CN109342100B - Fracturing system pressure test control method - Google Patents

Fracturing system pressure test control method Download PDF

Info

Publication number
CN109342100B
CN109342100B CN201811445886.5A CN201811445886A CN109342100B CN 109342100 B CN109342100 B CN 109342100B CN 201811445886 A CN201811445886 A CN 201811445886A CN 109342100 B CN109342100 B CN 109342100B
Authority
CN
China
Prior art keywords
pressure
preset
fracturing
signal
pressure value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811445886.5A
Other languages
Chinese (zh)
Other versions
CN109342100A (en
Inventor
王庆群
彭平生
王云海
李莉莉
肖勇
石权
刘灼
范杰
陆英娜
赵萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petrochemical Corp
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Original Assignee
Sinopec Oilfield Equipment Corp
Sinopec Siji Petroleum Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Equipment Corp, Sinopec Siji Petroleum Machinery Co Ltd filed Critical Sinopec Oilfield Equipment Corp
Priority to CN201811445886.5A priority Critical patent/CN109342100B/en
Publication of CN109342100A publication Critical patent/CN109342100A/en
Application granted granted Critical
Publication of CN109342100B publication Critical patent/CN109342100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones

Abstract

The invention provides a pressure test control method of a fracturing system, which comprises the following steps: s1, closing a valve of a discharge pipeline of the fracturing device; s2, the controller outputs a section of pulse signal to drive a motor of the fracturing device to rotate, so that the pressure of the discharge pipeline is increased, and the pressure sensor of the discharge pipeline outputs a pressure signal; s3, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives a motor of the fracturing device to rotate to enable the pressure of the discharge pipeline to rise until the preset pressure value is reached; the pressure test operation of the fracturing system is realized through the steps. The invention can greatly improve the safety of pressure test operation and improve the pressure test efficiency.

Description

Fracturing system pressure test control method
Technical Field
The invention relates to the field of petroleum drilling and production equipment, in particular to a pressure test control method for a fracturing system.
Background
The fracturing operation is a main measure for increasing and stabilizing yield in the exploration and development of oil and gas fields, a plurality of high-power fracturing devices are utilized to form a fracturing system, and as shown in figure 1, reservoir rock is fractured and a flow guide channel is formed. With the development of ultra-deep well and horizontal well technologies, the power of the needed fracturing unit is increased, and the weight and the volume of a single fracturing device are increased. For example, the output pressure of the existing equipment reaches 175Mpa, and because the pressure is high, the equipment needs to be subjected to pressure testing before being shut down and put into use again every time, so that the working state of the equipment is ensured to be good. Under the working condition of lower pressure, manual control is usually adopted for pressure testing, the danger to equipment and personnel is higher under the high-pressure working condition by the scheme, and the existing operation scheme is difficult to meet the requirements. No relevant records are found in the prior art.
Disclosure of Invention
The invention aims to provide a fracturing system pressure test control method, which can improve the safety of pressure test operation under a high-pressure working condition.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: a fracturing system pressure test control method comprises the following steps:
s1, closing a valve of a discharge pipeline of the fracturing device;
s2, the controller outputs a section of pulse signal to drive a motor of the fracturing device to rotate, so that the pressure of the discharge pipeline is increased, and the pressure sensor of the discharge pipeline outputs a pressure signal;
s3, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives a motor of the fracturing device to rotate to enable the pressure of the discharge pipeline to rise until the preset pressure value is reached;
the pressure test operation of the fracturing system is realized through the steps.
In the preferred scheme, the pulse signal is a pulse signal within a preset time, and the duration is 0.1-3 seconds.
In a preferred embodiment, the method further comprises the following steps:
s4, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing the pressure test;
if the current pressure value exceeds the preset range interval of the preset pressure value, outputting a fault alarm;
the pressure test operation of the fracturing system is realized through the steps.
In a preferred embodiment, the method further comprises the following steps:
s5, connecting the discharge pipeline of each fracturing device with a trunk pipeline through a branch pipeline, connecting the trunk pipeline with a bus pipeline, arranging a branch valve and a branch pressure sensor on the branch pipeline, arranging a trunk valve and a trunk pressure sensor on the trunk pipeline, and arranging a bus valve and a bus pressure sensor on the bus pipeline;
closing branch valves, and carrying out pressure test operation on each fracturing device;
and completing the pressure test operation of each branch line, and then sequentially completing the pressure test operation of the trunk line and the bus line.
In a preferred scheme, the pressure test operation of each branch line is synchronously performed.
In a preferred embodiment, the method further comprises the following steps:
s6, disconnecting the fracturing devices with faults, closing the main line valves and opening the branch line valves corresponding to the fracturing devices;
s7, the controller of any one or more fracturing devices outputs a section of pulse signal to drive the motor of the fracturing device to rotate, so that the pressure of the discharge pipeline is increased, and the main line pressure sensor outputs a pressure signal;
s8, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives a motor of the fracturing device to rotate to enable the pressure of the discharge pipeline to rise until the preset pressure value is reached;
s9, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, finishing the trunk line pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting a fault alarm of the main pipeline;
s10, closing the bus valve and opening the main valve;
s11, outputting a section of pulse signal by a controller of any one or more fracturing devices, driving a motor of the fracturing device to rotate, increasing the pressure of a discharge pipeline, and outputting a pressure signal by a bus pressure sensor;
s12, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, drives a motor of the fracturing device to rotate, enables the pressure of the discharge pipeline to rise until the pressure reaches the preset pressure value, and maintains the pressure;
s13, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing bus pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting a fault alarm of the bus pipeline;
the pressure test operation of the fracturing system with a plurality of fracturing devices is completed through the steps.
The preset pressure value is 145-175 MPa.
Under the condition that one set of fracturing device confirms to be reliable, obtaining a pressure increase curve by using a fixed pulse signal, and correcting the pressure increase curve by using a plurality of fracturing devices confirming to be reliable;
and recording a pressure increase curve of the pressure test operation of the subsequent equipment, and comparing the pressure increase curve with a standard pressure increase curve to quickly confirm whether the current equipment for pressure test has faults or hidden fault hazards.
According to the fracturing system pressure test control method provided by the invention, the safety of pressure test operation can be greatly improved, the pressure test efficiency is improved, and in the preferred scheme, the scheme of grouping and calibrating the pressure increase curve is adopted, so that the fault point can be quickly positioned.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
fig. 1 is a schematic diagram of the overall structure of the fracturing system of the present invention.
Fig. 2 is a schematic structural diagram of a single fracturing device of the present invention.
Fig. 3 is a schematic view of a pressure testing process of the fracturing device of the invention.
Fig. 4 is a schematic diagram of a pressure increase curve of the fracturing system of the present invention.
In the figure: the system comprises a fracturing device 1, a double-extension-shaft motor 101, a clutch 102, a multi-cylinder pump 103, a discharge pipeline 104, a branch pipeline 2, a branch valve 21, a branch pressure sensor 22, a trunk pipeline 3, a trunk valve 31, a trunk pressure sensor 32, a bus pipeline 4, a bus valve 41, a bus pressure sensor 42, a buffer tank 5 and a wellhead 6.
Detailed Description
The fracturing device 1 is structurally shown in fig. 2, two output shafts of a double-extension-shaft motor 101 are connected with a multi-cylinder pump 103 through a clutch 102, the multi-cylinder pump 103 adopts a plurality of piston pumps driven by a crankshaft, the position of a pump head is connected with an inlet pipeline through a liquid inlet one-way valve, the inlet pipeline is connected with a sand mixing device, the position of the pump head is connected with a discharge pipeline 104 through a liquid discharge one-way valve, and a valve and a pressure sensor are arranged on the discharge pipeline 104.
Example 1:
as shown in fig. 3, a method for controlling pressure test of a fracturing system includes the following steps:
s1, closing the valve of the discharge line 104 of the fracturing device 1;
s2, the controller outputs a section of pulse signal to drive a motor of the fracturing device 1 to rotate, so that the pressure of the discharge pipeline 104 is increased, and the pressure sensor of the discharge pipeline 104 outputs a pressure signal; preferably, the pulse signal is a pulse signal within a preset time, and the duration is 0.1-2 seconds. The pulse signal is used as an instruction signal of the motor frequency converter, and the motor frequency converter controls the motor to rotate.
S3, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives the motor of the fracturing device 1 to rotate to enable the pressure of the discharge pipeline 104 to rise until the preset pressure value is reached; in a preferable scheme, the preset pressure value is 145-175 MPa. 175MPa is used in this case.
S4, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing the pressure test;
if the current pressure value exceeds the preset range interval of the preset pressure value, outputting a fault alarm;
the pressure test operation of the fracturing system is realized through the steps. By adopting the scheme of short-time pulse and pressure feedback implementation, the invention ensures the safety and reliability of the pressure test process of the fracturing device. The probability of personnel and equipment loss is reduced to the minimum.
It is further preferred that in case a set of fracturing units 1 confirms reliability, the pressure increase curve is obtained by the method described above with a fixed pulse signal, as shown in fig. 4. And the pressure increase curves of a plurality of confirmed reliable fracturing devices 1 are corrected, the pressure increase curves of the pressure test operation of the subsequent fracturing devices 1 are recorded and compared with the standard pressure increase curves, and therefore whether faults or hidden troubles of the current fracturing devices 1 for pressure test exist can be quickly confirmed.
Example 2:
on the basis of the embodiment 1, the preferable scheme further comprises the following steps:
s5, as shown in fig. 1, the discharge pipe 104 of each fracturing device 1 is connected to the trunk pipe 3 through the branch pipe 2, the trunk pipe 3 is connected to the bus pipe 4, the branch pipe 2 is provided with the branch valve 21 and the branch pressure sensor 22, the trunk pipe 3 is provided with the trunk valve 31 and the trunk pressure sensor 32, and the bus pipe 4 is provided with the bus valve 41 and the bus pressure sensor 42; preferably, each trunk line 3 is connected to a buffer tank 5, and the buffer tank 5 is connected to the bus line 4. The sand mixing device is characterized in that the sand tanks are connected with the sand mixing device, the liquid tanks are connected with the sand mixing device, and the sand mixing device is one or more than one sand tank. The sand mulling device is connected with the inlet management of each fracturing device 1 through a low-pressure pipeline.
Closing the branch valves 21 and performing pressure test operation on each fracturing device 1;
and completing the pressure test operation of each branch line, and then sequentially completing the pressure test operation of the trunk line and the bus line.
In a preferred scheme, the pressure test operation of each branch line is synchronously performed.
S6, disconnecting the fracturing device 1 with the fault, closing the main line valve 31, opening the branch line valves 21 corresponding to the fracturing devices 1, and closing the main line valve 31;
s7, the controller of any one or more fracturing devices 1 outputs a section of pulse signal to drive the motors of the fracturing devices 1 to rotate, so that the pressure of the discharge pipeline 104 is increased, and the main line pressure sensor 32 outputs a pressure signal;
s8, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives the motor of the fracturing device 1 to rotate to enable the pressure of the discharge pipeline 104 to rise until the preset pressure value is reached;
s9, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, finishing the trunk line pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting a fault alarm of the main pipeline 3;
s10, closing the bus valve 41 and opening the main valve 31;
s11, the controller of any one or more fracturing devices 1 outputs a section of pulse signal to drive the motors of the fracturing devices 1 to rotate, so that the pressure of the discharge pipeline 104 is increased, and the bus pressure sensor 42 outputs a pressure signal;
s12, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, drives the motor of the fracturing device 1 to rotate, enables the pressure of the discharge pipeline 104 to rise until the pressure reaches the preset pressure value, and maintains the pressure;
s13, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing bus pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting a fault alarm of the bus pipeline 4;
the pressure test operation of the fracturing system having a plurality of fracturing devices 1 is completed through the above steps.
Example 3:
in another optional scheme, a method for controlling pressure test of a fracturing system comprises the following steps:
s01, connecting the discharge pipe 104 of each fracturing device 1 with the trunk pipe 3 through the branch pipe 2, connecting the trunk pipe 3 with the bus pipe 4, arranging the branch valve 21 and the branch pressure sensor 22 on the branch pipe 2, arranging the trunk valve 31 and the trunk pressure sensor 32 on the trunk pipe 3, and arranging the bus valve 41 and the bus pressure sensor 42 on the bus pipe 4;
closing the bus valve 41, and giving a signal by the main controller to enable a part of branch controllers to control the output pressure of the fracturing device 1;
the bus pressure sensor 42 outputs a pressure signal, and the main controller receives the pressure signal and compares the pressure signal with a preset pressure value;
s02, grouping again, the main controller gives out signals to make a part of branch controllers output pressure;
the bus pressure sensor 42 outputs a pressure signal, and the main controller receives the pressure signal and compares the pressure signal with a preset pressure value;
s03, regrouping, wherein the main controller gives signals to make part of branch controllers output pressure;
s04, sequentially executing the steps S02-S03 to enable all the fracturing devices controlled by the branch controllers to participate in pressure output;
s05, when the pressure fed back by the bus pressure sensor 42 reaches a set value, maintaining the pressure;
after the pressure is maintained for a period of time, reading a current pressure signal output by the bus pressure sensor 42, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing the pressure test;
if the current pressure value exceeds the preset range interval of the preset pressure value, outputting a fault alarm, and starting a fault positioning step;
the rapid pressure test operation of the fracturing system is realized through the steps. In the pressure test operation process, the fault point can also be quickly positioned.
In the preferred scheme as shown in fig. 4, in the process of pressure test operation, grouping conditions and pressure values after each pressure test operation are recorded to obtain an actual pressure increase curve;
and comparing the actual pressure increase curve with a preset pressure increase curve, and quickly positioning the fault position according to the record of the difference position and the grouping condition.
In a preferred scheme, after each grouping, the number of the fracturing devices 1 outputting pressure is kept consistent, and the pulse signals output each time are kept consistent. The grouping method in this example adopts a round-robin grouping scheme, for example, 10 sets of fracturing devices 1 are grouped into numbers 01-10, and 2 sets are used for pressure testing, wherein the first set is numbers 01 and 02, the second set is numbers 02 and 03, and so on. Each set of fracturing device 1 is ensured to participate in at least one pressure test output, preferably more than 2 pressure test outputs.
In the preferred scheme, if the actual pressure increase curve and the preset pressure increase curve have differences at the output position of each pressure test, the fault is positioned in the bus pipeline 4.
In the preferred scheme, the corresponding grouping condition records are inquired according to the difference points, and the failure probability of more fracturing devices 1 in the grouping is higher. For example, when the positions of pressure test outputs involving the fracturing device No. 03 are different every time, the fault is positioned in the fracturing device No. 03 and the branch pipeline 2 connected with the fracturing device No. 03, the fault point can be quickly found by independently testing the fracturing device No. 03, after the fault point is found, equipment of the fault point is independently disconnected, for example, one or two clutches 102 in the fracturing device No. 1 are disconnected, and the steps are carried out again until all the fault points are eliminated. When the number of the fracturing devices 1 is larger than the number of the members grouped at each time, and each set of the fracturing device 1 can be ensured to participate in at least one pressure test output, the obtained actual pressure increase curve is irrelevant to the number of the fracturing devices 1.
In a preferred scheme, the preset pressure increase curve is obtained by adopting a fault-free fracturing system according to the same grouping number and output pulse signal measurement. In a preferable scheme, the preset pressure value is 145-175 MPa.
The above-described embodiments are merely preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention is defined by the claims, and equivalents including technical features described in the claims. I.e., equivalent alterations and modifications within the scope hereof, are also intended to be within the scope of the invention. For the sake of brevity, all the combinations of the embodiments are not exemplified, and therefore, the technical features of the embodiments can be combined with each other to generate more technical solutions without conflict.

Claims (5)

1. A pressure test control method of a fracturing system is characterized by comprising the following steps:
s1, closing a valve of a discharge pipeline (104) of the fracturing device (1);
s2, the controller outputs a section of pulse signal to drive a motor of the fracturing device (1) to rotate, so that the pressure of the discharge pipeline (104) is increased, and a pressure sensor of the discharge pipeline (104) outputs a pressure signal;
the pulse signal is a pulse signal within a preset time, and the duration is 0.1-3 seconds;
s3, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives a motor of the fracturing device (1) to rotate to enable the pressure of the discharge pipeline (104) to rise until the preset pressure value is reached;
s4, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing the pressure test;
if the current pressure value exceeds the preset range interval of the preset pressure value, outputting a fault alarm;
s5, connecting a discharge pipeline (104) of each fracturing device (1) with a main pipeline (3) through a branch pipeline (2), connecting the main pipeline (3) with a bus pipeline (4), arranging a branch valve (21) and a branch pressure sensor (22) on the branch pipeline (2), arranging a main valve (31) and a main pressure sensor (32) on the main pipeline (3), and arranging a bus valve (41) and a bus pressure sensor (42) on the bus pipeline (4);
closing the branch valves (21), and carrying out pressure test operation on each fracturing device (1);
completing the pressure test operation of each branch line, and then sequentially completing the pressure test operation of the trunk line and the bus line;
and realizing the pressure test operation of the fracturing system through the steps S1-S5.
2. The fracturing system pressure test control method according to claim 1, which is characterized in that: the pressure test operation of each branch line is synchronously carried out.
3. The fracturing system pressure test control method according to claim 1, further comprising the steps of:
s6, disconnecting the fracturing devices (1) with faults, closing the main line valves (31) and opening the branch line valves (21) corresponding to the fracturing devices (1);
s7, the controller of any one or more fracturing devices (1) outputs a section of pulse signal to drive the motors of the fracturing devices (1) to rotate, so that the pressure of the discharge pipeline (104) is increased, and the main line pressure sensor (32) outputs a pressure signal;
s8, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, and drives a motor of the fracturing device (1) to rotate to enable the pressure of the discharge pipeline (104) to rise until the preset pressure value is reached;
s9, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, finishing the trunk line pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting a fault alarm of the main pipeline (3);
s10, closing the bus valve (41) and opening the main valve (31);
s11, outputting a section of pulse signal by a controller of any one or more fracturing devices (1), driving a motor of the fracturing device (1) to rotate, increasing the pressure of a discharge pipeline (104), and outputting a pressure signal by a bus pressure sensor (42);
s12, the controller receives the pressure signal, compares the pressure signal with a preset pressure value, maintains the pressure if the pressure signal reaches the preset pressure value, outputs a section of same pulse signal again if the pressure signal does not reach the preset pressure value, drives a motor of the fracturing device (1) to rotate, enables the pressure of the discharge pipeline (104) to rise until the pressure reaches the preset pressure value, and maintains the pressure;
s13, maintaining the pressure for a period of time, reading a current pressure signal output by the pressure sensor, comparing the current pressure signal with a preset pressure value, and if the current pressure value is within a set range of the preset pressure value, completing bus pressure test;
if the current pressure value exceeds the preset range of the pressure value, outputting fault alarm of the bus pipeline (4);
completing the pressure test operation of the fracturing system with a plurality of fracturing devices (1) through steps S1-S12.
4. The method for controlling the pressure test of the fracturing system according to any one of claims 1 to 3, wherein: the preset pressure value is 145-175 MPa.
5. The method for controlling the pressure test of the fracturing system according to any one of claims 1 to 3, wherein: under the condition that one set of fracturing device (1) confirms reliability, obtaining a pressure increase curve by using a fixed pulse signal, and correcting the pressure increase curve by using a plurality of fracturing devices (1) which confirm reliability;
and recording a pressure increase curve of the pressure test operation of the subsequent equipment, and comparing the pressure increase curve with a standard pressure increase curve to quickly confirm whether the current equipment for pressure test has faults or hidden fault hazards.
CN201811445886.5A 2018-11-29 2018-11-29 Fracturing system pressure test control method Active CN109342100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811445886.5A CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811445886.5A CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Publications (2)

Publication Number Publication Date
CN109342100A CN109342100A (en) 2019-02-15
CN109342100B true CN109342100B (en) 2021-08-06

Family

ID=65318606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811445886.5A Active CN109342100B (en) 2018-11-29 2018-11-29 Fracturing system pressure test control method

Country Status (1)

Country Link
CN (1) CN109342100B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112000042B (en) * 2020-08-26 2024-03-12 中国石油化工集团有限公司 Equal network control system and method for multi-electric fracturing device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153752A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic jetting tubing sand filling stratified multi-stage fracturing technology for horizontal well
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN205400702U (en) * 2016-02-25 2016-07-27 青岛地质工程勘察院 Hard strata shallow layer geothermal well fracturing unit
CN106677756A (en) * 2017-03-07 2017-05-17 库尔勒金川矿业有限公司 Active fracturing device for coal rock softening and coal rock fracturing construction process
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
US10017374B1 (en) * 2014-09-16 2018-07-10 Roy Malcolm Moffitt, Jr. Refueling system for supplying fuel to fracturing equipment
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well
RU2667561C1 (en) * 2017-10-12 2018-09-21 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of multiple hydraulic fracturing of formation in open inclined well hole

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2302520Y (en) * 1997-05-24 1998-12-30 郑福余 Reversed flow type on-site voltage-measuring apparatus for high-voltage construction
JP4528721B2 (en) * 2005-12-28 2010-08-18 株式会社東芝 Generator rotor crack propagation prediction system, operation condition determination support system, method and program, and operation control system
DE102006001425B4 (en) * 2006-01-10 2009-10-01 Benteler Automobiltechnik Gmbh Rohrprüfanlage
CN201355302Y (en) * 2008-12-29 2009-12-02 中国石化集团江汉石油管理局第四机械厂 Fracturing operation pressure testing device
US8453764B2 (en) * 2010-02-01 2013-06-04 Aps Technology, Inc. System and method for monitoring and controlling underground drilling
WO2011137460A2 (en) * 2010-04-30 2011-11-03 S.P.M. Flow Control, Inc. Machines, systems, computer-implemented methods, and computer program products to test and certify oil and gas equipment
US9500068B2 (en) * 2010-11-12 2016-11-22 Ut-Battelle, Llc Cavitation-based hydro-fracturing simulator
CN102419257A (en) * 2011-12-16 2012-04-18 中国石化集团江汉石油管理局第四机械厂 Sand conveying test device of sand fracturing and mixing vehicle
US20170212535A1 (en) * 2012-08-17 2017-07-27 S.P.M. Flow Control, Inc. Field pressure test control system and methods
US9322243B2 (en) * 2012-08-17 2016-04-26 S.P.M. Flow Control, Inc. Automated relief valve control system and method
CN102818680A (en) * 2012-08-20 2012-12-12 珠海格力电器股份有限公司 Pressure testing device
CN102944414A (en) * 2012-12-04 2013-02-27 中国石油大学(华东) Erosive abrasion test device for fracturing tool
CN103196762B (en) * 2013-04-25 2014-10-15 重庆地质矿产研究院 Experimental device and method for reforming shale gas reservoir through pulse hydraulic fracturing
US9650882B2 (en) * 2014-12-16 2017-05-16 Caterpillar Inc. System for detecting leakage in a pump used in hydraulic fracturing
CN104568405B (en) * 2014-12-25 2017-09-01 中国石油天然气集团公司 Slips strength test device and its system
CN104975852B (en) * 2015-06-25 2016-06-08 中国石油大学(北京) The diagnostic method of multistage frac water horizontal well oil-producing gas position and system thereof
CN105181251A (en) * 2015-09-22 2015-12-23 山东康迪泰克工程橡胶有限公司 Pulse segmented pressure testing device and pressure testing method
CN205353793U (en) * 2015-12-31 2016-06-29 武汉博汇油田工程服务有限公司 Fracturing unit proving ground pipeline pressure control system
CN205958188U (en) * 2016-08-19 2017-02-15 中国水利水电第三工程局有限公司 Pressure testing device
CN107764652A (en) * 2016-08-20 2018-03-06 王东玉 A kind of 210MPa production trees device for detecting water pressure
CN207194878U (en) * 2017-07-27 2018-04-06 中石化石油工程机械有限公司第四机械厂 A kind of electricity of single-machine double-pump structure drives pressure break equipment
CN107905776B (en) * 2017-12-04 2019-11-08 中国石油天然气股份有限公司 A kind of gas well fracturing drainage system and method
CN108845038B (en) * 2018-07-04 2020-10-09 荆州市世纪派创石油机械检测有限公司 Valve hydrostatic test device and test method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675374A (en) * 2013-11-29 2015-06-03 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Unconventional CO2 fracturing site operation technology
CN104153752A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Hydraulic jetting tubing sand filling stratified multi-stage fracturing technology for horizontal well
US10017374B1 (en) * 2014-09-16 2018-07-10 Roy Malcolm Moffitt, Jr. Refueling system for supplying fuel to fracturing equipment
CN205400702U (en) * 2016-02-25 2016-07-27 青岛地质工程勘察院 Hard strata shallow layer geothermal well fracturing unit
WO2018048974A1 (en) * 2016-09-07 2018-03-15 Schlumberger Technology Corporation Systems and methods for injecting fluids into high pressure injector line
CN106677756A (en) * 2017-03-07 2017-05-17 库尔勒金川矿业有限公司 Active fracturing device for coal rock softening and coal rock fracturing construction process
RU2667561C1 (en) * 2017-10-12 2018-09-21 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of multiple hydraulic fracturing of formation in open inclined well hole
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well

Also Published As

Publication number Publication date
CN109342100A (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CA3134039A1 (en) Frac pump automatic rate adjustment and critical plunger speed indication
CN103808569B (en) High-pressure fatigue test device and test method
CN104314905B (en) Prestressing force intelligent tensioning hydraulic system, prestress tensioning equipment and its control method
CN202814687U (en) High temperature pulse integrated test system of motor vehicle bake hose
US9303488B2 (en) Method and apparatus for removing hydrate plugs
CN107142947B (en) To be displaced the investigating method of the axial force of the supports servo-system for servo target
CN101672748B (en) 400MPa super-high pressure fatigue test device and test method
CN109342100B (en) Fracturing system pressure test control method
CN103196762A (en) Experimental device and method for reforming shale gas reservoir through pulse hydraulic fracturing
CN109632353B (en) Quick positioning method for pressure test fault of fracturing system
CN103939421A (en) Fatigue test method and device used for hydraulic cylinder
WO2018161577A1 (en) Monitoring and control method utilized in coal reservoir fracking at mining well, device, and monitoring and control apparatus
CN106321071B (en) Production parameter optimization method for oil pumping unit
CN107478400A (en) Pressure testing device and its method a kind of while that detect multiple valves
CN106777518B (en) A kind of driving source discrimination method for rail control motor power
CN211215547U (en) Degasser for dissolved gas in oil
CN203069459U (en) Insulator internal pressure testing device
RU2693090C1 (en) Method for determining tubing tightness in injection wells
CN103743583B (en) A kind of gas delivering pipe system pressure experimental device
CN102840953A (en) Method for confirming damage of cooling water pipe of blast furnace cooling wall
CN110905658A (en) Pressure diagnosis device and method for high-pressure branch of mobile diesel engine
CN115324548A (en) Temporary plugging staged fracturing experimental device for open hole horizontal well
CN104819144B (en) The method and device of Hydraulic pump fault in a kind of detection hydraulic system
CN110045717B (en) Device and method for testing butt joint performance of underwater control module
CN207795743U (en) A kind of cable tension test device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210930

Address after: 434020 Longshan Temple Street, Jingzhou District, Jingzhou, Hubei

Patentee after: SINOPEC SIJI PETROLEUM MACHINERY Co.,Ltd.

Patentee after: SINOPEC Group

Patentee after: SINOPEC OILFIELD EQUIPMENT Corp.

Address before: 434020 Longshan Temple Street, Jingzhou District, Jingzhou, Hubei

Patentee before: SINOPEC SIJI PETROLEUM MACHINERY Co.,Ltd.

Patentee before: SINOPEC OILFIELD EQUIPMENT Corp.

TR01 Transfer of patent right