CN109368445A - The method of self-lifting system is used in blast furnace construction - Google Patents

The method of self-lifting system is used in blast furnace construction Download PDF

Info

Publication number
CN109368445A
CN109368445A CN201811436205.9A CN201811436205A CN109368445A CN 109368445 A CN109368445 A CN 109368445A CN 201811436205 A CN201811436205 A CN 201811436205A CN 109368445 A CN109368445 A CN 109368445A
Authority
CN
China
Prior art keywords
platform
furnace shell
construction
ring
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811436205.9A
Other languages
Chinese (zh)
Inventor
赵彦龙
杜宁
赵文军
王宁
鞠常林
边语
陈佳彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201811436205.9A priority Critical patent/CN109368445A/en
Publication of CN109368445A publication Critical patent/CN109368445A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/04Driving gear ; Details thereof, e.g. seals
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A method of self-lifting system being used in blast furnace construction, belongs to blast furnace technical field of construction.Solve a series of construction problems such as last furnace shell welding, furnace inner waterproofing, the arrangement of installation for welding, cooling wall installation, furnace sealing erection of equipment and welding, tuyere equipment installation by setting up self-lifting system.Including ring-like movable platform, electric hoisting mechanism, round hanging platform, while ring shaped movable platform plays rain-proof, radix saposhnikoviae outside furnace, safe and reliable operation platform is also provided for construction personnel.Electric hoisting mechanism is made by control cabinet, electric block, provides raising power.Round hanging platform can prevent in furnace into rain, and table top is to weld the storeroom of equipment, and platform edges provide fixed point for electric hoisting mechanism.The advantage is that properly solving the safety of construction personnel, construction equipment, one is created securely and reliably, convenient for the construction environment of operation.

Description

The method of self-lifting system is used in blast furnace construction
Technical field
The invention belongs to blast furnace technical field of construction, in particular, provide one kind in blast furnace construction using automatic lifting system The method of system builds the installation and welding of last furnace shell ontology and installations and facilities suitable for blast furnace, particularly suitable for coastal and gas Time condition is disliked slightly regional.
Background technique
Blast furnace is the heart of entire ironmaking engineering, and last furnace shell installation and welding are the core works in entire blast furnace construction Journey, the installation quality of furnace shell are the premises for guaranteeing blast furnace service life.Shoudu Iron and Steel Co capital Tang 5500m3The BF Design service life 25 years, furnace shell Turn round steel sheel for variable cross-section, be welded to form one by 25 band coaming plates, material BB503, steel plate thickness 60mm~ 110mm, shell top mark is 52.2 meters high, all high altitude operation of constructing, and thus must properly solve construction personnel, construction equipment Safety carries out radix saposhnikoviae, Rainproof working, creates one securely and reliably, convenient for the construction environment of operation, just can guarantee furnace shell installation Quality.
It is taken in previous last furnace shell installation and sets up rain-proof shelter on furnace shell, furnace shell inner and outer portions layer is set up Scaffold takes the simple measures such as zebra cloth enclosing radix saposhnikoviae, causes construction safety guaranteed conditions poor, and construction efficiency low quality Difference, weld seam are repeatedly done over again.Shoudu Iron and Steel Co capital Tang 5500m3Blast furnace is located at prince wife Cao pasture industrial area, is coastal area, climate item of constructing Part influence is very big, and furnace shell is installed by taking self-lifting system, provides a safe and reliable construction for construction personnel Platform, while solving the problems such as radix saposhnikoviae, rain-proof, installation for welding storage, it furnace shell construction quality is effectively guaranteed improves and apply Work efficiency rate, at the same be again the installation of next step cooling wall, furnace sealing erection of equipment and welding, tuyere equipment installation, water system it is under the overall leadership The work such as road installation create condition, and automatic lifting mechanism is used for multiple times, and is recycled.
Summary of the invention
The purpose of the present invention is to provide the methods that self-lifting system is used in blast furnace is built, and are mentioned automatically by setting up The system of liter solves last furnace shell welding, furnace inner waterproofing, the arrangement of installation for welding, cooling wall installation, furnace sealing erection of equipment With a series of construction problems such as welding, tuyere equipment installation, the safe and reliable guarantee measure convenient for construction, it is ensured that construction matter Amount.
The present invention is made of ring-like movable platform, electric hoisting mechanism, round hanging platform three parts.Ring shaped movable platform While playing rain-proof, radix saposhnikoviae outside furnace, safe and reliable operation platform is also provided for construction personnel.Electric hoisting mechanism by Control cabinet, electric block are made into, and provide raising power.Round hanging platform can be prevented into rain in furnace, and table top is welding The storeroom of equipment, platform edges provide fixed point for electric hoisting mechanism.Steps are as follows for Specific construction:
(1) furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform 1 one according to construction drawing, ring-shaped platform Upper installation promotes lifting lug 2 and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld Contracting leg 3.
(2) round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, is made and is justified according to construction drawing Type ring-shaped platform 4 one, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres 5, completely spreads 5mm thick steel plate on platform Sealing welding, surrounding set up railing.
(3) electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks 6 are uniformly arranged, by matching Electric cabinet 7 controls electric block single action or linkage, and power distribution cabinet 7 is fixed on round hanging platform.
(4) each section combination installation
Ring shaped movable platform 1 is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block 6 And power distribution cabinet 7 is mounted on round hanging platform 4, again by round hanging platform (4) integral hoisting in furnace shell suitable for reading, power distribution cabinet 7 power on electric block 6 are made to tangle ring shaped movable Platform Lug 2, raising as needed or reduce ring shaped movable platform, pass through Ring-shaped platform Retractive leg (3) adjusts platform and furnace shell gap, is laid with springboard and asbestos cloth when being greater than 100mm, platform raising is in place It is rigidly fixed on furnace shell with connecting rod afterwards, is carrying out the work such as furnace shell welding.
(5) it is recycled
It is next in progress after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage In the period, circulation is back and forth until furnace shell erecting and welding is completed.
The present invention evades the drawbacks of original conventional construction method, and furnace shell is welded by taking self-lifting system, to apply Worker person provides a safe and reliable operation platform, while solving the problems such as radix saposhnikoviae, rain-proof, installation for welding storage, has Effect ensure that furnace shell construction quality improves construction efficiency, while be again the installation of next step cooling wall, furnace sealing facility peace The work such as dress and welding, tuyere equipment installation, water-system pipeline installation create condition, and automatic lifting mechanism is repeatedly made With, reduce labor intensity, small investment, it is highly-safe, installation quality is high the advantages that.
Detailed description of the invention
Fig. 1 is ring-shaped platform schematic top plan view.Wherein, ring-shaped platform ontology 1, ring-shaped platform Retractive leg 3.
Fig. 2 is ring-shaped platform schematic front view.Wherein, ring-shaped platform promotes lifting lug 2.
Fig. 3 is round hanging platform schematic front view.Wherein, round hanging platform body 4, suspension centre 5.
Fig. 4 is round hanging platform schematic top plan view.
Fig. 5 is automatic lifting schematic front view.Wherein, ring-shaped platform ontology 1, ring-shaped platform suspension centre 2, ring-shaped platform are flexible Leg 3, round hanging platform body 4, suspension centre 5, electric block 6, power distribution cabinet 7.
Specific embodiment
Illustrate embodiment of the present invention with reference to the accompanying drawing:
1, furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform 1 one according to construction drawing, ring-shaped platform Upper installation promotes lifting lug 2 and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld Contracting leg 3.
2, round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, is made and is justified according to construction drawing Type ring-shaped platform 4 one, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres 5, completely spreads 5mm thick steel plate on platform Sealing welding, surrounding set up railing.
3, electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks 6 are uniformly arranged, by matching Electric cabinet 7 controls electric block single action or linkage, and power distribution cabinet 7 is fixed on round hanging platform.
4, each section combination installation
Ring shaped movable platform 1 is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block 6 And power distribution cabinet 7 is mounted on round hanging platform 4, again that round 4 integral hoisting of hanging platform is suitable for reading in furnace shell, power distribution cabinet 7 Powering on makes electric block 6 tangle ring shaped movable Platform Lug 2, raising as needed or reduction ring shaped movable platform, passes through Ring-shaped platform Retractive leg 3 adjusts platform and furnace shell gap, is laid with springboard and asbestos cloth when being greater than 100mm, platform raising in place after It is rigidly fixed on furnace shell with connecting rod, is carrying out the work such as furnace shell welding.
5, it is recycled
It is next in progress after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage In the period, circulation is back and forth until furnace shell erecting and welding is completed.

Claims (1)

1. a kind of method for using self-lifting system in blast furnace construction, which is characterized in that construction procedure are as follows:
(1) furnace external welding ring-shaped platform fabrication and installation
According to furnace shell outer diameter, ring-shaped platform construction drawing is drawn, makes ring-shaped platform (1) one, on ring-shaped platform according to construction drawing Installation promotes lifting lug (2) and platform device for positioning and securing, and outlet installs windbreak, and installs furnace external welding ring-shaped platform one It is a, it sets up temporary support and stage+module at 600mm, is uniformly installed 16 ring-shaped platforms and stretched under the furnace shell collar extension for needing to weld Contracting leg (3);
(2) round hanging platform production on furnace shell
Round hanging platform construction figure is drawn according to furnace shell diameter, determines each portion's size of platform, round ring is made according to construction drawing (4) one, shape platform, platform diameter is greater than 4 meters of furnace shell diameter, is uniformly arranged 8 suspension centres (5), completely spreads 5mm thick steel plate on platform Sealing welding, surrounding set up railing;
(3) electric hoisting mechanism
According to weight such as ring shaped movable platform, construction personnel, welding machine, wldings, 8 electric blocks (6) are uniformly arranged, distribution is passed through Cabinet (7) controls electric block single action or linkage, and power distribution cabinet (7) is fixed on round hanging platform;
(4) each section combination installation
Ring shaped movable platform (1) is mounted on furnace shell outer wall to be welded and is fixed temporarily first, secondly by electric block (6) And power distribution cabinet (7) is mounted on round hanging platform (4), and it is again that round hanging platform (4) integral hoisting is suitable for reading in furnace shell, match Electric cabinet (7), which powers on, tangles electric block (6) ring shaped movable Platform Lug (2), and raising as needed or reduction annular are living Moving platform adjusts platform and furnace shell gap by ring-shaped platform Retractive leg (3), is laid with springboard and asbestos cloth when being greater than 100mm, puts down Platform raising is rigidly fixed on furnace shell with connecting rod afterwards in place, is carrying out the work such as furnace shell welding;
(5) it is recycled
Next week is being carried out after the completion of each pair of dress 4-5 band of furnace shell is as a cycle welding use in furnace shell erection stage Phase, circulation is back and forth until furnace shell erecting and welding is completed.
CN201811436205.9A 2018-11-28 2018-11-28 The method of self-lifting system is used in blast furnace construction Pending CN109368445A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811436205.9A CN109368445A (en) 2018-11-28 2018-11-28 The method of self-lifting system is used in blast furnace construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811436205.9A CN109368445A (en) 2018-11-28 2018-11-28 The method of self-lifting system is used in blast furnace construction

Publications (1)

Publication Number Publication Date
CN109368445A true CN109368445A (en) 2019-02-22

Family

ID=65377457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811436205.9A Pending CN109368445A (en) 2018-11-28 2018-11-28 The method of self-lifting system is used in blast furnace construction

Country Status (1)

Country Link
CN (1) CN109368445A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042180A (en) * 2019-05-21 2019-07-23 北京首钢建设集团有限公司 The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction
CN110144425A (en) * 2019-05-21 2019-08-20 北京首钢建设集团有限公司 A kind of multi-functional application method for hanging platform in blast furnace construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201343543Y (en) * 2009-02-20 2009-11-11 中冶实久建设有限公司 Movable hanging scaffold for installing hot blast furnace
CN207296349U (en) * 2017-09-28 2018-05-01 中国二十二冶集团有限公司 Steel stove shell installation flashing, wind proofing structure
CN208071727U (en) * 2018-02-08 2018-11-09 上海宝冶建设工业炉工程技术有限公司 A kind of blast furnace hanging scaffold

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201343543Y (en) * 2009-02-20 2009-11-11 中冶实久建设有限公司 Movable hanging scaffold for installing hot blast furnace
CN207296349U (en) * 2017-09-28 2018-05-01 中国二十二冶集团有限公司 Steel stove shell installation flashing, wind proofing structure
CN208071727U (en) * 2018-02-08 2018-11-09 上海宝冶建设工业炉工程技术有限公司 A kind of blast furnace hanging scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042180A (en) * 2019-05-21 2019-07-23 北京首钢建设集团有限公司 The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction
CN110144425A (en) * 2019-05-21 2019-08-20 北京首钢建设集团有限公司 A kind of multi-functional application method for hanging platform in blast furnace construction

Similar Documents

Publication Publication Date Title
CN109368445A (en) The method of self-lifting system is used in blast furnace construction
CN105177202B (en) A kind of blast furnace overhaul method
CN104846143B (en) Construction method for replacing steelmaking converter flue
CN106996214A (en) A kind of communication tower provided with prefabricated pile basis
CN206753188U (en) A kind of communication tower provided with prefabricated pile basis
CN110409837A (en) A kind of large-span double-layer steel screen roof system sub-unit construction method for hanging
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN106086263A (en) A kind of collaborative hanging method of blast furnace cooling stave
CN107489163A (en) A kind of metallurgical industry body of heater annular bolt installation method
CN104551524A (en) Oxygen lance vertically maintaining method and device corresponding to same
CN110241285A (en) Converter mouth petticoat pipe more changing device, replacement structure and replacing options
CN103394321A (en) Mounting method for large-diameter packed tower internals
CN105220763B (en) A kind of integrated prefabricated pumping plant of intelligent direct burial lasted a long time
CN105438982A (en) A rapid replacing method of a grate of a hot-blast stove of a blast furnace
CN208327196U (en) A kind of penstock stiffening ring mounting bracket
CN102311074A (en) Converter afterheat boiler maintenance equipment and boiler maintenance method
CN110042180A (en) The construction method of furnace outer ring platform furnace shell welding surroundings in blast furnace construction
CN206110637U (en) Adjustable construction work platform of inside maintenance of blast furnace scrubber tower
CN106836949B (en) Large scale equipment rotary construction method
CN208964987U (en) The heat treatment tooling of nuclear power safety injection tank end socket
CN110144425A (en) A kind of multi-functional application method for hanging platform in blast furnace construction
CN105953599A (en) Construction method of condenser
CN204530491U (en) A kind of high pier hydraulic climbing mould construction frame
CN207046708U (en) A kind of short group's davit lifts the Lift-on/Lift-off System of tall and big anaerobism tank body
CN205046828U (en) Circular orbit movable hanging flower basket curtain construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190222