CN209510396U - A thermodynamic system with one furnace and two machines switching operation - Google Patents

A thermodynamic system with one furnace and two machines switching operation Download PDF

Info

Publication number
CN209510396U
CN209510396U CN201920235335.XU CN201920235335U CN209510396U CN 209510396 U CN209510396 U CN 209510396U CN 201920235335 U CN201920235335 U CN 201920235335U CN 209510396 U CN209510396 U CN 209510396U
Authority
CN
China
Prior art keywords
boiler
steam
pipeline
steam turbine
pressure cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920235335.XU
Other languages
Chinese (zh)
Inventor
李路明
曾文标
宋宝军
夏良伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201920235335.XU priority Critical patent/CN209510396U/en
Application granted granted Critical
Publication of CN209510396U publication Critical patent/CN209510396U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Turbines (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

本实用新型提供了一种一炉带两机切换运行热力系统。主要解决了传统的电厂锅炉主要设备发生故障时,整个单元都要被迫停止运行的问题。在满足一炉带一机的前提下,如2台汽机均处于较低负荷(2台汽机总负荷不小于1台锅炉的最低稳燃负荷,不大于1台锅炉的最高负荷),可停1台炉,剩下的1台炉可同时为2台汽机送汽;另外,在1台炉为2台汽机供汽时,可启动另1台炉完成由“一炉带两机”到“一炉带一机”的在线切换。以上功能可通过增加旁路管道和相应阀门配置实现。提高了机组运行的灵活性和经济性。

This utility model provides a thermal system for switching between one boiler and two turbines. It primarily solves the problem that in traditional power plant boilers, the entire unit is forced to shut down when the main equipment fails. Under the premise of one boiler supporting one turbine, if both turbines are at low loads (the total load of the two turbines is not less than the minimum stable combustion load of one boiler and not greater than the maximum load of one boiler), one boiler can be shut down, and the remaining boiler can simultaneously supply steam to both turbines. Furthermore, when one boiler is supplying steam to two turbines, another boiler can be started to complete the online switching from "one boiler supporting two turbines" to "one boiler supporting one turbine." These functions can be achieved by adding bypass pipelines and corresponding valve configurations. This improves the flexibility and economy of unit operation.

Description

一种一炉带两机切换运行热力系统A thermodynamic system with one furnace and two machines switching operation

技术领域technical field

本发明涉及热电发电技术领域,具体是一种一炉带两机切换运行热力系统。The invention relates to the technical field of thermoelectric power generation, in particular to a thermodynamic system with one furnace and two machines switching operation.

背景技术Background technique

现代大容量电站机组由于采用蒸汽中间再热方式,一般采用单元制,即每台锅炉直接向所配合的一台汽轮机供汽,汽轮机驱动发电机,组成了炉-机-电纵向联系的独立单元,各独立单元之间没有大的横向联系,在机组正常运行时,本单元所需要的蒸汽和厂用电取自本单元。Since modern large-capacity power plant units adopt the steam intermediate reheating method, they generally adopt a unit system, that is, each boiler directly supplies steam to a matched steam turbine, and the steam turbine drives the generator, forming an independent unit of furnace-mechanical-electrical vertical connection , there is no large horizontal connection between independent units. When the unit is in normal operation, the steam and plant power required by this unit are taken from this unit.

与一般小容量机组采用的非单元制系统(母管制系统,即将多台给水和过热蒸汽参数相同的机组分别用公用管道将给水和过热蒸汽联在一期的发电系统)相比,单元机组系统简单,管道短,管道附件少,投资较为节省,系统本身的可靠性较高,操作方便,便于滑参数启、停,适合炉、机、电集中控制。Compared with the non-unit system adopted by general small-capacity units (main control system, that is, a power generation system in which multiple units with the same parameters of feed water and superheated steam are connected to the first-stage power generation system with public pipelines), the unit unit system Simple, short pipeline, less pipeline accessories, less investment, high reliability of the system itself, convenient operation, easy to start and stop by sliding parameters, suitable for centralized control of furnace, machine and electricity.

单元制系统的缺点是其中任意主要设备发生故障时,整个单元都要被迫停止运行,相邻单元之间不能互相支援,机炉之间也不能切换运行,运行的灵活性较差;当系统频率发生变化时,单元机组由于锅炉的热惯性大,故对负荷的适应性较差。The disadvantage of the unit system is that when any major equipment fails, the entire unit will be forced to stop running, adjacent units cannot support each other, and machines and furnaces cannot switch between operations, and the flexibility of operation is poor; when the system When the frequency changes, the unit unit has poor adaptability to the load due to the large thermal inertia of the boiler.

发明内容Contents of the invention

本发明的目的是为了解决上述现有技术存在的问题,进而提供一种一炉带两机切换运行热力系统,相邻热力单元之间能互相支援,机炉之间也能切换运行,运行的灵活性好;对负荷的适应性强,可实现在整个电厂负荷低于单台机组的满负荷时,当某一台锅炉因故障停运,此时相对应的汽轮机可不停机继续保持运行,提高了机组运行的灵活性和经济性。The purpose of the present invention is to solve the above-mentioned problems in the prior art, and further provide a thermal system with one furnace and two switching machines, in which adjacent thermal units can support each other, and the furnaces can also be switched to operate Good flexibility; strong adaptability to load, when the load of the entire power plant is lower than the full load of a single unit, when a certain boiler stops operating due to failure, the corresponding steam turbine can continue to run without stopping, improving It improves the flexibility and economy of unit operation.

本发明的目的是通过以下技术方案实现的:The purpose of the present invention is achieved through the following technical solutions:

一种一炉带两机切换运行热力系统,包括一号锅炉、二号锅炉、一号汽轮机、二号汽轮机,一号锅炉通过管路给水,所述的一号锅炉蒸汽出汽口通过一号主蒸汽管道连通至一号汽轮机高压缸进汽口,一号汽轮机高压缸出汽口通过管道连通至一号锅炉的低温再热器入口母管上,一号锅炉的低温再热器的出口母管通过一号再热管道连通至一号汽轮机的中压缸进汽口,一号汽轮机的中压缸出汽口通过管路连通至低压缸;A thermal system with one furnace and two machines switching operation, including No. 1 boiler, No. 2 boiler, No. 1 steam turbine, and No. 2 steam turbine. The main steam pipeline is connected to the steam inlet of the high-pressure cylinder of steam turbine No. 1, and the steam outlet of the high-pressure cylinder of steam turbine No. 1 is connected to the inlet main pipe of the low-temperature reheater of the No. The pipe is connected to the steam inlet of the medium-pressure cylinder of the steam turbine No. 1 through the No. 1 reheat pipe, and the steam outlet of the medium-pressure cylinder of the No. 1 steam turbine is connected to the low-pressure cylinder through the pipeline;

二号锅炉通过管路给水,所述的二号锅炉蒸汽出汽口通过二号主蒸汽管道连通至二号汽轮机高压缸进汽口,二号汽轮机高压缸出汽口通过管道连通至二号锅炉的低温再热器入口母管上,二号锅炉的低温再热器的出口母管通过二号再热管道连通至二号汽轮机的中压缸进汽口,二号汽轮机的中压缸出汽口通过管路连通至低压缸;No. 2 boiler feeds water through the pipeline, and the steam outlet of the No. 2 boiler is connected to the steam inlet of the No. 2 steam turbine high-pressure cylinder through the No. 2 main steam pipeline, and the steam outlet of the No. 2 steam turbine high-pressure cylinder is connected to the No. 2 boiler through a pipeline. On the inlet main pipe of the low-temperature reheater, the outlet main pipe of the low-temperature reheater of the No. 2 boiler is connected to the steam inlet of the medium-pressure cylinder of the No. 2 steam turbine through the No. The port is connected to the low-pressure cylinder through the pipeline;

其中,所述的一号主蒸汽管道上引出有旁路管道连通至二号主蒸汽管道上并在该旁路管道上设置有调节阀、关断阀,一号再热管道上引出有旁路管道连通至二号再热管道上并在该旁路管道上设置有调节阀、关断阀,所述的一号汽轮机高压缸出汽口与一号锅炉的低温再热器入口母管连接的管道上引出旁路管道与二号汽轮机高压缸出汽口与二号锅炉的低温再热器入口母管连接的管道连接,并在该旁路管道上设置有调节阀、关断阀;Wherein, the No. 1 main steam pipeline leads to a bypass pipeline connected to the No. 2 main steam pipeline, and the bypass pipeline is provided with a regulating valve and a shut-off valve, and the No. 1 reheat pipeline leads to a bypass pipeline. The pipeline is connected to the No. 2 reheat pipeline and a regulating valve and a shut-off valve are set on the bypass pipeline. The steam outlet of the high-pressure cylinder of the No. 1 steam turbine is connected to the main pipe of the low-temperature reheater inlet of the No. 1 boiler. The bypass pipe leading out of the pipe is connected to the pipe connecting the steam outlet of the high-pressure cylinder of the No. 2 steam turbine and the inlet main pipe of the low-temperature reheater of the No. 2 boiler, and a regulating valve and a shut-off valve are installed on the bypass pipe;

所述的一号主蒸汽管道、一号再热管道、一号汽轮机高压缸出汽口连通一号锅炉的低温再热器入口母管的管道上在靠近一号汽轮机的一侧均设置有调节阀,所述的二号主蒸汽管道、二号再热管道、二号汽轮机高压缸出汽口连通二号锅炉的低温再热器入口母管的管道上在靠近二号锅炉的一侧均设置有调节阀与关断阀。The No. 1 main steam pipe, No. 1 reheat pipe, No. 1 steam turbine high-pressure cylinder steam outlet connected to the No. 1 boiler’s low-temperature reheater inlet main pipe are all provided with regulating valves on the side close to the No. 1 steam turbine. The No. 2 main steam pipe, the No. 2 reheat pipe, and the No. 2 steam turbine high-pressure cylinder outlet connected to the No. 2 boiler's low-temperature reheater inlet main pipe are all set on the side close to the No. 2 boiler There are regulating valves and shut-off valves.

本发明的有益效果是:通过采用本发明的技术方案,与现有的大容量单元制机组相比,本发明采用的“一炉带两机”系统可实现在整个电厂负荷低于单台机组的满负荷时,当某一台锅炉因故障停运,此时相对应的汽轮机可不停机继续保持运行,提高了机组运行的灵活性和经济性。The beneficial effects of the present invention are: by adopting the technical scheme of the present invention, compared with the existing large-capacity unitary units, the "one furnace with two machines" system adopted in the present invention can realize that the load of the entire power plant is lower than that of a single unit When a boiler is at full load, when a certain boiler is out of operation due to a failure, the corresponding steam turbine can continue to run without stopping, which improves the flexibility and economy of unit operation.

附图说明Description of drawings

图1为本发明的系统结构原理示意图。Fig. 1 is a schematic diagram of the system structure principle of the present invention.

具体实施方式Detailed ways

下面将结合附图对本发明做进一步的详细说明:本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式,但本发明的保护范围不限于下述实施例。The present invention will be described in further detail below in conjunction with the accompanying drawings: the present embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation is provided, but the protection scope of the present invention is not limited to the following embodiments.

如图1所示,本实施例所涉及的一种一炉带两机切换运行热力系统,包括一号锅炉、二号锅炉、一号汽轮机、二号汽轮机,其特征在于,一号锅炉通过管路给水,所述的一号锅炉蒸汽出汽口通过一号主蒸汽管道连通至一号汽轮机高压缸进汽口,一号汽轮机高压缸出汽口通过管道连通至一号锅炉的低温再热器入口母管上,一号锅炉的低温再热器的出口母管通过一号再热管道连通至一号汽轮机的中压缸进汽口,一号汽轮机的中压缸出汽口通过管路连通至低压缸;As shown in Figure 1, a thermal system with one furnace and two machines switching operation involved in this embodiment includes No. 1 boiler, No. 2 boiler, No. 1 steam turbine, and No. 2 steam turbine. The steam outlet of the No. 1 boiler is connected to the steam inlet of the No. 1 steam turbine high-pressure cylinder through the No. 1 main steam pipeline, and the steam outlet of the No. 1 steam turbine high-pressure cylinder is connected to the low-temperature reheater of the No. 1 boiler through a pipeline. On the inlet main pipe, the outlet main pipe of the low-temperature reheater of the No. 1 boiler is connected to the steam inlet of the medium-pressure cylinder of the No. 1 steam turbine through the No. 1 reheat pipe, and the steam outlet of the medium-pressure cylinder of the No. 1 steam turbine is connected through the pipeline to the low pressure cylinder;

二号锅炉通过管路给水,所述的二号锅炉蒸汽出汽口通过二号主蒸汽管道连通至二号汽轮机高压缸进汽口,二号汽轮机高压缸出汽口通过管道连通至二号锅炉的低温再热器入口母管上,二号锅炉的低温再热器的出口母管通过二号再热管道连通至二号汽轮机的中压缸进汽口,二号汽轮机的中压缸出汽口通过管路连通至低压缸;No. 2 boiler feeds water through the pipeline, and the steam outlet of the No. 2 boiler is connected to the steam inlet of the No. 2 steam turbine high-pressure cylinder through the No. 2 main steam pipeline, and the steam outlet of the No. 2 steam turbine high-pressure cylinder is connected to the No. 2 boiler through a pipeline. On the inlet main pipe of the low-temperature reheater, the outlet main pipe of the low-temperature reheater of the No. 2 boiler is connected to the steam inlet of the medium-pressure cylinder of the No. 2 steam turbine through the No. The port is connected to the low-pressure cylinder through the pipeline;

其中,所述的一号主蒸汽管道上引出有旁路管道连通至二号主蒸汽管道上并在该旁路管道上设置有调节阀、关断阀,一号再热管道上引出有旁路管道连通至二号再热管道上并在该旁路管道上设置有调节阀、关断阀,所述的一号汽轮机高压缸出汽口与一号锅炉的低温再热器入口母管连接的管道上引出旁路管道与二号汽轮机高压缸出汽口与二号锅炉的低温再热器入口母管连接的管道连接,并在该旁路管道上设置有调节阀、关断阀;Wherein, the No. 1 main steam pipeline leads to a bypass pipeline connected to the No. 2 main steam pipeline, and the bypass pipeline is provided with a regulating valve and a shut-off valve, and the No. 1 reheat pipeline leads to a bypass pipeline. The pipeline is connected to the No. 2 reheat pipeline and a regulating valve and a shut-off valve are set on the bypass pipeline. The steam outlet of the high-pressure cylinder of the No. 1 steam turbine is connected to the main pipe of the low-temperature reheater inlet of the No. 1 boiler. The bypass pipe leading out of the pipe is connected to the pipe connecting the steam outlet of the high-pressure cylinder of the No. 2 steam turbine and the inlet main pipe of the low-temperature reheater of the No. 2 boiler, and a regulating valve and a shut-off valve are installed on the bypass pipe;

所述的一号主蒸汽管道、一号再热管道、一号汽轮机高压缸出汽口连通一号锅炉的低温再热器入口母管的管道上在靠近一号汽轮机的一侧均设置有调节阀,所述的二号主蒸汽管道、二号再热管道、二号汽轮机高压缸出汽口连通二号锅炉的低温再热器入口母管的管道上在靠近二号锅炉的一侧均设置有调节阀与关断阀。The No. 1 main steam pipe, No. 1 reheat pipe, No. 1 steam turbine high-pressure cylinder steam outlet connected to the No. 1 boiler’s low-temperature reheater inlet main pipe are all provided with regulating valves on the side close to the No. 1 steam turbine. The No. 2 main steam pipe, the No. 2 reheat pipe, and the No. 2 steam turbine high-pressure cylinder outlet connected to the No. 2 boiler's low-temperature reheater inlet main pipe are all set on the side close to the No. 2 boiler There are regulating valves and shut-off valves.

具体的,有2台参数一致的机组,在满足一炉带一机的前提下,如2台汽机均处于较低负荷(2台汽机总负荷不小于1台锅炉的最低稳燃负荷,不大于1台锅炉的最高负荷),可停1台炉,剩下的1台炉可同时为2台汽机送汽;另外,在1台炉为2台汽机供汽时,可启动另1台炉完成由“一炉带两机”到“一炉带一机”的在线切换;以上功能可通过增加旁路管道和相应阀门配置实现。Specifically, if there are 2 units with the same parameters, on the premise that one boiler with one unit is satisfied, if the two turbines are at a relatively low load (the total load of the two turbines is not less than the minimum stable combustion load of one boiler, and is not greater than The maximum load of one boiler), one boiler can be stopped, and the remaining one boiler can supply steam to two turbines at the same time; in addition, when one boiler supplies steam to two turbines, another boiler can be started to complete Online switching from "one furnace with two machines" to "one furnace with one machine"; the above functions can be realized by adding bypass pipes and corresponding valve configurations.

从一号锅炉主蒸汽进入主蒸汽管道,一部分主蒸汽进入一号汽轮机高压缸做功,从主蒸汽管道上引出一根旁路管道连接至二号汽轮机的高压缸,将剩余的主蒸汽引入二号汽轮机高压缸做功;在一号汽轮机的进汽管道上设调节阀,在二号汽轮机的进气管道上设调节阀、关断阀;2台汽机的高压缸排汽合流进入冷再入口母管,在一号汽轮机的高排汽管道上设调节阀,在二号汽轮机的高排汽管道上设调节阀、关断阀;经过一号锅炉再热器换热后,从一号锅炉热再排出的再热蒸汽进入热再出口母管,一部分热段再热蒸汽进入一号汽轮机中压缸做功,另外从热再出口母管上引出一根旁路管道连接至二号汽轮机中压缸,将剩余的热段再热蒸汽引入二号汽轮机中压缸做功,在一号汽轮机的中压缸进汽管道上设调节阀,在二号汽轮机的中压缸进汽管道上设调节阀、关断阀。The main steam from the No. 1 boiler enters the main steam pipeline, and part of the main steam enters the high-pressure cylinder of the No. 1 steam turbine to do work. A bypass pipe is drawn from the main steam pipeline to connect to the high-pressure cylinder of the No. 2 steam turbine, and the remaining main steam is introduced into the No. 2 steam turbine. The high-pressure cylinder of the steam turbine works; set a regulating valve on the steam inlet pipe of the No. 1 steam turbine, and set a regulating valve and a shut-off valve on the intake pipe of the No. 2 steam turbine; the exhaust steam of the high-pressure cylinders of the two steam turbines merges into the cold re-entry main pipe , set a regulating valve on the high exhaust steam pipeline of the No. 1 steam turbine, set a regulating valve and a shut-off valve on the high exhaust steam pipeline of the No. 2 steam turbine; The exhausted reheat steam enters the heat re-export main pipe, and part of the reheat steam in the hot section enters the intermediate pressure cylinder of No. 1 steam turbine to do work. In addition, a bypass pipe is drawn from the heat re-export main pipe to connect to the intermediate pressure cylinder of No. 2 steam turbine. The remaining reheated steam in the hot section is introduced into the intermediate pressure cylinder of No. cut off valve.

上述流程中如一号汽轮机负荷高而二号汽轮机负荷低,从二号汽轮机高压缸出来的再热蒸汽压力较低,如不采取措施可能导致压力较低的蒸汽不能进入冷再入口母管,压力不匹配可能导致压力较低的蒸汽难以排出,此时须通过二号汽轮机中调门或增设管道调节阀调整其高排压力与一号汽轮机一致,保证两台汽机高排蒸汽安全稳定汇入冷再入口母管。In the above process, if the load of No. 1 steam turbine is high and the load of No. 2 steam turbine is low, the pressure of the reheat steam coming out of the high-pressure cylinder of No. Mismatch may cause low-pressure steam to be difficult to discharge. At this time, the high discharge pressure of No. 2 steam turbine must be adjusted to be consistent with that of No. 1 steam turbine through the middle regulating valve of the No. Inlet parent pipe.

另外,在一号锅炉同时给2台汽机供汽时,若需实现一号锅炉带一号汽轮机、二号锅炉带二号汽轮机的在线切换功能,可在二号锅炉的主汽管道、冷再入口管道、热再出口管道上设调节阀及关断阀。缓慢调节各机炉的负荷及管道流量、工质参数等,条件满足后关闭各旁路关断阀即可。In addition, when No. 1 boiler supplies steam to 2 steam turbines at the same time, if it is necessary to realize the online switching function of No. 1 boiler with No. 1 steam turbine and No. 2 boiler with No. Regulating valves and shut-off valves are installed on the inlet pipeline and the heat re-export pipeline. Slowly adjust the load of each furnace, pipeline flow, working fluid parameters, etc., and close each bypass shut-off valve after the conditions are met.

以上所述,仅为本发明较佳的具体实施方式,这些具体实施方式都是基于本发明整体构思下的不同实现方式,而且本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。The above are only preferred specific implementations of the present invention. These specific implementations are all based on different implementations under the overall concept of the present invention, and the scope of protection of the present invention is not limited thereto. Anyone familiar with the technical field Within the technical scope disclosed in the present invention, any changes or substitutions that can be easily conceived by a skilled person shall fall within the protection scope of the present invention. Therefore, the protection scope of the present invention should be determined by the protection scope of the claims.

Claims (1)

1. a kind of two machine switchover operation therrmodynamic system of a furnace zone, including No.1 boiler, No. two boilers, No.1 steam turbine, No. two vapour Turbine, which is characterized in that No.1 boiler passes through No.1 main steam pipe by pipeline water supply, the No.1 Boiler Steam venthole Road is connected to No.1 steam turbine high-pressure cylinder air intake, and No.1 steam turbine high-pressure cylinder venthole is connected to No.1 boiler by pipeline In low-temperature reheater entrance main pipe, the outlet main pipe of the low-temperature reheater of No.1 boiler is connected to No.1 by No.1 reheating pipeline The intermediate pressure cylinder venthole of the intermediate pressure cylinder air intake of steam turbine, No.1 steam turbine passes through pipeline connection to low pressure (LP) cylinder;
No. two boilers are connected to No. two by No. two main steam lines by pipeline water supply, No. two Boiler Steam ventholes Steam turbine high-pressure cylinder air intake, No. two steam turbine high-pressure cylinder ventholes are entered by the low-temperature reheater that pipeline is connected to No. two boilers In mouth main pipe, the outlet main pipe of the low-temperature reheater of No. two boilers is connected to the middle pressure of No. two steam turbines by No. two reheating pipelines The intermediate pressure cylinder venthole of cylinder air intake, No. two steam turbines passes through pipeline connection to low pressure (LP) cylinder;
Wherein, bypass duct is led on the No.1 main steam line to be connected on No. two main steam lines and in the bypass It is provided with regulating valve, shut-off valve on pipeline, bypass duct is led on No.1 reheating pipeline and is connected on No. two reheating pipelines simultaneously Regulating valve, shut-off valve are provided on the bypass duct, the No.1 steam turbine high-pressure cylinder venthole is low with No.1 boiler Bypass duct and No. two steam turbine high-pressure cylinder ventholes and No. two boilers are drawn on the pipeline of warm reheater entrance main pipe connection The pipeline connection of low-temperature reheater entrance main pipe connection, and regulating valve, shut-off valve are provided on the bypass duct;Described one Number main steam line, No.1 reheating pipeline, No.1 steam turbine high-pressure cylinder venthole connection No.1 boiler low-temperature reheater entrance Be provided with regulating valve in the side close to No.1 steam turbine on the pipeline of main pipe, No. two main steam lines, No. two again Close to two on the pipeline for the low-temperature reheater entrance main pipe that heat pipeline, No. two steam turbine high-pressure cylinder ventholes are connected to No. two boilers The side of number boiler is provided with regulating valve and shut-off valve.
CN201920235335.XU 2019-02-25 2019-02-25 A thermodynamic system with one furnace and two machines switching operation Active CN209510396U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920235335.XU CN209510396U (en) 2019-02-25 2019-02-25 A thermodynamic system with one furnace and two machines switching operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920235335.XU CN209510396U (en) 2019-02-25 2019-02-25 A thermodynamic system with one furnace and two machines switching operation

Publications (1)

Publication Number Publication Date
CN209510396U true CN209510396U (en) 2019-10-18

Family

ID=68204634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920235335.XU Active CN209510396U (en) 2019-02-25 2019-02-25 A thermodynamic system with one furnace and two machines switching operation

Country Status (1)

Country Link
CN (1) CN209510396U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653810A (en) * 2019-02-25 2019-04-19 哈尔滨锅炉厂有限责任公司 A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN113175368A (en) * 2021-04-25 2021-07-27 西安热工研究院有限公司 Boiler steam turbine interconnection system based on main pipe system transformation and operation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653810A (en) * 2019-02-25 2019-04-19 哈尔滨锅炉厂有限责任公司 A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN109653810B (en) * 2019-02-25 2024-03-22 哈尔滨锅炉厂有限责任公司 One furnace with two-machine switching operation thermodynamic system
CN113175368A (en) * 2021-04-25 2021-07-27 西安热工研究院有限公司 Boiler steam turbine interconnection system based on main pipe system transformation and operation method
CN113175368B (en) * 2021-04-25 2022-08-02 西安热工研究院有限公司 A boiler-turbine interconnection system and operation method based on the transformation of parent control

Similar Documents

Publication Publication Date Title
CN109653810B (en) One furnace with two-machine switching operation thermodynamic system
CN111237018A (en) A Cascade Utilization System of Industrial Steam Residual Pressure Applied in the Mode of Shutdown of Coal-fired Steam Supply Unit
CN103452611B (en) Combined-cycle combined heat and power system
TW558592B (en) Combined cycle power plant
CN106194297A (en) The double branch road heating system of a kind of cogeneration turbine
CN212154886U (en) A Cascade Utilization System of Industrial Steam Residual Pressure Applied in the Mode of Shutdown of Coal-fired Steam Supply Unit
CN113175362B (en) A main pipe connection system and operation method for realizing zero output of low pressure cylinder
WO2011079613A1 (en) Feed water and drainage system for medium pressure heater in power plant
CN111237735A (en) An emergency industrial steam supply system that realizes the shutdown of large coal-fired generator sets without stopping the furnace
CN112145244B (en) System and method for improving water supply temperature and steam supply capacity of coal-fired power generating unit
CN101892876B (en) Method for primary control of a steam turbine installation
CN114576605B (en) A system and method for deep peak regulation by using reheated steam to heat feed water
CN113175370B (en) A system and operation method for interconnecting boilers and steam turbines between different units
CN112833378B (en) Reheating system capable of improving heat supply capacity
CN113175361B (en) A connection and operation method of a high-pressure cylinder based on zero output and reheat steam bus pipe
CN113175360A (en) Bus pipe connection system for improving deep peak shaving low-pressure cylinder efficiency and operation method
CN113175367A (en) Master control system for improving peak regulation capacity and flexibility of unit and operation method
CN113494321B (en) High-pressure cylinder zero-output-force-based bus pipe connection system and operation method
CN207864014U (en) A kind of heat regenerative system based on back pressure turbine
JP2012207542A (en) Steam turbine power generating installation
CN110878708A (en) An economical and practical industrial steam supply system with large flow and high parameters
CN214887267U (en) Gas-steam combined cycle unit capable of cooling electric actuator
CN113175368B (en) A boiler-turbine interconnection system and operation method based on the transformation of parent control
CN212105985U (en) Thermodynamic system capable of recycling redundant heat in starting process of unit
CN108131174A (en) A kind of heat regenerative system based on back pressure turbine