CN109368445A - The method of self-lifting system is used in blast furnace construction - Google Patents
The method of self-lifting system is used in blast furnace construction Download PDFInfo
- Publication number
- CN109368445A CN109368445A CN201811436205.9A CN201811436205A CN109368445A CN 109368445 A CN109368445 A CN 109368445A CN 201811436205 A CN201811436205 A CN 201811436205A CN 109368445 A CN109368445 A CN 109368445A
- Authority
- CN
- China
- Prior art keywords
- platform
- furnace shell
- construction
- ring
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
A method of self-lifting system being used in blast furnace construction, belongs to blast furnace technical field of construction.Solve a series of construction problems such as last furnace shell welding, furnace inner waterproofing, the arrangement of installation for welding, cooling wall installation, furnace sealing erection of equipment and welding, tuyere equipment installation by setting up self-lifting system.Including ring-like movable platform, electric hoisting mechanism, round hanging platform, while ring shaped movable platform plays rain-proof, radix saposhnikoviae outside furnace, safe and reliable operation platform is also provided for construction personnel.Electric hoisting mechanism is made by control cabinet, electric block, provides raising power.Round hanging platform can prevent in furnace into rain, and table top is to weld the storeroom of equipment, and platform edges provide fixed point for electric hoisting mechanism.The advantage is that properly solving the safety of construction personnel, construction equipment, one is created securely and reliably, convenient for the construction environment of operation.
Description
Technical field
The invention belongs to blast furnace technical field of construction, in particular, provide one kind in blast furnace construction using automatic lifting system
The method of system builds the installation and welding of last furnace shell ontology and installations and facilities suitable for blast furnace, particularly suitable for coastal and gas
Time condition is disliked slightly regional.
Background technique
Blast furnace is the heart of entire ironmaking engineering, and last furnace shell installation and welding are the core works in entire blast furnace construction
Journey, the installation quality of furnace shell are the premises for guaranteeing blast furnace service life.Shoudu Iron and Steel Co capital Tang 5500m3The BF Design service life 25 years, furnace shell
Turn round steel sheel for variable cross-section, be welded to form one by 25 band coaming plates, material BB503, steel plate thickness 60mm~
110mm, shell top mark is 52.2 meters high, all high altitude operation of constructing, and thus must properly solve construction personnel, construction equipment
Safety carries out radix saposhnikoviae, Rainproof working, creates one securely and reliably, convenient for the construction environment of operation, just can guarantee furnace shell installation
Quality.
It is taken in previous last furnace shell installation and sets up rain-proof shelter on furnace shell, furnace shell inner and outer portions layer is set up
Scaffold takes the simple measures such as zebra cloth enclosing radix saposhnikoviae, causes construction safety guaranteed conditions poor, and construction efficiency low quality
Difference, weld seam are repeatedly done over again.Shoudu Iron and Steel Co capital Tang 5500m3Blast furnace is located at prince wife Cao pasture industrial area, is coastal area, climate item of constructing
Part influence is very big, and furnace shell is installed by taking self-lifting system, provides a safe and reliable construction for construction personnel
Platform, while solving the problems such as radix saposhnikoviae, rain-proof, installation for welding storage, it furnace shell construction quality is effectively guaranteed improves and apply
Work efficiency rate, at the same be again the installation of next step cooling wall, furnace sealing erection of equipment and welding, tuyere equipment installation, water system it is under the overall leadership
The work such as road installation create condition, and automatic lifting mechanism is used for multiple times, and is recycled.
Summary of the invention
The purpose of the present invention is to provide the methods that self-lifting system is used in blast furnace is built, and are mentioned automatically by setting up
The system of liter solves last furnace shell welding, furnace inner waterproofing, the arrangement of installation for welding, cooling wall installation, furnace sealing erection of equipment
With a series of construction problems such as welding, tuyere equipment installation, the safe and reliable guarantee measure convenient for construction, it is ensured that construction matter
Amount.
The present invention is made of ring-like movable platform, electric hoisting mechanism, round hanging platform three parts.Ring shaped movable platform
While playing rain-proof, radix saposhnikoviae outside furnace, safe and reliable operation platform is also provided for construction personnel.Electric hoisting mechanism by
Control cabinet, electric block are made into, and provide raising power.Round hanging platform can be prevented into rain in furnace, and table top is welding
The storeroom of equipment, platform edges provide fixed point for electric hoisting mechanism.Steps are as follows for Specific construction:
(1) furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform 1 one according to construction drawing, ring-shaped platform
Upper installation promotes lifting lug 2 and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one
It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld
Contracting leg 3.
(2) round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, is made and is justified according to construction drawing
Type ring-shaped platform 4 one, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres 5, completely spreads 5mm thick steel plate on platform
Sealing welding, surrounding set up railing.
(3) electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks 6 are uniformly arranged, by matching
Electric cabinet 7 controls electric block single action or linkage, and power distribution cabinet 7 is fixed on round hanging platform.
(4) each section combination installation
Ring shaped movable platform 1 is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block 6
And power distribution cabinet 7 is mounted on round hanging platform 4, again by round hanging platform (4) integral hoisting in furnace shell suitable for reading, power distribution cabinet
7 power on electric block 6 are made to tangle ring shaped movable Platform Lug 2, raising as needed or reduce ring shaped movable platform, pass through
Ring-shaped platform Retractive leg (3) adjusts platform and furnace shell gap, is laid with springboard and asbestos cloth when being greater than 100mm, platform raising is in place
It is rigidly fixed on furnace shell with connecting rod afterwards, is carrying out the work such as furnace shell welding.
(5) it is recycled
It is next in progress after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage
In the period, circulation is back and forth until furnace shell erecting and welding is completed.
The present invention evades the drawbacks of original conventional construction method, and furnace shell is welded by taking self-lifting system, to apply
Worker person provides a safe and reliable operation platform, while solving the problems such as radix saposhnikoviae, rain-proof, installation for welding storage, has
Effect ensure that furnace shell construction quality improves construction efficiency, while be again the installation of next step cooling wall, furnace sealing facility peace
The work such as dress and welding, tuyere equipment installation, water-system pipeline installation create condition, and automatic lifting mechanism is repeatedly made
With, reduce labor intensity, small investment, it is highly-safe, installation quality is high the advantages that.
Detailed description of the invention
Fig. 1 is ring-shaped platform schematic top plan view.Wherein, ring-shaped platform ontology 1, ring-shaped platform Retractive leg 3.
Fig. 2 is ring-shaped platform schematic front view.Wherein, ring-shaped platform promotes lifting lug 2.
Fig. 3 is round hanging platform schematic front view.Wherein, round hanging platform body 4, suspension centre 5.
Fig. 4 is round hanging platform schematic top plan view.
Fig. 5 is automatic lifting schematic front view.Wherein, ring-shaped platform ontology 1, ring-shaped platform suspension centre 2, ring-shaped platform are flexible
Leg 3, round hanging platform body 4, suspension centre 5, electric block 6, power distribution cabinet 7.
Specific embodiment
Illustrate embodiment of the present invention with reference to the accompanying drawing:
1, furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform 1 one according to construction drawing, ring-shaped platform
Upper installation promotes lifting lug 2 and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one
It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld
Contracting leg 3.
2, round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, is made and is justified according to construction drawing
Type ring-shaped platform 4 one, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres 5, completely spreads 5mm thick steel plate on platform
Sealing welding, surrounding set up railing.
3, electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks 6 are uniformly arranged, by matching
Electric cabinet 7 controls electric block single action or linkage, and power distribution cabinet 7 is fixed on round hanging platform.
4, each section combination installation
Ring shaped movable platform 1 is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block 6
And power distribution cabinet 7 is mounted on round hanging platform 4, again that round 4 integral hoisting of hanging platform is suitable for reading in furnace shell, power distribution cabinet 7
Powering on makes electric block 6 tangle ring shaped movable Platform Lug 2, raising as needed or reduction ring shaped movable platform, passes through
Ring-shaped platform Retractive leg 3 adjusts platform and furnace shell gap, is laid with springboard and asbestos cloth when being greater than 100mm, platform raising in place after
It is rigidly fixed on furnace shell with connecting rod, is carrying out the work such as furnace shell welding.
5, it is recycled
It is next in progress after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage
In the period, circulation is back and forth until furnace shell erecting and welding is completed.
Claims (1)
1. a kind of method for using self-lifting system in blast furnace construction, which is characterized in that construction procedure are as follows:
(1) furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform (1) one, on ring-shaped platform according to construction drawing
Installation promotes lifting lug (2) and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one
It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld
Contracting leg (3);
(2) round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, round ring is made according to construction drawing
(4) one, shape platform, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres (5), completely spreads 5mm thick steel plate on platform
Sealing welding, surrounding set up railing;
(3) electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks (6) are uniformly arranged, distribution is passed through
Cabinet (7) controls electric block single action or linkage, and power distribution cabinet (7) is fixed on round hanging platform;
(4) each section combination installation
Ring shaped movable platform (1) is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block (6)
And power distribution cabinet (7) is mounted on round hanging platform (4), and it is again that round hanging platform (4) integral hoisting is suitable for reading in furnace shell, match
Electric cabinet (7), which powers on, tangles electric block (6) ring shaped movable Platform Lug (2), and raising as needed or reduction annular are living
Moving platform adjusts platform and furnace shell gap by ring-shaped platform Retractive leg (3), is laid with springboard and asbestos cloth when being greater than 100mm, puts down
Platform raising is rigidly fixed on furnace shell with connecting rod afterwards in place, is carrying out the work such as furnace shell welding;
(5) it is recycled
Next week is being carried out after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage
Phase, circulation is back and forth until furnace shell erecting and welding is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811436205.9A CN109368445A (en) | 2018-11-28 | 2018-11-28 | The method of self-lifting system is used in blast furnace construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811436205.9A CN109368445A (en) | 2018-11-28 | 2018-11-28 | The method of self-lifting system is used in blast furnace construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109368445A true CN109368445A (en) | 2019-02-22 |
Family
ID=65377457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811436205.9A Pending CN109368445A (en) | 2018-11-28 | 2018-11-28 | The method of self-lifting system is used in blast furnace construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109368445A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042180A (en) * | 2019-05-21 | 2019-07-23 | 北京首钢建设集团有限公司 | The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction |
CN110144425A (en) * | 2019-05-21 | 2019-08-20 | 北京首钢建设集团有限公司 | A kind of multi-functional application method for hanging platform in blast furnace construction |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201343543Y (en) * | 2009-02-20 | 2009-11-11 | 中冶实久建设有限公司 | Movable hanging scaffold for installing hot blast furnace |
CN207296349U (en) * | 2017-09-28 | 2018-05-01 | 中国二十二冶集团有限公司 | Steel stove shell installation flashing, wind proofing structure |
CN208071727U (en) * | 2018-02-08 | 2018-11-09 | 上海宝冶建设工业炉工程技术有限公司 | A kind of blast furnace hanging scaffold |
-
2018
- 2018-11-28 CN CN201811436205.9A patent/CN109368445A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201343543Y (en) * | 2009-02-20 | 2009-11-11 | 中冶实久建设有限公司 | Movable hanging scaffold for installing hot blast furnace |
CN207296349U (en) * | 2017-09-28 | 2018-05-01 | 中国二十二冶集团有限公司 | Steel stove shell installation flashing, wind proofing structure |
CN208071727U (en) * | 2018-02-08 | 2018-11-09 | 上海宝冶建设工业炉工程技术有限公司 | A kind of blast furnace hanging scaffold |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042180A (en) * | 2019-05-21 | 2019-07-23 | 北京首钢建设集团有限公司 | The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction |
CN110144425A (en) * | 2019-05-21 | 2019-08-20 | 北京首钢建设集团有限公司 | A kind of multi-functional application method for hanging platform in blast furnace construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109368445A (en) | The method of self-lifting system is used in blast furnace construction | |
CN105177202B (en) | A kind of blast furnace overhaul method | |
CN104846143B (en) | Construction method for replacing steelmaking converter flue | |
CN106996214A (en) | A kind of communication tower provided with prefabricated pile basis | |
CN206753188U (en) | A kind of communication tower provided with prefabricated pile basis | |
CN110409837A (en) | A kind of large-span double-layer steel screen roof system sub-unit construction method for hanging | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN106086263A (en) | A kind of collaborative hanging method of blast furnace cooling stave | |
CN107489163A (en) | A kind of metallurgical industry body of heater annular bolt installation method | |
CN104551524A (en) | Oxygen lance vertically maintaining method and device corresponding to same | |
CN110241285A (en) | Converter mouth petticoat pipe more changing device, replacement structure and replacing options | |
CN103394321A (en) | Mounting method for large-diameter packed tower internals | |
CN105220763B (en) | A kind of integrated prefabricated pumping plant of intelligent direct burial lasted a long time | |
CN105438982A (en) | A rapid replacing method of a grate of a hot-blast stove of a blast furnace | |
CN208327196U (en) | A kind of penstock stiffening ring mounting bracket | |
CN102311074A (en) | Converter afterheat boiler maintenance equipment and boiler maintenance method | |
CN110042180A (en) | The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction | |
CN206110637U (en) | Adjustable construction work platform of inside maintenance of blast furnace scrubber tower | |
CN106836949B (en) | Large scale equipment rotary construction method | |
CN208964987U (en) | The heat treatment tooling of nuclear power safety injection tank end socket | |
CN110144425A (en) | A kind of multi-functional application method for hanging platform in blast furnace construction | |
CN105953599A (en) | Construction method of condenser | |
CN204530491U (en) | A kind of high pier hydraulic climbing mould construction frame | |
CN207046708U (en) | A kind of short group's davit lifts the Lift-on/Lift-off System of tall and big anaerobism tank body | |
CN205046828U (en) | Circular orbit movable hanging flower basket curtain construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190222 |