CN109339811A - A kind of rock tunnel(ling) machine rollback method for dismounting - Google Patents

A kind of rock tunnel(ling) machine rollback method for dismounting Download PDF

Info

Publication number
CN109339811A
CN109339811A CN201811494375.2A CN201811494375A CN109339811A CN 109339811 A CN109339811 A CN 109339811A CN 201811494375 A CN201811494375 A CN 201811494375A CN 109339811 A CN109339811 A CN 109339811A
Authority
CN
China
Prior art keywords
machine
ling
rock tunnel
cutterhead
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811494375.2A
Other languages
Chinese (zh)
Other versions
CN109339811B (en
Inventor
齐梦学
单军
安龙飞
杨国清
王雁军
王建伟
孙若勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201811494375.2A priority Critical patent/CN109339811B/en
Publication of CN109339811A publication Critical patent/CN109339811A/en
Application granted granted Critical
Publication of CN109339811B publication Critical patent/CN109339811B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • E21D9/087Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • E21D9/0875Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
    • E21D9/0879Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket the shield being provided with devices for lining the tunnel, e.g. shuttering

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of rock tunnel(ling) machine rollback method for dismounting, characterized in that described method includes following steps: 1) cutterhead side block is removed;2) drilling machine and the disassembly of arch erector system;3) side/top shield is removed;4) driving section retracts;5) stepping section retracts;6) complete machine is dismantled.Use the present invention has the advantage that: (1), cancel the disassembly cavern for expanding section and dismantle cavern and the auxiliary construction channel that is arranged for construction, effectively solves the problems, such as in the case of great burying too long accessory channel, accessory channel and to dismantle cavern con struction long in time limit, at high cost, reduce ancillary works amount, saves construction investment;(2) feasibility is high, operates convenient, overall short time limit;(3) compared with existing method for dismounting, without the equipment such as erection crane, 98% or more cost savings in disassembly cavern.(4) project amount is reduced, and plays the protection to environment.

Description

A kind of rock tunnel(ling) machine rollback method for dismounting
Technical field
The present invention relates to a kind of method for dismounting, especially a kind of rock tunnel(ling) machine rollback method for dismounting.
Background technique
Currently, for rock tunnel(ling) machine (TBM) disassembly, usually there are two types of modes: first is that dismantling in hole;After tunnel holing through, It disassembles and is transported to outside hole in the disassembly cavern for expanding section;Second is that being dismantled outside hole;After tunnel holing through, complete machine continuation is walked forward It proceeds to outside hole and disintegrates.
Disassembly needs to apply in advance in hole or TBM is tunneled and applied the disassembly cavern for expanding section, installation bridge-type after penetrating through The lifting equipments such as crane assist cavern and equipment installation period long, and especially big cross section TBM needs big cross section to dismantle cavern, Construction time is even up to 3~6 months, and economic cost and time cost are all very high.The precondition dismantled outside hole is that TBM is persistently dug It proceeds near tunnel portal or hole, the working condition is less in Construction practices.With the continuous popularization that TBM is applied, face The working condition faced is more and more harsh, and part engineering does not have directly driving and nearby or rapidly applies disassembly cavern to hole Condition.
Summary of the invention
It is an object of the invention to provide a kind of rock tunnel(ling) machine rollback disassemblies that economy and time cost can be effectively reduced Method.
It is realized the purpose of the present invention is technical solution in this way, a kind of rock tunnel(ling) machine rollback method for dismounting, institute The method of stating includes the following steps: 1) cutterhead side block dismounting;2) drilling machine and the disassembly of arch erector system;3) side/top shield is removed; 4) driving section retracts;5) stepping section retracts;6) complete machine is dismantled.
In order to meet the current condition that retracts, also need to carry out tunnel cross-section review step between the step 3) and step 4) Suddenly.
Further, in the step 1), mainly include the following steps:
(1) rock tunnel(ling) machine is retreated to the enough working spaces in front, cutterhead position is adjusted, so that one of cutterhead side block is in Underface, plane operate on disk while block and central block, while block and side block between weld seam;
(2) braking of confirmation cutterhead is good, remove immediately below first piece of cutterhead while block and central block, other while block between connection spiral shell Bolt simultaneously installs screw rod group, and cutterhead side block is slowly fallen on hole bottom using screw rod group, removes screw rod group;
(3) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes second piece of cutterhead side block at hole bottom according to above-mentioned steps;
(4) rock tunnel(ling) machine retreats 2m, and cutterhead is rotated by 90 °, and cutterhead is auxiliarily fixed with sleeper prevents unexpected rotation, according to above-mentioned Step removes third block cutterhead side block.
(5) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes the 4th piece of cutterhead side block according to above-mentioned steps.
In the step 2, when dismantling drilling machine and arch erector system, need to be torn open using auxiliary hanging point It unloads, meanwhile, it should be avoided in back off procedure and interfere with hole wall.
In the step 3), mainly include the following steps:
(1) by two sides overlap joint shield and top shield rigid connection;
(2) top shield falls back to bottom together with overlap joint shield and welds with guide holder;
(3) it removes guide holder and bolt is installed, shield, overlap joint shield and guide holder will be pushed up using top shield oil cylinder and jack disengaging together Driving assembly takes out spline, falls top shield after rise;
(4) top shield oil cylinder is removed, top shield and guide holder are integrally translated backward, and falls on girder platform;
(5) shield oil cylinder in side extend out to side shield abutting hole wall, and is fixed on Dong Bi using anchor pole, removes voussoir, oil cylinder and method Orchid, rock tunnel(ling) machine retreat.
In the step 4), mainly include the following steps:
(1) to support the tight hole wall of stretcher for boot and shoe, propelling cylinder is retracted, and rock tunnel(ling) machine complete machine is driven to move backward;
(2) propelling cylinder retract stroke terminates, and falls rear support and stretching hole bottom;
(3) support boots are detached from hole wall, and propelling cylinder stretches out, and pushing tow support boots move back;
(4) propelling cylinder stretches out stroke and terminates, and supports boots stretching hole wall again;
(5) rear support is packed up, continues to retract;So circulation, rock tunnel(ling) machine continuously retract;
(6) in rock tunnel(ling) machine back off procedure, connecting bridge region is synchronous remove in tunneling process after mating traveling rail and Steel sleeper, the sundries such as cleaning hole bed mud slag.
In the step 5), according to stepping segment length and section, continue rollback rock tunnel(ling) machine to disassembly place.
In the step 6), mainly include the following steps:
(1) TBM return back to position appropriate, when having knocked down condition, removes after rock tunnel(ling) machine mating section by section from the front to the back Vehicle and the mixed bridge of spray;
(2) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, remove connecting bridge;
(3) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, transport channel it is unimpeded after, have bad luck near face The components such as cutterhead, the shield removed;
Wherein, primary sequence dismantles tunnel piercing machine host: cutter head center block → propelling cylinder → support boots and support boots oil cylinder → master Tail beam and rear support → saddletree and girder middle section → girder leading portion → driving assembly → bottom shield.
Wherein, described is to remove in opposite side/top shield simultaneously or in advance to rollback hole section cross section to tunnel cross-section review Size is scanned, and is judged whether to meet the current condition of rock tunnel(ling) machine rollback after side/top shield is removed, may be sent out part The hole section advanced processing of raw interference, smoothly retracts for rock tunnel(ling) machine and creates conditions.
By adopting the above-described technical solution, the present invention has the advantage that:
(1), the auxiliary construction channel cancelling the disassembly cavern for expanding section and being arranged for construction disassembly cavern, effectively solves The problem that accessory channel is too long in the case of great burying, accessory channel and disassembly cavern con struction are long in time limit, at high cost, reduces auxiliary Project amount saves construction investment;
(2) feasibility is high, operates convenient, overall short time limit;
(3) compared with existing method for dismounting, without the equipment such as erection crane, 98% or more cost savings in disassembly cavern.
(4) project amount is reduced, and plays the protection to environment.
Detailed description of the invention
Detailed description of the invention of the invention is as follows:
Fig. 1 is that cutterhead of the invention dismantles flow diagram;
Fig. 2 is that shield of the invention dismantles flow diagram;
Fig. 3 is support boots rollback flow diagram of the invention.
Specific embodiment
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing, but the present invention does not limit to In these embodiments, any improvement or substitution on the present embodiment essence spirit still falls within the claims in the present invention and is wanted Seek the range of protection.
Embodiment 1: as shown in Figure 1, 2, 3, a kind of rock tunnel(ling) machine rollback method for dismounting, the method includes walking as follows Rapid: 1) cutterhead side block is removed;2) drilling machine and the disassembly of arch erector system;3) side/top shield is removed;4) driving section retracts;5) Stepping section retracts;6) complete machine is dismantled.
In order to judge whether cavern meets the current condition of rollback, also need to carry out tunnel between the step 3) and step 4) Road section checks step.
Wherein, described is to remove in opposite side/top shield simultaneously or in advance to rollback hole section cross section to tunnel cross-section review Size is scanned, and is judged whether to meet the current condition of rock tunnel(ling) machine rollback after side/top shield is removed, may be sent out part The hole section advanced processing of raw interference, smoothly retracts for rock tunnel(ling) machine and creates conditions.
It further describes, in the step 1), mainly includes the following steps:
(1) rock tunnel(ling) machine is retreated to the enough working spaces in front, cutterhead position is adjusted, so that one of cutterhead side block is in Underface, plane operate on disk while block and central block, while block and side block between weld seam;
(2) braking of confirmation cutterhead is good, remove immediately below first piece of cutterhead while block 1 and central block 5, other while block between connection Bolt simultaneously installs screw rod group, and cutterhead side block is slowly fallen on hole bottom using screw rod group, removes screw rod group;
(3) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes second piece of cutterhead side block 2 at hole bottom according to above-mentioned steps;
(4) rock tunnel(ling) machine retreats 2m, and cutterhead is rotated by 90 °, and cutterhead is auxiliarily fixed with sleeper prevents unexpected rotation, according to above-mentioned Step removes third block cutterhead side block 3.
(5) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes the 4th piece of cutterhead side block 4 according to above-mentioned steps.
In the step 2, when dismantling drilling machine and arch erector system, need to be torn open using auxiliary hanging point It unloads, meanwhile, it should be avoided in back off procedure and interfere with hole wall.
In the step 3), mainly include the following steps:
(1) two sides overlap joint shield 7 and top shield 6 are rigidly connected;
(2) top shield 6 falls back to bottom together with overlap joint shield 7 and welds with guide holder 9;
(3) it removes guide holder 9 and bolt is installed, shield 6, overlap joint shield 7 and guide holder 9 will be pushed up using top shield oil cylinder 10 and pushed up together It rises and is detached from driving assembly 13, take out spline, fall top shield after rise;
(4) top 6 oil cylinder of shield is removed, top shield 6 and 9 entirety of guide holder are translated backward, and falls on girder platform;
(5) side shield oil cylinder 11 extend out to side shield 8 and is close to hole wall, and is fixed on Dong Bi using anchor pole, remove voussoir, oil cylinder and Flange, rock tunnel(ling) machine retreat.
In the step 4), mainly include the following steps:
(1) to support 17 stretching hole wall of boots, propelling cylinder 15 is retracted, and rock tunnel(ling) machine complete machine is driven to move backward;
(2) 15 retract stroke of propelling cylinder terminates, and falls rear support 18 and stretching hole bottom;
(3) support boots 17 are detached from hole wall, and propelling cylinder 15 stretches out, and pushing tow support boots 17 move back;
(4) propelling cylinder 15 stretches out stroke and terminates, and supports the stretching hole wall again of boots 17;
(5) rear support 18 is packed up, continues to retract;So circulation, rock tunnel(ling) machine continuously retract;
(6) in rock tunnel(ling) machine back off procedure, connecting bridge region is synchronous remove in tunneling process after mating traveling rail and Steel sleeper 19, the sundries such as cleaning hole bed mud slag.
The present invention is using support boots back off technique, under normal circumstances, average daily rollback 250m-300m.
In this step, since tunnel cross-section is usually 200mm at least bigger than rock tunnel(ling) machine digging diameter, and drilling and blasting method Secondary lining wouldn't be often applied after construction, hole wall systematicness is poor.At this time if meeting the condition of the support tight hole wall of stretcher for boot and shoe, benefit It is retracted with step 4);If hole wall is relatively regular, after carrying out necessary transformation to support boots, returned using step 4) It moves back.
If cross dimensions is larger or hole wall is serious irregular and does not have treatment conditions, which can be selected folder Rail device rollback mode carries out or stepping mechanism rollback mode carries out, and certainly, idler wheel rollback, self-powered wheel group also may be selected Rollback, heavy body transporting unit rollback, tank trolley rollback, anticaustic rock tunnel(ling) machine stepping technique etc. are suitable for corresponding working condition Rollback mode.
In the step 5), according to stepping segment length and section, continue rollback rock tunnel(ling) machine to disassembly place.In step 5), can optional step 4 according to the actual situation in) rollback mode, anticaustic stepping mechanism can also be selected to return according to the actual situation Move back mode, rail clamping device and oil cylinder cooperation pushing tow rollback mode etc..
In the step 6), mainly include the following steps:
(1) TBM return back to position appropriate, when having knocked down condition, removes after rock tunnel(ling) machine mating section by section from the front to the back Vehicle and the mixed bridge of spray;
(2) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, remove connecting bridge;
(3) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, transport channel it is unimpeded after, have bad luck near face The components such as cutterhead, the shield removed;
Wherein, primary sequence dismantles tunnel piercing machine host: 5 → propelling cylinder of cutter head center block 15 → support boots 17 and support boots oil cylinder → girder tail end and 18 → saddletree of rear support and girder middle section 16 → girder, 14 → driving assembly of leading portion, 13 → bottom shield 12.
In the present invention, in rock tunnel(ling) machine back off procedure, host can slide backward along hole bottom, or backward along track Sliding;Mating trolley retracts along original track afterwards, to minimize rollback resistance.
Single phase tunnels under operating condition, and rock tunnel(ling) machine return back to assembling place (assembling cavern or Assembling outside the hole place) and tears open It unloads;Under two stages or multistage driving operating condition, rock tunnel(ling) machine return back to the intermediate auxiliary cavern to satisfy the requirements (such as maintenance hole Room) disassembly, it can also be return back to the disassembly of assembling place, should preferentially select the disassembly of auxiliary cavern.
It is laid with the tunnel of inverted arch prefabricated section in TBM tunneling process, needs to remove bottom shield, and is instead directed to specific operating condition The front end host cradle temporary support TBM of condition design.
In the present invention, by digging diameter 10m, Excavation Length 5km tunnel for, rollback dismantling technology applied more in the past Big cross section dismantles cavern compared to the saving duration 4 months or so.

Claims (9)

1. a kind of rock tunnel(ling) machine rollback method for dismounting, characterized in that described method includes following steps: 1) cutterhead side block is torn open It removes;2) drilling machine and the disassembly of arch erector system;3) side/top shield is removed;4) driving section retracts;5) stepping section retracts;6) whole Machine disassembly.
2. rock tunnel(ling) machine rollback method for dismounting as described in claim 1, it is characterized in that: the step 3) and step 4) it Between also need to carry out tunnel cross-section review step.
3. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 2, characterized in that main to wrap in the step 1) Include following steps:
(1) rock tunnel(ling) machine is retreated to the enough working spaces in front, cutterhead position is adjusted, so that one of cutterhead side block is in Underface, plane operate on disk while block and central block, while block and side block between weld seam;
(2) braking of confirmation cutterhead is good, remove immediately below first piece of cutterhead while block and central block, other while block between connection spiral shell Bolt simultaneously installs screw rod group, and cutterhead side block is slowly fallen on hole bottom using screw rod group, removes screw rod group;
(3) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes second piece of cutterhead side block at hole bottom according to above-mentioned steps;
(4) rock tunnel(ling) machine retreats 2m, and cutterhead is rotated by 90 °, and cutterhead is auxiliarily fixed with sleeper prevents unexpected rotation, according to above-mentioned Step removes third block cutterhead side block;
(5) rock tunnel(ling) machine retreats 2m, and cutterhead rotates 180 °, removes the 4th piece of cutterhead side block according to above-mentioned steps.
4. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 3, it is characterized in that: in the step 2, for boring When machine and arch erector system are dismantled, need to be dismantled using auxiliary hanging point, meanwhile, should be avoided in back off procedure with hole wall Interference.
5. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 4, characterized in that main to wrap in the step 3) Include following steps:
(1) by two sides overlap joint shield and top shield rigid connection;
(2) top shield falls back to bottom together with overlap joint shield and welds with guide holder;
(3) it removes guide holder and bolt is installed, shield, overlap joint shield and guide holder will be pushed up using top shield oil cylinder and jack disengaging together Driving assembly takes out spline, falls top shield after rise;
(4) top shield oil cylinder is removed, top shield and guide holder are integrally translated backward, and falls on girder platform;
(5) shield oil cylinder in side extend out to side shield abutting hole wall, and is fixed on Dong Bi using anchor pole, removes voussoir, oil cylinder and method Orchid, rock tunnel(ling) machine retreat.
6. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 5, characterized in that main to wrap in the step 4) Include following steps:
(1) to support the tight hole wall of stretcher for boot and shoe, propelling cylinder is retracted, and rock tunnel(ling) machine complete machine is driven to move backward;
(2) propelling cylinder retract stroke terminates, and falls rear support and stretching hole bottom;
(3) support boots are detached from hole wall, and propelling cylinder stretches out, and pushing tow support boots move back;
(4) propelling cylinder stretches out stroke and terminates, and supports boots stretching hole wall again;
(5) rear support is packed up, continues to retract;So circulation, rock tunnel(ling) machine continuously retract;
(6) in rock tunnel(ling) machine back off procedure, connecting bridge region is synchronous remove in tunneling process after mating traveling rail and Steel sleeper, the sundries such as cleaning hole bed mud slag.
7. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 6, characterized in that in the step 5), according to stepping Segment length and section continue rollback rock tunnel(ling) machine to disassembly place.
8. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 7, characterized in that main to wrap in the step 6) Include following steps:
(1) TBM return back to position appropriate, when having knocked down condition, removes after rock tunnel(ling) machine mating section by section from the front to the back Vehicle and the mixed bridge of spray;
(2) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, remove connecting bridge;
(3) tunnel piercing machine host and connecting bridge continue to return back to disassembly station, transport channel it is unimpeded after, have bad luck near face The components such as cutterhead, the shield removed;
Wherein, primary sequence dismantles tunnel piercing machine host: cutter head center block → propelling cylinder → support boots and support boots oil cylinder → master Tail beam and rear support → saddletree and girder middle section → girder leading portion → driving assembly → bottom shield.
9. rock tunnel(ling) machine rollback method for dismounting as claimed in claim 8, it is characterized in that: it is described to tunnel cross-section review be Opposite side/top shield, which is removed, simultaneously or is in advance scanned rollback hole section cross dimension, judges whether that meeting side/top shield tears open The current condition of rock tunnel(ling) machine rollback after removing is that rock tunnel(ling) machine is suitable to the hole section advanced processing that part may interfere Benefit retracts and creates conditions.
CN201811494375.2A 2018-12-07 2018-12-07 Tunnel boring machine backspacing dismounting method Active CN109339811B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811494375.2A CN109339811B (en) 2018-12-07 2018-12-07 Tunnel boring machine backspacing dismounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811494375.2A CN109339811B (en) 2018-12-07 2018-12-07 Tunnel boring machine backspacing dismounting method

Publications (2)

Publication Number Publication Date
CN109339811A true CN109339811A (en) 2019-02-15
CN109339811B CN109339811B (en) 2021-01-26

Family

ID=65303556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811494375.2A Active CN109339811B (en) 2018-12-07 2018-12-07 Tunnel boring machine backspacing dismounting method

Country Status (1)

Country Link
CN (1) CN109339811B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110410088A (en) * 2019-08-14 2019-11-05 中国铁建重工集团股份有限公司 Retractable tunneling machine and retraction method thereof
CN111322080A (en) * 2020-03-19 2020-06-23 西安建筑科技大学 Open TBM cutter head hole internal fixing method based on anchor rod locking process
CN111425213A (en) * 2020-04-17 2020-07-17 中铁十八局集团有限公司 In-tunnel rollback method for rock pipe jacking machine
CN112577768A (en) * 2020-12-14 2021-03-30 北京建工土木工程有限公司 Model test device for shield method main tunnel inner pump room mechanical construction back cover
CN112709577A (en) * 2020-12-24 2021-04-27 中交(广州)建设有限公司 In-tunnel transfer method of shield machine
CN113374480A (en) * 2021-06-07 2021-09-10 北京中煤矿山工程有限公司 Dismantling and well-exiting process for well drilling equipment of vertical shaft heading machine
CN113446020A (en) * 2021-08-03 2021-09-28 中国水利水电第三工程局有限公司 Non-hole-expanding type hole inner dismounting method for open type TBM (tunnel boring machine) host
CN114109403A (en) * 2021-11-05 2022-03-01 中铁工程装备集团有限公司 Inclined shaft TBM receiving method
CN114607403A (en) * 2022-03-31 2022-06-10 中铁隧道局集团有限公司 Method for quickly assembling initial construction equipment outside double-hole double-TBM tunnel by adopting continuous belt conveyor to discharge slag in limited field

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010174464A (en) * 2009-01-28 2010-08-12 Shimizu Corp Method of overhauling tunnel boring machine
CN105240022A (en) * 2015-09-21 2016-01-13 中铁十八局集团隧道工程有限公司 In-tunnel demounting method of TBM (tunnel boring machine) without expanding tunnel chamber
CN107035380A (en) * 2017-05-25 2017-08-11 淮南矿业(集团)有限责任公司 A kind of mining TBM retrusives method for dismounting
CN107575241A (en) * 2017-08-25 2018-01-12 康子纯 TBM and shield machine free to go forward or back out
CN108756909A (en) * 2018-05-04 2018-11-06 中国电建集团铁路建设有限公司 A kind of construction method of small space shield machine dismantling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010174464A (en) * 2009-01-28 2010-08-12 Shimizu Corp Method of overhauling tunnel boring machine
CN105240022A (en) * 2015-09-21 2016-01-13 中铁十八局集团隧道工程有限公司 In-tunnel demounting method of TBM (tunnel boring machine) without expanding tunnel chamber
CN107035380A (en) * 2017-05-25 2017-08-11 淮南矿业(集团)有限责任公司 A kind of mining TBM retrusives method for dismounting
CN107575241A (en) * 2017-08-25 2018-01-12 康子纯 TBM and shield machine free to go forward or back out
CN108756909A (en) * 2018-05-04 2018-11-06 中国电建集团铁路建设有限公司 A kind of construction method of small space shield machine dismantling

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110410088B (en) * 2019-08-14 2022-02-25 中国铁建重工集团股份有限公司 Retractable tunneling machine and retraction method thereof
CN110410088A (en) * 2019-08-14 2019-11-05 中国铁建重工集团股份有限公司 Retractable tunneling machine and retraction method thereof
CN111322080A (en) * 2020-03-19 2020-06-23 西安建筑科技大学 Open TBM cutter head hole internal fixing method based on anchor rod locking process
CN111322080B (en) * 2020-03-19 2021-06-29 西安建筑科技大学 Open TBM cutter head hole internal fixing method based on anchor rod locking process
CN111425213A (en) * 2020-04-17 2020-07-17 中铁十八局集团有限公司 In-tunnel rollback method for rock pipe jacking machine
CN111425213B (en) * 2020-04-17 2022-03-04 中铁十八局集团有限公司 In-tunnel rollback method for rock pipe jacking machine
CN112577768A (en) * 2020-12-14 2021-03-30 北京建工土木工程有限公司 Model test device for shield method main tunnel inner pump room mechanical construction back cover
CN112709577A (en) * 2020-12-24 2021-04-27 中交(广州)建设有限公司 In-tunnel transfer method of shield machine
CN113374480A (en) * 2021-06-07 2021-09-10 北京中煤矿山工程有限公司 Dismantling and well-exiting process for well drilling equipment of vertical shaft heading machine
CN113374480B (en) * 2021-06-07 2024-03-26 北京中煤矿山工程有限公司 Well unloading process for shaft boring machine well drilling equipment
CN113446020A (en) * 2021-08-03 2021-09-28 中国水利水电第三工程局有限公司 Non-hole-expanding type hole inner dismounting method for open type TBM (tunnel boring machine) host
CN114109403A (en) * 2021-11-05 2022-03-01 中铁工程装备集团有限公司 Inclined shaft TBM receiving method
CN114109403B (en) * 2021-11-05 2024-06-07 中铁工程装备集团有限公司 Inclined shaft TBM receiving method
CN114607403A (en) * 2022-03-31 2022-06-10 中铁隧道局集团有限公司 Method for quickly assembling initial construction equipment outside double-hole double-TBM tunnel by adopting continuous belt conveyor to discharge slag in limited field
CN114607403B (en) * 2022-03-31 2024-05-24 中铁隧道局集团有限公司 Method for quickly assembling initial construction equipment outside double-hole double-TBM tunnel by adopting continuous belt conveyor slag discharge in limited site

Also Published As

Publication number Publication date
CN109339811B (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN109339811A (en) A kind of rock tunnel(ling) machine rollback method for dismounting
WO2021056959A1 (en) Communication tunnel boring machine
WO2018082714A1 (en) Shield tunneling machine for tunnel connecting passageway and connecting passageway tunneling method thereof
CN103711499A (en) Shield tunneling machine split starting construction method
CN112343617B (en) Automatic mine roadway tunneling system
CN105626088B (en) T-shaped bored tunnel shield machine is gone into the well shift method
CN107178374B (en) Auxiliary supporting structure and front shield assembly of double-shield full-face rock tunnel boring machine
CN110671041A (en) Multifunctional tunneling integrated machine
CN102787847A (en) Roadway tunneling machine
CN110159289A (en) A kind of coal mine light section shield excavation machine
CN104790997A (en) Self-moving advance temporary supporting hydraulic bracket used for fully-mechanized excavation
CN108049886B (en) Slag discharging system of shield method connecting channel
CN108071403A (en) A kind of tunneling separate launching equipment
CN115288714A (en) Small-turning compact open-type full-face rock tunneling machine
CN108915714A (en) The double TBM installation methods in one hole
CN212406733U (en) Small-size rock gangway TBM entry driving machine
CN110410088B (en) Retractable tunneling machine and retraction method thereof
CN112228088A (en) Construction method of vertical shaft starting device for top-down pipe jacking construction in shield tunnel
CN112343613A (en) Construction method combining shield method and spray anchor support
CN107269286B (en) A kind of piping stretch system for tunnel piercing
CN114151090B (en) Method for disassembling and transporting TBM for two opposite constructions
CN110905824A (en) Tunnel slag discharging device, system and method
CN102536277A (en) Follower assorted supporting and anchoring system of cantilever type development machine
CN213775387U (en) Automatic change mining tunnelling machine
CN110159282A (en) A kind of construction technology of coal mine light section shield shield excavation machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant