CN105735993B - A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion - Google Patents

A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion Download PDF

Info

Publication number
CN105735993B
CN105735993B CN201610263139.4A CN201610263139A CN105735993B CN 105735993 B CN105735993 B CN 105735993B CN 201610263139 A CN201610263139 A CN 201610263139A CN 105735993 B CN105735993 B CN 105735993B
Authority
CN
China
Prior art keywords
working face
drilling
roof
carbon dioxide
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610263139.4A
Other languages
Chinese (zh)
Other versions
CN105735993A (en
Inventor
朱志洁
陈蓥
霍丙杰
张宏伟
李胜
韩军
宋卫华
汤国水
兰天伟
孙宝志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201610263139.4A priority Critical patent/CN105735993B/en
Publication of CN105735993A publication Critical patent/CN105735993A/en
Application granted granted Critical
Publication of CN105735993B publication Critical patent/CN105735993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to technical field of mine safety, and in particular to a kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion.The present invention be first working face both sides haulage drift and return aircourse close to working face vertex, to the roof strata direction on the inside of working face, some groups of drillings are set, carbon dioxide fracturing device is installed in drilling, packet presplit blasting is carried out successively, taken over simultaneously close at the top of the tailentry road of working face, move towards to arrange the drilling that several are parallel to each other along working face, drilling, which is pointed to, certain angle of inclination inside roof strata and between return aircourse, presplit blasting is carried out, realizes that the roof strata of working face front and side cuts top explosion.The present invention can effectively control the pressure bump behavior under the occurrence condition of tight roof rock stratum, cause impulsion pressure significant for preventing and treating tight roof, its method is simple, and security is good, simple to operate, easy to use, has wide applicability.

Description

A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion
Technical field
The invention belongs to technical field of mine safety, and in particular to a kind of preventing and treating tight roof based on carbon dioxide explosion The method of type bump.
Background technology
Liquid carbon dioxide blaster is simultaneously released using the heated vaporized expanding of liquid carbon dioxide, quick release gases at high pressure The device of the disrumpent feelings rock of enough blasting energies or coal breakage is put, substitutes the detonator in traditional coal mining or Deephole pre-splitting blasting to fry Medicine, overcome and blow the shortcomings of destructiveness in exploitation and presplitting is big, and dangerous high ore body crushes up with dynamite in the past, have and do not produce Spark, without blasting fume, plasting damage effect it is big, can Reusability the advantages that, be conventional explosives preferable alternate device, opened for mine safety Adopt and provide Reliable guarantee, generally applicable and colliery and non-coal mine with presplitting.
On many mining areas in China (such as Datong Mine Area, Shuozhou mining area, Yulin infrared ray light shine) coal seam preservation have intensity it is high, Thickness is big, the tight roof of good integrity, and because top plate preservation is complete, lithology is hard, with the propulsion of working face, tight roof Large area is outstanding without collapsing, and so as to cause goaf space gradually to increase, has gathered great number of elastic energy around goaf in coal and rock Amount, not only influence goaf nearby in coal body tunnel stability, and once hang dew top plate and collapse suddenly disconnected, broken in tight roof Substantial amounts of elasticity can discharge suddenly in disconnected or sliding Instability, form sharp pounding, cause tight roof type bump.Together When, due to the collective effect on the outstanding top of operated adjacent face goaf and this work face goaf tight roof, make to face sky tunnel and enclose Rock is in high stress level, and roadway deformation is violent, if fracture also results in bump to tight roof suddenly, to facing sky tunnel Security form greatly threaten.
In the prior art, the method for preventing and treating top plate impact is that roadway in the roof is dug in top plate, by roadway in the roof to top Plate carries out deep hole blasting, artificially cuts off top plate, and then promote goaf top plate inbreak, intensity and punching when reducing roof weighting Hitting property.The method of this preventing and treating top plate impact, although avoiding the generation of the bump caused by top plate impacts, needs Roadway in the roof is dug in top plate, cost is higher.The method of conventional process tight roof is to use explosive blasting overhead caving, but Be this method for highly gassy mine, great potential safety hazard be present, no matter approaches the working surface goaf or this work Substantial amounts of gas may all be gathered by making the goaf in face.
The content of the invention
The problem of existing for prior art, the present invention provide a kind of preventing and treating tight roof type based on carbon dioxide explosion The method of bump, it is therefore an objective to by using carbon dioxide explosion tight roof, security is improved while reducing cost.
Realize that the technical scheme of the object of the invention follows the steps below:
(1)Roof strata directly over working face cuts top explosion:Before to working face extraction, respectively in working face both sides Haulage drift and return aircourse set some groups of brills close to the vertex of working face to the roof strata direction on the inside of working face Hole, haulage drift drilling and return aircourse drilling are symmetric, and every group of drilling is made up of 3 drillings, working face tendency length For L, the bottom hole of 3 drilling respectively at 1.5/8L, 2.5/8L and 3.5/8L of working face tendency, push up by drilling hole bottom to coal seam The vertical range of plate is 3~5 times of coal seam thickness h;
Carbon dioxide fracturing device is installed in drilling, packet presplit blasting is carried out successively, realizes the top directly over working face Slate layer cuts top explosion;
(2)The roof strata of work side cuts top explosion:Taken over close at the top of the tailentry road of working face, Move towards to arrange the drilling that several are parallel to each other along working face, drilling, which is pointed to, one inside roof strata and between return aircourse Fixed angle of inclination, the vertical range at drilling hole bottom to roof are 3~5 times of coal seam thickness h;
Carbon dioxide fracturing device is installed in drilling, presplit blasting is carried out, realizes that the roof strata of work side cuts top Explosion.
Wherein, described step(1)In some groups of drilling aperture at intervals of 15m~30m.
Described step(2)In the vertical intervals of several drillings being parallel to each other be 10m~15m.
Described step(2)In drilling and the angle of return aircourse be 30 ° ~ 60 °.
Described bore diameter is 60mm~90mm.
Wired in series is used between described carbon dioxide fracturing device, bottom hole is pushed to by rig, sealed using hole packer Hole, sealed borehole length are 0.1~0.2 times of hole depth.
Compared with prior art, the features of the present invention and beneficial effect are:
The present invention is to use carbon dioxide Blasting Control tight roof type bump, is triggered by mining blaster preset Heater in liquid storage pipe realizes quick heating, and the liquid carbon dioxide in liquid storage pipe is become into gaseous state breaks through level pressure shearing piece, The extra-high sprayed from explosion release pipe acts on coal body and produces broken region, and produces new crack in the releasing direction, And then the effect of rock presplitting;By carrying out explosion to the tight roof directly over working face with work side, with The back production tight roof of working face can be caving in time, realize stress transfer and country rock reduction, avoid tight roof type impact ground The generation of pressure, while reduce and face sky roadway surrounding rock stress, realize the stabilization for facing sky roadway surrounding rock.
The present invention can effectively control the pressure bump behavior under the occurrence condition of tight roof rock stratum, for preventing and treating tight roof Cause impulsion pressure significant, its method is simple, and security is good, simple to operate, easy to use, has extensive practical Property.
Brief description of the drawings
Fig. 1 is that the method drilling arrangement of the preventing and treating tight roof type bump based on carbon dioxide explosion of the present invention is shown It is intended to;
Fig. 2 is Fig. 1 Section A-A figure;
Fig. 3 is Fig. 1 section B-B figure;
Wherein:1:Working face;2:Haulage drift;3:Return aircourse;4:Take over working face;5:Drilling;6:Roof strata;7: Coal seam;Arrow represents direction of extraction.
Embodiment
Embodiment
The embodiment of the present invention illustrates by taking the ore deposit of Shaanxi as an example, and it is bump mine, in the past using explosive blasting Release, effect is general, and potential safety hazard be present.
Using the method release of the preventing and treating tight roof type bump based on carbon dioxide explosion of the present invention, working face Length is 200m, and coal thickness is 10m, and top plate is based on peldon.Rig model ZDY4000S, the drill pipe diameter 60mm of use With carbon dioxide fracturing device, as shown in Fig. 1 ~ Fig. 3, follow the steps below:
(1)Roof strata directly over working face cuts top explosion:Before to the back production of working face 1, respectively in the both sides of working face 1 Haulage drift 2 and return aircourse 3 close to the vertex of working face, set to the direction of roof strata 6 of the inner side of working face 1 some Group drilling 5, the drilling of the side of haulage drift 2 and the drilling of the side of return aircourse 3 are symmetric, as shown in Fig. 2 every group of drilling It is made up of 3 drillings 5, it is 200m that working face 1, which is inclined to length L, and the bottom hole of 3 drilling 5 is respectively positioned at the 1.5/ of working face tendency At 8L, 2.5/8L and 3.5/8L, the vertical range at drilling hole bottom to roof is 4 times of coal seam thickness h;
Carbon dioxide fracturing device is installed in drilling, carries out packet presplit blasting successively, realizes the top directly over working face 1 Slate layer 6 cuts top explosion;
(2)The roof strata of work side cuts top explosion:Pushed up close to the tailentry road 3 for taking over working face 4 Portion, move towards to arrange several drillings 5 for being parallel to each other along working face, drilling 5 point to the inside of roof stratas 6 and with return aircourse 3 Between have certain angle of inclination, the vertical range of 5 bottom holes of drilling to the top plate of coal seam 7 is 4 times of the thickness of coal seam 7;
Carbon dioxide fracturing device is installed in drilling, presplit blasting is carried out, realizes that the roof strata of work side cuts top Explosion.
Wherein, described step(1)In some groups of drilling aperture at intervals of 20m.
Described step(2)In drilling and the angle of return aircourse be 60 °.
Described step(2)In the vertical intervals of several drillings being parallel to each other be 15m.
Described bore diameter is 60mm.
Wired in series is used between described carbon dioxide fracturing device, bottom hole is pushed to by rig, sealed using hole packer Hole, sealed borehole length are 0.1 times of hole depth.
After top is cut in explosion, as the top plate above the stope of working face with work side is caving in time, avoid The generation of bump.Meanwhile face sky roadway deformation amount relatively cut top before reduce 60%, it is ensured that face the stabilization in sky tunnel.

Claims (2)

  1. A kind of 1. method of the preventing and treating tight roof type bump based on carbon dioxide explosion, it is characterised in that according to following step It is rapid to carry out:
    (1) roof strata directly over working face cuts top explosion:Before working face extraction, respectively in the haulage drift of working face both sides Vertex with return aircourse close to working face, some groups of drillings, transportation roadway are set to the roof strata direction on the inside of working face Road is drilled and return aircourse drilling is symmetric, and every group of drilling is made up of 3 drillings, and working face tendency length is L, and 3 are bored The bottom hole in hole respectively positioned at working face tendency 1.5/8L, 2.5/8L and 3.5/8L at, drilling hole bottom to roof it is vertical Distance is 3~5 times of coal seam thickness h;
    Carbon dioxide fracturing device is installed in drilling, packet presplit blasting is carried out successively, realizes the top plate rock directly over working face Layer cuts top explosion;
    (2) roof strata of work side cuts top explosion:Taken over close at the top of the tailentry road of working face, along work Make face to move towards to arrange the drilling that several are parallel to each other, drilling is pointed to roof strata inside and between return aircourse had certain Angle of inclination, the vertical range at drilling hole bottom to roof are 3~5 times of coal seam thickness h;
    Carbon dioxide fracturing device is installed in drilling, presplit blasting is carried out, realizes that the roof strata of work side cuts top explosion;
    The aperture of some groups of drilling is at intervals of 15m~30m in described step (1);
    The vertical interval of several drillings being parallel to each other is 10m~15m in described step (2);
    The angle of drilling and return aircourse in described step (2) is 30 °~60 °;
    Wired in series is used between described carbon dioxide fracturing device, bottom hole is pushed to by rig, sealing of hole, envelope are carried out using hole packer Hole length is 0.1~0.2 times of hole depth.
  2. 2. a kind of method of preventing and treating tight roof type bump based on carbon dioxide explosion according to claim 1, It is characterized in that described bore diameter is 60mm~90mm.
CN201610263139.4A 2016-04-26 2016-04-26 A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion Active CN105735993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610263139.4A CN105735993B (en) 2016-04-26 2016-04-26 A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610263139.4A CN105735993B (en) 2016-04-26 2016-04-26 A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion

Publications (2)

Publication Number Publication Date
CN105735993A CN105735993A (en) 2016-07-06
CN105735993B true CN105735993B (en) 2017-12-19

Family

ID=56283215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610263139.4A Active CN105735993B (en) 2016-04-26 2016-04-26 A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion

Country Status (1)

Country Link
CN (1) CN105735993B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050237B (en) * 2016-08-12 2019-02-05 中煤科工集团西安研究院有限公司 Goaf is underlied the fully mechanized mining Controlling of Coal Outburst system and method in coal seam
CN106288988B (en) * 2016-08-31 2018-02-23 北京龙德时代技术服务有限公司 Intelligent carbon dioxide blasting technology method
CN107044284A (en) * 2017-02-23 2017-08-15 四川川交路桥有限责任公司 A kind of mountain tunnel mechanized construction method based on high-pressure carbon dioxide fracturing
CN107014262B (en) * 2017-04-12 2018-10-16 中铁十六局集团地铁工程有限公司 A kind of construction method of subway station artificial digging pile carbon dioxide explosion
CN107941097A (en) * 2017-11-08 2018-04-20 中铁十局集团第八工程有限公司 A kind of process of liquid carbon dioxide fracturing rock
CN108506040A (en) * 2018-03-06 2018-09-07 北京科技大学 A kind of deep high stress tunnel pressure relief method based on carbon dioxide fracturing
CN110081786A (en) * 2019-03-25 2019-08-02 大同煤矿集团有限责任公司 Coal mine tight roof directional fracturing control method
CN110905505A (en) * 2019-11-28 2020-03-24 辽宁工程技术大学 Coal mining method based on carbon dioxide blasting
CN111042815B (en) * 2019-12-27 2020-12-22 中南大学 Method for releasing stress of triangular suspended ceiling area by blasting island body
CN111271065A (en) * 2020-03-03 2020-06-12 中国矿业大学 Method for forming roadway anti-impact weak structural layer through coal rock gas cracking
CN111336877A (en) * 2020-04-17 2020-06-26 安徽理工大学 Crack-controllable forced caving blasting method
CN112127888B (en) * 2020-09-27 2022-08-23 山西鑫桥科技有限公司 Method for treating top coal, direct roof and old roof
CN113090264B (en) * 2021-04-27 2022-09-16 河南理工大学 Horizontal deep borehole CO for hard coal seam and hard rock stratum 2 Fracturing safety roof control method
CN113216965A (en) * 2021-05-20 2021-08-06 山西鑫桥科技有限公司 Method for preventing rock burst
CN113153294A (en) * 2021-06-02 2021-07-23 江苏徐矿能源股份有限公司张双楼煤矿 Pre-splitting anti-impact method for lithologic change area of top plate
CN113339065B (en) * 2021-06-29 2024-02-02 中煤科工开采研究院有限公司 Method for preventing and controlling rock burst of multi-coal pillar stoping roadway along air
CN114183138B (en) * 2021-10-12 2023-10-20 安徽理工大学 Coal bed non-mining drilling pre-splitting blasting method
CN114199088B (en) * 2021-11-16 2024-01-02 北京中煤矿山工程有限公司 Brushing and expanding shaft bottom coal bunker hole distribution structure of carbon dioxide fracturing device and brushing and expanding process
CN117108295B (en) * 2023-10-20 2024-03-08 山东能源集团有限公司 Advanced presplitting area prevention and control method for rock burst of high-position thick hard rock stratum

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852506A (en) * 2012-10-17 2013-01-02 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103334790A (en) * 2013-07-23 2013-10-02 辽宁工程技术大学 High-pressure gas blasting-based coal seam roof advance presplitting method
CN203685187U (en) * 2013-10-17 2014-07-02 湖南汉寿中煤科技有限公司 Oriented CO2 air cannon device
CN103953342A (en) * 2014-04-11 2014-07-30 山东山矿测控技术有限公司 Improved carbon dioxide explosion initiating device used for coal mine, and assembly method thereof
CN104500019A (en) * 2014-11-18 2015-04-08 辽宁工程技术大学 Reinforced anti-reflection method for promoting gas extraction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852506A (en) * 2012-10-17 2013-01-02 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103334790A (en) * 2013-07-23 2013-10-02 辽宁工程技术大学 High-pressure gas blasting-based coal seam roof advance presplitting method
CN203685187U (en) * 2013-10-17 2014-07-02 湖南汉寿中煤科技有限公司 Oriented CO2 air cannon device
CN103953342A (en) * 2014-04-11 2014-07-30 山东山矿测控技术有限公司 Improved carbon dioxide explosion initiating device used for coal mine, and assembly method thereof
CN104500019A (en) * 2014-11-18 2015-04-08 辽宁工程技术大学 Reinforced anti-reflection method for promoting gas extraction

Also Published As

Publication number Publication date
CN105735993A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105735993B (en) A kind of method of the preventing and treating tight roof type bump based on carbon dioxide explosion
CN101644156B (en) Method for weakening coal-rock mass by hydraulic blasting and fracturing
CN104100266B (en) The method of preventing and treating gob side entry bump
CN107035370A (en) One kind cuts top pressure relief method for gob side entry retaining static crushing
CN106194147B (en) The method of straight well horizontal well joint igniting in a kind of underground coal gasification(UCG) exploitation
CN103924956A (en) Advanced pre-splitting method for lump coal mining
CN102678120A (en) Method for releasing pressure and removing danger of rock burst
CN103278055A (en) Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting
CN110067558A (en) A kind of severe inclined thick coal seam stope drift active workings joint release prevention and treatment impulsion pressure method
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN105804753A (en) Carbon dioxide blasting-based method for weakening top caving coal on hard coal seam
CN106285679A (en) A kind of presplitting and the method softening igneous rock tight roof
CN110259447A (en) Underground coal mine oriented perforating pressure break cuts top release shield lane method
CN101876520A (en) Segment pre-blasting technology for steeply dipping hard coal seam roof
CN103244124A (en) Method for coal mine tunnel working surface to pass through abandoned roadway in forced caving pressure relief mode
LU500326B1 (en) Method for extracting pressure relief gas through thick and hard roof rock stratum blasting permeability increase and directional long borehole interception
CN111520183A (en) Method for treating gas generated by mining, blasting, roof cutting, pressure relief and permeability improvement of coal seam group under thick-layer sandstone
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN106643355B (en) A kind of overhead caving method of the huge thick tight roof of deep coalmine
Yang et al. Application cumulative tensile explosions for roof cutting in Chinese underground coal mines
CN107762511A (en) A kind of class strip-type coal-mining method cut top filling and close on goaf
CN109209325A (en) A method of uncovering coal in vertical shaft is carried out using radial technology
CN109025999B (en) One-field three-purpose top coal weakening method
CN104612747B (en) A kind of high methane stope tight roof collapses and emits the prevention and controls causing combustion gas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant