CN109282145A - A kind of gas pipeline hot standby pressure regulation method online - Google Patents

A kind of gas pipeline hot standby pressure regulation method online Download PDF

Info

Publication number
CN109282145A
CN109282145A CN201811303101.0A CN201811303101A CN109282145A CN 109282145 A CN109282145 A CN 109282145A CN 201811303101 A CN201811303101 A CN 201811303101A CN 109282145 A CN109282145 A CN 109282145A
Authority
CN
China
Prior art keywords
pressure
valve
ball valve
tap line
pressure regulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811303101.0A
Other languages
Chinese (zh)
Other versions
CN109282145B (en
Inventor
聂中文
孔芋丁
姜念琛
冯骋
单超
喻斌
于永志
龚云峰
庞宝华
黄晶
王永吉
左勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201811303101.0A priority Critical patent/CN109282145B/en
Publication of CN109282145A publication Critical patent/CN109282145A/en
Application granted granted Critical
Publication of CN109282145B publication Critical patent/CN109282145B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of gas pipeline hot standby pressure regulation methods online, this method comprises: being connected to pressure regulation tap line and spare pressure regulation tap line;Various valves and monitoring device are being concatenated respectively with pressure regulation tap line and spare pressure regulation tap line;By each pressure controller and the access of pressure high relay with pressure regulation tap line and spare pressure regulation tap line;Natural gas input is with pressure regulation tap line and spare pressure regulation tap line;Set the pressure set points of each pressure controller and the high relay of pressure;SCADA system is carrying out online pressure regulation with pressure regulation tap line and spare pressure regulation tap line according to the selection of the pressure set points of the first operating pressure regulating valve and the second operating pressure regulating valve;After online pressure regulation, natural gas is exported by second header.Beneficial effects of the present invention: can be achieved the entire handoff procedure of gas pipeline yard voltage-regulating system, be not necessarily to manual intervention, on-line automatic completion, smooth transition, high reliablity.

Description

A kind of gas pipeline hot standby pressure regulation method online
Technical field
The present invention relates to gas pipeline technical field, in particular to a kind of gas pipeline hot standby pressure regulation method online.
Background technique
Voltage-regulating system is one of the critical facility of gas pipeline point defeated station field.To guarantee that gas continuous and stable transports to downstream, The design of voltage-regulating system is most important.The voltage-regulating system mainly used in the past, for cold standby, is adjusted with road and spare road switch mode Pressure system mainly include front and back converge tracheae, process upstream switching ball, urgent block valve, pressure regulator valve (including monitoring pressure adjust Valve and operating pressure regulating valve), downstream process ball valve, pressure controller.With road and spare road urgent block valve and pressure regulation Valve (monitoring pressure-regulating valve+operating pressure regulating valve) process set value is all the same.When with the voltage-regulating system failure on road, therefore Hinder signal to upload, spare road is switched to by process upstream switching ball.
There are the following problems for the voltage-regulating system of this cold standby mode: (one) and the not all system failure can be with signal shapes Formula uploads, and when the system failure can not upload, back-up system can not come into operation in time, and the safety for causing entire voltage-regulating system is hidden Suffer from;(2) two-way voltage-regulating system is cold standby, when needing to switch with/spare road voltage-regulating system, passes through process upstream switch valve Switch with/spare road, at this moment regulating valve vigorous motion, pressure can not relatively smooth transition, or even surpass after having valve The risk of pressure;(3) cold standby voltage-regulating system relies on simple logic judgment, has corresponding monitoring and protection to downstream pressure superpressure, It is even truncated when necessary and is being switched to spare road with road voltage-regulating system, but for the blocking of road voltage-regulating system or the too low work of flow Condition, without the respective logic for detecting and protecting automatically.
Summary of the invention
To solve the above problems, the purpose of the present invention is to provide a kind of gas pipeline hot standby pressure regulation method online, it can root The on-line automatic switching on the road of pressure regulation is realized according to demand, is improved continuity, stability and the reliability of detection and control, is facilitated fortune Row maintenance.
The present invention provides a kind of gas pipeline hot standby pressure regulation methods online, this method comprises:
It is connected between the first header and the second header with pressure regulation tap line and spare pressure regulation tap line, and by institute It states the first header to connect with the first process pipelines, second header is connect with the second process pipelines;
It is described be sequentially connected in series in pressure regulation tap line the first technique ball valve, the first process bands executing agency ball valve, First monitors pressure-regulating valve, the first operating pressure regulating valve, first thermometer, first pressure transmitter, second pressure on the spot Transmitter, third pressure transmitter, first check-valve and the second technique ball valve;
First pressure controller is connect with the first monitoring pressure-regulating valve and the first pressure transmitter, by the Two pressure controllers are connect with the first operating pressure regulating valve and the second pressure transmitter, by first pressure Gao Gaoji Electric appliance is connect with first process bands executing agency's ball valve and the third pressure transmitter;
The 7th technique ball valve, the second process bands executing agency ball have been sequentially connected in series in the spare pressure regulation tap line Valve, second monitor pressure-regulating valve, the second operating pressure regulating valve, second thermometer, the 4th pressure transmitter, the 5th pressure on the spot Power transmitter, the 6th pressure transmitter, second check-valve and the 8th technique ball valve;
Third pressure controller is connect with the second monitoring pressure-regulating valve and the 4th pressure transmitter, by the Four pressure controllers are connect with the second operating pressure regulating valve and the 5th pressure transmitter, by second pressure Gao Gaoji Electric appliance is connect with second process bands executing agency's ball valve and the 6th pressure transmitter;
Natural gas inputs first header, and by the first technique ball valve and the 7th technique ball valve respectively into Enter described with pressure regulation tap line and the spare pressure regulation tap line;
Be set separately the first pressure controller, the second pressure controller, the high relay of the first pressure, The pressure set points of the third pressure controller, the 4th pressure controller and the high relay of the second pressure, and Ensure that the first operating pressure regulating valve is different with the pressure set points of the second operating pressure regulating valve;
SCADA system is set according to the pressure of the first operating pressure regulating valve and the second operating pressure regulating valve Value selection is described to carry out online pressure regulation with pressure regulation tap line or the spare pressure regulation tap line;
After online pressure regulation, natural gas is exported by second header.
It is described when carrying out online pressure regulation with pressure regulation tap line when selecting as further improvement of the invention, it is described First pressure controller, the second pressure controller and the high relay of the first pressure are controlled respectively according to pressure set points Make the first monitoring pressure-regulating valve, the first operating pressure regulating valve and first process bands executing agency ball valve Valve opening;
When selecting the spare pressure regulation tap line to carry out online pressure regulation, the third pressure controller, the described 4th Pressure controller and the high relay of two pressure controlled respectively according to pressure set points it is described second monitoring pressure-regulating valve, The valve opening of the second operating pressure regulating valve and second process bands executing agency ball valve.
As further improvement of the invention, first process bands executing agency ball valve, the first monitoring pressure tune Valve, the first operating pressure regulating valve, second process bands executing agency ball valve, the second monitoring pressure is saved to adjust Valve, the second operating pressure regulating valve flow signal access after instrument junction box and be sent into SCADA system and supervised in real time It surveys.
As further improvement of the invention, the first pressure transmitter, the second pressure transmitter and third pressure First pressure controller described in power transmitter real-time monitoring, the second pressure controller and the high relay of the first pressure Pressure value and pressure signal is accessed after instrument junction box and is sent into SCADA system and carries out real-time monitoring;
Described in 4th pressure transmitter, the 5th pressure transmitter and the 6th pressure transmitter real-time monitoring Third pressure controller, the pressure value of the 4th pressure controller and the high relay of the second pressure and by pressure signal SCADA system progress real-time monitoring is sent into after accessing instrument junction box.
It is improved as of the invention further, the temperature letter of the described first thermometer and the described second thermometer on the spot on the spot It number accesses after instrument junction box and is sent into SCADA system and carries out real-time monitoring.
As further improvement of the invention, when setting pressure set points: the pressure of the second pressure controller is set Definite value is SP, and the pressure set points of the first pressure controller are SP+ △ P1, the pressure of the high relay of the first pressure Setting value is SP+ △ P2, and the pressure set points of the 4th pressure controller are SP- △ P1, the third pressure controller Pressure set points are SP+ △ P1, and the pressure set points of the high relay of the second pressure are SP+ △ P2;
Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, and SP is greater than SP- △ P1.
It is improved as of the invention further, further includes: to described with pressure regulation tap line and the spare pressure regulation branch Blow-down pipe on the pipeline of road is vented.
As further improvement of the invention, between the first technique ball valve and the first process bands executing agency ball valve With the natural gas in pressure regulation tap line by being set between the first technique ball valve and the first process bands executing agency ball valve The first blow-down pipe set is vented;
Between first process bands executing agency's ball valve and the first monitoring pressure-regulating valve with pressure regulation branch Natural gas on pipeline between first process bands executing agency's ball valve and the first monitoring pressure-regulating valve by being arranged The second blow-down pipe be vented;
Between the first operating pressure regulating valve and the first check-valve with natural in pressure regulation tap line Gas is vented by the third blow-down pipe being arranged between the first operating pressure regulating valve and the first check-valve.
As further improvement of the invention, between the 7th technique ball valve and the second process bands executing agency ball valve Natural gas in spare pressure regulation tap line between the 7th technique ball valve and the second process bands executing agency ball valve by setting The 4th blow-down pipe set is vented;
Spare pressure regulation branch between second process bands executing agency's ball valve and the second monitoring pressure-regulating valve Natural gas on pipeline between second process bands executing agency's ball valve and the second monitoring pressure-regulating valve by being arranged The 5th blow-down pipe be vented;
It is natural in spare pressure regulation tap line between the second operating pressure regulating valve and the 7th shut-off valve Gas is vented by the 6th blow-down pipe being arranged between the second operating pressure regulating valve and the 7th shut-off valve.
It is improved as of the invention further, when the first technique ball valve breaks down, natural gas passes through described the The first by-pass line for being arranged on one technique ball valve enters described with pressure regulation tap line;
When the 7th technique ball valve break down when, natural gas by be arranged on the 7th technique ball valve second by Road pipeline enters the spare pressure regulation tap line.
The invention has the benefit that the entire handoff procedure of gas pipeline yard voltage-regulating system can be realized, without artificial dry In advance, on-line automatic completion, smooth transition, high reliablity.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the hot standby regulator online of gas pipeline described in the embodiment of the present invention.
1, first flange;2, the first process pipelines;3, pipe cap;4, the first header;5-1, with pressure regulation tap line;5-2, First technique ball valve;5-3, the first process bands executing agency ball valve;5-4, the first monitoring pressure-regulating valve;5-5, the first movement pressure Force regulating valve;5-6, first check-valve;5-7, the second technique ball valve;5-8, third technique ball valve;5-9, the first shut-off valve;5- 10, the first by-pass line;5-11, the first blow-down pipe;5-12, the 4th technique ball valve;5-13, the second shut-off valve;5-14, third Flange;5-15, the second blow-down pipe;5-16, the 5th technique ball valve;5-17, third shut-off valve;5-18, the 4th flange;5-19, Third blow-down pipe;5-20, the 6th technique ball valve;5-21, the 4th shut-off valve;5-22, the 5th flange;5-23, first are with regard to ground temperature Spend table;5-24, first pressure transmitter;5-25, second pressure transmitter;5-26, third pressure transmitter;5-27, the first pressure Force controller;5-28, second pressure controller;The high relay of 5-29, first pressure;5-30, first instrument cable;5-31, Second instrument cable;5-32, third instrument cable;5-33, the 4th instrument cable;5-34, the 5th instrument cable;5-35, the 6th Instrument cable;6-1, spare pressure regulation tap line;6-2, the 7th technique ball valve;6-3, the second process bands executing agency ball valve;6- 4, the second monitoring pressure-regulating valve;6-5, the second operating pressure regulating valve;6-6, second check-valve;6-7, the 8th technique ball valve; 6-8, the 9th technique ball valve;6-9, the 5th shut-off valve;6-10, the second by-pass line;6-11, the 4th blow-down pipe;6-12, the tenth Technique ball valve;6-13, the 6th shut-off valve;6-14, the 6th flange;6-15, the 5th blow-down pipe;6-16, the 11st technique ball valve; 6-17, the 7th shut-off valve;6-18, the 7th flange;6-19, the 6th blow-down pipe;6-20, the 12nd technique ball valve;6-21, the 8th Shut-off valve;6-22, eight treating observances are blue;The thermometer on the spot of 6-23, second;6-24, the 4th pressure transmitter;6-25, the 5th pressure become Send device;6-26, the 6th pressure transmitter;6-27, third pressure controller;6-28, the 4th pressure controller;6-29, the second pressure Li Gaogao relay;6-30, the 7th instrument cable;6-31, the 8th instrument cable;6-32, the 9th instrument cable;6-33, the tenth Instrument cable;6-34, the 11st instrument cable;6-35, the 12nd instrument cable;7, the second header;8, the second process pipelines;9, Second flange.
Specific embodiment
The present invention is described in further detail below by specific embodiment and in conjunction with attached drawing.
A kind of gas pipeline of the embodiment of the present invention hot standby pressure regulation method online, this method comprises:
It is connected between the first header 4 and the second header 7 with pressure regulation tap line 5-1 and spare pressure regulation tap line 6- 1, and the first header 4 is connect with the first process pipelines 2, the second header 7 is connect with the second process pipelines 8;
With being sequentially connected in series the first technique ball valve 5-2, the first process bands executing agency ball valve on pressure regulation tap line 5-1 5-3, first monitor pressure-regulating valve 5-4, the first operating pressure regulating valve 5-5, first thermometer 5-23, first pressure change on the spot Send device 5-24, second pressure transmitter 5-25, third pressure transmitter 5-26, first check-valve 5-6 and the second technique ball valve 5- 7;
First pressure controller 5-27 is connect with the first monitoring pressure-regulating valve 5-4 and first pressure transmitter 5-24, Second pressure controller 5-28 is connect with the first operating pressure regulating valve 5-5 and second pressure transmitter 5-25, by the first pressure Li Gaogao relay 5-29 is connect with the first process bands executing agency ball valve 5-3 and third pressure transmitter 5-26;
The 7th technique ball valve 6-2, the second process bands executing agency ball have been sequentially connected in series on spare pressure regulation tap line 6-1 Valve 6-3, second monitor pressure-regulating valve 6-4, the second operating pressure regulating valve 6-5, second thermometer 6-23, the 4th pressure on the spot Transmitter 6-24, the 5th pressure transmitter 6-25, the 6th pressure transmitter 6-26, second check-valve 6-6 and the 8th technique ball valve 6-7;
Third pressure controller 6-27 is connect with the second monitoring pressure-regulating valve 6-4 and the 4th pressure transmitter 6-24, 4th pressure controller 6-28 is connect with the second operating pressure regulating valve 6-5 and the 5th pressure transmitter 6-25, by the second pressure Li Gaogao relay 6-29 is connect with the second process bands executing agency ball valve 6-3 and the 6th pressure transmitter 6-26;
Natural gas inputs the first header 4, and is respectively enterd by the first technique ball valve 5-2 and the 7th technique ball valve 6-2 With pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1;
Be set separately first pressure controller 5-27, second pressure controller 5-28, the high relay 5-29 of first pressure, The pressure set points of third pressure controller 6-27, the 4th pressure controller 6-28 and the high relay 6-29 of second pressure, and Ensure that the pressure set points of the first operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 are different;
SCADA system is according to the pressure set points of the first operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 Selection is carrying out online pressure regulation with pressure regulation tap line 5-1 or spare pressure regulation tap line 6-1;
After online pressure regulation, natural gas is exported by the second header 7.
When selection when carrying out online pressure regulation with pressure regulation tap line 5-1, first pressure controller 5-27, second pressure control The device 5-28 processed and high relay 5-29 of first pressure controlled respectively according to pressure set points the first monitoring pressure-regulating valve 5-4, The valve opening of first operating pressure regulating valve 5-5 and the first process bands executing agency ball valve 5-3;
When selecting spare pressure regulation tap line 6-1 to carry out online pressure regulation, third pressure controller 6-27, the 4th pressure control The device 6-28 processed and high relay 6-29 of two pressure controls the second monitoring pressure-regulating valve 6-4, according to pressure set points respectively The valve opening of two operating pressure regulating valve 6-5 and the second process bands executing agency ball valve 6-3.
First process bands executing agency ball valve 5-3, the first monitoring pressure-regulating valve 5-4, the first operating pressure regulating valve 5- 5, the flow of the second process bands executing agency ball valve 6-3, the second monitoring pressure-regulating valve 6-4, the second operating pressure regulating valve 6-5 Signal is sent into SCADA system progress real-time monitoring after accessing instrument junction box.
First pressure transmitter 5-24, second pressure transmitter 5-25 and third pressure transmitter 5-26 real-time monitoring first The pressure value of pressure controller 5-27, second pressure controller 5-28 and the high relay 5-29 of first pressure and by pressure signal SCADA system progress real-time monitoring is sent into after accessing instrument junction box.4th pressure transmitter 6-24, the 5th pressure transmitter 6-25 and the 6th pressure transmitter 6-26 real-time monitoring third pressure controller 6-27, the 4th pressure controller 6-28 and the second pressure Pressure signal is simultaneously accessed after instrument junction box and is sent into SCADA system and is supervised in real time by the pressure value of Li Gaogao relay 6-29 It surveys.
The temperature signal of the first thermometer 6-23 on the spot of thermometer 5-23 and second on the spot is sent after accessing instrument junction box Enter SCADA system and carries out real-time monitoring.
When setting pressure set points: by the pressure set points of second pressure controller 5-28 as SP, first pressure controller The pressure set points of 5-27 are SP+ △ P1, and the pressure set points of the high relay 5-29 of first pressure are SP+ △ P2, the 4th pressure The pressure set points of force controller 6-28 are SP- △ P1, and the pressure set points of third pressure controller 6-27 are SP+ △ P1, the The pressure set points of the high relay 6-29 of two pressure are SP+ △ P2;Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, SP are greater than SP- △ P1.In general, △ P1=0.05MPa, △ P2=0.1MPa.
By with the first operating pressure regulating valve 5-5 and spare pressure regulation tap line 6-1 on pressure regulation tap line 5-1 On the second operating pressure regulating valve 6-5 pressure set points it is different, realize with pressure regulation tap line 5-1 and spare pressure regulation The on-line automatic switching of tap line 6-1 is not necessarily to manual intervention.
Further, further includes: to the blow-down pipe on pressure regulation tap line 5-1 and spare pressure regulation tap line 6-1 Line is vented.
Specifically, between the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 with pressure regulation bypass duct Natural gas on line 5-1 passes through first be arranged between the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 and puts Blank pipe line 5-11 is vented.
Between the monitoring of first process bands executing agency ball valve 5-3 and first pressure-regulating valve 5-4 with pressure regulation bypass duct Natural gas on line 5-1 is by being arranged between the monitoring of the first process bands executing agency ball valve 5-3 and first pressure-regulating valve 5-4 Second blow-down pipe 5-15 is vented.
Between first operating pressure regulating valve 5-5 and first check-valve 5-6 with natural on pressure regulation tap line 5-1 Gas passes through the third blow-down pipe 5-19 being arranged between the first operating pressure regulating valve 5-5 and first check-valve 5-6 and is vented.
On spare pressure regulation tap line 6-1 between 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3 Natural gas pass through the 4th blow-down pipe that is arranged between the 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3 6-11 is vented.
Spare pressure regulation bypass duct between the monitoring of second process bands executing agency ball valve 6-3 and second pressure-regulating valve 6-4 Natural gas on line 6-1 is by being arranged between the monitoring of the second process bands executing agency ball valve 6-3 and second pressure-regulating valve 6-4 5th blow-down pipe 6-15 is vented.
The day on spare pressure regulation tap line 6-1 between second operating pressure regulating valve 6-5 and the 7th shut-off valve 6-17 Right gas passes through the 6th blow-down pipe 6-19 being arranged between the second operating pressure regulating valve 6-5 and the 7th shut-off valve 6-17 and is put It is empty.
Further, when the first technique ball valve 5-2 breaks down, natural gas on the first technique ball valve 5-2 by being arranged The first by-pass line 5-10 enter with pressure regulation tap line 5-1.When the 7th technique ball valve 6-2 breaks down, natural gas Enter spare pressure regulation tap line 6-1 by the second by-pass line 6-10 being arranged on the 7th technique ball valve 6-2.
Hot standby pressure regulation method is hot standby online based on gas pipeline as shown in Figure 1 online for gas pipeline of the present invention Regulator, the device are included in online hot standby pressure control device and spare online hot standby pressure control device.Wherein one Hot standby pressure control device is included in pressure regulation tap line 5-1 and the first voltage regulator controllers Lu Yong online.With pressure regulation branch The road both ends pipeline 5-1 are connect with the first header 4 and the second header 7 respectively, with being sequentially connected in series on pressure regulation tap line 5-1 One technique ball valve 5-2, the first process bands executing agency ball valve 5-3, the first monitoring pressure-regulating valve 5-4, the first operating pressure tune Save valve 5-5, first thermometer 5-23, first pressure transmitter 5-24, second pressure transmitter 5-25, third pressure inverting on the spot Device 5-26, first check-valve 5-6 and the second technique ball valve 5-7.First voltage regulator controllers include and first monitors pressure-regulating valve The 5-4 and first pressure controller 5-27 of first pressure transmitter 5-24 connection and the first operating pressure regulating valve 5-5 and second The second pressure controller 5-28 of pressure transmitter 5-25 connection and with the first process bands executing agency ball valve 5-3 and third The high relay 5-29 of first pressure of pressure transmitter 5-26 connection.
In addition spare online hot standby pressure control device includes spare pressure regulation tap line 6-1 and the second Regulation Control all the way Device.The spare both ends pressure regulation tap line 6-1 are connect with the first header 4 and the second header 7 respectively, spare pressure regulation tap line 6-1 On be sequentially connected in series the 7th technique ball valve 6-2, the second process bands executing agency ball valve 6-3, second monitoring pressure-regulating valve 6-4, Second operating pressure regulating valve 6-5, second thermometer 6-23, the 4th pressure transmitter 6-24, the 5th pressure transmitter 6- on the spot 25, the 6th pressure transmitter 6-26, second check-valve 6-6 and the 8th technique ball valve 6-7.Second voltage regulator controllers include and second Monitor the third pressure controller 6-27 and the second operating pressure of pressure-regulating valve 6-4 and the 4th pressure transmitter 6-24 connection 4th pressure controller 6-28 of regulating valve 6-5 and the 5th pressure transmitter 6-25 connection and machine is executed with the second process bands The high relay 6-29 of second pressure of structure ball valve 6-3 and the 6th pressure transmitter 6-26 connection.
Wherein, the first header 4 is connect with 2 one end of the first process pipelines, 2 other end of the first process pipelines and first flange 1 Connection, the second header 7 are connect with 8 one end of the second process pipelines, and 8 other end of the second process pipelines is connect with second flange 9.First The both ends of header 4 and the second header 7 are all connected with pipe cap 3.
First technique ball valve 5-2 is equipped with the first by-pass line 5-10, and first one end by-pass line 5-10 is connected to first Between header 4 and the first technique ball valve 5-2 on pressure regulation tap line 5-1, the connection of the first by-pass line 5-10 other end Between the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 on pressure regulation tap line 5-1.First Along natural gas flow to being sequentially connected in series third technique ball valve 5-8 and the first shut-off valve 5-9 on by-pass line 5-10.
First one end blow-down pipe 5-11 is connected to the first technique ball valve 5-2 and the first process bands executing agency ball valve 5-3 Between on pressure regulation tap line 5-1, the first blow-down pipe 5-11 other end is vented by third flange 5-14 and yard System is connected.Along natural gas flow to being sequentially connected in series the 4th technique ball valve 5-12 and the second shut-off valve 5- on first blow-down pipe 5-11 13.Second one end blow-down pipe 5-15 is connected to the monitoring of the first process bands executing agency ball valve 5-3 and first pressure-regulating valve 5-4 Between on pressure regulation tap line 5-1, the second blow-down pipe 5-15 other end is vented by the 4th flange 5-18 and yard System is connected.Along natural gas flow to being sequentially connected in series the 5th technique ball valve 5-16 and third shut-off valve 5- on second blow-down pipe 5-15 17.The one end third blow-down pipe 5-19 be connected between third pressure transmitter 5-26 and first check-valve 5-6 with pressure regulation On tap line 5-1, the third blow-down pipe 5-19 other end is connected by the 5th flange 5-22 with yard blowdown system.Third is put Along natural gas flow to being sequentially connected in series the 6th technique ball valve 5-20 and the 4th shut-off valve 5-21 on blank pipe line 5-19.
7th technique ball valve 6-2 is equipped with the second by-pass line 6-10, and second one end by-pass line 6-10 is connected to first On spare pressure regulation tap line 6-1 between header 4 and the 7th technique ball valve 6-2, the connection of the second by-pass line 6-10 other end On spare pressure regulation tap line 6-1 between the 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3.Second Along natural gas flow to being sequentially connected in series the 9th technique ball valve 6-8 and the 5th shut-off valve 6-9 on by-pass line 6-10.
4th one end blow-down pipe 6-11 is connected to the 7th technique ball valve 6-2 and the second process bands executing agency ball valve 6-3 Between spare pressure regulation tap line 6-1 on, the 4th blow-down pipe 6-11 other end is vented by the 6th flange 6-14 and yard System is connected.Along natural gas flow to being sequentially connected in series the tenth technique ball valve 6-12 and the 6th shut-off valve 6- on 4th blow-down pipe 6-11 13.5th one end blow-down pipe 6-15 is connected to the monitoring of the second process bands executing agency ball valve 6-3 and second pressure-regulating valve 6-4 Between spare pressure regulation tap line 6-1 on, the 5th blow-down pipe 6-15 other end is vented by the 7th flange 6-18 and yard System is connected.Along natural gas flow to being sequentially connected in series the 11st technique ball valve 6-16 and the 7th shut-off valve on 5th blow-down pipe 6-15 6-17.6th one end blow-down pipe 6-19 connects the spare pressure regulation between the 6th pressure transmitter 6-26 and second check-valve 6-6 On tap line 6-1, the 6th blow-down pipe 6-19 other end is connected by eight treating observances orchid 6-22 with yard blowdown system.6th puts Along natural gas flow to being sequentially connected in series the 12nd technique ball valve 6-20 and the 8th shut-off valve 6-21 on blank pipe line 6-19.
First pressure transmitter 5-24 is connect by first instrument cable 5-30 with first pressure controller 5-27, the first prison Pressure control force regulating valve 5-4 is connect by the 4th instrument cable 5-33 with first pressure controller 5-27, second pressure transmitter 5- 25 are connect by second instrument cable 5-31 with second pressure controller 5-28, and the first operating pressure regulating valve 5-5 passes through the 5th Instrument cable 5-34 is connect with second pressure controller 5-28, third pressure transmitter 5-26 by third instrument cable 5-32 with The high relay 5-29 connection of first pressure, the first process bands executing agency ball valve 5-3 pass through the 6th instrument cable 5-35 and the The high relay 5-29 connection of one pressure.4th pressure transmitter 6-24 is controlled by the 7th instrument cable 6-30 and third pressure Device 6-27 connection, the second monitoring pressure-regulating valve 6-4 are connect by the tenth instrument cable 6-33 with third pressure controller 6-27, 5th pressure transmitter 6-25 is connect by the 8th instrument cable 6-31 with the 4th pressure controller 6-28, the second operating pressure tune Section valve 6-5 is connect by the 11st instrument cable 6-34 with the 4th pressure controller 6-28, and the 6th pressure transmitter 6-26 passes through 9th instrument cable 6-32 is connect with the high relay 6-29 of second pressure, and the second process bands executing agency ball valve 6-3 passes through the 12 instrument cable 6-35 are connect with the high relay 6-29 of second pressure.
Wherein, the first process bands executing agency ball valve 5-3 and the second process bands executing agency ball valve 6-3 is that full-bore is double Guan Shuan lets out valve, and failure is closed;First monitoring pressure-regulating valve 5-4 and the second monitoring pressure-regulating valve 6-4 is that failure is closed;First Operating pressure regulating valve 5-5 and the second operating pressure regulating valve 6-5 is that failure is opened.
With the third pressure transmitter 5-26 on pressure regulation tap line 5-1 downstream and spare pressure regulation tap line 6-1 On the downstream of the 6th pressure transmitter 6-26 be respectively provided with first check-valve 5-6 and second check-valve 6-6, prevent with tune The pressure anti-channeling for pressing tap line 5-1 and spare pressure regulation tap line 6-1 guarantees with pressure regulation tap line 5-1 and spare tune It presses the pressure of tap line 6-1 acquisition respectively independent, avoids downstream pressure superelevation while triggering in all pressure regulation tap lines Technique block valve.All shut-off valves of the invention are all made of axial flow type check valve.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of gas pipeline hot standby pressure regulation method online, which is characterized in that this method comprises:
It is connected between the first header (4) and the second header (7) with pressure regulation tap line (5-1) and spare pressure regulation tap line (6-1), and first header (4) is connect with the first process pipelines (2), by second header (7) and the second process duct Line (8) connection;
Described with being sequentially connected in series the first technique ball valve (5-2), the first process bands executing agency on pressure regulation tap line (5-1) Ball valve (5-3), first monitor the thermometer (5- on the spot of pressure-regulating valve (5-4), the first operating pressure regulating valve (5-5), first 23), first pressure transmitter (5-24), second pressure transmitter (5-25), third pressure transmitter (5-26), first check-valve (5-6) and the second technique ball valve (5-7);
By first pressure controller (5-27) and first monitoring pressure-regulating valve (5-4) and the first pressure transmitter (5-24) connection, by second pressure controller (5-28) and the first operating pressure regulating valve (5-5) and the second pressure Transmitter (5-25) connection, by the high relay (5-29) of first pressure and first process bands executing agency ball valve (5-3) It is connected with the third pressure transmitter (5-26);
The 7th technique ball valve (6-2) is sequentially connected in series on the spare pressure regulation tap line (6-1), the second process bands execute machine Structure ball valve (6-3), second monitor the thermometer (6- on the spot of pressure-regulating valve (6-4), the second operating pressure regulating valve (6-5), second 23), the 4th pressure transmitter (6-24), the 5th pressure transmitter (6-25), the 6th pressure transmitter (6-26), second check-valve (6-6) and the 8th technique ball valve (6-7);
By third pressure controller (6-27) and second monitoring pressure-regulating valve (6-4) and the 4th pressure transmitter (6-24) connection, by the 4th pressure controller (6-28) and the second operating pressure regulating valve (6-5) and the 5th pressure Transmitter (6-25) connection, by the high relay (6-29) of second pressure and second process bands executing agency ball valve (6-3) It is connected with the 6th pressure transmitter (6-26);
Natural gas inputs first header (4), and passes through the first technique ball valve (5-2) and the 7th technique ball valve (6-2) respectively enters described with pressure regulation tap line (5-1) and the spare pressure regulation tap line (6-1);
The first pressure controller (5-27), the second pressure controller (5-28), first pressure height is set separately High relay (5-29), the third pressure controller (6-27), the 4th pressure controller (6-28) and second pressure The pressure set points of Li Gaogao relay (6-29), and ensure that the first operating pressure regulating valve (5-5) and described second is moved The pressure set points for making pressure-regulating valve (6-5) are different;
SCADA system is according to the pressure of the first operating pressure regulating valve (5-5) and the second operating pressure regulating valve (6-5) The selection of power setting value is described to carry out online pressure regulation with pressure regulation tap line (5-1) or the spare pressure regulation tap line (6-1);
After online pressure regulation, natural gas is exported by second header (7).
2. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that when selection is described with tune When tap line (5-1) being pressed to carry out online pressure regulation, the first pressure controller (5-27), the second pressure controller (5- 28) and the high relay (5-29) of the first pressure controls the first monitoring pressure-regulating valve according to pressure set points respectively The valve opening of (5-4), the first operating pressure regulating valve (5-5) and first process bands executing agency ball valve (5-3);
When selecting the spare pressure regulation tap line (6-1) to carry out online pressure regulation, the third pressure controller (6-27), institute State the 4th pressure controller (6-28) and described in the high relay (6-29) of two pressure controls respectively according to pressure set points Second monitoring pressure-regulating valve (6-4), the second operating pressure regulating valve (6-5) and second process bands executing agency ball The valve opening of valve (6-3).
3. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that first process bands are held It is row mechanism ball valve (5-3), first monitoring pressure-regulating valve (5-4), the first operating pressure regulating valve (5-5), described Second process bands executing agency ball valve (6-3), second monitoring pressure-regulating valve (6-4), second operating pressure are adjusted The flow signal of valve (6-5) is sent into SCADA system progress real-time monitoring after accessing instrument junction box.
4. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that the first pressure pick-up First pressure control described in device (5-24), the second pressure transmitter (5-25) and third pressure transmitter (5-26) real-time monitoring Device (5-27) processed, the second pressure controller (5-28) and the high relay (5-29) of the first pressure pressure value and will Pressure signal is sent into SCADA system progress real-time monitoring after accessing instrument junction box;
4th pressure transmitter (6-24), the 5th pressure transmitter (6-25) and the 6th pressure transmitter (6- 26) third pressure controller (6-27), the 4th pressure controller (6-28) described in real-time monitoring and the second pressure are high Pressure signal is simultaneously accessed after instrument junction box and is sent into SCADA system and is supervised in real time by the pressure value of high relay (6-29) It surveys.
5. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that the described first temperature on the spot The temperature signal of table (5-23) and the described second thermometer (6-23) on the spot access after instrument junction box be sent into SCADA system into Row real-time monitoring.
6. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that setting pressure set points When: it is SP, the pressure of the first pressure controller (5-27) by the pressure set points of the second pressure controller (5-28) Setting value is SP+ △ P1, and the pressure set points of the high relay (5-29) of the first pressure are SP+ △ P2, the 4th pressure The pressure set points of force controller (6-28) are SP- △ P1, and the pressure set points of the third pressure controller (6-27) are SP+ △ P1, the pressure set points of the high relay (6-29) of the second pressure are SP+ △ P2;
Wherein, SP+ △ P2 is greater than SP+ △ P1, SP+ △ P1 and is greater than SP, and SP is greater than SP- △ P1.
7. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that further include: to it is described It is vented with the blow-down pipe in pressure regulation tap line (5-1) and the spare pressure regulation tap line (6-1).
8. gas pipeline according to claim 7 hot standby pressure regulation method online, which is characterized in that the first technique ball valve Passing through institute with the natural gas on pressure regulation tap line (5-1) between (5-2) and the first process bands executing agency ball valve (5-3) State the first blow-down pipe (5-11) being arranged between the first technique ball valve (5-2) and the first process bands executing agency ball valve (5-3) It is vented;
Between first process bands executing agency ball valve (5-3) and first monitoring pressure-regulating valve (5-4) with tune The natural gas on tap line (5-1) is pressed to press by first process bands executing agency ball valve (5-3) and first monitoring The second blow-down pipe (5-15) being arranged between force regulating valve (5-4) is vented;
Between the first operating pressure regulating valve (5-5) and the first check-valve (5-6) with pressure regulation tap line (5- 1) natural gas on by be arranged between the first operating pressure regulating valve (5-5) and the first check-valve (5-6) Three blow-down pipes (5-19) are vented.
9. gas pipeline according to claim 7 hot standby pressure regulation method online, which is characterized in that the 7th technique ball valve The natural gas on spare pressure regulation tap line (6-1) between (6-2) and the second process bands executing agency ball valve (6-3) passes through institute State the 4th blow-down pipe (6-11) being arranged between the 7th technique ball valve (6-2) and the second process bands executing agency ball valve (6-3) It is vented;
Spare tune between second process bands executing agency ball valve (6-3) and second monitoring pressure-regulating valve (6-4) The natural gas on tap line (6-1) is pressed to press by second process bands executing agency ball valve (6-3) and second monitoring The 5th blow-down pipe (6-15) being arranged between force regulating valve (6-4) is vented;
Spare pressure regulation tap line between the second operating pressure regulating valve (6-5) and the 7th shut-off valve (6-17) Natural gas on (6-1) between the second operating pressure regulating valve (6-5) and the 7th shut-off valve (6-17) by being arranged The 6th blow-down pipe (6-19) be vented.
10. gas pipeline according to claim 1 hot standby pressure regulation method online, which is characterized in that when first technique When ball valve (5-2) breaks down, natural gas passes through the first by-pass line (5-10) for being arranged on the first technique ball valve (5-2) Into described with pressure regulation tap line (5-1);
When the 7th technique ball valve (6-2) is broken down, natural gas is by being arranged on the 7th technique ball valve (6-2) Second by-pass line (6-10) enters the spare pressure regulation tap line (6-1).
CN201811303101.0A 2018-11-02 2018-11-02 Online hot standby pressure regulating method for gas transmission pipeline Active CN109282145B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811303101.0A CN109282145B (en) 2018-11-02 2018-11-02 Online hot standby pressure regulating method for gas transmission pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811303101.0A CN109282145B (en) 2018-11-02 2018-11-02 Online hot standby pressure regulating method for gas transmission pipeline

Publications (2)

Publication Number Publication Date
CN109282145A true CN109282145A (en) 2019-01-29
CN109282145B CN109282145B (en) 2020-02-07

Family

ID=65175312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811303101.0A Active CN109282145B (en) 2018-11-02 2018-11-02 Online hot standby pressure regulating method for gas transmission pipeline

Country Status (1)

Country Link
CN (1) CN109282145B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023155275A1 (en) * 2022-02-21 2023-08-24 烟台杰瑞石油装备技术有限公司 Pressure regulating system and pressure regulating system control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ID20814A (en) * 1997-05-09 1999-03-11 Praxair Technology Inc PROCESSING AND PLANNING TO SUPPORT OR TO HELP A GAS DISTRIBUTION TOOL
CN204114569U (en) * 2014-09-28 2015-01-21 上海京盾科技经济信息有限公司 LNG air feeder
CN205261226U (en) * 2015-11-13 2016-05-25 天津华迈燃气装备股份有限公司 Large -scale regulator of brief multi -functional incessant air feed
CN106382466A (en) * 2016-12-14 2017-02-08 中国石油天然气集团公司 Gas conveying pipeline metering and pressure adjusting device and method
CN106439495A (en) * 2016-12-14 2017-02-22 中国石油天然气集团公司 Gas transmission pipe pressure and flow control system integrated skid-mounted device
CN205979184U (en) * 2016-07-29 2017-02-22 北京航天动力研究所 Sled dress formula pressure regulating system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ID20814A (en) * 1997-05-09 1999-03-11 Praxair Technology Inc PROCESSING AND PLANNING TO SUPPORT OR TO HELP A GAS DISTRIBUTION TOOL
CN204114569U (en) * 2014-09-28 2015-01-21 上海京盾科技经济信息有限公司 LNG air feeder
CN205261226U (en) * 2015-11-13 2016-05-25 天津华迈燃气装备股份有限公司 Large -scale regulator of brief multi -functional incessant air feed
CN205979184U (en) * 2016-07-29 2017-02-22 北京航天动力研究所 Sled dress formula pressure regulating system
CN106382466A (en) * 2016-12-14 2017-02-08 中国石油天然气集团公司 Gas conveying pipeline metering and pressure adjusting device and method
CN106439495A (en) * 2016-12-14 2017-02-22 中国石油天然气集团公司 Gas transmission pipe pressure and flow control system integrated skid-mounted device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023155275A1 (en) * 2022-02-21 2023-08-24 烟台杰瑞石油装备技术有限公司 Pressure regulating system and pressure regulating system control method

Also Published As

Publication number Publication date
CN109282145B (en) 2020-02-07

Similar Documents

Publication Publication Date Title
CN109653810B (en) One furnace with two-machine switching operation thermodynamic system
US8528314B2 (en) Method and apparatus for combined cycle power plant startup
CN109282145A (en) A kind of gas pipeline hot standby pressure regulation method online
CN108104888A (en) A kind of power grid frequency modulation system and method based on frequency modulation bypass
CN210343441U (en) Main reheat steam drainage system of steam turbine of thermal power plant
CN209213462U (en) A kind of gas pipeline hot standby regulator online
CN109340575A (en) A kind of online regulator and its online pressure regulation method of gas pipeline
CN108361683A (en) A kind of full load section reheating temperature intelligence control system
CN209510396U (en) A kind of two machine switchover operation therrmodynamic system of a furnace zone
CN211821676U (en) Unit main oil way simulation test system
CN212510516U (en) Device for realizing energy conservation of temperature and pressure reduction device in hot standby state
CN109210376A (en) A kind of gas pipeline hot standby regulator online
CN103225743A (en) Transportation and distribution method for natural gas
CN113819400B (en) Multi-source integrated automatic switching combined steam supply system and method
US4703722A (en) Boiler starting system
CN111207286B (en) Unit main oil way simulation test system
CN219828563U (en) Safety pressure increasing and reducing device for heating system
CN106246261A (en) The system of the 350MW supercritical in line Air-Cooling Island of double extraction unit feed pump turbine and method of work thereof
CN220890274U (en) Steam turbine generator unit low-pressure heater drainage system and steam turbine generator unit
CN110185932B (en) Online hot standby pressure regulating device of pressure reducing station of finished oil pipeline
CN210107064U (en) Online hot standby automatic pressure regulating device of finished oil pipeline pressure reduction station
JP3780789B2 (en) Steam turbine equipment
CN220049290U (en) Nitrogen purging device based on unit steam-water sampling system transformation
CN222011023U (en) Medium-pressure combined steam valve for hot-section heating pressure adjustment and thermodynamic system
CN215336275U (en) Boiler soot blowing steam source device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100120 Beijing Xicheng District six laying Kang

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Beijing Xicheng District six laying Kang

Applicant before: China National Petroleum Corp.

Applicant before: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20191225

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Beijing Xicheng District six laying Kang

Applicant before: CHINA NATIONAL PETROLEUM Corp.

Applicant before: China Petroleum Pipeline Engineering Co.,Ltd.

Applicant before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant