CN109359749A - A kind of gridding equipment management system - Google Patents

A kind of gridding equipment management system Download PDF

Info

Publication number
CN109359749A
CN109359749A CN201811156959.9A CN201811156959A CN109359749A CN 109359749 A CN109359749 A CN 109359749A CN 201811156959 A CN201811156959 A CN 201811156959A CN 109359749 A CN109359749 A CN 109359749A
Authority
CN
China
Prior art keywords
information
management
equipment
module
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811156959.9A
Other languages
Chinese (zh)
Inventor
杜宇
刘奕
党宝平
陈建鹏
张霞
刘前元
蔡峡
李玉兵
唐浩
南航
余文才
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chai Jianlin
JINCHANG POWER SUPPLY Co OF STATE GRID GANSU ELECTRIC POWER Co
Original Assignee
Chai Jianlin
JINCHANG POWER SUPPLY Co OF STATE GRID GANSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chai Jianlin, JINCHANG POWER SUPPLY Co OF STATE GRID GANSU ELECTRIC POWER Co filed Critical Chai Jianlin
Priority to CN201811156959.9A priority Critical patent/CN109359749A/en
Publication of CN109359749A publication Critical patent/CN109359749A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/10Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation
    • G06K7/10544Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation by scanning of the records by radiation in the optical part of the electromagnetic spectrum
    • G06K7/10821Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation by scanning of the records by radiation in the optical part of the electromagnetic spectrum further details of bar or optical code scanning devices
    • G06K7/10861Methods or arrangements for sensing record carriers, e.g. for reading patterns by electromagnetic radiation, e.g. optical sensing; by corpuscular radiation by scanning of the records by radiation in the optical part of the electromagnetic spectrum further details of bar or optical code scanning devices sensing of data fields affixed to objects or articles, e.g. coded labels
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of gridding equipment management systems, including mobile control terminal, at least an equipment and two dimensional code corresponding with equipment to generate printing equipment;The mobile control terminal includes management module, rights management distribution module, Response Code scan module, personnel's login module, personal information module, the management institutional framework that the present invention passes through creation layering, and the personnel stored in management module are carried out with the division of corresponding with every layer-management institutional framework authority classification and zone of responsibility, so that all personnel has specific equipment management, the zone of responsibility of safety supervision, mesh-managing layers at different levels are by the supervision of upper layer network management level, ensure work in every duty fulfillment to process each link, post and individual, effectively facilitate the normal smooth development of overall work, greatly improve equipment Management Level, effectively work in every can be made more to standardize, institutionalization.

Description

A kind of gridding equipment management system
Technical field
The present invention relates to a kind of management system, in particular to a kind of gridding equipment management systems.
Background technique
With the construction and continuous development of power grid, it is of company level important that each provincial company of national grid subordinate carries several states net The possession maintenance work in intensive UHV transmission channel and several electric transmission line channels, and it is responsible for numerous transmission line of electricity dimensions Nurse makees, and still, as power grid continues to develop, equipment O&M quantity is multiplied, and personnel depaly is but constantly reduced, at this stage In work, workflow and Db Management Model have seriously lagged behind the development of grid equipment, and equipment management is from making an inspection tour maintenance Analysis and summary is arrived again, the due level of IT application has not been reached yet, do not have accurate information to grasp " health " situation of equipment, Therefore there are troubleshooting low efficiency, fault message can not be traced, artificial degree is high, data management is difficult and data information journey The problems such as lower is spent, therefore, designing a kind of gridding equipment management system is those skilled in the relevant arts' urgent problem.
Summary of the invention
In order to solve the above technical problems, technical solution provided by the invention are as follows: a kind of gridding equipment management system, including Mobile control terminal, at least an equipment and two dimensional code corresponding with equipment generate printing equipment;
The mobile control terminal includes management module, rights management distribution module, Response Code scan module, personnel's login mould Block, personal information module;
The management module includes personal management module and device management module, and the personal management module is for storing institute There is personal information, the device management module is for storing all devices information;
The rights management distribution module is used to create the management institutional framework of layering, and to the people stored in management module Member carries out the division of corresponding with every layer-management institutional framework authority classification and zone of responsibility, determines the permission and working range of personnel Permission and successively distribution downwards, and device management information be assigned under permissions at different levels and carries out multi-zone supervision;
The Response Code scan module is for being scanned the two dimensional code in equipment and obtaining relevant facility information simultaneously Jump to personnel's login module;
Personnel's login module includes employee's login module and user log-in block, for employee and user login with It publishes;
The personal information module includes logging in corresponding employee information and user from personnel different in personnel's login module Information.
As an improvement, the management institutional framework includes at least level Four mesh-managing layer, the net in every layer of mesh-managing layer Lattice person is supervised by superior grid person.
As an improvement, the device management information includes device name information, equipment account information, equipment electrical connection letter Breath, device fault information, operation maintenance personnel's information, maintenance of equipment information and equipment fortune inspection standardized information.
As an improvement, the employee information include personal hierarchical information, personal liability area information, personal authority information, with And higher level corresponding with individual, inferior grid information.Show in this way it is more intuitive, with more operability.
As an improvement, the user information includes electricity consumption information, exterior chain functional information, power purchase record information, have a power failure public affairs It accuses information, drop in handle information, electrical power services group's information.
As an improvement, its staff's benefits method, comprising the following steps:
S1, printing equipment is generated by two dimensional code generate two dimensional code corresponding with equipment and including facility information, and by two Dimension code is printed and is affixed in corresponding equipment;
The management institutional framework that S2, creation are layered, multi-zone supervision institutional framework includes level-one mesh-managing layer, level responsibility People is company leader, is responsible for doing a good job of it and is in charge of work, and does a good job of it the work in zone of responsibility;
Second level mesh-managing layer, level person liable are portion of company management room responsible person, company of counties and districts responsible person, second level grid Level person liable in management level has been implemented main body responsibility by the supervision of the level person liable of upper level mesh-managing layer;
Three-level mesh-managing layer, level person liable are secondary unit supervisor, company of counties and districts secondary unit person liable, three-level net Level person liable in lattice management level has been implemented main body responsibility by the supervision of the level person liable of upper level mesh-managing layer;
Level Four mesh-managing layer, level person liable are base class monitor and group leader, employee, the level responsibility in level Four mesh-managing layer Supervision of the people by the level person liable of upper level mesh-managing layer, lay a good foundation management;
S3, the personal information for storing typing in management module carry out authority classification corresponding with every layer-management institutional framework With the division of zone of responsibility, the permission and the simultaneously successively distribution downwards of working range permission of personnel are determined, and device management information is divided It is assigned to each zone of responsibility and carries out multi-zone supervision;
S4, personnel, which are scanned two dimensional code using mobile control terminal Response Code scan module, obtains infrastructure device information, And it jumps to personnel's login module and carries out personal information verification and log in;
After S5, personnel are logged in by employee's login module, according to authority classification and zone of responsibility corresponding to personnel individual, show Show corresponding employee information, and shows facility information corresponding with its zone of responsibility.
As an improvement, its user management method, comprising the following steps:
A, printing equipment is generated by two dimensional code and generates two dimensional code corresponding with equipment and including facility information, and will be two-dimentional Code is printed and is affixed in corresponding equipment;
B, personnel are scanned two dimensional code using mobile control terminal Response Code scan module and obtain infrastructure device information, and Personnel's login module is jumped to carry out personal information verification and log in;
C, after personnel are logged in by user log-in block, corresponding facility information and user information are shown.
The present invention has the advantage that management institutional framework of the present invention by creation layering, and to being deposited in management module The personnel of storage carry out the division of corresponding with every layer-management institutional framework authority classification and zone of responsibility so that all personnel have it is bright The zone of responsibility of true equipment management, safety supervision, mesh-managing layers at different levels are by the supervision of upper layer network management level, it is ensured that each Item responsibility implements to each link, post and the individual of process, effectively facilitates the normal smooth development of overall work, significantly Equipment Management Level is improved, so that work in every is more standardized, institutionalization.
Detailed description of the invention
Fig. 1 is a kind of system structure diagram of gridding equipment management system of the present invention.
Fig. 2 is the schematic diagram of management institutional framework in a kind of gridding equipment management system of the present invention.
Fig. 3 is the schematic diagram of staff's benefits method in a kind of system of gridding equipment management system of the present invention.
Fig. 4 is the schematic diagram of user management method in a kind of system of gridding equipment management system of the present invention.
Specific embodiment
In conjunction with attached drawing 1~3, a kind of gridding equipment management system, including mobile control terminal, at least an equipment, Yi Jiyu The corresponding two dimensional code of equipment generates printing equipment;The mobile control terminal includes management module, rights management distribution module, two dimension Code scan module, personnel's login module, personal information module;The management module includes personal management module and equipment management mould Block, the personal management module is for storing all personnel's information, and the device management module is for storing all devices information; The rights management distribution module is used to create the management institutional framework of layering, and the personnel that store in management module are carried out and The division of every layer-management institutional framework corresponding authority classification and zone of responsibility, determine personnel permission and working range permission and by Layer distribution downwards, and device management information be assigned under permissions at different levels and carries out multi-zone supervision;The two dimensional code is swept Module is retouched for being scanned to the two dimensional code in equipment and obtaining relevant facility information and jump to personnel's login module;Institute The personnel login module of stating includes employee's login module and user log-in block, the login for employee and user with publish;It is described Personal information module includes logging in corresponding employee information and user information from personnel different in personnel's login module.
Wherein, the management institutional framework includes at least level Four mesh-managing layer, the grid person in every layer of mesh-managing layer Supervised by superior grid person.
Level-one mesh-managing layer is responsible for reliability, same period line loss, defect statistics, grid supervision;Second level mesh-managing layer fortune Dimension maintenance director, transmission of electricity fortune inspection supervisor, responsible person's management, overhaul technological transformation, the plan that has a power failure, grid supervision;Three-level mesh-managing Layer substation equipment maintenance and repair squad leader, is responsible for device parameter, operating condition, two ticket management, and level Four mesh-managing layer is responsible for basic management, is passed through Grid-based management specifies responsibility and responsible party, and leading cadre and administrative staff take the lead to fulfil supervision and oversight responsibility, improves Safety in production leading capacity and management penetration power.
Wherein, the device management information include device name information, equipment account information, equipment electrical connectivity information, Device fault information, operation maintenance personnel's information, maintenance of equipment information and equipment fortune inspection standardized information.
Wherein, the employee information includes personal hierarchical information, personal liability area information, personal authority information, Yi Jiyu Personal corresponding higher level, inferior grid information;The user information includes electricity consumption information, exterior chain functional information, power purchase record Information, the notice information that has a power failure drop in handle information, electrical power services group's information.
Its staff's benefits method, comprising the following steps:
S1, printing equipment is generated by two dimensional code generate two dimensional code corresponding with equipment and including facility information, and by two Dimension code is printed and is affixed in corresponding equipment;
The management institutional framework that S2, creation are layered, multi-zone supervision institutional framework includes level-one mesh-managing layer, level responsibility People is company leader, is responsible for doing a good job of it and is in charge of work, and does a good job of it the work in zone of responsibility;
Second level mesh-managing layer, level person liable are portion of company management room responsible person, company of counties and districts responsible person, second level grid Level person liable in management level has been implemented main body responsibility by the supervision of the level person liable of upper level mesh-managing layer;
Three-level mesh-managing layer, level person liable are secondary unit supervisor, company of counties and districts secondary unit person liable, three-level net Level person liable in lattice management level has been implemented main body responsibility by the supervision of the level person liable of upper level mesh-managing layer;
Level Four mesh-managing layer, level person liable are base class monitor and group leader, employee, the level responsibility in level Four mesh-managing layer Supervision of the people by the level person liable of upper level mesh-managing layer, lay a good foundation management;
S3, the personal information for storing typing in management module carry out authority classification corresponding with every layer-management institutional framework With the division of zone of responsibility, the permission and the simultaneously successively distribution downwards of working range permission of personnel are determined, and device management information is divided It is assigned to each zone of responsibility and carries out multi-zone supervision;
S4, personnel, which are scanned two dimensional code using mobile control terminal Response Code scan module, obtains infrastructure device information, And it jumps to personnel's login module and carries out personal information verification and log in;
After S5, personnel are logged in by employee's login module, according to authority classification and zone of responsibility corresponding to personnel individual, show Show corresponding employee information, and shows facility information corresponding with its zone of responsibility.
As an improvement, its user management method, comprising the following steps:
A, printing equipment is generated by two dimensional code and generates two dimensional code corresponding with equipment and including facility information, and will be two-dimentional Code is printed and is affixed in corresponding equipment;
B, personnel are scanned two dimensional code using mobile control terminal Response Code scan module and obtain infrastructure device information, and Personnel's login module is jumped to carry out personal information verification and log in;
C, after personnel are logged in by user log-in block, corresponding facility information and user information are shown.
The present invention and its embodiments have been described above, this description is no restricted, shown in the drawings Only one of embodiments of the present invention, actual structure is not limited to this.All in all if the ordinary skill of this field Personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution phase As frame mode and embodiment, be within the scope of protection of the invention.

Claims (7)

1. a kind of gridding equipment management system, it is characterised in that: including mobile control terminal, at least an equipment and and equipment Corresponding two dimensional code generates printing equipment;
The mobile control terminal include management module, rights management distribution module, Response Code scan module, personnel's login module, Personal information module;
The management module includes personal management module and device management module, and the personal management module is for storing owner Member's information, the device management module is for storing all devices information;
The rights management distribution module be used for create be layered management institutional framework, and to the personnel stored in management module into The division of row corresponding with every layer-management institutional framework authority classification and zone of responsibility, determines the permission and working range permission of personnel And successively distribution downwards, and device management information be assigned under permissions at different levels and carries out multi-zone supervision;
The Response Code scan module to the two dimensional code in equipment for being scanned and obtaining relevant facility information and jump To personnel's login module;
Personnel's login module includes employee's login module and user log-in block, the login for employee and user with step on Out;
The personal information module includes logging in corresponding employee information and user information from personnel different in personnel's login module.
2. a kind of gridding equipment management system according to claim 1, it is characterised in that: the management institutional framework packet At least level Four mesh-managing layer is included, the grid person in every layer of mesh-managing layer is supervised by superior grid person.
3. a kind of gridding equipment management system according to claim 1, it is characterised in that: the device management information packet It includes device name information, equipment account information, equipment electrical connectivity information, device fault information, operation maintenance personnel's information, set Standby repair message and equipment fortune inspection standardized information.
4. a kind of gridding equipment management system according to claim 1, it is characterised in that: the employee information includes People's hierarchical information, personal liability area information, personal authority information and higher level corresponding with individual, inferior grid information.
5. a kind of gridding equipment management system according to claim 1, it is characterised in that: the user information includes using Information about power, power purchase record information, the notice information that has a power failure, drops in handle information, electrical power services group's information at exterior chain functional information.
6. a kind of management method of gridding equipment management system according to claim 1, which is characterized in that including following Step:
S1, printing equipment is generated by two dimensional code generate two dimensional code corresponding with equipment and including facility information, and by two dimensional code It prints and affixes in corresponding equipment;
The management institutional framework that S2, creation are layered, multi-zone supervision institutional framework includes level-one mesh-managing layer, and level person liable is Company leader is responsible for doing a good job of it and is in charge of work, and does a good job of it the work in zone of responsibility;
Second level mesh-managing layer, level person liable are portion of company management room responsible person, company of counties and districts responsible person, second level mesh-managing Layer in level person liable by upper level mesh-managing layer level person liable supervision, implemented main body responsibility;
Three-level mesh-managing layer, level person liable are secondary unit supervisor, company of counties and districts secondary unit person liable, three-level grid pipe Manage layer in level person liable by upper level mesh-managing layer level person liable supervision, implemented main body responsibility;
Level Four mesh-managing layer, level person liable are base class monitor and group leader, employee, the level person liable in level Four mesh-managing layer by The supervision of the level person liable of upper level mesh-managing layer, lay a good foundation management;
S3, the personal information for storing typing in management module carry out authority classification corresponding with every layer-management institutional framework and duty Appoint area division, determine personnel permission and working range permission and successively downwards distribution, and by device management information distribute to Each zone of responsibility carries out multi-zone supervision;
S4, personnel, which are scanned two dimensional code using mobile control terminal Response Code scan module, obtains infrastructure device information, and jumps Personnel's login module is gone to carry out personal information verification and log in;
After S5, personnel are logged in by employee's login module, according to authority classification and zone of responsibility corresponding to personnel individual, phase is shown The employee information answered, and show facility information corresponding with its zone of responsibility.
7. a kind of management method of gridding equipment management system according to claim 1, which is characterized in that including following Step:
A, printing equipment is generated by two dimensional code and generates two dimensional code corresponding with equipment and including facility information, and two dimensional code is beaten It prints off and comes and affix in corresponding equipment;
B, personnel are scanned two dimensional code using mobile control terminal Response Code scan module and obtain infrastructure device information, and jump Personal information verification is carried out to personnel's login module and is logged in;
C, after personnel are logged in by user log-in block, corresponding facility information and user information are shown.
CN201811156959.9A 2018-09-30 2018-09-30 A kind of gridding equipment management system Pending CN109359749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811156959.9A CN109359749A (en) 2018-09-30 2018-09-30 A kind of gridding equipment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811156959.9A CN109359749A (en) 2018-09-30 2018-09-30 A kind of gridding equipment management system

Publications (1)

Publication Number Publication Date
CN109359749A true CN109359749A (en) 2019-02-19

Family

ID=65348465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811156959.9A Pending CN109359749A (en) 2018-09-30 2018-09-30 A kind of gridding equipment management system

Country Status (1)

Country Link
CN (1) CN109359749A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109919519A (en) * 2019-04-03 2019-06-21 重庆市万盛自来水有限公司 A kind of city secondary water-supply facilities control method and system based on two dimensional code

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103635A (en) * 2011-01-05 2011-06-22 安徽兴博远实信息科技有限公司 Household condition grid management mode of population social affair comprehensive service information
CN105356615A (en) * 2015-11-30 2016-02-24 国网安徽省电力公司铜陵供电公司 Mobile polling control system for high-voltage overhead transmission lines based on QR (Quick Response) Code technology
CN106156917A (en) * 2015-04-07 2016-11-23 中国联合网络通信有限公司广州市分公司 Management of fire safety information system based on grid-based management mode
CN106203229A (en) * 2016-07-07 2016-12-07 立德高科(昆山)数码科技有限责任公司 The terminal unit recognition Quick Response Code of different rights is with the method for the different information of display
CN206133688U (en) * 2016-07-05 2017-04-26 华润电力(常熟)有限公司 Equipment inspection two -dimensional code system of power plant
CN107196679A (en) * 2017-06-29 2017-09-22 国网冀北电力有限公司承德供电公司 Make an inspection tour task creating method and server
CN107346476A (en) * 2017-08-30 2017-11-14 江苏板桥软件有限公司 A kind of security production supervision and management system based on internet
CN107564126A (en) * 2017-09-14 2018-01-09 广东电网有限责任公司电力科学研究院 Substation secondary device intelligent patrol detection mobile terminal, server and system
CN107688861A (en) * 2017-09-11 2018-02-13 卢启平 Inspection management method based on Quick Response Code

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102103635A (en) * 2011-01-05 2011-06-22 安徽兴博远实信息科技有限公司 Household condition grid management mode of population social affair comprehensive service information
CN106156917A (en) * 2015-04-07 2016-11-23 中国联合网络通信有限公司广州市分公司 Management of fire safety information system based on grid-based management mode
CN105356615A (en) * 2015-11-30 2016-02-24 国网安徽省电力公司铜陵供电公司 Mobile polling control system for high-voltage overhead transmission lines based on QR (Quick Response) Code technology
CN206133688U (en) * 2016-07-05 2017-04-26 华润电力(常熟)有限公司 Equipment inspection two -dimensional code system of power plant
CN106203229A (en) * 2016-07-07 2016-12-07 立德高科(昆山)数码科技有限责任公司 The terminal unit recognition Quick Response Code of different rights is with the method for the different information of display
CN107196679A (en) * 2017-06-29 2017-09-22 国网冀北电力有限公司承德供电公司 Make an inspection tour task creating method and server
CN107346476A (en) * 2017-08-30 2017-11-14 江苏板桥软件有限公司 A kind of security production supervision and management system based on internet
CN107688861A (en) * 2017-09-11 2018-02-13 卢启平 Inspection management method based on Quick Response Code
CN107564126A (en) * 2017-09-14 2018-01-09 广东电网有限责任公司电力科学研究院 Substation secondary device intelligent patrol detection mobile terminal, server and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109919519A (en) * 2019-04-03 2019-06-21 重庆市万盛自来水有限公司 A kind of city secondary water-supply facilities control method and system based on two dimensional code

Similar Documents

Publication Publication Date Title
CN104361419B (en) Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification
CN105515186B (en) A kind of working method of remote-control system
CN106570784A (en) Integrated model for voltage monitoring
CN109829125A (en) Show the platform of user management of dispatching of power netwoks operation data
CN102999815A (en) Multi-dimensional risk assessment and control method for power system safety and model
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN113450065A (en) Production operation management system and method for wind power plant
CN110570101A (en) Intelligent OMS system for power grid distribution network
CN110400040A (en) A kind of quick transmission system of management and running information based on mobile Internet
CN102708411A (en) Method for evaluating risk of regional grid on line
CN101751435A (en) Data exchanging system and method for electric power system
CN102968696A (en) Marketing-distribution-dispatch business system information fusion and application method
CN106251052A (en) The county's grid power blackout management and control of a kind of ground and analysis decision plateform system
CN104809933A (en) Unscripted emergency drill system, method and equipment for power grid
CN107272532A (en) A kind of electric self-service terminal method for visually monitoring and platform
CN108470386A (en) A kind of cable run intelligent inspection system based on GPS and cloud platform
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN106815373A (en) Big data methods of exhibiting and system are rushed to repair in distribution based on BI analyses
CN206584222U (en) A kind of supercentral station's centralized monitoring system
CN102968691B (en) Power failure planning decision-making system and application process thereof
CN105262227A (en) Fool-proof lockout system
CN110298764A (en) A kind of guarantor powers visualization system and method
CN207320950U (en) The integrated anti-error system of regulation and control
CN107069957A (en) A kind of recording constant value remote online modification and check method
CN108256770A (en) Photo-voltaic power generation station O&M managing and control system based on mobile application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219

RJ01 Rejection of invention patent application after publication