CN109341449A - A kind of high courtyard primary drilling Discrete control explosion well completion method of big section - Google Patents

A kind of high courtyard primary drilling Discrete control explosion well completion method of big section Download PDF

Info

Publication number
CN109341449A
CN109341449A CN201811227028.3A CN201811227028A CN109341449A CN 109341449 A CN109341449 A CN 109341449A CN 201811227028 A CN201811227028 A CN 201811227028A CN 109341449 A CN109341449 A CN 109341449A
Authority
CN
China
Prior art keywords
explosion
rock
courtyard
blasthole
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811227028.3A
Other languages
Chinese (zh)
Other versions
CN109341449B (en
Inventor
邵昌友
彭立正
张纪堂
刘文华
王正英
历波
石绍飞
徐新海
郭同晓
李保健
曹书沧
孙旭如
胡贵发
司书波
于林波
李春鹏
周涌
房涛
霍兴伟
石帅
白继坤
孟亚辉
翟利军
刘天涯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Huibaoling Iron Mine Co Ltd
Original Assignee
Linyi Huibaoling Iron Mine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Huibaoling Iron Mine Co Ltd filed Critical Linyi Huibaoling Iron Mine Co Ltd
Priority to CN201811227028.3A priority Critical patent/CN109341449B/en
Publication of CN109341449A publication Critical patent/CN109341449A/en
Application granted granted Critical
Publication of CN109341449B publication Critical patent/CN109341449B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of big high courtyard primary drilling Discrete control explosion well completion methods of section, including (1) to determine drilling machine type;(2) determination of explosion simultaneous shaft sin king specification;(3) compensation space;(4) blasthole is determined;(5) powder charge;(6) short-delay time;(7) it detonates;Beneficial effects of the present invention are the high simultaneous shaft sin king technology perforating of 70 meters big section, powder charge, the entire work progress of explosion, construction personnel completes in the drilling chamber of top, it realizes inside courtyard, lower part unmanned operation, avoids the security risks such as falling from high altitude, high-altitude junk, scalings;It is aerated without installing special blower or air hose;Without setting up ladder, job platform, without using pusher leg drill, save the cost, labor intensity is low, and operating condition is good, realizes essential safety operation;Primary drilling sectional blasting method process is simple, from perforating to explosion Cheng Jing, the construction period 22-27 days.

Description

A kind of high courtyard primary drilling Discrete control explosion well completion method of big section
Technical field
The present invention relates to a kind of coal mining methods, in particular to a kind of big high courtyard primary drilling Discrete control of section Explosion well completion method.
Technical background
Full stage (up and down) combination is mainly used to dig quick-fried mining codes i.e. FCM method in the back production of iron ore underground, similar In the construction that mine slot raise, mine chute and the dark vertical of type extend, often since courtyard height is big, ore hardness is big, day Well driving is always the problem of mining industry and the most important link of mining.
In conventional mining method, such as common law, suspended bulkhead raising method;It is small that common law driving courtyard generally tunnels height In 60 meters of courtyard, using, to eye, installing people's row ladder, erect bracket, workbench is upward with driving on airleg rock drill Drilling It is mobile.The equipment such as platform, geomantic omen pipe, drilling machine are withdrawn before explosion, prevent explosion from damaging.Courtyard takes the upward anti-mode dug to dig Into ventilation is difficult, and ventilation time is long.The technique have complex procedures, Working gantry height, large labor intensity, driving speed slowly, Low efficiency, ventilation time length, high material consumption, it is at high cost, operation it is dangerous the disadvantages of.
Suspended bulkhead raising method construction cutting well, although working procedure is reduced, ventilation and working environment are improved, and personnel need It constructs in cutting well, while increasing support staff, capital investment is big.
Anti- well drilling machine method is using rotary drilling broken rock pore-forming and reversed reaming, rock is squeezed using hobboing cutter, scraping and The method of shearing-crushing rock Cheng Jing, rock belong to extremely hard rock class, and penetration rate is slow, low efficiency, cost serious to hob abrasion It is high.
Common law and anti-well drilling machine method require just carry out kerve to the secondary expansion brush of cutting well progress, and program is complicated, applies Work efficiency fruit is poor, is easy to appear and expands the problems such as groove height is inadequate.
Summary of the invention
The purpose of the present invention is to provide a kind of big high courtyard primary drilling Discrete control explosion well completion method of section, Ke Yiti Height cutting well construction efficiency, lifting construction safety coefficient reduce labor intensity of workers, improve construction environment, and short time limit is safe Pit mining method.
In order to solve the above technical problem, the present invention provides the high courtyard primary drilling Discrete control explosion Cheng Jingfang of big section Method, technical essential are as follows:
(1) drilling machine type is determined according to rock body quality of mine property, blast charging amount etc., is determined and is drilled by the drilling machine type Diameter;
(2) height of the determination of explosion simultaneous shaft sin king specification, courtyard segmentation is mainly related with rock property and compensation space, 70 meters of day well sections are tall and big, use 3 meters of * 3 meters of sections, explosion height of lift for 5 meters;
(3) compensation space passes through to the compensation space for accommodating each segment blast fractured rock, after each segment blast, rock Block falls on lower part chamber, forms heap body, if the onepull day a height of H of well section, cross-sectional area S, courtyard inclination angle is α, lower part cave The a height of h in room;
Vb=Sh
Vz=SH (k-1)/sin α
In formula, Vb is rock mass compensation space;Vz is the broken swollen rear volume size of rock mass, and k is broken swollen coefficient;If under thinking avalanche Rock can be accommodated by lower part rock mass engineering project chamber completely, then need Vb > Vz;
(4) effect according to each blasthole in courtyard is arranged keyhole in center blasthole periphery, is forming courtyard shape Periphery hole is arranged in position, and the periphery hole is set on four angles of courtyard profile;
(5) powder charge, using the explosion medication to match with explosion burden;
(6) short-delay time, first banger hole and time banger hole short-delay time are T
T=t1+t2+t3
T1 is that rock crack and crack propagation time occurs, and t2 is that the throwing of rock slag is full of the cavity time, and t3 is that rock slag is fallen Form the time of cavity;
(7) it is there are enough scope of freedoms when ringing shot hole blasting after ensuring, blasting quality is improved, using half second delay detonator Detonator couples fuse arming test experiment initiation, and igniting primer is put in blasthole bottom.
Preferably, the cross-sectional area of courtyard should be determined according to the lump ore full-size for falling mine, due to the increase with well depth, More up, well head section can be gradually reduced;Cross-sectional area is 9 square metres, and penalty coefficient is 0.55~0.7, and single explosion section is high It can achieve 5~7 meters;If penalty coefficient is less than 0.5, a height of 2~4 meters of single explosion section;In soft rock borehole blasting Cheng Jing, Explosion height of lift can be greater than 10 meters, for nature of ground be in it is hard or more, explosion height of lift should be less than 10 meters or less.
Preferably, it detonates one by one for blasthole, and if short-delay time differs greatly, no matter how blasthole is arranged, as long as Blasthole spacing is up to standard, and broken rock volume can be accommodated by lower part chamber, can realize courtyard;But drilling machine construction for convenience, Blasthole position still needs to be arranged according to certain rule.
Preferably, short-delay time relatively reasonable between via hole and keyhole is generally 95-105ms, periphery hole with it is auxiliary It helps relatively reasonable short-delay time between hole to should be greater than 150ms, preferable demolition effect can be obtained.
Preferably, the explosive that explosion velocity is 3000m/s or so is suitable for medium-hard rock, being capable of preferable demolition effect;It is quick-fried Speed is that the explosive of 4000m/s or so is suitable for solid rock, and demolition effect is good;In addition to it is prevented from first banger hole, because It is excessive for detonation energy, lead to excessive impact dynamic pressure, fragmented rock is blocked in hole, the charge constitution in first banger hole, The determination of degree of packing and explosive payload is most important, and has significant impact to the detonation of subsequent blasthole, determines demolition effect.
Preferably, to prevent blasthole from phenomenon of miss-firing occur, blasting quality is influenced, each blasthole is all made of double Nonel detonators Detonation.
Beneficial effects of the present invention are the high simultaneous shaft sin king technology perforating of 70 meters big section, powder charge, the entire work progress of explosion, are applied Worker person completes in the drilling chamber of top, realizes inside courtyard, lower part unmanned operation, avoids falling from high altitude, high-altitude The security risks such as junk, scalings;It is aerated without installing special blower or air hose;Without setting up ladder, job platform, Without using pusher leg drill, save the cost, labor intensity is low, and operating condition is good, realizes essential safety operation;Primary chisel Rock sectional blasting method process is simple, from perforating to explosion Cheng Jing, the construction period 22-27 days.
Detailed description of the invention
Fig. 1 is cloth hole schematic diagram of the present invention
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, the present invention is carried out further specifically It is bright.
Big section high courtyard primary drilling Discrete control explosion well completion method provided by the invention, technical essential are as follows:
(1) drilling machine type is determined according to rock body quality of mine property, blast charging amount etc., is determined and is drilled by the drilling machine type Diameter;
(2) height of the determination of explosion simultaneous shaft sin king specification, courtyard segmentation is mainly related with rock property and compensation space, 70 meters of day well sections are tall and big, use 3 meters of * 3 meters of sections, explosion height of lift for 5 meters;
(3) compensation space passes through to the compensation space for accommodating each segment blast fractured rock, after each segment blast, rock Block falls on lower part chamber, forms heap body, if the onepull day a height of H of well section, cross-sectional area S, courtyard inclination angle is α, lower part cave The a height of h in room;
Vb=Sh
Vz=SH (k-1)/sin α
In formula, Vb is rock mass compensation space;Vz is the broken swollen rear volume size of rock mass, and k is broken swollen coefficient;If under thinking avalanche Rock can be accommodated by lower part rock mass engineering project chamber completely, then need Vb > Vz;
(4) effect according to each blasthole in courtyard is arranged keyhole in center blasthole periphery, is forming courtyard shape Periphery hole is arranged in position, and the periphery hole is set on four angles of courtyard profile;
(5) powder charge, using the explosion medication to match with explosion burden;
(6) short-delay time, first banger hole and time banger hole short-delay time are T
T=t1+t2+t3
T1 is that rock crack and crack propagation time occurs, and t2 is that the throwing of rock slag is full of the cavity time, and t3 is that rock slag is fallen Form the time of cavity;
(7) it is there are enough scope of freedoms when ringing shot hole blasting after ensuring, blasting quality is improved, using half second delay detonator Detonator couples fuse arming test experiment initiation, and igniting primer is put in blasthole bottom.
Preferably, the cross-sectional area of courtyard should be determined according to the lump ore full-size for falling mine, due to the increase with well depth, More up, well head section can be gradually reduced;Cross-sectional area is 9 square metres, and penalty coefficient is 0.55~0.7, and single explosion section is high It can achieve 5~7 meters;If penalty coefficient is less than 0.5, a height of 2~4 meters of single explosion section;In soft rock borehole blasting Cheng Jing, Explosion height of lift can be greater than 10 meters, for nature of ground be in it is hard or more, explosion height of lift should be less than 10 meters or less.
Preferably, it detonates one by one for blasthole, and if short-delay time differs greatly, no matter how blasthole is arranged, as long as Blasthole spacing is up to standard, and broken rock volume can be accommodated by lower part chamber, can realize courtyard;But drilling machine construction for convenience, Blasthole position still needs to be arranged according to certain rule.
Preferably, short-delay time relatively reasonable between via hole and keyhole is generally 95-105ms, periphery hole with it is auxiliary It helps relatively reasonable short-delay time between hole to should be greater than 150ms, preferable demolition effect can be obtained.
Preferably, the explosive that explosion velocity is 3000m/s or so is suitable for medium-hard rock, being capable of preferable demolition effect;It is quick-fried Speed is that the explosive of 4000m/s or so is suitable for solid rock, and demolition effect is good;In addition to it is prevented from first banger hole, because It is excessive for detonation energy, lead to excessive impact dynamic pressure, fragmented rock is blocked in hole, the charge constitution in first banger hole, The determination of degree of packing and explosive payload is most important, and has significant impact to the detonation of subsequent blasthole, determines demolition effect.
Preferably, to prevent blasthole from phenomenon of miss-firing occur, blasting quality is influenced, each blasthole is all made of double Nonel detonators Detonation.
Beneficial effects of the present invention are the high simultaneous shaft sin king technology perforating of 70 meters big section, powder charge, the entire work progress of explosion, are applied Worker person completes in the drilling chamber of top, realizes inside courtyard, lower part unmanned operation, avoids falling from high altitude, high-altitude The security risks such as junk, scalings;It is aerated without installing special blower or air hose;Without setting up ladder, job platform, Without using pusher leg drill, save the cost, labor intensity is low, and operating condition is good, realizes essential safety operation;Primary chisel Rock sectional blasting method process is simple, from perforating to explosion Cheng Jing, the construction period 22-27 days.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Any modifications, equivalent replacements, and improvements etc. done within mind and principle, is all included in the scope of protection of the present invention.

Claims (6)

1. the big high courtyard primary drilling Discrete control explosion well completion method of section, which comprises the steps of:
(1) drilling machine type is determined according to rock body quality of mine property, blast charging amount etc., determines that drilling is straight by the drilling machine type Diameter;
(2) height of the determination of explosion simultaneous shaft sin king specification, courtyard segmentation is mainly related with rock property and compensation space, and 70 meters Its well section is tall and big, uses 3 meters of * 3 meters of sections, explosion height of lift for 5 meters;
(3) compensation space is by the way that the compensation space for accommodating each segment blast fractured rock, after each segment blast, sillar is fallen To lower part chamber, heap body is formed, if the onepull day a height of H of well section, cross-sectional area S, courtyard inclination angle is α, and lower part chamber is high For h;
Vb=Sh
Vz=SH (k-1)/sin α
In formula, Vb is rock mass compensation space;Vz is the broken swollen rear volume size of rock mass, and k is broken swollen coefficient;If the rock under thinking avalanche It can be accommodated completely by lower part rock mass engineering project chamber, then need Vb > Vz;
(4) keyhole is arranged in center blasthole periphery, in the position for forming courtyard shape in the effect according to each blasthole in courtyard Periphery hole is set, and the periphery hole is set on four angles of courtyard profile;
(5) powder charge, using the explosion medication to match with explosion burden;
(6) short-delay time, first banger hole and time banger hole short-delay time are T
T=t1+t2+t3
T1 is that rock crack and crack propagation time occurs, and t2 is that the throwing of rock slag is full of the cavity time, and t3 is that rock slag falls to be formed The time of cavity;
(7) it is there are enough scope of freedoms when ringing shot hole blasting after ensuring, blasting quality is improved, using half second delay Nonel detonator Couple fuse arming test experiment initiation, igniting primer is put in blasthole bottom.
2. big section high courtyard primary drilling Discrete control explosion well completion method according to claim 1, which is characterized in that day The cross-sectional area of well should be determined according to the lump ore full-size for falling mine, due to the increase with well depth, more up, well head section meeting It is gradually reduced;Cross-sectional area is 9 square metres, and penalty coefficient is 0.55~0.7, and single explosion section height can achieve 5~7 meters;If Penalty coefficient is less than 0.5, and a height of 2~4 meters of single explosion section;In soft rock borehole blasting Cheng Jing, explosion height of lift can be big In 10 meters, for nature of ground be in it is hard or more, explosion height of lift should be less than 10 meters or less.
3. big section high courtyard primary drilling Discrete control explosion well completion method according to claim 1, which is characterized in that right It detonates one by one in blasthole, and if short-delay time differs greatly, no matter how blasthole is arranged, as long as blasthole spacing is up to standard, broken rock Volume can be accommodated by lower part chamber, can realize courtyard;But drilling machine construction for convenience, blasthole position is still needed to according to one Fixed rule is arranged.
4. big section high courtyard primary drilling Discrete control explosion well completion method according to claim 1, which is characterized in that auxiliary Short-delay time relatively reasonable between hole and keyhole is helped to be generally 95-105ms, it is relatively reasonable micro- between periphery hole and via hole The poor time should be greater than 150ms, can obtain preferable demolition effect.
5. big section high courtyard primary drilling Discrete control explosion well completion method according to claim 1, which is characterized in that quick-fried The explosive that speed is 3000m/s or so is suitable for medium-hard rock, being capable of preferable demolition effect;Explosion velocity is 4000m/s's or so Explosive is suitable for solid rock, and demolition effect is good;It is led in addition to being prevented from first banger hole because detonation energy is excessive Excessive impact dynamic pressure is caused, fragmented rock is blocked in hole, the charge constitution in first banger hole, degree of packing and explosive payload It determines most important, and has a significant impact to the detonation of subsequent blasthole, determine demolition effect.
6. big section high courtyard primary drilling Discrete control explosion well completion method according to claim 1, which is characterized in that be It prevents blasthole from phenomenon of miss-firing occur, influences blasting quality, each blasthole is all made of double Nonel detonator detonations.
CN201811227028.3A 2018-10-22 2018-10-22 Sectional control blasting well completion method for one-time rock drilling of large-section high raise Active CN109341449B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811227028.3A CN109341449B (en) 2018-10-22 2018-10-22 Sectional control blasting well completion method for one-time rock drilling of large-section high raise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811227028.3A CN109341449B (en) 2018-10-22 2018-10-22 Sectional control blasting well completion method for one-time rock drilling of large-section high raise

Publications (2)

Publication Number Publication Date
CN109341449A true CN109341449A (en) 2019-02-15
CN109341449B CN109341449B (en) 2021-02-19

Family

ID=65310647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811227028.3A Active CN109341449B (en) 2018-10-22 2018-10-22 Sectional control blasting well completion method for one-time rock drilling of large-section high raise

Country Status (1)

Country Link
CN (1) CN109341449B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043302A (en) * 2019-05-28 2019-07-23 河南发恩德矿业有限公司 A kind of only safe and efficient construction method of head development end vent (-escape) raise of long range
CN110307762A (en) * 2019-08-08 2019-10-08 福州大学 A kind of courtyard quick well formation method based on deep hole hole by hole initiation technique
CN110578465A (en) * 2019-08-27 2019-12-17 湖南柿竹园有色金属有限责任公司 One-time well drilling and hole distribution method
CN111193270A (en) * 2019-09-09 2020-05-22 清华大学 Method and device for flexibly compensating unbalance of three-phase four-leg converter with limited capacity
CN112179225A (en) * 2020-09-27 2021-01-05 鞍钢集团矿业有限公司 One-time well-completion blasting method
CN112211639A (en) * 2020-10-13 2021-01-12 宝钢集团新疆八一钢铁有限公司 One-step well completion method for high-depth large-section medium-deep hole
CN113983883A (en) * 2021-10-27 2022-01-28 湖南柿竹园有色金属有限责任公司 Deep hole internal subsection energy-gathering detonation once-through well completion method
CN114001606A (en) * 2021-10-27 2022-02-01 湖南柿竹园有色金属有限责任公司 Method for expanding and distributing holes of circular shaft
CN114688928A (en) * 2022-02-18 2022-07-01 安徽开发矿业有限公司 Large-aperture drilling one-time blasting well-forming blast hole arrangement and blasting method for ultra-deep cutting (slip) well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306679A (en) * 2013-05-21 2013-09-18 马钢(集团)控股有限公司 '|'-shaped free surface holing one-step well completion technology
RU2602567C1 (en) * 2015-11-05 2016-11-20 Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук Method of blasting ores and rocks
CN108132006A (en) * 2017-12-25 2018-06-08 中南大学 Anti-clogging quick well formation undercut blast hole arrangement and its blasting method
CN108613599A (en) * 2018-05-03 2018-10-02 湖北三鑫金铜股份有限公司 A method of segmentation courtyard simultaneous shaft sin king

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306679A (en) * 2013-05-21 2013-09-18 马钢(集团)控股有限公司 '|'-shaped free surface holing one-step well completion technology
RU2602567C1 (en) * 2015-11-05 2016-11-20 Федеральное государственное бюджетное учреждение науки Институт горного дела им. Н.А. Чинакала Сибирского отделения Российской академии наук Method of blasting ores and rocks
CN108132006A (en) * 2017-12-25 2018-06-08 中南大学 Anti-clogging quick well formation undercut blast hole arrangement and its blasting method
CN108613599A (en) * 2018-05-03 2018-10-02 湖北三鑫金铜股份有限公司 A method of segmentation courtyard simultaneous shaft sin king

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043302A (en) * 2019-05-28 2019-07-23 河南发恩德矿业有限公司 A kind of only safe and efficient construction method of head development end vent (-escape) raise of long range
CN110307762A (en) * 2019-08-08 2019-10-08 福州大学 A kind of courtyard quick well formation method based on deep hole hole by hole initiation technique
CN110307762B (en) * 2019-08-08 2023-11-21 福州大学 Quick well forming method for courtyard based on deep hole-by-hole detonation technology
CN110578465A (en) * 2019-08-27 2019-12-17 湖南柿竹园有色金属有限责任公司 One-time well drilling and hole distribution method
CN111193270A (en) * 2019-09-09 2020-05-22 清华大学 Method and device for flexibly compensating unbalance of three-phase four-leg converter with limited capacity
CN112179225A (en) * 2020-09-27 2021-01-05 鞍钢集团矿业有限公司 One-time well-completion blasting method
CN112211639A (en) * 2020-10-13 2021-01-12 宝钢集团新疆八一钢铁有限公司 One-step well completion method for high-depth large-section medium-deep hole
CN113983883A (en) * 2021-10-27 2022-01-28 湖南柿竹园有色金属有限责任公司 Deep hole internal subsection energy-gathering detonation once-through well completion method
CN114001606A (en) * 2021-10-27 2022-02-01 湖南柿竹园有色金属有限责任公司 Method for expanding and distributing holes of circular shaft
CN114688928A (en) * 2022-02-18 2022-07-01 安徽开发矿业有限公司 Large-aperture drilling one-time blasting well-forming blast hole arrangement and blasting method for ultra-deep cutting (slip) well

Also Published As

Publication number Publication date
CN109341449B (en) 2021-02-19

Similar Documents

Publication Publication Date Title
CN109341449A (en) A kind of high courtyard primary drilling Discrete control explosion well completion method of big section
CN101328809B (en) Non-bottom pillar deep hole falling-back type mining method
CN105735993B (en) A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion
CN105937395B (en) A kind of comprehensive dig of coal mine big cross section hard-rock tunnel combines rapidly and efficiently driving method with big gun pick
CN103306679B (en) " ︱ type " scope of freedom slotting simultaneous shaft sin king technique
CN104533418A (en) Deep hole static rock breaking method for underground coal mine
CN103528444B (en) A kind of stope rockburst pressure relief prevention method
CN108374661A (en) A kind of middle pilot shaft shaft formatting by one blasting method
CN102967191A (en) Blasting method for treatment of gob
LU500326B1 (en) Method for extracting pressure relief gas through thick and hard roof rock stratum blasting permeability increase and directional long borehole interception
CN106440981B (en) Improve the deep hole blasting method of bulk yield in developmental joint fissure granite mine
CN104613831A (en) Construction method for additionally forming periphery auxiliary holes in periphery of vertical shaft periphery hole
CN110307762A (en) A kind of courtyard quick well formation method based on deep hole hole by hole initiation technique
CN103790591A (en) Comprehensive mechanized impact type rock tunneling machine
CN108362179A (en) A kind of energy saving cut shot method of star
CN104807381B (en) Method for forming cutting surface in deep hole blasting
CN106643355B (en) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN114353608B (en) Safety ore mining method
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
CN111780633B (en) Step-type rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel
US7896443B2 (en) Ore extraction using combined blast and thermal fragmentation
CN103410513B (en) Uneasily mining orebody mechanization process for stoping
NO762410L (en)
CN109341451A (en) A kind of damped blasting of tunnels structure and construction
CN209295800U (en) A kind of damped blasting of tunnels structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method of one-time rock drilling and subsection controlled blasting for large section high raise

Effective date of registration: 20220107

Granted publication date: 20210219

Pledgee: China Construction Bank Corporation Linyi Luozhuang sub branch

Pledgor: LINYI HUI BAO LING IRON Co.,Ltd.

Registration number: Y2022980000200