CN109322618A - Heterogeneous shale gas well Reservoir Section finishing drilling method - Google Patents

Heterogeneous shale gas well Reservoir Section finishing drilling method Download PDF

Info

Publication number
CN109322618A
CN109322618A CN201811221405.2A CN201811221405A CN109322618A CN 109322618 A CN109322618 A CN 109322618A CN 201811221405 A CN201811221405 A CN 201811221405A CN 109322618 A CN109322618 A CN 109322618A
Authority
CN
China
Prior art keywords
well
discharge capacity
drilled
shale gas
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811221405.2A
Other languages
Chinese (zh)
Other versions
CN109322618B (en
Inventor
张远香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Oilfield Fangyuan Workover Operation Co.,Ltd.
Original Assignee
Chengdu Kesheng Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Kesheng Petroleum Technology Co Ltd filed Critical Chengdu Kesheng Petroleum Technology Co Ltd
Priority to CN201811221405.2A priority Critical patent/CN109322618B/en
Publication of CN109322618A publication Critical patent/CN109322618A/en
Application granted granted Critical
Publication of CN109322618B publication Critical patent/CN109322618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses heterogeneous shale gas well Reservoir Section finishing drilling methods, it is protected for the drilling technology of shale gas Reservoir Section finishing drilling, it is serious especially suitable for heterogeneity, from macroscopically seeing the longer casing programme of shale reservoir section, it is high to provide a set of feasibility, effective engineering construction method, and without expensive drilling fluid system, only start with from engineering viewpoint, sufficient finishing and specification have been carried out to the barefoot interval of shale interval, it solves the deeper shale gas well finishing drilling of buried depth in the prior art to make a trip difficulty, the big problem of setting of casing risk, realize reduces operating risk from construction technology, improve the purpose of setting of casing safety coefficient.

Description

Heterogeneous shale gas well Reservoir Section finishing drilling method
Technical field
The present invention relates to shale gas well drilling engineering fields, and in particular to heterogeneous shale gas well Reservoir Section finishing drilling method.
Background technique
Shale gas refers to that preservation is continuous life in the Unconventional gas preserved in series of rocks based on rich organic shale At biochemical genesis air and heat origin cause of formation gas or both mixing, can be present in intrinsic fracture and hole with free state, to inhale Attached state is present in kerogen, clay particle surface, and there are also minute quantities to be stored in kerogen and asphalitine with dissolved state, dissociates Gas ratio is generally 20%~85%.Shale gas is mined natural gas from rammell, and main body is located at dark-coloured mud shale Or in high-carbon mud shale, shale gas is to be present in mud stone, high-carbon mud stone, shale and aleuritic texture in main body with absorption or free state Natural gas in rock class interlayer, it can be generated in the various stage natural gas main bodys of organic origin with free phase (about 50%) it is present in crack, hole and other reservoir spaces, kerogen, clay particle is present in adsorbed state (about 50%) And pore surface, minute quantity are stored in kerogen, asphalitine and petroleum with dissolved state.Natural gas exists in sandwich-like Siltstone, silty, argillaceous siltstoue, even in sandstone formation.It is nearest poly- in source bed after natural gas generates Collection, shows as typical original place Reservoir model, larger with the difference such as oil shale, oil-sand, asphalt.Not with conventional reservoir gas reservoir Together, shale is both the source rock that natural gas generates, and aggregation and the reservoir and cap rock that save natural gas.Therefore, the content of organic matter High black shale, high-carbon mud stone etc. are often best shale gas developmental conditions.
In recent years, it is influenced by the U.S., Canadian shale gas Successful commercial exploitation, global shale gas exploration and development is in quick Developing state.However, storage medium is shale formation since shale gas original place is at the trap pattern of hiding.For conventional gas and oil For field, shale formation is all the geologic structure as source bed or cap rock, therefore as one can imagine the reservoir of shale gas is permeated Rate is extremely low, and it is difficult to exploit.
Firstly, the reservoir of shale gas reservoir is generally in low hole, the physical property characteristic of low-permeability, the resistance ratios of air-flow are routinely natural Gas is big, and all wells require implementation reservoir fracturing improvement could be mined.Secondly, shale gas recovery ratio compares conventional gas Low, conventional gas recovery ratio is 60% or more, and shale gas is only 5%~60%.Low yield, which affects people, is keen to it, The U.S. has had some advanced technologies that shale gas well yield can be improved.The reservoir of Chinese shale gas reservoir compared with the U.S. Difference, the shale gas-bearing formation buried depth such as the Sichuan Basin is bigger than the U.S., the shale gas-bearing formation depth in the U.S. at 800~2600 meters, and The shale gas-bearing formation buried depth in the Sichuan Basin is at 2000~3500 meters.The increase of shale gas-bearing formation depth is undoubtedly in our jejune skills of sheet Development difficulty is added in art again.Specific on drilling engineering, due to the extremely low rock permeability of shale interval, lead to drilling well In journey in shale gas Reservoir Section, drilling fluid can not be dehydrated to form complete mud cake in the borehole wall, and the shortcoming of mud cake leads to drilling tool and well Lack lubrication and buffering between wall, causes frictional resistance very big, make a trip difficulty, and subsequent casings are even resulted in when serious can not be successfully down Enter, causes wellbore to scrap or be merely able to carry out sidetracking, cause serious engineering accident.It is all in the prior art in drilling fluid to this Performance, studied on formula, such as attempted using oil base drilling fluid, it is intended to ensure that casing is smooth by OPTIMIZATION OF DRILLING FLUID In the shaft bottom Reservoir Section of shale gas well, however this mode is ineffective, especially for China Sichuan Basin buried depth phase For deeper shale gas reservoir, also results in drilling fluid cost and sharply rise, cause business exploitation profit meagre or even profit It is negative, this is tantamount to make the matter worse for the shale gas for being originally difficult to commercialize.
Summary of the invention
The purpose of the present invention is to provide heterogeneous shale gas well Reservoir Section finishing drilling methods, to solve buried depth in the prior art Deeper shale gas well finishing drilling makes a trip problem difficult, that setting of casing risk is big, realize reduced from construction technology operating risk, Improve the purpose of setting of casing safety coefficient.
The present invention is achieved through the following technical solutions:
Heterogeneous shale gas well Reservoir Section finishing drilling method, comprising the following steps:
(a) drilling to design well depth, shaft bottom has stayed well head bag, is recycled to shaft bottom landwaste with discharge capacity A and returns out to well head, completes The sieve residue log of full well section;Remember that bottom depth is Y, the depth of upper layer casing shoe is M, takes X=(Y-M)/2+M;
(b) back reaming pulls out of hole to upper layer casing shoe, recycles one week in the casing shoe of upper layer, is drilled into shaft bottom under termination of pumping stalling, Prospect pit bottom sand setting height;Shaft bottom sand setting is destroyed, again drilling to design well depth, with discharge capacity A circulation one week;
(c) termination of pumping, which has stalled, is drilled into well depth X: if entering step (e) in trip-out process without the resistance hanging point within 10t;If There is resistance hanging point in trip-out process, and be hampered more than 10t, then enters step (d);
(d) it is risen with discharge capacity A/2 back reaming and is drilled into 10m above resistance hanging point, then to be drilled under reaming under discharge capacity A/4 under resistance hanging point Square 10m, the stalling of termination of pumping later pull out of hole again: if resistance is hung less than 10t in trip-out process, having continued to be drilled into well depth X, enter step (e);If being hampered still above 10t, this step is repeated, until resistance when termination of pumping stalling pulls out of hole hangs and is less than 10t, is further continued for pulling out of hole To well depth X, enter step (e);
(e) at well depth X, with discharge capacity A circulation one week, it is drilled into Y under termination of pumping stalling, and rise be drilled at well depth X again;If (Y-M) > 50m then enables Y=X, takes X '=(Y-M)/2+M;
(f) X is replaced with X ', repeats step (c)~(e), until (Y-M)≤50m;
(g) it pulls out of hole to the casing shoe of upper layer, with discharge capacity A/4 circulation one week in the casing shoe of upper layer, rises and be drilled into well head, trap Pipe.
It makes a trip problem difficult, that setting of casing risk is big for the deeper shale gas well finishing drilling of buried depth in the prior art, this Invention proposes that heterogeneous shale gas well Reservoir Section finishing drilling method, this method pass through drilling engineering technology controlling and process completely, it is ensured that shale The shaft bottom Reservoir Section wellbore of gas well is unobstructed, improves the big problem of setting of casing risk as caused by the shortcoming of wall cake.We Method is crept into first to design well depth, and well head bag has been stayed in shaft bottom, and complete well head bag can provide droping space for sand setting, also complete for the later period Well tool provides enough pocket depths.Shaft bottom landwaste is recycled to discharge capacity A later to return out to well head, completes the landwaste of full well section Well logging to ensure the complete of sieve residue log work, while enabling the landwaste just drilled out in well to return and draining into well head and set through solid controlling It is standby to be handled, avoid the accumulation of new landwaste in well.Note bottom depth is Y at this time, the depth of upper layer casing shoe is M, takes X= (Y-M)/2+M, depth X at this time are the well depth midpoint between the casing shoe of shaft bottom to upper layer.The is carried out to barefoot interval later Single treatment.Back reaming, lower reaming belong to the professional term in drilling engineering, and those skilled in the art are appreciated that.By falling Reaming pulls out of hole to the casing shoe of upper layer, so that first time processing is carried out to barefoot interval, using in bottom drilling assembly (BHA) Large-sized position such as centralizer, bit gauge protection, modifying to the borehole wall from bottom to top, eliminates and bores when opening new stratum in the borehole wall The irregular special-shaped corner angle formed, so that entire wellbore tends to be smooth continuous.Also, inevitable turn on pump during back reaming, because This gradually can be driven upwards the special-shaped corner angle landwaste scraped from the borehole wall using drilling fluid, up to back reaming to upper layer casing shoe Interior, drilling tool has been in home at this time, is sufficiently recycled, it is ensured that and circulation time at least one week, so that the institute on drill bit There is the drilling fluid in casing that can be recycled, so that can be adequately discharged by the landwaste that back reaming is driven upwards It is handled to well head.Circulation one week, that is, refer to that drilling fluid is pumped into drilling rod from slush pump, until being returned out from annular space to well head institute The time needed.By casing inner diameter it is known that drilling rod internal-and external diameter is it is known that the discharge capacity of slush pump is taken it is known that therefore recycling one week Between can directly calculate.After the time requirement that circulation meets one week, shaft bottom, prospect pit bottom sand setting are drilled under termination of pumping stalling Height simultaneously records sand setting height, provides for later period setting of casing, lower completion tubular column with long foundation.It visits to after the sand setting of shaft bottom, turn on pump, weight New drilling is to design well depth, so that shaft bottom sand setting is destroyed, convenient for being recycled in shaft bottom.At this time with discharge capacity A circulation one week, again Landwaste in well is cleared up, is also drawn off the chip off-falling collided in going down process in well.(c) is entered step later, termination of pumping stalling pulls out of hole To well depth X: if without the resistance hanging point within 10t in trip-out process, in the distance for indicating bottom depth Y to well depth X, wellbore is by upper State processing it is more unobstructed, the resistance hanging point within 10t will not cause too big harm, casing to casing job in engineering Can be by the resistance hanging point within 10t using inertia in decentralization process of pouring water, therefore it is directly entered step (e);If rising drill-through Cheng Zhongyou hinders hanging point, and is hampered more than 10t, then enters step (d).The step (d) are as follows: risen and be drilled into discharge capacity A/2 back reaming 10m above hanging point is hindered, then to be drilled into 10m below resistance hanging point under reaming under discharge capacity A/4, the stalling of termination of pumping later pulls out of hole again: if rising Resistance, which is hung, during boring is less than 10t, then has continued to be drilled into well depth X, enter step (e);If being hampered still above 10t, this is repeated Step has been further continued for being drilled into well depth X, enter step (e) until resistance when termination of pumping stalling pulls out of hole hangs and is less than 10t.Wherein, pass through The back reaming operation of resistance hanging point takes the discharge capacity of A/2, is to reduce discharge capacity herein to the half of normal circulation discharge capacity, wellbore is avoided to exist Build the pressure suddenly when hindering hanging point by blocking serious, in the excessive well of discharge capacity, cause bottom drill tool simultaneously by the blocking of upper sheet resistance hanging point, The lifting of lower section drilling liquid pressure forms and blocks on bottom drill tool in such cases to the complex situations of centre force simultaneously up and down Under suppress, easily cause drilling tool stuck, form serious engineering accident.Therefore control back reaming operation discharge capacity is normal in the present invention The half for recycling discharge capacity, even if there is the situation that builds the pressure, pressure rises also can be significant slack-off, and it is stuck to be unlikely to moment.It is opened in pressure When beginning to rise, provides the enough reaction time quickly to transfer drilling tool for driller, so that drilling tool is quickly left danger zone, greatly Overcome shale gas well in the prior art be easy to build the pressure stuck drilling tool the case where.And the lower reaming operation by hindering hanging point takes A/4 Discharge capacity, be herein reduce discharge capacity to normal circulation discharge capacity a quarter.Take the discharge capacity of A/4 has the technical effect that head It first still prevents from building the pressure in unexpected well, reserves more operation times for driller, prominent build the pressure is avoided to be lifted drilling tool and lead The drilling rod for causing top more weak bears the impact of moment;Secondly, in existing bottom drilling assembly, when be often used screw motor The characteristics of drilling tool, such drilling tool, is that exporting revolving speed and displacement size is positively correlated, herein under the premise of, during lower reaming, drop Low discharge capacity can effectively make the output revolving speed of screw motor be decreased obviously compared to the revolving speed in drilling process to A/4, and lower stroke Drill bit can not quickly break originally more hard shale formation during eye, can effectively advance along old wellbore, avoid boring New wellbore or the situation for drilling out larger step, hole etc. out, the significant safety improved during lower reaming and wellbore are steady It is qualitative.The stalling of termination of pumping later pulls out of hole again, and trip-out at this time is that examination pulls out of hole, it is therefore intended that examine the back reaming carried out just now, under Reaming effect, if the borehole wall is modified into rule.If the borehole wall is adequately corrected, pulling out of hole at this time should be more smooth, It shows it is then resistance hanging point within no 10t on engineering parameter, can then continue to be drilled into well depth X at this time.If the borehole wall passes through primary The finishing of back reaming, lower reaming is still difficult to pass through, and shows on engineering parameter to be exactly to be hampered still above 10t, then repeats this Step is that repetition " is risen with discharge capacity A/2 back reaming and is drilled into 10m above resistance hanging point, then hung with being drilled into resistance under reaming under discharge capacity A/4 Point lower section 10m, the stalling of termination of pumping later pull out of hole again ", until resistance when termination of pumping stalling pulls out of hole hangs and is less than 10t, it has been further continued for being drilled into Well depth X in trip-out process, encounters any point being hampered more than 10t, is carried out this step, to guarantee the chance to full well section all Resistance point is all modified.It enters step (e) later: at well depth X, with discharge capacity A circulation one week, being modified to during turn on pump reaming On the landwaste that rushes in the casing of upper layer recycled, be allowed to be discharged in well.It is drilled into Y under the stalling of termination of pumping later, and rises be drilled into again At well depth X;If (Y-M) > 50m, enables Y=X, X '=(Y-M)/2+M is taken;X is replaced with X ', repeats step (c)~(e), until (Y-M)≤50m.Step (e) to (f) is then double of the finishing carried out to the barefoot interval of shale reservoir gradually, is modified every time Separation takes the midpoint of top barefoot interval, until (Y-M)≤50m, that is, the separation that last time is modified is apart from upper layer The distance of casing shoe is less than or equal to 50m, at this point, full well section is all sufficiently modified, all resistance hanging points being hampered more than 10t It is all sufficiently modified, the borehole wall of entire barefoot interval obtains sufficient specification, and the irregular corner angle of the borehole wall, are fallen from power at keyway The position that rank etc. can all influence to make a trip can access stable finishing, ensure that the reliability of casing job.? (Y-M)≤50m when, directly pull out of hole in the casing shoe of upper layer, with discharge capacity A/4 circulation one week in the casing shoe of upper layer, following at this time Ring discharge capacity is only discharge capacity A/4, is to carry secretly because being in more clean state in mineshaft annulus at this time without using discharge capacity It is returned on landwaste, circulation is intended merely to provide necessary process for the new slurry needed for before replacement setting of casing in engineering for one week.Because trapping Improve the overall performance of drilling fluid in well before Guan, optimal mode is exactly that direct replace newly is starched, and new slurry is not due to by landwaste Pollution, properties splendid to the suspending power of landwaste can be effectively prevent miscellaneous in the drilling fluid of top all in optimum state Object sinks down into shaft bottom.It is recycled with the small displacement of A/4, can be effectively reduced bottom drill tool and the extension of upper layer casing is cut, reduced to upper The injury of layer internal surface of sleeve pipe.Circulation after a week, can be completed new slurry and replace, directly rise be drilled into well head later, carry out setting of casing work Industry.The present invention is protected for the drilling technology of shale gas Reservoir Section finishing drilling, serious especially suitable for heterogeneity, from macro The longer casing programme of shale reservoir section is seen in sight, provides a set of feasibility height, effective engineering construction method, and nothing Expensive drilling fluid system need to be used, only starts with from engineering viewpoint, the barefoot interval of shale interval has been carried out sufficiently Finishing and specification, it is big to solve make a trip difficult, setting of casing risk of the deeper shale gas well finishing drilling of buried depth in the prior art Problem realizes the purpose for reducing operating risk from construction technology, improving setting of casing safety coefficient.
The annular space that discharge capacity A meets shaft bottom to upper layer casing shoe returns speed not less than 0.8m/s.It is different for drilling engineering The wellbore of size, various sizes of drilling rod and different slush pump performances are all the factors of specific discharge capacity that influences, therefore difficult Specifically to be limited discharge capacity.And the end reaction of discharge capacity is exactly that annular space returns speed, therefore limits annular space in this programme and return speed not Lower than 0.8m/s, discharge capacity A only needs to meet the condition, and quantitative restriction can be carried out to the discharge capacity A in different wells.
Preferably, the complete well head bag reserves 5~10m.
Preferably, the revolving speed of the back reaming is 40~50rpm, and the revolving speed of the lower reaming is 20~30rpm.Back reaming In the process, using 40~50rpm, sufficiently the borehole wall can be modified by the gauge teeth of drill bit.And during lower reaming, turn Speed is only 20~30rpm, can further avoid the situation for drilling out new wellbore or drilling out larger step, hole etc., further Safety and hole stability under improving during reaming.
It preferably, further include that logging operation is carried out before setting of casing.This operation rise get into well head after carry out, refer to It is traditional wireline logging operation.For the wellbore construction for using more advanced well logging LWD technology to carry out, then without Need to carry out this step.
Compared with prior art, the present invention having the following advantages and benefits:
1, the heterogeneous shale gas well Reservoir Section finishing drilling method of the present invention carries out pair gradually to the barefoot interval of shale reservoir Half modifies, and the separation modified every time takes the midpoint of top barefoot interval, until (Y-M)≤50m, that is, last time are modified Distance of the separation apart from upper layer casing shoe be less than or equal to 50m, at this point, full well section is all sufficiently modified, Suo Youyu Resistance is more than that the resistance hanging point of 10t is all sufficiently modified, and the borehole wall of entire barefoot interval obtains sufficient specification, and the borehole wall is not advised The position that then corner angle, keyway, rank of falling from power etc. can all influence to make a trip can access stable finishing, ensure that setting of casing The reliability of operation.
2, the heterogeneous shale gas well Reservoir Section finishing drilling method of the present invention, for shale gas Reservoir Section finishing drilling drilling technology into Go protection, it is serious especially suitable for heterogeneity, from the longer casing programme of shale reservoir section is macroscopically seen, provide a set of Feasibility height, effective engineering construction method, and without expensive drilling fluid system, only from engineering viewpoint Start with, sufficient finishing and specification have been carried out to the barefoot interval of shale interval, solved the deeper page of buried depth in the prior art Rock gas well finishing drilling makes a trip problem difficult, that setting of casing risk is big, and realizing reduces under operating risk, raising from construction technology The purpose of casing safety coefficient.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the logical schematic of the specific embodiment of the invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1:
Heterogeneous shale gas well Reservoir Section finishing drilling method as shown in Figure 1, comprising the following steps:
(a) drilling to design well depth, shaft bottom has stayed well head bag, is recycled to shaft bottom landwaste with discharge capacity A and returns out to well head, completes The sieve residue log of full well section;Remember that bottom depth is Y, the depth of upper layer casing shoe is M, takes X=(Y-M)/2+M;
(b) back reaming pulls out of hole to upper layer casing shoe, recycles one week in the casing shoe of upper layer, is drilled into shaft bottom under termination of pumping stalling, Prospect pit bottom sand setting height;Shaft bottom sand setting is destroyed, again drilling to design well depth, with discharge capacity A circulation one week;
(c) termination of pumping, which has stalled, is drilled into well depth X: if entering step (e) in trip-out process without the resistance hanging point within 10t;If There is resistance hanging point in trip-out process, and be hampered more than 10t, then enters step (d);
(d) it is risen with discharge capacity A/2 back reaming and is drilled into 10m above resistance hanging point, then to be drilled under reaming under discharge capacity A/4 under resistance hanging point Square 10m, the stalling of termination of pumping later pull out of hole again: if resistance is hung less than 10t in trip-out process, having continued to be drilled into well depth X, enter step (e);If being hampered still above 10t, this step is repeated, until resistance when termination of pumping stalling pulls out of hole hangs and is less than 10t, is further continued for pulling out of hole To well depth X, enter step (e);
(e) at well depth X, with discharge capacity A circulation one week, it is drilled into Y under termination of pumping stalling, and rise be drilled at well depth X again;If (Y-M) > 50m then enables Y=X, takes X '=(Y-M)/2+M;
(f) X is replaced with X ', repeats step (c)~(e), until (Y-M)≤50m;
(g) it pulls out of hole to the casing shoe of upper layer, with discharge capacity A/4 circulation one week in the casing shoe of upper layer, rises and be drilled into well head, trap Pipe.
Embodiment 2:
Heterogeneous shale gas well Reservoir Section finishing drilling method as shown in Figure 1, on the basis of embodiment 1, discharge capacity A meets well The annular space of bottom to upper layer casing shoe returns speed not less than 0.8m/s.The bit gauge protection of bottom drilling assembly is having a size of 8- in the present embodiment 1/2 ", drilling rod outer diameter 5 ", discharge capacity 2.5m3/ min can be calculated annular space at this time and return speed in the case where not considering wellbore amplification degree 1.92m/s.Due to the compaction stability and compactness of shale formation, wellbore amplification degree is aobvious and easy generally between 10~20% See, annular space returns speed and can still be maintained on 1.6m/s.It is to be with A/2, i.e. 1.25m3The discharge capacity of/min is fallen During reaming, it still is able to meet annular space and returns speed on 0.8m/s, the row's of returning ability of landwaste is fully ensured that.
Preferred embodiment is that the complete well head bag reserves 10m.The revolving speed of the back reaming is 40~50rpm, described The revolving speed of lower reaming is 20~30rpm.It further include that logging operation is carried out before setting of casing.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (5)

1. heterogeneous shale gas well Reservoir Section finishing drilling method, which comprises the following steps:
(a) drilling to design well depth, stayed well head bag, be recycled to shaft bottom landwaste with discharge capacity A and return out to well head, complete full well by shaft bottom The sieve residue log of section;Remember that bottom depth is Y, the depth of upper layer casing shoe is M, takes X=(Y-M)/2+M;
(b) back reaming pulls out of hole to upper layer casing shoe, recycles one week in the casing shoe of upper layer, is drilled into shaft bottom, prospect pit under termination of pumping stalling Bottom sand setting height;Shaft bottom sand setting is destroyed, again drilling to design well depth, with discharge capacity A circulation one week;
(c) termination of pumping, which has stalled, is drilled into well depth X: if entering step (e) in trip-out process without the resistance hanging point within 10t;If pulling out of hole There is resistance hanging point in the process, and be hampered more than 10t, then enters step (d);
(d) it is risen with discharge capacity A/2 back reaming and is drilled into 10m above resistance hanging point, then to be drilled under reaming under discharge capacity A/4 below resistance hanging point 10m, the stalling of termination of pumping later pull out of hole again: if resistance is hung less than 10t in trip-out process, having continued to be drilled into well depth X, enter step (e);If being hampered still above 10t, this step is repeated, until resistance when termination of pumping stalling pulls out of hole hangs and is less than 10t, is further continued for pulling out of hole To well depth X, enter step (e);
(e) at well depth X, with discharge capacity A circulation one week, it is drilled into Y under termination of pumping stalling, and rise be drilled at well depth X again;(if Y-M) > 50m, then enable Y=X, takes X '=(Y-M)/2+M;
(f) X is replaced with X ', repeats step (c)~(e), until (Y-M)≤50m;
(g) it pulls out of hole to the casing shoe of upper layer, with discharge capacity A/4 circulation one week in the casing shoe of upper layer, rises and be drilled into well head, setting of casing.
2. heterogeneous shale gas well Reservoir Section finishing drilling method according to claim 1, which is characterized in that discharge capacity A meets well The annular space of bottom to upper layer casing shoe returns speed not less than 0.8m/s.
3. heterogeneous shale gas well Reservoir Section finishing drilling method according to claim 1, which is characterized in that the complete well head bag Reserved 5~10m.
4. heterogeneous shale gas well Reservoir Section finishing drilling method according to claim 1, which is characterized in that the back reaming Revolving speed is 40~50, and the revolving speed of the lower reaming is 20~30rpm.
5. heterogeneous shale gas well Reservoir Section finishing drilling method according to claim 1, which is characterized in that further include trapping Logging operation is carried out before pipe.
CN201811221405.2A 2018-10-19 2018-10-19 Method for completing drilling of heterogeneous shale gas well reservoir section Active CN109322618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811221405.2A CN109322618B (en) 2018-10-19 2018-10-19 Method for completing drilling of heterogeneous shale gas well reservoir section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811221405.2A CN109322618B (en) 2018-10-19 2018-10-19 Method for completing drilling of heterogeneous shale gas well reservoir section

Publications (2)

Publication Number Publication Date
CN109322618A true CN109322618A (en) 2019-02-12
CN109322618B CN109322618B (en) 2020-04-07

Family

ID=65262797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811221405.2A Active CN109322618B (en) 2018-10-19 2018-10-19 Method for completing drilling of heterogeneous shale gas well reservoir section

Country Status (1)

Country Link
CN (1) CN109322618B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058796A (en) * 2019-11-25 2020-04-24 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN111444637A (en) * 2020-05-28 2020-07-24 洲际海峡能源科技有限公司 Shale gas long-section horizontal well casing running safety evaluation method and system
CN116065950A (en) * 2022-12-08 2023-05-05 大庆石油管理局有限公司 Intelligent drilling construction process based on oil gas development engineering driller surface layer construction

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4302052A (en) * 1980-10-07 1981-11-24 Chem-Struct Corporation Modular hydraulic mining tool with slurry inlet metering
WO2008023089A1 (en) * 2006-08-23 2008-02-28 Teijo Hulkkonen Drilling device for drilling and reaming of a hole
GB2464416A (en) * 2005-02-22 2010-04-21 Weatherford Lamb Drilling and completing a wellbore in underbalanced conditions
CN103670317A (en) * 2013-12-06 2014-03-26 中国石油集团长城钻探工程有限公司 Simulation pipe string rigidity pigging method
CN103764944A (en) * 2011-05-30 2014-04-30 Sld强化开采有限公司 A method of conditioning a wall of a bore section
CN104358519A (en) * 2014-09-12 2015-02-18 中国石油集团长城钻探工程有限公司 Segment-type well completion method
CN105625944A (en) * 2016-02-15 2016-06-01 中国石油天然气股份有限公司 Drilling method for sidetracking horizontal well with same diameter as original well shaft
CN106285540A (en) * 2015-06-01 2017-01-04 中国石油天然气股份有限公司 Coal bed gas well casing pipe repairing method
CN106337667A (en) * 2016-09-27 2017-01-18 中国石油集团川庆钻探工程有限公司 Secondary-exploitation horizontal well cementing and completion construction method
WO2017030944A1 (en) * 2015-08-14 2017-02-23 Baker Hughes Incorporated Modular earth-boring tools, modules for such tools and related methods
CN107288546A (en) * 2017-08-16 2017-10-24 北京奥瑞安能源技术开发有限公司 The completion method and horizontal well of a kind of horizontal well
CN107620582A (en) * 2017-08-08 2018-01-23 广州海洋地质调查局 Bilayer sleeve sand control completion technique and double-layer anti-sand completion tubular column
CN107829683A (en) * 2017-04-27 2018-03-23 成都全富科技有限公司 A kind of horizontal collecting well group well track of shale gas and boring method
CN108071343A (en) * 2017-12-11 2018-05-25 中国海洋石油集团有限公司 The narrow pressure window well three of deep water opens time Casing Program Design Method
CN108533180A (en) * 2018-04-24 2018-09-14 中国海洋石油集团有限公司 A kind of drilling engineering is with boring hole-drawing device and reaming method

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4302052A (en) * 1980-10-07 1981-11-24 Chem-Struct Corporation Modular hydraulic mining tool with slurry inlet metering
GB2464416A (en) * 2005-02-22 2010-04-21 Weatherford Lamb Drilling and completing a wellbore in underbalanced conditions
WO2008023089A1 (en) * 2006-08-23 2008-02-28 Teijo Hulkkonen Drilling device for drilling and reaming of a hole
CN103764944A (en) * 2011-05-30 2014-04-30 Sld强化开采有限公司 A method of conditioning a wall of a bore section
CN103670317A (en) * 2013-12-06 2014-03-26 中国石油集团长城钻探工程有限公司 Simulation pipe string rigidity pigging method
CN104358519A (en) * 2014-09-12 2015-02-18 中国石油集团长城钻探工程有限公司 Segment-type well completion method
CN106285540A (en) * 2015-06-01 2017-01-04 中国石油天然气股份有限公司 Coal bed gas well casing pipe repairing method
WO2017030944A1 (en) * 2015-08-14 2017-02-23 Baker Hughes Incorporated Modular earth-boring tools, modules for such tools and related methods
CN105625944A (en) * 2016-02-15 2016-06-01 中国石油天然气股份有限公司 Drilling method for sidetracking horizontal well with same diameter as original well shaft
CN106337667A (en) * 2016-09-27 2017-01-18 中国石油集团川庆钻探工程有限公司 Secondary-exploitation horizontal well cementing and completion construction method
CN107829683A (en) * 2017-04-27 2018-03-23 成都全富科技有限公司 A kind of horizontal collecting well group well track of shale gas and boring method
CN107620582A (en) * 2017-08-08 2018-01-23 广州海洋地质调查局 Bilayer sleeve sand control completion technique and double-layer anti-sand completion tubular column
CN107288546A (en) * 2017-08-16 2017-10-24 北京奥瑞安能源技术开发有限公司 The completion method and horizontal well of a kind of horizontal well
CN108071343A (en) * 2017-12-11 2018-05-25 中国海洋石油集团有限公司 The narrow pressure window well three of deep water opens time Casing Program Design Method
CN108533180A (en) * 2018-04-24 2018-09-14 中国海洋石油集团有限公司 A kind of drilling engineering is with boring hole-drawing device and reaming method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
田宗强等: "《东方 1-1 气田浅层大位移水平井钻井技术》", 《石油钻采工艺》 *
祝华业: "《SA369井在科威特北部油田的钻井实践》", 《内蒙古石油化工》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058796A (en) * 2019-11-25 2020-04-24 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN111058796B (en) * 2019-11-25 2021-11-09 西南石油大学 Method for improving shale gas well oil layer casing well cementation quality
CN111444637A (en) * 2020-05-28 2020-07-24 洲际海峡能源科技有限公司 Shale gas long-section horizontal well casing running safety evaluation method and system
CN111444637B (en) * 2020-05-28 2023-04-25 洲际海峡能源科技有限公司 Shale gas long-section horizontal well casing running safety evaluation method and system
CN116065950A (en) * 2022-12-08 2023-05-05 大庆石油管理局有限公司 Intelligent drilling construction process based on oil gas development engineering driller surface layer construction
CN116065950B (en) * 2022-12-08 2023-11-03 大庆石油管理局有限公司 Intelligent drilling construction process based on oil gas development engineering driller surface layer construction

Also Published As

Publication number Publication date
CN109322618B (en) 2020-04-07

Similar Documents

Publication Publication Date Title
US7270182B2 (en) Earth loop installed with sonic apparatus
CN105781499B (en) A kind of multistage anti-sand method of ocean gas hydrate decompression exploitation
AU2015395724B2 (en) Formation fracturing using heat treatment
CN103867119B (en) Coal reservoir well completion transformation method
CN109322618A (en) Heterogeneous shale gas well Reservoir Section finishing drilling method
CN101787854A (en) Subsection well completion system of bottom water reservoir horizontal well
RU2494214C1 (en) Method for well construction
WO2011005271A1 (en) Forming multiple deviated wellbores
CN109162643A (en) Finishing drilling method for continuous type shale reservoir
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN109488212B (en) Drilling and completion method in shale reservoir in drilling engineering
CN104612752A (en) Sand prevention filling device
Rodvelt Vertical well construction and hydraulic fracturing for CBM completions
RU2453674C1 (en) Method of well operation
CN112647849B (en) Sea water deep drilling method for offshore drilling
RU2317404C1 (en) Method to create gravel filter in horizontal bore
RU2021477C1 (en) Method for well construction
RU2541978C1 (en) Well construction method
US11598182B2 (en) Methods of producing hydrocarbons from unconsolidated sand formations
CN109209233B (en) Drilling method for improving low drilling speed of shale reservoir
US11499086B1 (en) Subterranean drilling and completion in geothermal wells
Karmanov et al. The use of airlift during drilling of technological wells
AS et al. Drilling Methods
CN109441342B (en) Drilling acceleration method in shale formation
CN1247876C (en) Method for improving low permeable mineral ieservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210203

Address after: 257051 No.27, Xisi Road, Dongying District, Dongying City, Shandong Province

Patentee after: Shengli Oilfield Fangyuan Workover Operation Co.,Ltd.

Address before: 610000 Shiyang Industrial Park, hi tech Zone, Chengdu, Sichuan

Patentee before: CHENGDU KESHENG PETROLEUM TECHNOLOGY Co.,Ltd.