CN109356190B - 一种格构柱式墩台混凝土塔吊基础及其施工方法 - Google Patents

一种格构柱式墩台混凝土塔吊基础及其施工方法 Download PDF

Info

Publication number
CN109356190B
CN109356190B CN201811344475.7A CN201811344475A CN109356190B CN 109356190 B CN109356190 B CN 109356190B CN 201811344475 A CN201811344475 A CN 201811344475A CN 109356190 B CN109356190 B CN 109356190B
Authority
CN
China
Prior art keywords
foundation
tower crane
concrete
concrete foundation
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811344475.7A
Other languages
English (en)
Other versions
CN109356190A (zh
Inventor
张具林
全有维
蔡王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201811344475.7A priority Critical patent/CN109356190B/zh
Publication of CN109356190A publication Critical patent/CN109356190A/zh
Application granted granted Critical
Publication of CN109356190B publication Critical patent/CN109356190B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Abstract

本发明公开一种格构柱式墩台混凝土塔吊基础,包括四根钻孔灌注桩,四根插入到钻孔灌注桩内的格构柱,浇筑在格构柱顶部的混凝土基础,以及预埋在所述混凝土基础内的预埋基础节或预埋螺栓;所述混凝土基础为十字梁式基础,所述格构柱的顶部伸入所述混凝土基础内,并与混凝土基础的十字梁四角的钢筋相互连接,所述预埋基础节或预埋螺栓预埋于混凝土基础的十字梁上。本发明格构柱同混凝土墩台相结合的塔吊基础,能够很好的解决传统塔吊钢平台同格构柱之间的钢结构焊接中易出现的质量问题,对于加快基坑土方和支撑的施工进度和减轻施工人员的劳动强度均具有很好的作用,并且在使用过程中,完全确保工程大型机械的使用安全。

Description

一种格构柱式墩台混凝土塔吊基础及其施工方法
技术领域
本发明涉及建筑工程行业大型施工机械--塔吊的格构式基础设置领域。
背景技术
建筑施工塔吊的格构式钢平台基础,已经在建筑工程中普遍采用,其方法是先期施工四根钻孔灌注桩,利用插入到桩基内的格构柱,升到自然地面以上,采用钢梁相互连接塔吊标准节和格构柱。
采用这种结构型式的塔吊基础,从施工现场的实施效果来看并不是非常令人满意的,主要存在的问题塔吊基础钢梁无法同格构柱可靠连接(塔吊基础钢梁下翼缘是平整的,而格构柱是四根角钢,钢板同角钢不能形成可靠连接),只能采用角焊缝相互焊接。
而角焊缝在钢结构工程中只是一种次要构件的焊接连接方式,一般不作为主要构件的受力焊缝;并且此角焊缝需要在现场焊接,更容易产生质量问题,主要有以下几个方面:
第一是焊道清根,焊接前的焊道清根只能通过观感来判断,不易达到完全令人满意、放心的地步;
第二是现场焊缝仰焊焊接,仰焊本身就是一种在焊接工艺中最难实施的焊接手段,对于焊工的技术等级及焊接经验都有非常高的要求,在施工现场不容易达到;
第三是对于角焊缝目前没有可靠的焊缝检测手段,只能通过焊缝表面观察来检查焊缝质量,具有很大的随意性和偶然性;
第四是对于承受动力荷载的结构,不宜采用焊缝连接形式,如必须采用焊缝连接形式,应采用全熔透焊缝并将焊缝表面进行打磨,消除焊缝表面的质量缺陷;
第五是大多数土建工程施工现场,焊工的技术等级达不到钢结构焊接的要求。
第六是塔吊基础的设置单位一般是工程总承包单位,而总承包单位内对钢结构专业了解的人员较少,所以在塔吊钢平台的设置、安装、焊接过程中,没有能力对其焊接质量进行检查、评价和验收。
发明内容
发明目的:本发明目的在于针对现有技术的不足,提供一种格构柱式墩台混凝土塔吊基础,使塔吊先期就能够安装,在地下室基坑土方开挖、混凝土内支撑施工中塔吊就可以进行材料的垂直、水平运输,加快工程施工进度、降低施工人员的劳动强度,并确保在工程前期安装的基础及塔吊能够安全使用。
技术方案:本发明所述格构柱式墩台混凝土塔吊基础,包括四根钻孔灌注桩,四根插入到钻孔灌注桩内的格构柱,浇筑在格构柱顶部的混凝土基础,以及预埋在所述混凝土基础内的预埋基础节或预埋螺栓;
所述混凝土基础为十字梁式基础,所述格构柱的顶部伸入所述混凝土基础内,并与混凝土基础的十字梁四角的钢筋相互连接,所述预埋基础节或预埋螺栓预埋于混凝土基础的十字梁上。
本发明进一步优选地技术方案为,所述格构柱的底部至少插入所述钻孔灌注桩内3000mm。
优选地,所述混凝土基础内为预埋基础节,预埋基础节的四角分别固定在所述混凝土基础的十字梁上,且四角的位置分别位于四根格构柱与混凝土基础的连接节点和十字梁的中心点之间;塔吊通过所述预埋基础节与混凝土基础连接。
优选地,所述混凝土基础内为四个预埋螺栓,四个预埋螺栓分别预埋在四根格构柱与混凝土基础的连接节点和十字梁的中心点之间的十字梁梁臂上;塔吊通过所述预埋螺栓与混凝土基础连接。
优选地,所述格构柱与混凝土基础的连接节点的底部通过托板支撑,格构柱内部通过铁板封闭。
本发明上述格构柱式墩台混凝土塔吊基础的施工方法,包括如下步骤:
(1)在塔吊位置架设位置施工四根钻孔灌注桩,再将格构柱插入钻孔灌注桩桩基内至少3000mm,格构柱的顶部露出地面;
(2)土方开挖至塔吊基础底部标高,用木模板支设模具;
(3)绑扎混凝土基础的钢筋,先绑扎十字梁钢筋,十字梁四角的钢筋与四根格构柱的顶部相互绑扎连接;再绑板面钢筋;
(4)准确放样出塔吊预埋件的位置,并与十字梁钢筋焊接牢固,同时做好塔吊防雷措施;
(5)整体浇筑混凝土基础,达到设计强度后在塔吊预埋件上安装塔吊。
有益效果:本发明格构柱同混凝土墩台相结合的塔吊基础,能够很好的解决传统塔吊钢平台同格构柱之间的钢结构焊接中易出现的质量问题,对于加快基坑土方和支撑的施工进度和减轻施工人员的劳动强度均具有很好的作用,并且在使用过程中,完全确保工程大型机械的使用安全,对具有类似的工程,具有一定的推广性;另外本发明的基础形式与板式混凝土基础相比每个基础混凝土节约方量为10m3,节约钢筋约700kg,能够降低施工成本,提高施工效率。
附图说明
图1为本发明塔吊基础的结构示意图;
图2为本发明所述混凝土基础的平面布置图;
图3为本发明所述格构柱和混凝土基础的节点结构示意图;
图中,1-格构柱、2-混凝土基础、3-预埋螺栓。
具体实施方式
下面通过附图对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。
实施例:以某工程为例,地下一层,具体地质情况详见下表。
格构柱式墩台混凝土塔吊基础,采用四根Φ800mm的钻孔灌注桩,截面为460mm×460mm的格构柱1插入灌注桩不小于3000mm。在格构柱1顶部采用现浇混凝土基础2。塔吊同混凝土基础2的连接采用预埋螺栓3。混凝土基础2为十字梁式基础,梁宽1000mm,高1250mm,梁翼缘为200厚混凝土板,十字梁采用200×400的梁连系。460mm×460mm格构柱1插入十字梁基础内,塔吊预埋螺栓3也预埋在十字梁上。四个预埋螺栓3分别预埋在四根格构柱1与混凝土基础2的连接节点和十字梁的中心点之间的十字梁梁臂上。格构柱1截面边长为460mm,钢柱长度为8.9m,缀板间净距340mm,格构柱分肢材料L140×12,缀条材料L40×5,格构柱1与混凝土基础2交接处采用100mm宽托板托住,格构柱内部用5mm厚铁板焊死,保证混凝土顺利浇筑。
格构柱式墩台混凝土塔吊基础的施工方法,包括如下步骤:
(1)在塔吊位置架设位置施工四根钻孔灌注桩,再将格构柱1插入钻孔灌注桩桩基内至少3000mm,格构柱1的顶部露出地面;
(2)土方开挖至塔吊基础底部标高,用木模板支设模具;
(3)绑扎混凝土基础2的钢筋,先绑扎十字梁钢筋,十字梁四角的钢筋与四根格构柱1的顶部相互绑扎连接;再绑板面钢筋;
(4)准确放样出塔吊预埋螺栓3的位置,并与十字梁钢筋焊接牢固,同时做好塔吊防雷措施;
(5)整体浇筑混凝土基础2,达到设计强度后在塔吊预埋螺栓3上安装塔吊。
采用以上的基础形式搭设的塔吊完全确保工程大型机械的使用安全,具体验算过程如下:
一、计算依据:
1、《塔式起重机混凝土基础工程技术规程》JGJ/T187-2009
2、《混凝土结构设计规范》(2015年版)GB50010-2010
3、《建筑桩基技术规范》JGJ94-2008
4、《建筑地基基础设计规范》GB50007-2011
5、《钢结构设计标准》GB50017-2017
塔吊施工最不利状态为塔吊的吊臂与十字梁的梁臂平行。
二、塔机属性
塔机型号 TC6010
塔机独立状态的最大起吊高度H0(m) 40.5
塔机独立状态的计算高度H(m) 47
塔身桁架结构 方钢管
塔身桁架结构宽度B(m) 1.6
三、塔机荷载
1、塔机传递至基础荷载标准值
2、塔机传递至基础荷载设计值
四、桩顶作用效应计算
承台及其上土的自重荷载标准值:
承台体积=11.18m3
Gk=Tγc+h'γ'=279kN
承台及其上土的自重荷载设计值:G=1.35Gk=1.35×279=377.3kN
桩对角线距离:L=(ab 2+al 2)0.5=(2.72+2.72)0.5=3.82m1、荷载效应标准组合
轴心竖向力作用下:Qk=(Fk+Gk+Gp2)/n=(490+377.3+20)/4=221.8kN
荷载效应标准组合偏心竖向力作用下:
Qkmax=(Fk+Gk+Gp2)/n+(Mk+FVk(H0-hr+h/2))/L
=(490+377.3+20)/4+(1718+18.9×(1.25+8.9-3-1.25/2))/3.82=687.6kN
Qkmin=(Fk+Gk+Gp2)/n-(Mk+FVk(H0-hr+h/2))/L
=(490+377.3+20)/4-(1712+74×(1.25+8.9-3-1.25/2))/3.82=-352.78kN
2、荷载效应基本组合
荷载效应基本组合偏心竖向力作用下:
Qmax=(F+G+1.35×Gp2)/n+(M+Fv(H0-hr+h/2))/L
=(661.5+972+1.35×20)/4+(2311+99.9×(1.25+8.9-3-1.25/2))/3.82=1021kN
Qmin=(F+G+1.35×Gp2)/n-(M+Fv(H0-hr+h/2))/L
=(661.5+972+1.35×20)/4-(2311+99.9×(1.25+8.9-3-1.25/2))/3.82=-191kN
五、格构柱计算
1、格构式钢柱换算长细比验算
整个格构柱截面对X、Y轴惯性矩:
I=4[I0+A0(a/2-Z0)2]=4×[603.68+32.51×(46.00/2-3.90)2]=49854.612cm4
整个构件长细比:λx=λy=H0/(I/(4A0))0.5=890/(49854.612/(4×32.51))0.5=45.454
分肢长细比:λ1=l01/iy0=40.00/2.77=14.44
分肢毛截面积之和:A=4A0=4×32.51×102=13004mm2
构件截面中垂直于X轴的各斜缀条的毛截面积之和:
A1x=2Az=2×3.79×100=758mm2
格构式钢柱绕两主轴的换算长细比:
λ0max=(λx 2+40A/A1x)0.5=(45.4542+40×13004/758)0.5=52.463
λ0max=52.463≤[λ]=150
满足要求!
2、格构式钢柱分肢的长细比验算
λ1=14.44≤0.7λ0max=0.7×52.463=36.724
满足要求!
3、格构式钢柱受压稳定性验算
λ0max(fy/235)0.5=52.463×(235/235)0.5=52.463
查表《钢结构设计规范》GB50017附录C:b类截面轴心受压构件的稳定系数:
满足要求!
4、缀件验算
缀件所受剪力:V=Af(fy/235)0.5/85=13004×215×10-3×(235/235)0.5/85=32.892kN
格构柱相邻缀板轴线距离:l1=l01+4=34.00+4=38cm
斜缀条轴向压力值:
N0=V/(2cosα)=V/(2a/(a2+l1 2)0.5)=32.892/(2×0.46/(0.462+0.402)0.5)=21.4kN
缀条计算长度:lt=(a2+l1 2)0.5=(4602+3802)0.5=596.66mm
缀条长细比:λ=lt/imin=59.67/0.78=76.4<80
满足要求!
六、桩承载力验算
考虑基坑开挖后,格构柱段外露,不存在侧阻力,此时为最不利状态
1、桩基竖向抗压承载力计算
桩身周长:u=πd=3.14×0.8=2.513m
桩端面积:Ap=πd2/4=3.14×0.82/4=0.503m2
Ra=ψuΣqsia·li+qpa·Ap
=0.8×2.513×(4.795×8+7.32×25+6.41×35)+1900×0.503=1851.853kN
Qk=221.8kN≤Ra=1851.853kN
Qkmax=687.6kN≤1.2Ra=1.2×1851.853=2222.224kN
满足要求!
2、桩基竖向抗拔承载力计算
Qkmin=-352.78kN<0
按荷载效应标准组合计算的桩基拔力:Qk'=352.78kN
桩身位于地下水位以下时,位于地下水位以下的桩自重按桩的浮重度计算,
桩身的重力标准值:Gp=ltz-10)Ap=18.525×(25-10)×0.503=139.771kN
Ra'=ψuΣλiqsiali+Gp=0.8×2.513×(0.3×4.795×8+0.4×7.32×25+0.6×6.41×35)+139.771=580.736kN
Qk'=352.78kN≤Ra'=580.736kN
满足要求!
3、桩身承载力计算
纵向普通钢筋截面面积:As=nπd2/4=14×3.142×162/4=2815mm2
(1)、轴心受压桩桩身承载力
荷载效应基本组合下的桩顶轴向压力设计值:Q=Qmax=1021kN
ψcfcAp+0.9fy'As'=(0.75×19.1×0.503×106+0.9×(300×2814.867))×10-3=7965.489kN
Q=1021kN≤ψcfcAp+0.9fy'As'=7965.489kN
满足要求!
(2)、轴心受拔桩桩身承载力
荷载效应基本组合下的桩顶轴向拉力设计值:Q'=-Qmin=163.852kN
fyAS=300×2814.867×10-3=844.46kN
Q'=163.852kN≤fyAS=844.46kN
满足要求!
4、桩身构造配筋计算
As/Ap×100%=(2814.867/(0.503×106))×100%=0.56%≥0.45%
满足要求!
5、裂缝控制计算
裂缝控制按三级裂缝控制等级计算。
(1)、纵向受拉钢筋配筋率
有效受拉混凝土截面面积:Ate=d2π/4=8002π/4=502655mm2
ρte=(As+Aps)/Ate=(2814.867+0)/502655=0.006<0.01
取ρte=0.01
(2)、纵向钢筋等效应力
σsk=Qk'/As=121.372×103/2814.867=43.118N/mm2
(3)、裂缝间纵向受拉钢筋应变不均匀系数
ψ=1.1-0.65ftk/(ρteσsk)=1.1-0.65×2.39/(0.01×43.118)=-2.503
取ψ=0.2
(4)、受拉区纵向钢筋的等效直径
dep=Σnidi 2/Σniνidi=(14×162+0×182)/(14×1×16+0×0.8×18)=16mm
(5)、最大裂缝宽度
ωmax=αcrψσsk(1.9c+0.08depte)/Es=2.7×0.2×43.118×(1.9×50+0.08×16/0.01)/200000=0.026m
m≤ωlim=0.2mm
满足要求!
七、承台计算
1、荷载计算
塔身截面对角线上的荷载设计值:
Fmax=F/4+M/(20.5B)=661.5/4+2311/(20.5×1.6)=1187kN
Fmin=F/4-M/(20.5B)=661.5/4-2311/(20.5×1.6)=-857.2kN
Vmax=609kN,Mmax=375kN·m,Mmin=-817.9kN·m
2、受剪切计算
截面有效高度:h0=h-δc-D/2=1250-50-22/2=1189mm
受剪切承载力截面高度影响系数:βhs=(800/1189)1/4=0.906
塔吊边至桩边的水平距离:a1b=(ab-B-d)/2=(2.7-1.6-0.8)/2=0.3m
a1l=(al-B-d)/2=(2.7-1.6-0.8)/2=0.3m
计算截面剪跨比:λb'=a1b/h0=0.3/1.189=0.25,取λb=0.25;
λl'=a1l/h0=0.25/1.189=0.505,取λl=0.25;
承台剪切系数:αb=1.75/(λb+1)=1.75/(0.25+1)=1.4
αl=1.75/(λl+1)=1.75/(0.25+1)=1.4
βhsαbftl'h0=0.906×1.4×1570×1×1.189=2367.7kN
βhsαlftl'h0=0.906×1.4×1570×1×1.189=2367.7kN
V=593.898kN≤min(βhsαbftbh0,βhsαlftlh0)=2367.7kN
满足要求!
3、受冲切计算
钢格构柱顶部基础承台底有角钢托板,所以无需对混凝土承台进行抗冲切验算
4、承台配筋计算
(1)、承台梁底部配筋
αS1=Mmin/(α1fcl'h0 2)=817.9×106/(1×16.7×1000×11892)=0.0346
ζ1=1-(1-2αS1)0.5=1-(1-2×0.0346)0.5=0.036
γS1=1-ζ1/2=1-0.036/2=0.982
AS1=Mmin/(γS1h0fy1)=817.9×106/(0.982×1189×300)=2335mm2
最小配筋率:ρ=max(0.2,45ft/fy1)=max(0.2,45×1.57/300)=max(0.2,0.236)=0.236%
梁底需要配筋:A1=max(AS1,ρlh0)=max(2335,0.0024×1000×1189)=2853mm2
梁底部实际配筋:AS1'=3042mm2≥A1=2801mm2
满足要求!
(2)、承台梁上部配筋
αS2=Mmax/(α2fcl'h0 2)=375×106/(1×16.7×1000×11892)=0.016
ζ2=1-(1-2αS2)0.5=1-(1-2×0.016)0.5=0.016
γS2=1-ζ2/2=1-0.016/2=0.992
AS2=Mmax/(γS2h0fy2)=375×106/(0.992×1189×300)=1060mm2
最小配筋率:ρ=max(0.2,45ft/fy2)=max(0.2,45×1.57/300)=max(0.2,0.236)=0.236%
梁上部需要配筋:A2=max(AS2,ρl'h0)=max(1060,0.0024×1000×1189)=2801mm2
梁上部实际配筋:AS2'=3042mm2≥A2=2801mm2
满足要求!
(3)、梁腰筋配筋
梁腰筋按照构造配筋4Φ14
(4)、承台梁箍筋计算
箍筋抗剪
计算截面剪跨比:λ'=(L-20.5B)/(2h0)=(4-20.5×1.6)/(2×1.189)=0.73
取λ=1.5
混凝土受剪承载力:1.75ftl'h0/(λ+1)=1.75×1570×1×1.189/(1.5+1)=1306.711kN
Vmax=609kN≤1.75ftl'h0/(λ+1)=1306.711kN
按构造规定选配钢筋!
配箍率验算
ρsv=nAsv1/(l's)=4×(3.142×122/4)/(1000×200)=0.226%≥psv
ρmin=0.24ft/fyv=0.24×1.57/300=0.126%
经验算,本实施例塔吊基础满足工程设计规范。
如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。

Claims (3)

1.一种格构柱式墩台混凝土塔吊基础,其特征在于,包括四根钻孔灌注桩,四根插入到钻孔灌注桩内的格构柱,浇筑在格构柱顶部的混凝土基础,以及预埋在所述混凝土基础内的预埋基础节或预埋螺栓;
所述混凝土基础为十字梁式基础,所述格构柱的顶部伸入所述混凝土基础内,并与混凝土基础的十字梁四角的钢筋相互连接,所述预埋基础节或预埋螺栓预埋于混凝土基础的十字梁上;
所述混凝土基础内为预埋基础节,预埋基础节的四角分别固定在所述混凝土基础的十字梁上,且四角的位置分别位于四根格构柱与混凝土基础的连接节点和十字梁的中心点之间;塔吊通过所述预埋基础节与混凝土基础连接;
所述混凝土基础内为四个预埋螺栓,四个预埋螺栓分别预埋在四根格构柱与混凝土基础的连接节点和十字梁的中心点之间的十字梁梁臂上;塔吊通过所述预埋螺栓与混凝土基础连接;
所述格构柱与混凝土基础的连接节点的底部通过托板支撑,格构柱内部通过铁板封闭。
2.根据权利要求1所述的格构柱式墩台混凝土塔吊基础,其特征在于,所述格构柱的底部至少插入所述钻孔灌注桩内3000 mm。
3.一种权利要求1所述格构柱式墩台混凝土塔吊基础的施工方法,其特征在于包括如下步骤:
(1)在塔吊位置架设位置施工四根钻孔灌注桩,再将格构柱插入钻孔灌注桩桩基内至少3000mm,格构柱的顶部露出地面;
(2)土方开挖至塔吊基础底部标高,用木模板支设模具;
(3)绑扎混凝土基础的钢筋,先绑扎十字梁钢筋,十字梁四角的钢筋与四根格构柱的顶部相互绑扎连接;再绑板面钢筋;
(4)准确放样出塔吊预埋件的位置,并与十字梁钢筋焊接牢固,同时做好塔吊防雷措施;
(5)整体浇筑混凝土基础,达到设计强度后在塔吊预埋件上安装塔吊。
CN201811344475.7A 2018-11-13 2018-11-13 一种格构柱式墩台混凝土塔吊基础及其施工方法 Active CN109356190B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811344475.7A CN109356190B (zh) 2018-11-13 2018-11-13 一种格构柱式墩台混凝土塔吊基础及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811344475.7A CN109356190B (zh) 2018-11-13 2018-11-13 一种格构柱式墩台混凝土塔吊基础及其施工方法

Publications (2)

Publication Number Publication Date
CN109356190A CN109356190A (zh) 2019-02-19
CN109356190B true CN109356190B (zh) 2024-03-01

Family

ID=65344848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811344475.7A Active CN109356190B (zh) 2018-11-13 2018-11-13 一种格构柱式墩台混凝土塔吊基础及其施工方法

Country Status (1)

Country Link
CN (1) CN109356190B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809647B (zh) * 2020-06-04 2022-08-12 陕西建工第六建设集团有限公司 一种格构柱与混凝土承台基础的连接结构
CN114941284A (zh) * 2022-03-04 2022-08-26 中建八局天津建设工程有限公司 永临结合塔吊基础及其施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282484A (ja) * 1999-03-30 2000-10-10 Shimizu Corp Rc場所打ち杭の杭頭構造
JP2002275916A (ja) * 2001-03-14 2002-09-25 Taisei Corp コンクリート造基礎部と場所打コンクリート杭との接合構造
CN201581409U (zh) * 2009-12-25 2010-09-15 浙江中成建工集团有限公司 深基坑钢格构柱支承十字交叉梁的组合式塔吊基础
CN202881965U (zh) * 2012-07-11 2013-04-17 浙江中成建工集团有限公司 深基坑中大力矩先置式塔吊基础
CN103485360A (zh) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 一种钢平台塔吊基础及其施工方法
RU2013147362A (ru) * 2013-10-23 2015-04-27 Закрытое акционерное общество "ЭРКОН" Незаглубляемый фундамент под сетку колонн
CN205296206U (zh) * 2016-01-19 2016-06-08 中厦建设有限公司 塔吊基础
CN209353365U (zh) * 2018-11-13 2019-09-06 中建八局第三建设有限公司 一种格构柱式墩台混凝土塔吊基础

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282484A (ja) * 1999-03-30 2000-10-10 Shimizu Corp Rc場所打ち杭の杭頭構造
JP2002275916A (ja) * 2001-03-14 2002-09-25 Taisei Corp コンクリート造基礎部と場所打コンクリート杭との接合構造
CN201581409U (zh) * 2009-12-25 2010-09-15 浙江中成建工集团有限公司 深基坑钢格构柱支承十字交叉梁的组合式塔吊基础
CN202881965U (zh) * 2012-07-11 2013-04-17 浙江中成建工集团有限公司 深基坑中大力矩先置式塔吊基础
CN103485360A (zh) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 一种钢平台塔吊基础及其施工方法
RU2013147362A (ru) * 2013-10-23 2015-04-27 Закрытое акционерное общество "ЭРКОН" Незаглубляемый фундамент под сетку колонн
CN205296206U (zh) * 2016-01-19 2016-06-08 中厦建设有限公司 塔吊基础
CN209353365U (zh) * 2018-11-13 2019-09-06 中建八局第三建设有限公司 一种格构柱式墩台混凝土塔吊基础

Also Published As

Publication number Publication date
CN109356190A (zh) 2019-02-19

Similar Documents

Publication Publication Date Title
CN208586936U (zh) 一种控保砖混建筑托梁拆墙施工装置
CN105113389A (zh) 装配式钢-混凝土组合结构桥墩柱构件
CN106337555A (zh) 建筑外墙悬挑结构三角钢支撑施工方法
CN101457548A (zh) 圆钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法
CN102086677A (zh) 预制钢筋砼梁及钢筋砼柱与梁连接节点
CN104499568A (zh) 方钢管预制柱-预制叠合梁装配整体式框架及施工方法
CN102071747A (zh) 方钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法
CN108867341B (zh) 一种gfrp管-混凝土-型钢组合柱脚节点及其施工方法
CN109356190B (zh) 一种格构柱式墩台混凝土塔吊基础及其施工方法
CN103711329A (zh) 外贴钢骨混凝土框架法加固结构的方法
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN109056710B (zh) 一种硬质地层钢管桩及其施工方法
CN110700082A (zh) 一种sma-ecc自复位圆钢管约束钢筋混凝土桥墩的柱脚节点
CN107013046B (zh) 一种大截面钢管混凝土组合柱的矫正方法
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN105133786A (zh) 空腹式快速施工组合梁及其建造方法
CN210597882U (zh) 一种格构式钢骨混凝土组合柱梁柱节点
CN104594343A (zh) 一种装配式桩及其施工方法
CN209353365U (zh) 一种格构柱式墩台混凝土塔吊基础
CN109457814B (zh) 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法
CN106284331B (zh) 大直径嵌岩灌注桩提高竖向承载力的方法
CN111648400B (zh) 一种人防工程逆做法遇厚层含水沙层施工方法
CN211498443U (zh) Sma-ecc自复位圆钢管约束钢筋混凝土柱脚节点
CN107401215A (zh) 装配式建筑及建筑方法
CN108951643B (zh) 超高层深基坑地下室核心筒大跨度大区域换撑施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant