CN107288546A - The completion method and horizontal well of a kind of horizontal well - Google Patents

The completion method and horizontal well of a kind of horizontal well Download PDF

Info

Publication number
CN107288546A
CN107288546A CN201710703381.3A CN201710703381A CN107288546A CN 107288546 A CN107288546 A CN 107288546A CN 201710703381 A CN201710703381 A CN 201710703381A CN 107288546 A CN107288546 A CN 107288546A
Authority
CN
China
Prior art keywords
well
horizontal
horizontal well
producing well
producing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710703381.3A
Other languages
Chinese (zh)
Other versions
CN107288546B (en
Inventor
杨陆武
郭卫东
崔玉环
孔令东
张明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aoruian Energy Source Tech & Dev Co Ltd
Original Assignee
Beijing Aoruian Energy Source Tech & Dev Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Aoruian Energy Source Tech & Dev Co Ltd filed Critical Beijing Aoruian Energy Source Tech & Dev Co Ltd
Priority to CN201710703381.3A priority Critical patent/CN107288546B/en
Publication of CN107288546A publication Critical patent/CN107288546A/en
Application granted granted Critical
Publication of CN107288546B publication Critical patent/CN107288546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses the step 1 of the completion method of a kind of horizontal well and horizontal well, the wherein completion method of horizontal well) be used to realize the connection of horizontal well and producing well, step 2) it is used to verifying that horizontal well is connected with the bias of producing well whether meet the requirements.The horizontal segment of horizontal well deviates the axis certain distance of producing well, PE screen casings in horizontal segment also can deviate from axis a certain distance of producing well, the space in the producing well centre position that PE screen casings take reduces, decentralization space is provided for the tubing string in tripping in producing well, tubing string in producing well transferred to predetermined depth, it is ensured that mining operation is smoothed out.After the completion of horizontal well is connected with producing well bias, need to verify whether horizontal well meets the requirements with eccentric connect of producing well, horizontal well connects the satisfactory distance for meaning horizontal well deviation producing well axis with producing well and disclosure satisfy that the PE screen casings in horizontal segment do not influence the tubing string in producing well to transfer to predetermined depth.

Description

The completion method and horizontal well of a kind of horizontal well
Technical field
The present invention relates to coal bed gas technical field, the completion method and horizontal well of more particularly to a kind of horizontal well.
Background technology
For the multi-branched horizontal well for exploiting coal bed methane, horizontal well is connected with producing well, the diameter of producing well Only 0.5 meter, the spacing of two wells need to could complete the connection of two wells at least at 200 meters by special connection instrument.Existing skill The connection of the horizontal segment and producing well of horizontal well is crept into generally towards the axis direction of producing well in art, has ensured that horizontal well and life Produce the connection of well.
After horizontal well is connected with producing well, in horizontal well can tripping in PE screen casings, in producing well also can running string, due to PE Screen casing has occupied the segment space of producing well, causes in producing well location conflicts between the tubing string of tripping in and PE screen casings, raw The tubing string of production well is unable to tripping in predeterminated position, and the progress of mining operation is influenceed when serious.
Therefore, the problem of how solving location conflicts between the PE screen casings of horizontal well and the tubing string of producing well, as ability Field technique personnel technical problem urgently to be resolved hurrily.
The content of the invention
In view of this, the invention provides a kind of completion method of horizontal well, to solve PE screen casings and the production of horizontal well Between the tubing string of well the problem of location conflicts.Present invention also offers a kind of horizontal well.
To achieve the above object, the present invention provides following technical scheme:
A kind of completion method of horizontal well, including:
Step 1) the eccentric horizontal segment and producing well for connecting horizontal well;
Step 2) verify whether the horizontal well meets the requirements with eccentric connect of the producing well, verify the horizontal well The distance for deviateing the axis of the producing well meets requirement, then enters and be oriented to operation, verifies that the horizontal well deviates the production The distance of the axis of well is undesirable, then repeating said steps 1) and the step 2).
It is preferred that, in the completion method of above-mentioned horizontal well, the step 1) include:
Step 11) control drilling tool to creep into the vertical section of the horizontal well and control the drilling tool just to described in target point drilling The first level section of the horizontal segment of horizontal well;
Step 12) the control drilling tool creeps into the of the horizontal segment towards the direction for deviateing the target point pre-determined distance Two horizontal segments;
Step 13) the control drilling tool creeps into the 3rd horizontal segment of the horizontal segment, the 3rd horizontal segment and the life Well bias connection is produced, the 3rd horizontal segment is connectivity points with the position that producing well bias is connected.
It is preferred that, in the completion method of above-mentioned horizontal well, the step 2) include:
Step 21) drilling tool of pulling out of hole is to the casing shoe of the horizontal well;
Step 22) into the producing well running string string to the producing well end;
Step 23) transfer the drilling tool, observation suspending weight change, if suspending weight stabilization, drilling tool is transferred along the horizontal well To the connectivity points, if suspending weight increase or reduction, above carry the drilling tool, while above carrying the tubing string of the producing well Then string transfers the drilling tool to the connectivity points, the producing well transfers the tubing string string, determines the pipe to preset height Whether the position that is hampered of post string, the eccentric throw that is hampered between position and the axis of the producing well described in checking meets the requirements, and tests Demonstrate,prove the eccentric throw and meet requirement, then enter and be oriented to operation, verify that the eccentric throw is undesirable, then repeating said steps 1) With the step 2).
It is preferred that, in the completion method of above-mentioned horizontal well, the step 21) also include being located at step 21) before step Rapid 20) turn on pump circulates back reaming.
It is preferred that, in the completion method of above-mentioned horizontal well, the step 11) and the step 12) in forbid above carrying institute State drilling tool.
A kind of horizontal well, the completion side opened up using the horizontal well described in any one above-mentioned scheme of the horizontal well Method.
It can be seen from the above technical proposal that the completion method for the horizontal well that the present invention is provided, including step 1) and step 2), step 1) be used to realize the connection of horizontal well and producing well, step 2) be used to verify that horizontal well is connected with the bias of producing well Whether meet the requirements.The PE screen casings that the horizontal segment of horizontal well deviates in the axis certain distance of producing well, horizontal segment also will be inclined From axis a certain distance of producing well, the space in the producing well centre position that PE screen casings take reduces, in being tripping in producing well Tubing string provide decentralization space so that the tubing string in producing well can be transferred to predetermined depth, it is ensured that mining operation it is smooth Carry out.Whether meet, it is necessary to verify that horizontal well is connected with the bias of producing well after the completion of horizontal well is connected with producing well bias It is required that, horizontal well connects the satisfactory distance for meaning horizontal well deviation producing well axis with producing well and disclosure satisfy that level PE screen casings in section do not influence the tubing string in producing well to transfer to predetermined depth, so as to ensure smoothly entering for mining effect OK.
Present invention also offers a kind of horizontal well, the water opened up described in any one above-mentioned scheme of use of the horizontal well The completion method of horizontal well is opened up.Because the completion method of horizontal well has above-mentioned technique effect, pass through the completion side of the horizontal well The horizontal well that method is opened up also has same technique effect, will not be repeated here.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
The flow chart of the completion method for the horizontal well that Fig. 1 provides for first embodiment of the invention;
The flow chart of the completion method for the horizontal well that Fig. 2 provides for second embodiment of the invention;
The flow chart of the completion method for the horizontal well that Fig. 3 provides for third embodiment of the invention.
Embodiment
The invention discloses a kind of completion method of horizontal well, with solve horizontal well PE screen casings and producing well tubing string it Between location conflicts the problem of.The invention also discloses a kind of horizontal well.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Refer to Fig. 1-Fig. 3, the flow chart of the completion method for the horizontal well that Fig. 1 provides for first embodiment of the invention; The flow chart of the completion method for the horizontal well that Fig. 2 provides for second embodiment of the invention;Fig. 3 is third embodiment of the invention The flow chart of the completion method of the horizontal well of offer.
The invention discloses a kind of completion method of horizontal well, including:
Step 1) the eccentric horizontal segment and producing well for connecting horizontal well;
Step 2) verify whether horizontal well meets the requirements with eccentric connect of producing well, checking horizontal well deviates producing well The distance of axis, which is met, to be required, then enters and be oriented to operation, and the distance for the axis that checking horizontal well deviates producing well is undesirable, Then repeat step 1) and step 2).
The horizontal segment of horizontal well is connected with producing well bias, herein it should be noted that eccentric connection refers to horizontal well Horizontal segment deviates the axis of producing well, and the axis of horizontal segment and the axis of producing well are non-intersect, and axis and the production of horizontal segment There is a certain distance in the horizontal direction between the axis of well.
The PE screen casings that the horizontal segment of horizontal well deviates in the axis certain distance of producing well, horizontal segment also can deviate from production Axis a certain distance of well, the space in the producing well centre position that PE screen casings take reduces, and is the tubing string in tripping in producing well There is provided decentralization space so that the tubing string in producing well can be transferred to predetermined depth, it is ensured that mining operation is smoothed out.
Whether accorded with after the completion of horizontal well is connected with producing well bias, it is necessary to verify that horizontal well is connected with the bias of producing well Close and require, horizontal well connects the satisfactory distance for meaning horizontal well deviation producing well axis with producing well and disclosure satisfy that water PE screen casings in flat section do not influence the tubing string in producing well to transfer to predetermined depth, ensure that being smoothed out for mining effect.
Horizontal well deviates the required distance of the axis of producing well:The axial line distance that horizontal well deviates producing well is at least tubing string The radius sum of radius and PE screen casings.
If the distance that horizontal well deviates the axis of producing well meets production requirement, into guide effect;If level The distance of axis that well deviates producing well is unsatisfactory for production requirement, then repeat step 1) and step 2), that is, repeat eccentric connection with Whether the eccentric connection of checking meets the requirements.Only when the distance that horizontal well deviates the axis of producing well meets production requirement, bore The horizontal completion entered could carry out normal coal-bed gas exploitation, otherwise can reduce the efficiency and yield of coal-bed gas exploitation.
In a specific embodiment of this programme, step 1) specifically include:
Step 11) control the vertical section and control drilling tool of drilling tool drilling horizontal well just creeping into the level of horizontal well to target point The first level section of section;
Step 12) drilling tool is controlled towards the second horizontal segment of the direction drilling horizontal segment for deviateing target point pre-determined distance;
Step 13) control drilling tool creeps into the 3rd horizontal segment of horizontal segment, and the 3rd horizontal segment and producing well are eccentric to be connected, and the 3rd Horizontal segment is connectivity points with the position that producing well bias is connected.
Step 1) it is used to realize the connection of horizontal well and producing well, specific connection step includes step 11)-step 13).
Step 11) be used for realize horizontal well vertical section and first level section drilling, and producing well drilling.First , it is necessary to which drilling tool is just crept into target point in the drilling process of horizontal segment.The drilling situation of underground is understood on well for convenience, preferably , target point depth tripping in strong magnetic joint, producing well is connected between the drill bit and screw rod of drilling tool inserting tube, strong magnetic joint For providing the magnetic field to be measured of an alternation, the maximum effective distance of electromagnetic signal is 40-70m, and inserting tube connects for gathering strong magnetic The magnetic field intensity signal that head is produced, the signal of inserting tube collection reaches ground data acquisition software after treatment and data analysis is soft After part, azimuth-range of the horizontal well track relative to the target point of producing well is drawn.
Depth of setting, the distance interval of adjacent two data collection and the horizontal well of drilling tool are inputted in data acquisition software Initial well depth, generally the data of collection are once analyzed by DAS every 3m, in this programme A specific embodiment in, adjacent two data collection distance at intervals of half meter.
During data acquisition, data receiver software constantly receives the field strength values (Hx, Hy and Hz) of strong magnetic joint, and The three bars curves on field strength values are generated by DAS, herein it should be noted that needing to ensure three letters Number curve stops data acquisition, and gathered data again, reforms data analysis without breakpoint when wrong.
In a specific embodiment of this programme, when connection operation starts, the test point distance sleeve footwear of instrument are connected Distance be less than 8m when, the horizontal well track measured relative to the target point of producing well orientation by the magnetic disturbance of sleeve pipe Influence is big, and the data now measured cannot function as connecting the Main Basiss of operation, it is necessary to by follow-up measurement data, subsequently take After several groups of connection data, tool-face position and screw rod build angle rate etc. judge to connect number when operation starts with checking during with reference to drilling According to reasonability and accuracy, it is then determined that whether the foundation analyzed as final data.
Step 12) be used for horizontal well the second horizontal segment drilling, the drilling of the second horizontal segment needs progressively to deviate target Point is crept into, after the second horizontal segment drilling terminates, and target point pre-determined distance is deviateed in the end of the second horizontal segment.Second horizontal segment Realize deviation of the horizontal well relative to producing well.
In a specific embodiment of this programme, operation early stage is connected, first level section, first are just crept into target point The length of horizontal segment is 12m, then creeps into the second horizontal segment, and the second horizontal segment deviates target point and carries out connection operation, and straight well rises Data of two group of second horizontal segment relative to the azimuth-range of the target point of producing well are at least analyzed before connection instrument, control is bored The distance that head deviates target point is 15cm, and last group analysis data calculates the distance for deviateing target point within 15cm then no longer Carry out orientation adjustment.
It is determined that target point vertical depth when, it is necessary to controlled with reference to the drill bit of drilling tool in the physical location in coal seam into target hang down It is deep.
The length that drilling tool creeps into i.e. the 3rd horizontal segment during to apart from connectivity points 5m is that drilling tool is carried in 5m, notice, connects engineering Teacher and orientation engineer's verification downhole data and track data, it is determined that last 5m drilling mode, now the straight well such as horizontal well rises Go out to connect instrument.If the drilling orientation of horizontal well needs adjustment, using directional drilling mode, the drilling orientation of such as horizontal well It is not required to adjust orientation, using rotary drilling mode.
In step 11) and step 12) in, it is necessary to data acquisition software gather information analyze, directional well engineering Bit location hole deviation, orientation, vertical depth, north and south coordinate and the thing for the information prediction horizontal well that teacher gathers according to data acquisition software Coordinate, and it is supplied to connection engineer;
The data for connecting engineer's information gathered by data acquisition software and being predicted according to orientation engineer are divided Analysis, data below is provided to orientation well engineer:Distance of the drill bit away from inserting tube, the shaft bottom south new to target azimuth difference, target spot The new thing coordinate of northern coordinate, target spot and the new vertical depth of target spot;
The data that orientation well engineer is provided according to connection engineer determine the drilling measure of the 3rd horizontal segment, connect instrument (connection instrument includes underground part and well-surface part, and underground part mainly includes strong magnetic joint and inserting tube, and well-surface part includes number According to acquisition software and DAS) accuracy of data presented by the horizontal well of orientation well engineer prediction drill bit position The accuracy for putting hole deviation, orientation, vertical depth, north and south coordinate and thing coordinate is directly affected, and orientation well engineer is needed according to most The information of new data collection software collection Accurate Prediction shaft bottom orientation as much as possible.
In a specific embodiment of this programme, step 2) include:
Step 21) trip-out drilling tool to horizontal well casing shoe;
Step 22) into producing well running string string to producing well end;
Step 23) drilling tool is transferred along horizontal well, observation suspending weight changes, if suspending weight is stable, drilling tool is transferred to connectivity points, If suspending weight increases or reduced, drilling tool is above carried, while then the tubing string string for above carrying producing well transfers drilling tool to preset height To connectivity points, producing well decentralization tubing string string determines the position that is hampered of tubing string string, checking is hampered between position and the axis of producing well Eccentric throw whether meet the requirements, checking eccentric throw meet require, then enter be oriented to operation, checking eccentric throw it is undesirable, Then repeat step 1) and step 2).
Step 21) drilling tool can be played a protective role, prevent bit freezing.Due to producing well transfer tubing string string time compared with Long, drilling tool, which is carried to casing shoe, to be played a protective role to drilling tool, improve the security of drilling tool work.
Step 2) it is used to verify whether horizontal well meets the requirements with eccentric connect of producing well, specifically include step 21)-step It is rapid 23).
Step 21) and step 22) can carry out simultaneously.
Step 21) also include be located at step 21) before step 20) turn on pump circulation back reaming, facilitate above carrying for drilling tool, keep away Exempt to break drilling rod during above the carrying of drilling tool.
Step 11) and step 12) in forbid above carrying drilling tool, it is to avoid cause signal acquisition to interrupt due to above carrying drilling tool, collect During signal, it is desirable to which drilling tool is continuous and at the uniform velocity transfers.
, it is necessary to illustrate with driller on duty during connecting operation, the first level section of horizontal well and the second horizontal segment are normal If forbidding above carrying drilling tool without special circumstances, it is necessary to need prior notice to connect engineer when above carrying drilling tool during drilling.
The first level section and the second horizontal segment of horizontal well do data point during normal drilling if necessary to above carry drilling tool Analysis notifies orientation well engineer, it is necessary to connect engineer, is given an order by orientation well engineer and determines above to carry drilling tool to required well depth.
Present invention also offers a kind of horizontal well, the water opened up described in any one above-mentioned scheme of use of the horizontal well The completion method of horizontal well is opened up.Because the completion method of horizontal well has above-mentioned technique effect, pass through the completion side of the horizontal well The horizontal well that method is opened up also has same technique effect, will not be repeated here.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (6)

1. a kind of completion method of horizontal well, it is characterised in that including:
Step 1) the eccentric horizontal segment and producing well for connecting horizontal well;
Step 2) verify whether the horizontal well meets the requirements with eccentric connect of the producing well, verify that the horizontal well deviates The distance of the axis of the producing well, which is met, to be required, then enters and be oriented to operation, verifies that the horizontal well deviates the producing well The distance of axis is undesirable, then repeating said steps 1) and the step 2).
2. the completion method of horizontal well according to claim 1, it is characterised in that the step 1) include:
Step 11) control drilling tool to creep into the vertical section of the horizontal well and control the drilling tool just to creep into the level to target point The first level section of the horizontal segment of well;
Step 12) drilling tool is controlled towards the second water of the direction drilling horizontal segment for deviateing the target point pre-determined distance Flat section;
Step 13) the control drilling tool creeps into the 3rd horizontal segment of the horizontal segment, the 3rd horizontal segment and the producing well Bias connection, the 3rd horizontal segment is connectivity points with the position that producing well bias is connected.
3. the completion method of horizontal well according to claim 2, it is characterised in that the step 2) include:
Step 21) drilling tool of pulling out of hole is to the casing shoe of the horizontal well;
Step 22) into the producing well running string string to the producing well end;
Step 23) transfer the drilling tool, observation suspending weight change, if suspending weight stabilization, drilling tool is transferred to institute along the horizontal well Connectivity points are stated, if suspending weight increase or reduction, above carry the drilling tool, while above carrying the tubing string string of the producing well extremely Preset height, then transfers the drilling tool to the connectivity points, the producing well transfers the tubing string string, determines the tubing string string The position that is hampered, whether the checking eccentric throw being hampered between position and the axis of the producing well meet the requirements, checking institute State eccentric throw and meet requirement, then enter and be oriented to operation, verify that the eccentric throw is undesirable, then repeating said steps 1) and institute State step 2).
4. the completion method of horizontal well according to claim 3, it is characterised in that the step 21) also include being located at step It is rapid 21) before step 20) turn on pump circulation back reaming.
5. the completion method of horizontal well according to claim 2, it is characterised in that the step 11) and the step 12) In forbid above carrying the drilling tool.
6. a kind of horizontal well, it is characterised in that the water opened up in use claim 1-5 described in any one of the horizontal well The completion method of horizontal well.
CN201710703381.3A 2017-08-16 2017-08-16 A kind of completion method and horizontal well of horizontal well Active CN107288546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710703381.3A CN107288546B (en) 2017-08-16 2017-08-16 A kind of completion method and horizontal well of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710703381.3A CN107288546B (en) 2017-08-16 2017-08-16 A kind of completion method and horizontal well of horizontal well

Publications (2)

Publication Number Publication Date
CN107288546A true CN107288546A (en) 2017-10-24
CN107288546B CN107288546B (en) 2019-05-03

Family

ID=60106280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710703381.3A Active CN107288546B (en) 2017-08-16 2017-08-16 A kind of completion method and horizontal well of horizontal well

Country Status (1)

Country Link
CN (1) CN107288546B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104756A (en) * 2017-12-15 2018-06-01 天水电气传动研究所有限责任公司 A kind of control method of automatic back reaming
CN109322618A (en) * 2018-10-19 2019-02-12 成都科盛石油科技有限公司 Heterogeneous shale gas well Reservoir Section finishing drilling method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1333858A (en) * 1998-11-20 2002-01-30 Cdx天然气有限公司 Method and system for accessing substerranean deposits from the surface
CN101975055A (en) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 Method for remediating trouble well of coal bed gas multi-branch horizontal well
CN101994505A (en) * 2010-09-17 2011-03-30 北京奥瑞安能源技术开发有限公司 Drilling construction method by cooperation of horizontal wells and extraction straight wells for coal bed methane in multiple objective layers
CN102322252A (en) * 2011-05-30 2012-01-18 北京奥瑞安能源技术开发有限公司 Coal bed gas multi-branched horizontal well system and job practices thereof
CN106677746A (en) * 2017-01-05 2017-05-17 中国神华能源股份有限公司 Method for coal bed gas exploitation of full working face through down-hole system
US20170145779A1 (en) * 2014-05-09 2017-05-25 Welltec A/S Downhole completion system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1333858A (en) * 1998-11-20 2002-01-30 Cdx天然气有限公司 Method and system for accessing substerranean deposits from the surface
CN101975055A (en) * 2010-09-17 2011-02-16 北京奥瑞安能源技术开发有限公司 Method for remediating trouble well of coal bed gas multi-branch horizontal well
CN101994505A (en) * 2010-09-17 2011-03-30 北京奥瑞安能源技术开发有限公司 Drilling construction method by cooperation of horizontal wells and extraction straight wells for coal bed methane in multiple objective layers
CN102322252A (en) * 2011-05-30 2012-01-18 北京奥瑞安能源技术开发有限公司 Coal bed gas multi-branched horizontal well system and job practices thereof
US20170145779A1 (en) * 2014-05-09 2017-05-25 Welltec A/S Downhole completion system
CN106677746A (en) * 2017-01-05 2017-05-17 中国神华能源股份有限公司 Method for coal bed gas exploitation of full working face through down-hole system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104756A (en) * 2017-12-15 2018-06-01 天水电气传动研究所有限责任公司 A kind of control method of automatic back reaming
CN109322618A (en) * 2018-10-19 2019-02-12 成都科盛石油科技有限公司 Heterogeneous shale gas well Reservoir Section finishing drilling method

Also Published As

Publication number Publication date
CN107288546B (en) 2019-05-03

Similar Documents

Publication Publication Date Title
CN107829683B (en) A kind of horizontal collecting well group well track of shale gas and boring method
EP1440220B1 (en) An entry well with slanted well bores and method
US10858929B2 (en) Methods for drilling multiple parallel wells with passive magnetic ranging
BRPI0518347B1 (en) METHOD FOR CONNECTING UNDERGROUND ROAD, AND, WELL HOLE NETWORK
CN103109040A (en) Monitoring of drilling operations with flow and density measurement
CN111140173B (en) Horizontal directional core drilling straightening and deviation correcting drilling tool and drilling method
CN102892970A (en) Methods and systems for drilling
CN105064982B (en) Coal field ground hole is accurately oriented to target spot in underworkings docks equipment and method
AU2002349947A1 (en) An entry well with slanted well bores and method
CN105064919A (en) Ultra-short-radius radial lateral drilling method for horizontal wells
CN107801408A (en) The tunneling system of acid system that can be oriented in real time
CN110735629B (en) Water guide fracture zone height judging method based on upward drilling speed
CN108716396A (en) A kind of development approach of coal bed gas multiple-limb distal end connected well
CN110043229A (en) A kind of more well group connection convergence recovery methods of Gas Hydrate In Sea Areas
CN104612691B (en) Single borehole multilateral directional butted well salt mining method
CN109184693A (en) The old mining area old well production potential tapping technique of rock salt
CN107288546A (en) The completion method and horizontal well of a kind of horizontal well
CN111058819B (en) Method for covering hard top plate on hydraulic fracturing treatment working face
CN107060642A (en) Horizontal well track control method being connected trona deep-thin layer more
CN106930733A (en) Coal bed gas group wells extraction system and method for construction
CN109812228A (en) Drilling method for double horizontal wells
CN101956548B (en) Coal bed methane multi-branch horizontal well system and modification method thereof
CN108071340B (en) A kind of well track design preferred method
CN107916891B (en) Drilling method suitable for 26-inch guide pipe single-cylinder double wells
CN105588539A (en) Device for monitoring coal body transverse deformation on line and monitoring method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant