CN109339464A - A kind of locker for steel construction horizontal sliding - Google Patents

A kind of locker for steel construction horizontal sliding Download PDF

Info

Publication number
CN109339464A
CN109339464A CN201811258412.XA CN201811258412A CN109339464A CN 109339464 A CN109339464 A CN 109339464A CN 201811258412 A CN201811258412 A CN 201811258412A CN 109339464 A CN109339464 A CN 109339464A
Authority
CN
China
Prior art keywords
locker
otic placode
plate
mounting plate
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811258412.XA
Other languages
Chinese (zh)
Other versions
CN109339464B (en
Inventor
包海明
杨少林
于光
史剑
史一剑
彭琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Research Institute Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201811258412.XA priority Critical patent/CN109339464B/en
Publication of CN109339464A publication Critical patent/CN109339464A/en
Application granted granted Critical
Publication of CN109339464B publication Critical patent/CN109339464B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses a kind of lockers for steel construction horizontal sliding, belong to the realm of building construction, including locker otic placode, locker ontology and locking wedge block, locker ontology is fixedly mounted below locker otic placode, locker ontology lower surface is equipped with the locking sliding slot for being used for installation locking voussoir and passing through for track, locking sliding slot the right and left is inclined ramp, locks and is equipped with symmetrical two locking wedge blocks on sliding slot;Locking wedge block is integrally in the shape of a right-angled ladder, and inclined side is contacted with inclined ramp;Adjusting screw rod is fixedly installed on locker otic placode, adjusting screw rod one end is cased with preloading spring, and preloading spring one end is fixedly connected on adjusting screw rod, and the other end is fixedly connected on locking wedge block.The beneficial effects of the present invention are: carrying out horizontal sliding construction using this locker, horizontal sliding function and steel construction are separated, have the characteristics that structure is simple, versatile, occupying little space is very suitable to narrow field environment, installation and easy to operate.

Description

A kind of locker for steel construction horizontal sliding
Technical field
The present invention relates to the realm of building construction more particularly to a kind of lockers for steel construction horizontal sliding.
Background technique
For large span complex steel structure engineering, such as stadiums, terminal, exhibition center Long Span Roof Structures, Since field condition is more complicated, can not be using full hall scaffold construction or fragment lifting due to narrow field, duration anxiety etc. Etc. forms of construction work, relatively be suitble to using slip mode construct.
Slipping and assembling platform generally ride upon large-span steel it is long to certain side, be sliding element platform for lining, and The starting point for implementing sliding can carry out down a piece of sliding after completing the assembly of a sliding element and sliding out platform for lining The assembly of unit.After piston shoes are removed in sliding design position, support is fixed in substructure, repeats this process until having constructed At.
As the application for a patent for invention of Publication No. CN107142966A discloses a kind of top dress cunning for reverse construction Rail horizontal transporter and its construction method, including be installed on the floor bottom surface of reverse construction upper layer track, sliding Device, lifting rope and transport vehicle, transport vehicle are lifted on the carriage by lifting rope, and carriage is installed on the track It goes up and can have and moved along track.The patent using lifting by the way of, have that structure is complicated, is not used to narrow field In environment, rock the problems such as serious.
For another example the utility model that notification number is CN207701143U discloses the complete tooling construction of two lining integration of one kind and sets It is standby, including guarded drainage construction part, two lining sliding slots by window enter mould pour part, vault band mould mortar depositing construction part and auxiliary move Part, the auxiliary movable part along being arranged in parallel to trimmed tunnel bottom surface central axes direction, and on the auxiliary movable part by It is interior to outer set gradually guarded drainage construction part, two lining sliding slots by window enter mould pour part and vault band mould mortar depositing construction part; The auxiliary movable part is set as including biserial slideway, movable block, column, crossbeam and retaining mechanism;The column is set as Telescopic column.It exists in the environment that structure is complicated, is not suitable for narrow field, the problems such as troublesome in poeration.
Summary of the invention
For overcome in the prior art building apply middle horizontal sliding device exist structure is complicated, be not suitable for narrow field environment, The problems such as inconvenient for installation and operation, the present invention provides a kind of lockers for steel construction horizontal sliding, including locker Otic placode, locker ontology and locking wedge block, the locker ontology are fixedly mounted below the locker otic placode, the locking Device ontology lower surface is equipped with the locking sliding slot for installing the locking wedge block and passing through for track, described locking sliding slot or so two While being inclined ramp, symmetrical two locking wedge blocks are installed on the locking sliding slot;The locking wedge block is whole In the shape of a right-angled ladder, inclined side is contacted with the inclined ramp;It is fixedly installed with adjusting screw rod on the locker otic placode, institute It states adjusting screw rod and is cased with preloading spring close to described locking wedge block one end, described preloading spring one end is fixedly connected on the adjusting On screw rod, the other end is fixedly connected on the locking wedge block.
Cooperated using locking wedge block, inclined ramp and preloading spring to lock and unlock track from track two sides, it is real Now to the clamping of track and loosen, and by the way that hydraulic cylinder is mounted on the pushing tow realized before and after locker otic placode on side to steel construction With pull, to reach horizontal sliding of the steel construction along track length direction.
Further, three right-angle sides of the locking wedge block are parallel with three sides on the locker ontology respectively, and two The locking wedge block is equipped among adjacent both sides for installing orbital pass in orbit.
Further, the locker otic placode includes front ear plate, rear otic placode, front ear plate mounting plate, rear otic placode mounting plate, locking Device ontology mounting plate and support plate, the locker ontology mounting plate lower surface are equipped with the locker ontology, the vestibule Plate mounting plate and it is described after otic placode mounting plate be fixedly mounted on the locker ontology mounting plate front and rear sides and with the locking Device ontology mounting plate is vertical, and the front ear plate and the rear otic placode are separately mounted to the front ear plate mounting plate and the rear otic placode On mounting plate;The support plate is mounted on the locker ontology mounting plate upper surface, and its front and rear sides is fixedly mounted on On the front ear plate mounting plate and the rear otic placode mounting plate.
Further, the adjusting screw rod is fixedly mounted on the rear otic placode mounting plate, and the preloading spring is covered described Adjusting screw rod front end.
Further, be separately installed at left and right sides of locker ontology lower surface for by the locking wedge block support in institute The voussoir supporting plate in locking sliding slot is stated, the voussoir supporting plate is fixedly mounted on the locker ontology by the first bolt.
Further, the front ear plate mounting plate is fixedly installed with antidumping hook plate close to the front ear plate on one side.
Further, the antidumping hook plate includes hook plate mounting portion and curved hook portion, and the hook plate mounting portion passes through second The antidumping hook plate is fixedly mounted on the front ear plate mounting plate by bolt, and the curved hook portion setting is pacified in the hook plate Fill subordinate portion close to track side and by track support on it.
Further, the front ear plate mounting plate and the rear otic placode mounting plate are equipped with the front ear plate passed through for track below Slot and rear otic placode slot, the curved hook portion are arranged in the front ear plate groove location.
Since track passes through among front ear plate slot and rear otic placode slot, upside and the left and right sides are limited in front ear plate In slot and rear otic placode slot, and by installing antidumping hook plate at otic placode groove location, can effectively it limit on the downside of track, to make Obtaining locker can not topple from track.
Further, the angle of the inclined ramp and track length direction is 15 ~ 30 °.
Further, the front ear plate and the rear otic placode are equipped with the mounting hole for installing hydraulic cylinder.
When hydraulic cylinder is mounted on front ear plate, when hydraulic cylinder stretches cylinder, locker otic placode integrally moves backward, due to locking It is connected between voussoir and rear otic placode mounting plate by preloading spring, the speed moved backward is less than locker otic placode, and edge is inclined Inclined ramp, which travels forward, pushes track side surfaces to, until track side surfaces are adjacent to, and by the friction of locking wedge block and track side surfaces Power is by track locking;When contracting cylinder, locker otic placode integrally travels forward, due to leading between locking wedge block and rear otic placode mounting plate Preloading spring is crossed to connect and be close to track side surfaces, the speed to travel forward is less than locker otic placode, and along inclined ramp to After move away from track side surfaces, locker and track are detached from.
When hydraulic cylinder is mounted on rear otic placode, when hydraulic cylinder contracting cylinder, locker otic placode integrally moves backward, due to locking It is connected between voussoir and rear otic placode mounting plate by preloading spring, the speed moved backward is less than locker otic placode, and edge is inclined Inclined ramp, which travels forward, pushes track side surfaces to, until track side surfaces are adjacent to, and by the friction of locking wedge block and track side surfaces Power is by track locking;When stretching cylinder, locker otic placode integrally travels forward, due to leading between locking wedge block and rear otic placode mounting plate Preloading spring is crossed to connect and be close to track side surfaces, the speed to travel forward is less than locker otic placode, and along inclined ramp to After move away from track side surfaces, locker and track are detached from.
Compared with prior art, the beneficial effects of the present invention are:
(1) cooperated using locking wedge block, inclined ramp and preloading spring to lock and unlock track from track two sides, realized Clamping to track and loosen, and realized on side before and after locker otic placode to the pushing tow of steel construction by the way that hydraulic cylinder to be mounted on and It pulls, to reach horizontal sliding of the steel construction along track length direction;
(2) pass through among front ear plate slot and rear otic placode slot due to track, upside and the left and right sides are limited in front ear plate In slot and rear otic placode slot, and by installing antidumping hook plate at otic placode groove location, can effectively it limit on the downside of track, to make Obtaining locker can not topple from track;
(3) horizontal sliding construction is carried out using this locker, horizontal sliding function and steel construction is separated, there is structure letter It is single, versatile, occupy little space be very suitable to narrow field environment, installation and it is easy to operate the features such as.
Detailed description of the invention
Fig. 1 is the present invention preferably locker three-dimensional structure diagram;
Fig. 2 is the present invention preferably locker ontology and locking wedge block matching chart;
Fig. 3 is the present invention preferably locker otic placode structure chart;
Fig. 4 is the present invention preferably antidumping hook plate structure chart;
Fig. 5 is the present invention preferably pushing tow steel construction schematic diagram;
Fig. 6 is that the present invention preferably pulls steel construction schematic diagram.
Specific embodiment
With reference to embodiments and attached drawing, the present invention will be described in further detail.It should be appreciated that described herein Specific examples are only used to explain the present invention, is not intended to limit the present invention.
As illustrated in fig. 1 and 2, the locker for steel construction horizontal sliding includes locker otic placode 1,2 and of locker ontology Locking wedge block 3, the locker ontology 2 are fixedly mounted on 1 lower section of locker otic placode, 2 lower surface of locker ontology Equipped with the locking sliding slot 21 for installing the locking wedge block 3 and passing through for track 4, described 21 the right and left of locking sliding slot is to incline Inclined ramp 22 is equipped with symmetrical two locking wedge blocks 3 on the locking sliding slot 21;The locking wedge block 3 is whole In the shape of a right-angled ladder, inclined side is contacted with the inclined ramp 22;Adjusting screw rod is fixedly installed on the locker otic placode 1 5, the adjusting screw rod 5 is cased with preloading spring 51 close to described 3 one end of locking wedge block, and described 51 one end of preloading spring is fixedly connected On the adjusting screw rod 5, the other end is fixedly connected on the locking wedge block 3.Using locking wedge block, inclined ramp and preload Spring, which is cooperated from track two sides, locks and unlocks track, realizes to the clamping of track and loosens, and by by hydraulic cylinder It is mounted on and realizes the pushing tow to steel construction on the side of locker otic placode front and back and pull, to reach steel construction along track length direction Horizontal sliding.
3 three right-angle sides of locking wedge block are parallel with three sides on the locker ontology 2 respectively, two locking wedges The orbital pass 31 for being mounted on track 4 is equipped among the adjacent both sides of block 3.
Referring to Fig. 3, locker otic placode 1 includes front ear plate 11, rear otic placode 12, front ear plate mounting plate 13, rear otic placode mounting plate 14, locker ontology mounting plate 15 and support plate 16,15 lower surface of locker ontology mounting plate are equipped with the locker Ontology 2, the front ear plate mounting plate 13 and the rear otic placode mounting plate 14 are fixedly mounted on the locker ontology mounting plate 15 Front and rear sides and vertical with the locker ontology mounting plate 15, the front ear plate 11 and it is described after otic placode 12 be separately mounted to institute It states on front ear plate mounting plate 13 and the rear otic placode mounting plate 14;The support plate 16 is mounted on the locker ontology mounting plate On 15 upper surfaces, and its front and rear sides is fixedly mounted on the front ear plate mounting plate 13 and the rear otic placode mounting plate 14.It adjusts Section screw rod 5 is fixedly mounted on the rear otic placode mounting plate 14, and 51 sets of the preloading spring in 5 front end of adjusting screw rod.
It is separately installed at left and right sides of 2 lower surface of locker ontology for sliding 3 support of locking wedge block in the locking Voussoir supporting plate 6 in slot 21, the voussoir supporting plate 6 are fixedly mounted on the locker ontology 2 by the first bolt 61.
Front ear plate mounting plate 13 is fixedly installed with antidumping hook plate 7 close to the front ear plate 11 on one side.Referring to fig. 4, resist and incline Covering hook plate 7 includes hook plate mounting portion 71 and curved hook portion 72, and the hook plate mounting portion 71 anti-is inclined by the second bolt 73 by described It covers hook plate 71 to be fixedly mounted on the front ear plate mounting plate 13, the curved hook portion 72 is arranged under the hook plate mounting portion 71 Portion close to 4 side of track and by 4 support of track on it.
Front ear plate mounting plate 13 and the rear otic placode mounting plate 14 are equipped with the vestibule board slot 131 passed through for track 4 below With rear otic placode slot 141, the curved hook portion 71 is arranged in 131 position of vestibule board slot.Due to track from front ear plate slot and after Passing through among otic placode slot, upside and the left and right sides are limited in vestibule board slot and rear otic placode slot, and by otic placode slot Antidumping hook plate is installed at position, can effectively be limited on the downside of track, so that locker can not topple from track.
The angle of inclined ramp 22 and 4 length direction of track is 15 ~ 30 °.
Front ear plate 11 and the rear otic placode 12 are equipped with the mounting hole 111 for installing hydraulic cylinder.
Referring to Fig. 5, when hydraulic cylinder 20 is mounted on front ear plate, when hydraulic cylinder 20 stretches cylinder, locker otic placode is whole backward Movement, due to being connected between locking wedge block and rear otic placode mounting plate by preloading spring, the speed moved backward is less than locking Device otic placode, and travel forward along inclined ramp and push track side surfaces to, until track side surfaces are adjacent to, and rely on locking wedge block and rail The frictional force of road side is by track locking, to realize the locking of locker 10 Yu track 4, hydraulic cylinder 20 pushes steel construction at this time 30 travel forward;When contracting cylinder, locker otic placode integrally travels forward, due to passing through between locking wedge block and rear otic placode mounting plate Preloading spring connects and is close to track side surfaces, and the speed to travel forward is less than locker otic placode, and backward along inclined ramp Track side surfaces are moved away from, locker 10 and track 4 are detached from, and locker 10 travels forward, and complete a pushing tow steel construction forward 30 process.
Referring to Fig. 6, when hydraulic cylinder 20 is mounted on rear otic placode, when 20 contracting cylinder of hydraulic cylinder, locker otic placode is whole backward Movement, due to being connected between locking wedge block and rear otic placode mounting plate by preloading spring, the speed moved backward is less than locking Device otic placode, and travel forward along inclined ramp and push track side surfaces to, until track side surfaces are adjacent to, and rely on locking wedge block and rail The frictional force of road side is by track locking, to realize the locking of locker 10 Yu track 4, hydraulic cylinder 20 pushes steel construction at this time 30 travel forward;When stretching cylinder, locker otic placode integrally travels forward, due to passing through between locking wedge block and rear otic placode mounting plate Preloading spring connects and is close to track side surfaces, and the speed to travel forward is less than locker otic placode, and backward along inclined ramp Track side surfaces are moved away from, locker 10 and track 4 are detached from, and locker 10 travels forward, and completes one and pulls steel construction forward 30 process.
The preferred embodiment of the present invention has shown and described in above description, as previously described, it should be understood that the present invention is not office Be limited to form disclosed herein, should not be regarded as an exclusion of other examples, and can be used for various other combinations, modification and Environment, and can be changed within that scope of the inventive concept describe herein by the above teachings or related fields of technology or knowledge It is dynamic.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, then it all should be appended by the present invention In scope of protection of the claims.

Claims (10)

1. a kind of locker for steel construction horizontal sliding, which is characterized in that including locker otic placode, locker ontology and lock Tight voussoir, the locker ontology are fixedly mounted below the locker otic placode, and locker ontology lower surface, which is equipped with, to be used In the locking sliding slot installing the locking wedge block and passing through for track, described locking sliding slot the right and left is inclined ramp, described Symmetrical two locking wedge blocks are installed on locking sliding slot;The locking wedge block is integrally in the shape of a right-angled ladder, inclines Bevel edge is contacted with the inclined ramp;Adjusting screw rod is fixedly installed on the locker otic placode, the adjusting screw rod is close to institute It states locking wedge block one end and is cased with preloading spring, described preloading spring one end is fixedly connected on the adjusting screw rod, and the other end is solid Surely it is connected on the locking wedge block.
2. a kind of locker for steel construction horizontal sliding according to claim 1, which is characterized in that the locking wedge Three right-angle sides of block are parallel with three sides on the locker ontology respectively, and two locking wedge blocks are set among adjacent both sides There is the orbital pass for being mounted on track.
3. a kind of locker for steel construction horizontal sliding according to claim 2, which is characterized in that the locker Otic placode includes front ear plate, rear otic placode, front ear plate mounting plate, rear otic placode mounting plate, locker ontology mounting plate and support plate, described Locker ontology mounting plate lower surface is equipped with the locker ontology, the front ear plate mounting plate and the rear otic placode mounting plate It is fixedly mounted on the locker ontology mounting plate front and rear sides and, the front ear plate vertical with the locker ontology mounting plate It is separately mounted on the front ear plate mounting plate and the rear otic placode mounting plate with the rear otic placode;The support plate is mounted on institute It states on locker ontology mounting plate upper surface, and its front and rear sides is fixedly mounted on the front ear plate mounting plate and the rear otic placode On mounting plate.
4. a kind of locker for steel construction horizontal sliding according to claim 3, which is characterized in that the adjusting spiral shell Bar is fixedly mounted on the rear otic placode mounting plate, and the preloading spring is covered in the adjusting screw rod front end.
5. a kind of locker for steel construction horizontal sliding according to claim 4, which is characterized in that the locker It is separately installed at left and right sides of ontology lower surface for the voussoir supporting plate by the locking wedge block support in the locking sliding slot, institute Voussoir supporting plate is stated to be fixedly mounted on the locker ontology by the first bolt.
6. a kind of locker for steel construction horizontal sliding according to claim 5, which is characterized in that the front ear plate Mounting plate is fixedly installed with antidumping hook plate close to the front ear plate on one side.
7. a kind of locker for steel construction horizontal sliding according to claim 6, which is characterized in that the antidumping Hook plate includes hook plate mounting portion and curved hook portion, and the hook plate mounting portion, which is fixed the antidumping hook plate by the second bolt, pacifies On the front ear plate mounting plate, curved hook portion setting is in hook plate mounting portion lower part close to track side and by rail Road support is on it.
8. a kind of locker for steel construction horizontal sliding according to claim 7, which is characterized in that the front ear plate Mounting plate and the rear otic placode mounting plate are equipped with the vestibule board slot and rear otic placode slot passed through for track, the curved hook portion below It is arranged in the front ear plate groove location.
9. a kind of locker for steel construction horizontal sliding according to claim 8, which is characterized in that the inclination is slided The angle of road and track length direction is 15~30 °.
10. a kind of locker for steel construction horizontal sliding according to claim 9, which is characterized in that the vestibule Plate and the rear otic placode are equipped with the mounting hole for installing hydraulic cylinder.
CN201811258412.XA 2018-10-26 2018-10-26 Locking device for horizontal sliding of steel structure Active CN109339464B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811258412.XA CN109339464B (en) 2018-10-26 2018-10-26 Locking device for horizontal sliding of steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811258412.XA CN109339464B (en) 2018-10-26 2018-10-26 Locking device for horizontal sliding of steel structure

Publications (2)

Publication Number Publication Date
CN109339464A true CN109339464A (en) 2019-02-15
CN109339464B CN109339464B (en) 2024-04-09

Family

ID=65311951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811258412.XA Active CN109339464B (en) 2018-10-26 2018-10-26 Locking device for horizontal sliding of steel structure

Country Status (1)

Country Link
CN (1) CN109339464B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109231071A (en) * 2018-09-28 2019-01-18 中国化学工程第六建设有限公司 Steel structure modularization construction process
CN110512876A (en) * 2019-08-28 2019-11-29 浙江精工钢结构集团有限公司 A kind of heavy grade upward slope gliding construction method of steel construction
CN112049433A (en) * 2020-08-11 2020-12-08 上海隧道工程有限公司 Steel truss pushing attitude control equipment and attitude control method thereof
CN114592700A (en) * 2022-02-28 2022-06-07 中建八局新型建造工程有限公司 Auxiliary mounting and positioning device for steel structure roller type sliding shoes
CN115450326A (en) * 2022-10-27 2022-12-09 中南大学 Incremental launching slide block type detachable module steel structure node and construction method thereof
CN116076270A (en) * 2023-02-10 2023-05-09 杭州利环环境集团有限公司 Assembled flower bed capable of rapidly lifting river banks and park landscapes and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201220283Y (en) * 2008-07-03 2009-04-15 嘉兴永佳精密机械制造有限公司 Locking mechanism of precision boring head
JP2013076253A (en) * 2011-09-30 2013-04-25 Lalique:Kk Floating prevention structure for scaffold board
CN203079644U (en) * 2012-11-26 2013-07-24 上海同济宝冶建设机器人有限公司 Hydraulic gliding device
CN106567550A (en) * 2016-11-04 2017-04-19 同济大学 Full-automatic bidirectional hydraulic rail clamping device
CN209482738U (en) * 2018-10-26 2019-10-11 中国建筑股份有限公司 A kind of locker for steel construction horizontal sliding

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201220283Y (en) * 2008-07-03 2009-04-15 嘉兴永佳精密机械制造有限公司 Locking mechanism of precision boring head
JP2013076253A (en) * 2011-09-30 2013-04-25 Lalique:Kk Floating prevention structure for scaffold board
CN203079644U (en) * 2012-11-26 2013-07-24 上海同济宝冶建设机器人有限公司 Hydraulic gliding device
CN106567550A (en) * 2016-11-04 2017-04-19 同济大学 Full-automatic bidirectional hydraulic rail clamping device
CN209482738U (en) * 2018-10-26 2019-10-11 中国建筑股份有限公司 A kind of locker for steel construction horizontal sliding

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109231071A (en) * 2018-09-28 2019-01-18 中国化学工程第六建设有限公司 Steel structure modularization construction process
CN110512876A (en) * 2019-08-28 2019-11-29 浙江精工钢结构集团有限公司 A kind of heavy grade upward slope gliding construction method of steel construction
CN112049433A (en) * 2020-08-11 2020-12-08 上海隧道工程有限公司 Steel truss pushing attitude control equipment and attitude control method thereof
CN114592700A (en) * 2022-02-28 2022-06-07 中建八局新型建造工程有限公司 Auxiliary mounting and positioning device for steel structure roller type sliding shoes
CN114592700B (en) * 2022-02-28 2023-12-08 中建八局新型建造工程有限公司 Auxiliary installation positioning device for steel structure roller type sliding shoes
CN115450326A (en) * 2022-10-27 2022-12-09 中南大学 Incremental launching slide block type detachable module steel structure node and construction method thereof
CN115450326B (en) * 2022-10-27 2024-04-26 中南大学 Pushing sliding block type detachable module steel structure node and construction method thereof
CN116076270A (en) * 2023-02-10 2023-05-09 杭州利环环境集团有限公司 Assembled flower bed capable of rapidly lifting river banks and park landscapes and construction method thereof
CN116076270B (en) * 2023-02-10 2024-05-03 杭州利环环境集团有限公司 Assembled flower bed capable of rapidly lifting river banks and park landscapes and construction method thereof

Also Published As

Publication number Publication date
CN109339464B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN109339464A (en) A kind of locker for steel construction horizontal sliding
CN202324576U (en) Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall
CN209482738U (en) A kind of locker for steel construction horizontal sliding
CN207003637U (en) A kind of telescopic movable platform
CN113235890B (en) Concrete ground leveling device
CN112943291A (en) Multifunctional multi-section working platform vehicle for tunnel excavation
CN204960432U (en) Underground vertical lifting stereo garage
CN217107006U (en) Air pushing device of subway single-crossover shield machine
CN214783467U (en) High-efficient interception buried type lifting road pile
DE10007656A1 (en) Device for arranging and converting e.g. multi-function rooms such as sports halls etc.
CN105257041A (en) Underground vertical lifting type stereo garage
CN211816944U (en) Steel structure combination beam for assembly type building
CN204956680U (en) Area reinforces shelter of loading and unloading certainly that blocks pole
KR101770230B1 (en) Form traveller
CA2557554A1 (en) A method and a device for the rail traffic on multiply, parallel guide-ways also as toys
CN108945175B (en) Wall bicycle frame and using method thereof
CN219241266U (en) Rail type integral moving scaffold
CN216196980U (en) Stereo garage
JP2021046769A (en) Bogie equipped with rail feeder
CN112593574B (en) Hidden support construction device
CN210944411U (en) Steel rope system for passenger elevator
CN211772779U (en) Trestle support column mechanism for steel structure
CN221162840U (en) Material transferring support for building construction
CN220600642U (en) Horizontal adjustable push bench for municipal construction
DE102018129016A1 (en) Prefabricated concrete component and loading system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant