CN109340575A CN201811303107.8A CN201811303107A CN109340575A CN 109340575 A CN109340575 A CN 109340575A CN 201811303107 A CN201811303107 A CN 201811303107A CN 109340575 A CN109340575 A CN 109340575A
Authority
CN
China
Prior art keywords
pressure
valve
regulating valve
controller
ball valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811303107.8A
Other languages
Chinese (zh)
Other versions
CN109340575B (en
Inventor
聂中文
孔芋丁
姜念琛
冯骋
单超
喻斌
于永志
龚云峰
庞宝华
黄晶
王永吉
左勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201811303107.8A priority Critical patent/CN109340575B/en
Publication of CN109340575A publication Critical patent/CN109340575A/en
Application granted granted Critical
Publication of CN109340575B publication Critical patent/CN109340575B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of online regulators of gas pipeline, it include: with pressure regulation tap line and spare pressure regulation tap line, it is connected separately with a technique ball valve thereon, process bands executing agency ball valve, monitor pressure-regulating valve, operating pressure regulating valve, thermometer on the spot, pressure transmitter, two pressure transmitters, check-valves and another technique ball valve, and process bands executing agency ball valve, monitoring pressure-regulating valve and operating pressure regulating valve are separately connected the high relay of pressure, one pressure controller and another pressure controller, and the pressure set points of the operating pressure regulating valve on two pipelines are different.The present invention also provides a kind of online pressure regulation methods of gas pipeline.The invention has the benefit that realizing voltage-regulating system in the on-line automatic completion in entire handoff procedure, smooth transition, high reliablity with road/spare road.

Description

A kind of online regulator and its online pressure regulation method of gas pipeline
Technical field
The present invention relates to gas pipeline technical fields, a kind of online regulator in particular to gas pipeline and Its online pressure regulation method.
Background technique
Voltage-regulating system is one of the critical facility of gas pipeline point defeated station field.To guarantee that gas continuous and stable transports to downstream, The design of voltage-regulating system is most important.The voltage-regulating system mainly used in the past, for cold standby, is adjusted with road and spare road switch mode Pressure system mainly include front and back converge tracheae, process upstream switching ball, urgent block valve, pressure regulator valve (including monitoring pressure adjust Valve and operating pressure regulating valve), downstream process ball valve, pressure controller.With road and spare road urgent block valve and pressure regulation Valve (monitoring pressure-regulating valve+operating pressure regulating valve) process set value is all the same.When with the voltage-regulating system failure on road, therefore Hinder signal to upload, spare road is switched to by process upstream switching ball.
There are the following problems for the voltage-regulating system of this cold standby mode: (one) and the not all system failure can be with signal shapes Formula uploads, and when the system failure can not upload, back-up system can not come into operation in time, and the safety for causing entire voltage-regulating system is hidden Suffer from;(2) two-way voltage-regulating system is cold standby, when needing to switch with/spare road voltage-regulating system, passes through process upstream switch valve Switch with/spare road, at this moment regulating valve vigorous motion, pressure can not relatively smooth transition, or even surpass after having valve The risk of pressure;(3) cold standby voltage-regulating system relies on simple logic judgment, has corresponding monitoring and protection to downstream pressure superpressure, It is even truncated when necessary and is being switched to spare road with road voltage-regulating system, but for the blocking of road voltage-regulating system or the too low work of flow Condition, without the respective logic for detecting and protecting automatically.
Summary of the invention
To solve the above problems, the purpose of the present invention is to provide a kind of online regulator of gas pipeline and its online Pressure regulation method, it can be achieved that the road of pressure regulation on-line automatic switching, improve detection and control continuity, stability and reliability, Facilitate operation and maintenance.
The present invention provides a kind of online regulators of gas pipeline, comprising:
With pressure regulation tap line, both ends are connect with the first header and the second header respectively, described with pressure regulation branch The first technique ball valve, the first process bands executing agency ball valve, the first monitoring pressure-regulating valve, first dynamic has been sequentially connected in series on pipeline Make pressure-regulating valve, first thermometer, first pressure transmitter, second pressure transmitter, third pressure transmitter, first on the spot Check-valves and the second technique ball valve, the first monitoring pressure-regulating valve connect first pressure control with the first pressure transmitter Device processed, the first operating pressure regulating valve and the second pressure transmitter connect second pressure controller, first work Skill band executing agency's ball valve connects the high relay of first pressure with the third pressure transmitter;
Spare pressure regulation tap line, both ends are connect with first header and second header respectively, described spare The 7th technique ball valve, the second process bands executing agency ball valve, the second monitoring pressure has been sequentially connected in series in pressure regulation tap line to adjust Thermometer, the 4th pressure transmitter, the 5th pressure transmitter, the 6th pressure become on the spot for valve, the second operating pressure regulating valve, second Device, second check-valve and the 8th technique ball valve are sent, the second monitoring pressure-regulating valve is connected with the 4th pressure transmitter Third pressure controller, the second operating pressure regulating valve connect the 4th pressure controller with the 5th pressure transmitter, Second process bands executing agency's ball valve connects the high relay of second pressure with the 6th pressure transmitter;
Wherein, first header is connect with first process pipelines one end, the first process pipelines other end and first Flanged joint, second header are connect with second process pipelines one end, the second process pipelines other end and second flange Connection;
The first operating pressure regulating valve is different with the pressure set points of the second operating pressure regulating valve.
As further improvement of the invention, the first pressure transmitter passes through first instrument cable and first pressure Force controller connection, the first monitoring pressure-regulating valve are connect by the 4th instrument cable with the first pressure controller, The second pressure transmitter is connect by second instrument cable with the second pressure controller, the first operating pressure tune Section valve is connect by the 5th instrument cable with the second pressure controller, and the third pressure transmitter passes through third instrument electricity Cable is connect with the high relay of the first pressure, and first process bands executing agency's ball valve passes through the 6th instrument cable and institute State the high relay connection of first pressure;
4th pressure transmitter is connect by the 7th instrument cable with the third pressure controller, second prison Pressure control force regulating valve is connect by the tenth instrument cable with the third pressure controller, and the 5th pressure transmitter passes through the Eight instrument cables are connect with the 4th pressure controller, the second operating pressure regulating valve by the 11st instrument cable with The 4th pressure controller connection, the 6th pressure transmitter pass through the 9th instrument cable and the second pressure Gao Gaoji Electric appliance connection, second process bands executing agency's ball valve pass through the 12nd instrument cable and the high relay of the second pressure Connection.
As further improvement of the invention, the both ends of first header and second header are all connected with pipe cap.
As further improvement of the invention, first process bands executing agency's ball valve and second process bands are executed Mechanism ball valve is full-bore having a double meaning pair and lets out valve, and failure is closed;The first monitoring pressure-regulating valve and the second monitoring pressure Force regulating valve is that failure is closed;The first operating pressure regulating valve and the second operating pressure regulating valve are that failure is opened.
As further improvement of the invention, the first check-valve and the second check-valve are axial-flow type non-return Valve.
The present invention also provides a kind of online pressure regulation methods of the online regulator of gas pipeline, comprising the following steps:
Step 1, natural gas inputs first header, and passes through the first technique ball valve and the 7th technique ball valve It respectively enters described with pressure regulation tap line and the spare pressure regulation tap line;
Step 2, it is high that the first pressure controller, the second pressure controller, the first pressure is set separately Relay, the third pressure controller, the 4th pressure controller and the high relay of the second pressure pressure set Definite value, and ensure that the first operating pressure regulating valve is different with the pressure set points of the second operating pressure regulating valve;
Step 3, SCADA system is according to the pressure of the first operating pressure regulating valve and the second operating pressure regulating valve The selection of power setting value is described to carry out online pressure regulation with pressure regulation tap line or the spare pressure regulation tap line, described in selection When carrying out online pressure regulation with pressure regulation tap line, 4 are entered step, when the selection spare pressure regulation tap line is adjusted online When pressure, 5 are entered step;
Step 4, the first pressure controller, the second pressure controller and the high relay root of the first pressure Control the first monitoring pressure-regulating valve, the first operating pressure regulating valve and first work respectively according to pressure set points Valve opening of the skill with executing agency's ball valve;
Step 5, the third pressure controller, the 4th pressure controller and the high relay root of the second pressure Control the second monitoring pressure-regulating valve, the second operating pressure regulating valve and second work respectively according to pressure set points Valve opening of the skill with executing agency's ball valve;
Step 6, after online pressure regulation, natural gas is exported by second header.
It is further improved as of the invention, is SP by the pressure set points of the second pressure controller in step 3, The pressure set points of the first pressure controller are SP+ △ P1, and the pressure set points of the high relay of the first pressure are SP+ △ P2, the pressure set points of the 4th pressure controller are SP- △ P1, and the pressure of the third pressure controller is set Value is SP+ △ P1, and the pressure set points of the high relay of the second pressure are SP+ △ P2;
Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, and SP is greater than SP- △ P1.
It is further improved as of the invention, in step 4, first process bands executing agency ball valve, first prison Pressure control force regulating valve, the first operating pressure regulating valve flow signal access instrument junction box after be sent into SCADA system Carry out real-time monitoring;
First described in the first pressure transmitter, the second pressure transmitter and third pressure transmitter real-time monitoring Pressure controller, the second pressure controller and the high relay of the first pressure pressure value and pressure signal is connect SCADA system progress real-time monitoring is sent into after entering instrument junction box;
Described first on the spot thermometer temperature signal access instrument junction box after be sent into SCADA system supervised in real time It surveys.
It is further improved as of the invention, in step 5, second process bands executing agency ball valve, second prison Pressure control force regulating valve, the second operating pressure regulating valve flow signal access instrument junction box after be sent into SCADA system Carry out real-time monitoring;
Described in 4th pressure transmitter, the 5th pressure transmitter and the 6th pressure transmitter real-time monitoring Third pressure controller, the pressure value of the 4th pressure controller and the high relay of the second pressure and by pressure signal SCADA system progress real-time monitoring is sent into after accessing instrument junction box;
Described second on the spot thermometer temperature signal access instrument junction box after be sent into SCADA system supervised in real time It surveys.
It is further improved as of the invention, in step 3:
Described when carrying out online pressure regulation with pressure regulation tap line, the first check-valve unidirectional cutoff when selecting;
When selecting the spare pressure regulation tap line to carry out online pressure regulation, the second check-valve unidirectional cutoff.
The invention has the benefit that
Voltage-regulating system is realized in the on-line automatic completion in entire handoff procedure with road/spare road, it is smooth transition, reliable Property it is high.
Outdoor sledge installing may be implemented to set, save space occupied.Pipe-line construction is set to more tend to standardization, modularization, people Property, reduce working procedure, facilitate operation and maintenance, reduce equipment investment and operating expenses.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the online regulator of gas pipeline described in the embodiment of the present invention.
In figure,
1, first flange;2, the first process pipelines;3, pipe cap;4, the first header;5-1, with pressure regulation tap line;5-2, First technique ball valve;5-3, the first process bands executing agency ball valve;5-4, the first monitoring pressure-regulating valve;5-5, the first movement pressure Force regulating valve;5-6, first check-valve;5-7, the second technique ball valve;5-8, third technique ball valve;5-9, the first shut-off valve;5- 10, the first by-pass line;5-11, the first blow-down pipe;5-12, the 4th technique ball valve;5-13, the second shut-off valve;5-14, third Flange;5-15, the second blow-down pipe;5-16, the 5th technique ball valve;5-17, third shut-off valve;5-18, the 4th flange;5-19, Third blow-down pipe;5-20, the 6th technique ball valve;5-21, the 4th shut-off valve;5-22, the 5th flange;5-23, first are with regard to ground temperature Spend table;5-24, first pressure transmitter;5-25, second pressure transmitter;5-26, third pressure transmitter;5-27, the first pressure Force controller;5-28, second pressure controller;The high relay of 5-29, first pressure;5-30, first instrument cable;5-31, Second instrument cable;5-32, third instrument cable;5-33, the 4th instrument cable;5-34, the 5th instrument cable;5-35, the 6th Instrument cable;6-1, spare pressure regulation tap line;6-2, the 7th technique ball valve;6-3, the second process bands executing agency ball valve;6- 4, the second monitoring pressure-regulating valve;6-5, the second operating pressure regulating valve;6-6, second check-valve;6-7, the 8th technique ball valve; 6-8, the 9th technique ball valve;6-9, the 5th shut-off valve;6-10, the second by-pass line;6-11, the 4th blow-down pipe;6-12, the tenth Technique ball valve;6-13, the 6th shut-off valve;6-14, the 6th flange;6-15, the 5th blow-down pipe;6-16, the 11st technique ball valve; 6-17, the 7th shut-off valve;6-18, the 7th flange;6-19, the 6th blow-down pipe;6-20, the 12nd technique ball valve;6-21, the 8th Shut-off valve;6-22, eight treating observances are blue;The thermometer on the spot of 6-23, second;6-24, the 4th pressure transmitter;6-25, the 5th pressure become Send device;6-26, the 6th pressure transmitter;6-27, third pressure controller;6-28, the 4th pressure controller;6-29, the second pressure Li Gaogao relay;6-30, the 7th instrument cable;6-31, the 8th instrument cable;6-32, the 9th instrument cable;6-33, the tenth Instrument cable;6-34, the 11st instrument cable;6-35, the 12nd instrument cable;7, the second header;8, the second process pipelines;9, Second flange.
Specific embodiment
The present invention is described in further detail below by specific embodiment and in conjunction with attached drawing.
Embodiment 1, as shown in Figure 1, a kind of online regulator of gas pipeline of the embodiment of the present invention, comprising: with Pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1.
It is connect respectively with the first header 4 and the second header 7 with the both ends pressure regulation tap line 5-1, with pressure regulation bypass duct The first technique ball valve 5-2, the first process bands executing agency ball valve 5-3, the first monitoring pressure-regulating valve have been sequentially connected in series on line 5-1 5-4, the first operating pressure regulating valve 5-5, first thermometer 5-23, first pressure transmitter 5-24, second pressure pick-up on the spot Device 5-25, third pressure transmitter 5-26, first check-valve 5-6 and the second technique ball valve 5-7, the first monitoring pressure-regulating valve 5- 4 connect first pressure controller 5-27 with first pressure transmitter 5-24, and the first operating pressure regulating valve 5-5 and second pressure become Send device 5-25 connection second pressure controller 5-28, the first process bands executing agency ball valve 5-3 and third pressure transmitter 5-26 Connect the high relay 5-29 of first pressure.
The spare both ends pressure regulation tap line 6-1 are connect with the first header 4 and the second header 7 respectively, spare pressure regulation bypass duct The 7th technique ball valve 6-2, the second process bands executing agency ball valve 6-3, the second monitoring pressure-regulating valve have been sequentially connected in series on line 6-1 6-4, the second operating pressure regulating valve 6-5, second thermometer 6-23, the 4th pressure transmitter 6-24, the 5th pressure inverting on the spot Device 6-25, the 6th pressure transmitter 6-26, second check-valve 6-6 and the 8th technique ball valve 6-7, the second monitoring pressure-regulating valve 6- 4 connect third pressure controller 6-27 with the 4th pressure transmitter 6-24, and the second operating pressure regulating valve 6-5 and the 5th pressure become Send device 6-25 connection the 4th pressure controller 6-28, the second process bands executing agency ball valve 6-3 and the 6th pressure transmitter 6-26 Connect the high relay 6-29 of second pressure.
Wherein, the first header 4 is connect with 2 one end of the first process pipelines, 2 other end of the first process pipelines and first flange 1 Connection, the second header 7 are connect with 8 one end of the second process pipelines, and 8 other end of the second process pipelines is connect with second flange 9.First The both ends of header 4 and the second header 7 are all connected with pipe cap 3.
To realize in the on-line automatic switching with pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1, therefore, to assure that The pressure set points of first operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 are different.
First technique ball valve 5-2 is equipped with the first by-pass line 5-10, and first one end by-pass line 5-10 is connected to first Between header 4 and the first technique ball valve 5-2 on pressure regulation tap line 5-1, the connection of the first by-pass line 5-10 other end Between the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 on pressure regulation tap line 5-1.First Along natural gas flow to being sequentially connected in series third technique ball valve 5-8 and the first shut-off valve 5-9 on by-pass line 5-10.
First one end blow-down pipe 5-11 is connected to the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 Between on pressure regulation tap line 5-1, the first blow-down pipe 5-11 other end is vented by third flange 5-14 and yard System is connected.Along natural gas flow to being sequentially connected in series the 4th technique ball valve 5-12 and the second shut-off valve 5- on first blow-down pipe 5-11 13.Second one end blow-down pipe 5-15 is connected to the monitoring of the first process bands executing agency ball valve 5-3 and first pressure-regulating valve 5-4 Between on pressure regulation tap line 5-1, the second blow-down pipe 5-15 other end is vented by the 4th flange 5-18 and yard System is connected.Along natural gas flow to being sequentially connected in series the 5th technique ball valve 5-16 and third shut-off valve 5- on second blow-down pipe 5-15 17.The one end third blow-down pipe 5-19 be connected between third pressure transmitter 5-26 and first check-valve 5-6 with pressure regulation On tap line 5-1, the third blow-down pipe 5-19 other end is connected by the 5th flange 5-22 with yard blowdown system.Third is put Along natural gas flow to being sequentially connected in series the 6th technique ball valve 5-20 and the 4th shut-off valve 5-21 on blank pipe line 5-19.
7th technique ball valve 6-2 is equipped with the second by-pass line 6-10, and second one end by-pass line 6-10 is connected to first On spare pressure regulation tap line 6-1 between header 4 and the 7th technique ball valve 6-2, the connection of the second by-pass line 6-10 other end On spare pressure regulation tap line 6-1 between the 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3.Second Along natural gas flow to being sequentially connected in series the 9th technique ball valve 6-8 and the 5th shut-off valve 6-9 on by-pass line 6-10.
4th one end blow-down pipe 6-11 is connected to the 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3 Between spare pressure regulation tap line 6-1 on, the 4th blow-down pipe 6-11 other end is vented by the 6th flange 6-14 and yard System is connected.Along natural gas flow to being sequentially connected in series the tenth technique ball valve 6-12 and the 6th shut-off valve 6- on 4th blow-down pipe 6-11 13.5th one end blow-down pipe 6-15 is connected to the monitoring of the second process bands executing agency ball valve 6-3 and second pressure-regulating valve 6-4 Between spare pressure regulation tap line 6-1 on, the 5th blow-down pipe 6-15 other end is vented by the 7th flange 6-18 and yard System is connected.Along natural gas flow to being sequentially connected in series the 11st technique ball valve 6-16 and the 7th shut-off valve on 5th blow-down pipe 6-15 6-17.6th one end blow-down pipe 6-19 connects the spare pressure regulation between the 6th pressure transmitter 6-26 and second check-valve 6-6 On tap line 6-1, the 6th blow-down pipe 6-19 other end is connected by eight treating observances orchid 6-22 with yard blowdown system.6th puts Along natural gas flow to being sequentially connected in series the 12nd technique ball valve 6-20 and the 8th shut-off valve 6-21 on blank pipe line 6-19.
First pressure transmitter 5-24 is connect by first instrument cable 5-30 with first pressure controller 5-27, the first prison Pressure control force regulating valve 5-4 is connect by the 4th instrument cable 5-33 with first pressure controller 5-27, second pressure transmitter 5- 25 are connect by second instrument cable 5-31 with second pressure controller 5-28, and the first operating pressure regulating valve 5-5 passes through the 5th Instrument cable 5-34 is connect with second pressure controller 5-28, third pressure transmitter 5-26 by third instrument cable 5-32 with The high relay 5-29 connection of first pressure, the first process bands executing agency ball valve 5-3 pass through the 6th instrument cable 5-35 and the The high relay 5-29 connection of one pressure.4th pressure transmitter 6-24 is controlled by the 7th instrument cable 6-30 and third pressure Device 6-27 connection, the second monitoring pressure-regulating valve 6-4 are connect by the tenth instrument cable 6-33 with third pressure controller 6-27, 5th pressure transmitter 6-25 is connect by the 8th instrument cable 6-31 with the 4th pressure controller 6-28, the second operating pressure tune Section valve 6-5 is connect by the 11st instrument cable 6-34 with the 4th pressure controller 6-28, and the 6th pressure transmitter 6-26 passes through 9th instrument cable 6-32 is connect with the high relay 6-29 of second pressure, and the second process bands executing agency ball valve 6-3 passes through the 12 instrument cable 6-35 are connect with the high relay 6-29 of second pressure.
First process bands executing agency ball valve 5-3 and the second process bands executing agency ball valve 6-3 is that full-bore is having a double meaning double Valve is let out, failure is closed;First monitoring pressure-regulating valve 5-4 and the second monitoring pressure-regulating valve 6-4 is that failure is closed;First movement Pressure-regulating valve 5-5 and the second operating pressure regulating valve 6-5 is that failure is opened.
With the third pressure transmitter 5-26 on pressure regulation tap line 5-1 downstream and spare pressure regulation tap line 6-1 On the downstream of the 6th pressure transmitter 6-26 be respectively provided with first check-valve 5-6 and second check-valve 6-6, prevent with tune The pressure anti-channeling for pressing tap line 5-1 and spare pressure regulation tap line 6-1 guarantees with pressure regulation tap line 5-1 and spare tune It presses the pressure of tap line 6-1 acquisition respectively independent, avoids downstream pressure superelevation while triggering in all pressure regulation tap lines Technique block valve.First check-valve 5-6 and second check-valve 6-6 is axial flow type check valve.
Embodiment 2, a kind of online pressure regulation method of the online regulator of gas pipeline, using online described in embodiment Regulator, comprising the following steps:
Step 1, natural gas inputs the first header 4, and is distinguished by the first technique ball valve 5-2 and the 7th technique ball valve 6-2 Into with pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1;
Step 2, first pressure controller 5-27, second pressure controller 5-28, the high relay of first pressure is set separately Device 5-29, third pressure controller 6-27, the 4th pressure controller 6-28 and the high relay 6-29 of second pressure pressure set Definite value, and ensure that the pressure set points of the first operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 are different;
Step 3, SCADA system is according to the pressure of the first operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 Setting value selection is carrying out online pressure regulation with pressure regulation tap line 5-1 or spare pressure regulation tap line 6-1, when selecting with pressure regulation When tap line 5-1 carries out online pressure regulation, 4 are entered step, when selecting spare pressure regulation tap line 6-1 to carry out online pressure regulation, Enter step 5;
Step 4, first pressure controller 5-27, second pressure controller 5-28 and the high relay 5-29 root of first pressure The first monitoring pressure-regulating valve 5-4, the first operating pressure regulating valve 5-5 and the first process bands are controlled respectively according to pressure set points to hold The valve opening of row mechanism ball valve 5-3;
Step 5, third pressure controller 6-27, the 4th pressure controller 6-28 and the high relay 6-29 root of second pressure The second monitoring pressure-regulating valve 6-4, the second operating pressure regulating valve 6-5 and the second process bands are controlled respectively according to pressure set points to hold The valve opening of row mechanism ball valve 6-3;
Step 6, after online pressure regulation, natural gas is exported by the second header 7.
It is SP, the pressure of first pressure controller 5-27 by the pressure set points of second pressure controller 5-28 in step 3 Setting value is SP+ △ P1, and the pressure set points of the high relay 5-29 of first pressure are SP+ △ P2, the 4th pressure controller 6- 28 pressure set points are SP- △ P1, and the pressure set points of third pressure controller 6-27 are SP+ △ P1, and second pressure is high The pressure set points of relay 6-29 are SP+ △ P2;Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, and SP is greater than SP-△P1.In general, △ P1=0.05MPa, △ P2=0.1MPa.By being pressed with the first movement on pressure regulation tap line 5-1 The pressure set points of the second operating pressure regulating valve 6-5 on force regulating valve 5-5 and spare pressure regulation tap line 6-1 are different, It realizes in the on-line automatic switching with pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1, is not necessarily to manual intervention.
In step 4, the first process bands executing agency ball valve 5-3, the first monitoring pressure-regulating valve 5-4, the first operating pressure The flow signal of regulating valve 5-5 is sent into SCADA system progress real-time monitoring after accessing instrument junction box;First pressure transmitter 5-24, second pressure transmitter 5-25 and third pressure transmitter 5-26 real-time monitoring first pressure controller 5-27, the second pressure The pressure value of force controller 5-28 and the high relay 5-29 of first pressure are simultaneously sent after pressure signal is accessed instrument junction box Enter SCADA system and carries out real-time monitoring;First on the spot thermometer 5-23 temperature signal access instrument junction box after be sent into SCADA System carries out real-time monitoring.
In step 5, the second process bands executing agency ball valve 6-3, the second monitoring pressure-regulating valve 6-4, the second operating pressure The flow signal of regulating valve 6-5 is sent into SCADA system progress real-time monitoring after accessing instrument junction box;4th pressure transmitter 6-24, the 5th pressure transmitter 6-25 and the 6th pressure transmitter 6-26 real-time monitoring third pressure controller 6-27, the 4th pressure The pressure value of force controller 6-28 and the high relay 6-29 of second pressure are simultaneously sent after pressure signal is accessed instrument junction box Enter SCADA system and carries out real-time monitoring;Second on the spot thermometer 6-23 temperature signal access instrument junction box after be sent into SCADA System carries out real-time monitoring.
Further, in step 3: when selection when carrying out online pressure regulation with pressure regulation tap line 5-1, first check-valve 5- 6 unidirectional cutoffs;When selecting spare pressure regulation tap line 6-1 to carry out online pressure regulation, second check-valve 6-6 unidirectional cutoff.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of online regulator of gas pipeline characterized by comprising
With pressure regulation tap line (5-1), both ends are connect with the first header (4) and the second header (7) respectively, described with tune The first technique ball valve (5-2), the first process bands executing agency ball valve (5-3), first have been sequentially connected in series in pressure tap line (5-1) Monitor pressure-regulating valve (5-4), the first operating pressure regulating valve (5-5), first thermometer (5-23), first pressure pick-up on the spot Device (5-24), second pressure transmitter (5-25), third pressure transmitter (5-26), first check-valve (5-6) and the second technique Ball valve (5-7), first monitoring pressure-regulating valve (5-4) and the first pressure transmitter (5-24) connect first pressure control Device (5-27) processed, the first operating pressure regulating valve (5-5) and the second pressure transmitter (5-25) connect second pressure Controller (5-28), first process bands executing agency ball valve (5-3) and the third pressure transmitter (5-26) connection the The high relay (5-29) of one pressure;
Spare pressure regulation tap line (6-1), both ends are connect with first header (4) and second header (7) respectively, institute It states and has been sequentially connected in series the 7th technique ball valve (6-2), the second process bands executing agency ball valve on spare pressure regulation tap line (6-1) (6-3), the second monitoring pressure-regulating valve (6-4), the second operating pressure regulating valve (6-5), second thermometer (6-23), the on the spot Four pressure transmitters (6-24), the 5th pressure transmitter (6-25), the 6th pressure transmitter (6-26), second check-valve (6-6) With the 8th technique ball valve (6-7), second monitoring pressure-regulating valve (6-4) and the 4th pressure transmitter (6-24) connection Third pressure controller (6-27), the second operating pressure regulating valve (6-5) and the 5th pressure transmitter (6-25) are even Meet the 4th pressure controller (6-28), second process bands executing agency ball valve (6-3) and the 6th pressure transmitter (6- 26) the high relay (6-29) of second pressure is connected;
Wherein, first header (4) connect with the first process pipelines (2) one end, the first process pipelines (2) other end with First flange (1) connection, second header (7) connect with the second process pipelines (8) one end, second process pipelines (8) The other end is connect with second flange (9);
The first operating pressure regulating valve (5-5) is different with the pressure set points of the second operating pressure regulating valve (6-5).
2. online regulator according to claim 1, which is characterized in that the first pressure transmitter (5-24) passes through First instrument cable (5-30) is connect with the first pressure controller (5-27), first monitoring pressure-regulating valve (5-4) It is connect by the 4th instrument cable (5-33) with the first pressure controller (5-27), the second pressure transmitter (5-25) It is connect by second instrument cable (5-31) with the second pressure controller (5-28), the first operating pressure regulating valve (5-5) is connect by the 5th instrument cable (5-34) with the second pressure controller (5-28), the third pressure transmitter (5-26) is connect by third instrument cable (5-32) with the high relay (5-29) of the first pressure, first process bands Executing agency's ball valve (5-3) is connect by the 6th instrument cable (5-35) with the high relay (5-29) of the first pressure;
4th pressure transmitter (6-24) passes through the 7th instrument cable (6-30) and the third pressure controller (6-27) Connection, second monitoring pressure-regulating valve (6-4) pass through the tenth instrument cable (6-33) and the third pressure controller (6- 27) it connects, the 5th pressure transmitter (6-25) passes through the 8th instrument cable (6-31) and the 4th pressure controller (6- 28) it connects, the second operating pressure regulating valve (6-5) is controlled by the 11st instrument cable (6-34) and the 4th pressure Device (6-28) connection, the 6th pressure transmitter (6-26) are high by the 9th instrument cable (6-32) and the second pressure Relay (6-29) connection, second process bands executing agency ball valve (6-3) pass through the 12nd instrument cable (6-35) and institute State high relay (6-29) connection of second pressure.
3. online regulator according to claim 1, which is characterized in that first header (4) and described second is converged The both ends of pipe (7) are all connected with pipe cap (3).
4. online regulator according to claim 1, which is characterized in that first process bands executing agency ball valve (5-3) and second process bands executing agency ball valve (6-3) are full-bore having a double meaning pair and let out valve, and failure is closed;Described first Monitoring pressure-regulating valve (5-4) and second monitoring pressure-regulating valve (6-4) are that failure is closed;The first operating pressure tune It saves valve (5-5) and the second operating pressure regulating valve (6-5) is that failure is opened.
5. online regulator according to claim 1, which is characterized in that the first check-valve (5-6) and described Two check-valves (6-6) are axial flow type check valve.
6. a kind of a kind of online pressure regulation side of the online regulator of gas pipeline as described in any one of claim 1-5 Method, which comprises the following steps:
Step 1, natural gas inputs first header (4), and passes through the first technique ball valve (5-2) and the 7th technique Ball valve (6-2) respectively enters described with pressure regulation tap line (5-1) and the spare pressure regulation tap line (6-1);
Step 2, the first pressure controller (5-27), the second pressure controller (5-28), described first is set separately The high relay (5-29) of pressure, the third pressure controller (6-27), the 4th pressure controller (6-28) and described The pressure set points of the high relay (6-29) of second pressure, and ensure the first operating pressure regulating valve (5-5) and described The pressure set points of second operating pressure regulating valve (6-5) are different;
Step 3, SCADA system is according to the first operating pressure regulating valve (5-5) and the second operating pressure regulating valve (6- 5) pressure set points selection is described to be carried out with pressure regulation tap line (5-1) or the spare pressure regulation tap line (6-1) Line pressure regulation enters step 4 when carrying out online pressure regulation with pressure regulation tap line (5-1) when selection is described, described spare when selecting When pressure regulation tap line (6-1) carries out online pressure regulation, 5 are entered step;
Step 4, the first pressure controller (5-27), the second pressure controller (5-28) and the first pressure are high Relay (5-29) controls first monitoring pressure-regulating valve (5-4), the first movement pressure according to pressure set points respectively The valve opening of force regulating valve (5-5) and first process bands executing agency ball valve (5-3);
Step 5, the third pressure controller (6-27), the 4th pressure controller (6-28) and the second pressure are high Relay (6-29) controls second monitoring pressure-regulating valve (6-4), the second movement pressure according to pressure set points respectively The valve opening of force regulating valve (6-5) and second process bands executing agency ball valve (6-3);
Step 6, after online pressure regulation, natural gas is exported by second header (7).
7. online pressure regulation method according to claim 6, which is characterized in that in step 3, by the second pressure controller The pressure set points of (5-28) are SP, and the pressure set points of the first pressure controller (5-27) are SP+ △ P1, described first The pressure set points of the high relay (5-29) of pressure are SP+ △ P2, and the pressure of the 4th pressure controller (6-28) is set Value is SP- △ P1, and the pressure set points of the third pressure controller (6-27) are SP+ △ P1, the second pressure Gao Gaoji The pressure set points of electric appliance (6-29) are SP+ △ P2;
Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, and SP is greater than SP- △ P1.
8. online pressure regulation method according to claim 6, which is characterized in that in step 4, first process bands execute machine Structure ball valve (5-3), it is described first monitoring pressure-regulating valve (5-4), the first operating pressure regulating valve (5-5) flow signal SCADA system progress real-time monitoring is sent into after accessing instrument junction box;
The first pressure transmitter (5-24), the second pressure transmitter (5-25) and third pressure transmitter (5-26) are real When monitor the first pressure controller (5-27), the second pressure controller (5-28) and the high relay of the first pressure Pressure signal is simultaneously accessed feeding SCADA system progress real-time monitoring after instrument junction box by the pressure value of device (5-29);
Described first on the spot thermometer (5-23) temperature signal access instrument junction box after be sent into SCADA system supervised in real time It surveys.
9. online pressure regulation method according to claim 6, which is characterized in that in step 5, second process bands execute machine Structure ball valve (6-3), it is described second monitoring pressure-regulating valve (6-4), the second operating pressure regulating valve (6-5) flow signal SCADA system progress real-time monitoring is sent into after accessing instrument junction box;
4th pressure transmitter (6-24), the 5th pressure transmitter (6-25) and the 6th pressure transmitter (6- 26) third pressure controller (6-27), the 4th pressure controller (6-28) described in real-time monitoring and the second pressure are high Pressure signal is simultaneously accessed after instrument junction box and is sent into SCADA system and is supervised in real time by the pressure value of high relay (6-29) It surveys;
Described second on the spot thermometer (6-23) temperature signal access instrument junction box after be sent into SCADA system supervised in real time It surveys.
10. online pressure regulation method according to claim 6, which is characterized in that in step 3:
When selection is described when carrying out online pressure regulation with pressure regulation tap line (5-1), the first check-valve (5-6) is unidirectionally cut Only;
When selecting the spare pressure regulation tap line (6-1) to carry out online pressure regulation, the second check-valve (6-6) is unidirectionally cut Only.
CN201811303107.8A 2018-11-02 2018-11-02 Online pressure regulating device and online pressure regulating method for gas transmission pipeline Active CN109340575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811303107.8A CN109340575B (en) 2018-11-02 2018-11-02 Online pressure regulating device and online pressure regulating method for gas transmission pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811303107.8A CN109340575B (en) 2018-11-02 2018-11-02 Online pressure regulating device and online pressure regulating method for gas transmission pipeline

Publications (2)

Publication Number Publication Date
CN109340575A true CN109340575A (en) 2019-02-15
CN109340575B CN109340575B (en) 2020-05-22

Family

ID=65313296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811303107.8A Active CN109340575B (en) 2018-11-02 2018-11-02 Online pressure regulating device and online pressure regulating method for gas transmission pipeline

Country Status (1)

Country Link
CN (1) CN109340575B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185932A (en) * 2019-05-20 2019-08-30 中国石油天然气集团有限公司 A kind of processed oil pipeline pressure-reducing station hot standby regulator online

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10220699A (en) * 1997-02-13 1998-08-21 Nec Kyushu Ltd Gas supply system
CN202561438U (en) * 2012-03-30 2012-11-28 蚌埠高科能源装备有限公司 Gas pipeline system for natural gas pressure regulation device
CN202884474U (en) * 2012-11-13 2013-04-17 山西高碳能源低碳化利用研究设计院有限公司 Device for merging coke oven gas synthetic natural gas into natural gas trunk line pipe network
CN203533212U (en) * 2013-09-02 2014-04-09 合肥巨网工业气体有限公司 Double-way pressure regulating device of central gas supply system
CN204114569U (en) * 2014-09-28 2015-01-21 上海京盾科技经济信息有限公司 LNG air feeder
CN204756455U (en) * 2015-07-24 2015-11-11 江苏华钡燃气设备有限公司 A regulator for natural gas air feed
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN106382466A (en) * 2016-12-14 2017-02-08 中国石油天然气集团公司 Gas conveying pipeline metering and pressure adjusting device and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10220699A (en) * 1997-02-13 1998-08-21 Nec Kyushu Ltd Gas supply system
CN202561438U (en) * 2012-03-30 2012-11-28 蚌埠高科能源装备有限公司 Gas pipeline system for natural gas pressure regulation device
CN202884474U (en) * 2012-11-13 2013-04-17 山西高碳能源低碳化利用研究设计院有限公司 Device for merging coke oven gas synthetic natural gas into natural gas trunk line pipe network
CN203533212U (en) * 2013-09-02 2014-04-09 合肥巨网工业气体有限公司 Double-way pressure regulating device of central gas supply system
CN204114569U (en) * 2014-09-28 2015-01-21 上海京盾科技经济信息有限公司 LNG air feeder
CN204756455U (en) * 2015-07-24 2015-11-11 江苏华钡燃气设备有限公司 A regulator for natural gas air feed
CN105822902A (en) * 2016-06-01 2016-08-03 乐山市山鹰模具有限责任公司 CNG gas device
CN106382466A (en) * 2016-12-14 2017-02-08 中国石油天然气集团公司 Gas conveying pipeline metering and pressure adjusting device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185932A (en) * 2019-05-20 2019-08-30 中国石油天然气集团有限公司 A kind of processed oil pipeline pressure-reducing station hot standby regulator online
CN110185932B (en) * 2019-05-20 2020-07-10 中国石油天然气集团有限公司 Online hot standby pressure regulating device of pressure reducing station of finished oil pipeline

Also Published As

Publication number Publication date
CN109340575B (en) 2020-05-22

Similar Documents

Publication Publication Date Title
CN210768936U (en) Shaft seal steam supply system with cooling device
JPS6193208A (en) Turbine bypass system
US8528314B2 (en) Method and apparatus for combined cycle power plant startup
CN111878182A (en) 660MW supercritical unit bypass control system and control method thereof
CN109653810A (en) A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN210343441U (en) Main reheat steam drainage system of steam turbine of thermal power plant
CN109340575A (en) A kind of online regulator and its online pressure regulation method of gas pipeline
CN209213462U (en) A kind of gas pipeline hot standby regulator online
CN109282145A (en) A kind of gas pipeline hot standby pressure regulation method online
CN211821676U (en) Unit main oil way simulation test system
CN210829929U (en) Compressed air supply system of electric pole production workshop
CN210485839U (en) Heat supply system
CN209510396U (en) A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN109210376A (en) A kind of gas pipeline hot standby regulator online
CN111459092A (en) Flash evaporation gas recovery integrated device and recovery method
CN103225743A (en) Transportation and distribution method for natural gas
CN113819400B (en) Multi-source integrated automatic switching combined steam supply system and method
CN213236984U (en) Power source safety fast switching device of gas pipeline regulating valve
CN111207286B (en) Unit main oil way simulation test system
CN205917764U (en) Gas turbine test platform fire extinguishing system
CN212510516U (en) Device for realizing energy conservation of temperature and pressure reduction device in hot standby state
CN219828563U (en) Safety pressure increasing and reducing device for heating system
CN210107064U (en) Online hot standby automatic pressure regulating device of finished oil pipeline pressure reduction station
KR102099013B1 (en) Operation method to the Combined Heat and Power Generation complying with the Demand of AGC and on the bases of Non self-constraint Bidding in the Power Trading System
CN110185932A (en) A kind of processed oil pipeline pressure-reducing station hot standby regulator online

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Beijing Xicheng District six laying Kang

Applicant before: China National Petroleum Corp.

Applicant before: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20200113

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant before: CHINA NATIONAL PETROLEUM Corp.

Applicant before: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Nie Zhongwen

Inventor after: Ren Yanguang

Inventor after: Huang Jing

Inventor after: Wang Yongji

Inventor after: Zuo Yong

Inventor after: Kong Yuding

Inventor after: Jiang Nianchen

Inventor after: Feng Cheng

Inventor after: Shan Chao

Inventor after: Yu Bin

Inventor after: Yu Yongzhi

Inventor after: Gong Yunfeng

Inventor after: Pang Baohua

Inventor before: Nie Zhongwen

Inventor before: Huang Jing

Inventor before: Wang Yongji

Inventor before: Zuo Yong

Inventor before: Kong Yuding

Inventor before: Jiang Nianchen

Inventor before: Feng Cheng

Inventor before: Shan Chao

Inventor before: Yu Bin

Inventor before: Yu Yongzhi

Inventor before: Gong Yunfeng

Inventor before: Pang Baohua

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant