge bearing platform structure and construction method Expired - Fee Related CN104775354B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510145076.8A CN104775354B (en) 2015-03-31 2015-03-31 A kind of large volume bridge bearing platform structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510145076.8A CN104775354B (en) 2015-03-31 2015-03-31 A kind of large volume bridge bearing platform structure and construction method

Publications (2)

Publication Number Publication Date
CN104775354A CN104775354A (en) 2015-07-15
CN104775354B true CN104775354B (en) 2016-07-06

Family

ID=53617097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510145076.8A Expired - Fee Related CN104775354B (en) 2015-03-31 2015-03-31 A kind of large volume bridge bearing platform structure and construction method

Country Status (1)

Country Link
CN (1) CN104775354B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821770B (en) * 2016-04-01 2017-05-24 上海城建市政工程(集团)有限公司 Connecting and locating method for multiple tower roots and large-size concrete bearing platform foundation of steel structure main tower
CN108797550A (en) * 2018-05-09 2018-11-13 中交公局第二工程有限公司 The special-shaped super large cushion cap of pile foundation layout has the construction method of bottom casing
CN110409609B (en) * 2019-07-18 2020-10-02 中交武汉港湾工程设计研究院有限公司 Pouring method for preventing concrete from cracking in ultra-long interval period

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4544202B2 (en) * 2006-05-30 2010-09-15 Jfeエンジニアリング株式会社 Reinforcing structure of rectangular pedestal, reinforcing structure of base of rectangular pedestal, and construction method thereof
CN101463610A (en) * 2007-12-20 2009-06-24 上海市基础工程公司 Comprehensive processing method for platform big volume concrete and built-in concrete support
CN101781931B (en) * 2010-01-21 2011-06-29 中铁二十局集团有限公司 Construction method of large-volume concrete bearing platform with one-time pouring in winter
CN102140801A (en) * 2010-02-02 2011-08-03 中交二公局第五工程有限公司 Cofferdam construction method in construction of deepwater pier bearing platform
CN102747742B (en) * 2012-07-24 2014-05-21 武汉大学 Construction method for large-volume concrete structure of bridge loading platform
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN104314011B (en) * 2014-11-17 2016-04-06 华北水利水电大学 A kind of concrete construction method of cushion cap under water

Also Published As

Publication number Publication date
CN104775354A (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN108103926B (en) Assembled hollow pier and its construction method based on end plate welding
CN205857032U (en) The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket
CN107190635B (en) Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN110080525B (en) Bidirectional synchronous construction method for high-rise building
CN108708267A (en) Long span assembled Bailey beam bridge and its erection method
CN104775354B (en) A kind of large volume bridge bearing platform structure and construction method
CN103726613B (en) A kind of novel fabricated concrete column
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN206408639U (en) Assembled steel reinforced concrete composite bridge
CN202899481U (en) Fast-assembled concrete stair
CN109853537B (en) Prestressed pile and construction method thereof
CN210067020U (en) Sub-structure assembled frame structure
CN106320184A (en) Novel fabricated bridge construction method
CN205313966U (en) Bulky bridge cushion cap structure
CN207436340U (en) A kind of Large-span Precast floor construction
CN105887918A (en) Tower crane foundation and construction method thereof
CN214994078U (en) Large-diameter pile column structure for reverse construction method engineering
CN115839102A (en) Wind power tower prestress stiffening type steel concrete high-rise pile cap foundation
CN205046668U (en) Connected node suitable for frame supported shear wall structure reverse construction
CN204401462U (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN103981810A (en) Steel tube arch main arch splicing and supporting system
CN211368652U (en) Pile platform structure based on thick riprap foundation
CN203684528U (en) Novel assembled concrete column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Jiang Yanhua

Document name: Notification of Passing Examination on Formalities

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Dong Hanjun

Inventor after: Dong Mansheng

Inventor after: Qin Xiaofeng

Inventor after: Li Man

Inventor after: Cang Jun

Inventor after: Tan Xiaofeng

Inventor after: Chen Bin

Inventor after: Xu Haijiang

Inventor before: Dong Hanjun

Inventor before: Qin Xiaofeng

Inventor before: Li Man

Inventor before: Dong Mansheng

Inventor before: Cang Jun

Inventor before: Tan Xiaofeng

Inventor before: Chen Bin

Inventor before: Xu Haijiang

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160222

Address after: 430040 Wuhan, East Lake District, Hubei Jin Lake Road, No. 11

Applicant after: China Communications 2nd Navigational Bureau

Address before: Tunxi road in Baohe District of Hefei city in Anhui province No. 193 building 180 room 104

Applicant before: Dong Mansheng

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706