CN109322320A - The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board - Google Patents

The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board Download PDF

Info

Publication number
CN109322320A
CN109322320A CN201811346409.3A CN201811346409A CN109322320A CN 109322320 A CN109322320 A CN 109322320A CN 201811346409 A CN201811346409 A CN 201811346409A CN 109322320 A CN109322320 A CN 109322320A
Authority
CN
China
Prior art keywords
cushion cap
construction
bottom board
basement bottom
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811346409.3A
Other languages
Chinese (zh)
Inventor
张健
李义轩
郑学刚
王前
朱世超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811346409.3A priority Critical patent/CN109322320A/en
Publication of CN109322320A publication Critical patent/CN109322320A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Composite Materials (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses the construction methods of a kind of Deep Thick Soft Ground Area cushion cap and basement bottom board, this method carries out cushion cap excavation by the way of steel sheet pile supporting, waist rail is set in steel sheet pile by calculating according to cushion cap depth, angle brace and to support, after the completion of excavation, pour bed course, construction waterproof and waterproof protective layer, cushion cap reinforcing bar is bound in waterproof protective layer, then in cushion cap reinforcing bar surrounding supporting module, cushion cap concrete is poured to basement bottom board bottom absolute altitude, construction bearing platform side waterproof and waterproof protective layer, steel sheet pile is extracted after the backfill earthwork and compacting, after the construction section bearing platform construction of delimitation, pour basement bottom board bed course, construction waterproof slab and waterproof protective layer, bind baseplate reinforcing bar, pour underplate concrete, complete basement bottom board construction.This method can it is simple, efficiently, the completion soft clay area cushion cap excavation supporting of safety and basement bottom board construction, it is ensured that construction operation steel sheet pile safe and convenient recycles after extracting, save the cost.

Description

The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board
Technical field
The present invention relates to the construction methods of a kind of Deep Thick Soft Ground Area cushion cap and basement bottom board.
Background technique
Cushion cap refers to bearing, being distributed the load transmitted by pier shaft, the steel for each stake top of connection being arranged at the top of pile foundation Reinforced concrete platform.In the area that Deep Thick Soft Ground Area, especially mud are deep, in order to guarantee deep pit monitor, the soil of cushion cap Side, which is excavated, to be generally required to carry out pattern foundation pit supporting structure, not only can guarantee speed of application using the method for steel sheet pile supporting, but also can guarantee in hole The safety in hole.But according to conventional way, cushion cap and basement bottom board pour simultaneously, using steel sheet pile supporting, As by the way of pouring simultaneously, steel sheet pile will be unable to extract, and cushion cap side waterproof construction is difficult, will definitely increase cost, Speed of application is slow.
Summary of the invention
Technical problem to be solved by the invention is to provide the constructions of a kind of Deep Thick Soft Ground Area cushion cap and basement bottom board Method, the defect that this method overcomes traditional cushion cap and basement bottom board to construct can be simple, efficient, safety complete using this method It constructs at soft clay area cushion cap excavation supporting and basement bottom board, it is ensured that construction operation steel sheet pile safe and convenient recycles after extracting It utilizes, save the cost.
In order to solve the above technical problems, the construction method of Deep Thick Soft Ground Area cushion cap of the present invention and basement bottom board includes such as Lower step:
Step 1:, according to bearing platform construction drawing surveying setting-out, cushion cap edge positions are determined in the construction segment limit of division, Certain distance construction steel sheet pile on the outside of cushion cap sideline;
Step 2: waist rail is arranged along steel sheet pile by calculating according to the depth of foundation pit, angle brace, length direction are set at waist rail angle Waist rail between be arranged to support;
Step 3: cushion cap earth excavation to cushion cap cheats bottom absolute altitude, in cushion cap hole, bottom pour mold builds cushion cap bed course;
Step 4: removing angle brace, to support and waist rail, cushion cap position is released on cushion cap bed course, according to cushion cap position in cushion cap pad Laying water-proof coiled material on layer, waterproof roll periphery has more cushion cap position certain length, and carries out protection, pours on waterproof roll Waterproof protective layer;
Step 5: binding cushion cap reinforcing bar in waterproof protective layer, and in cushion cap position surrounding supporting module, installation template adds Solid system pours cushion cap concrete to basement bottom board bottom absolute altitude;
Step 6: removing cushion cap surrounding template, the waterproof roll that cushion cap bottom has more certain length is translated into cushion cap side and fixation, It lays waterproof roll in cushion cap side and rolls up the waterproof roll overlap joint come with cushion cap bottom and fix, pasted on the outside of waterproof roll anti- Steel sheet pile is extracted after water conservation extruded sheet, cushion cap side backfill and compacting;
Step 7: this is constructed after all cushion caps press step 1 to step 6 construction in the construction segment limit of division Section levelling of the land, raft contact face dabbing cleaning, pours basement bottom board bed course in cushion cap top surface, then in basement bottom board pad It successively constructs on layer base plate waterproofing and waterproof slab protective layer;
Step 8: binding baseplate reinforcing bar on waterproof slab protective layer, baseplate reinforcing bar anchors into or penetrates through cushion cap reinforcing bar, pouring construction Basement bottom board concrete in section completes basement bottom board construction.
Further, in step 1, apart from steel sheet pile 800mm on the outside of the cushion cap sideline.
Further, in step 4, the length that the waterproof roll periphery has more cushion cap position is 500mm.
It is since the construction method of Deep Thick Soft Ground Area cushion cap of the present invention and basement bottom board uses above-mentioned technical proposal, i.e., our Method carries out cushion cap excavation by the way of steel sheet pile supporting, and waist rail, angle brace is arranged in steel sheet pile by calculating according to cushion cap depth With to support, after the completion of excavation, bed course, construction waterproof and waterproof protective layer are poured, cushion cap reinforcing bar is bound in waterproof protective layer, so Afterwards in cushion cap reinforcing bar surrounding supporting module, pour cushion cap concrete to basement bottom board bottom absolute altitude, construction bearing platform side waterproof and Waterproof protective layer backfills the earthwork and extracts steel sheet pile after being compacted, after the construction section bearing platform construction of delimitation, pours basement Bottom cushion, construct waterproof slab and waterproof protective layer, binds baseplate reinforcing bar, pours underplate concrete, completes basement bottom board Construction.The defect that this method overcomes traditional cushion cap and basement bottom board to construct, can be simple, efficient, safety complete using this method It constructs at soft clay area cushion cap excavation supporting and basement bottom board, it is ensured that construction operation steel sheet pile safe and convenient recycles after extracting It utilizes, save the cost.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is this method Steel Sheet Pile, waist rail, angle brace and schematic diagram is arranged to support;
Fig. 2 is bearing platform construction schematic diagram in this method;
Fig. 3 is cushion cap side waterproof and waterproof protective layer construction schematic diagram in this method;
Fig. 4 is basement bottom board construction schematic diagram in this method.
Specific embodiment
Embodiment is as shown in Figures 1 to 4, and the construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board of the present invention includes Following steps:
Step 1:, according to bearing platform construction drawing surveying setting-out, 1 edge positions of cushion cap are determined in the construction segment limit of division, Certain distance construction steel sheet pile 2 on the outside of 1 sideline of cushion cap;
Step 2: waist rail 3 is arranged along steel sheet pile 2 by calculating, in 3 jiaos of setting angle braces 4 of waist rail, length according to the depth of foundation pit Setting is to support 5 between the waist rail 3 in direction;
Step 3: 1 earth excavation of cushion cap to cushion cap 1 cheats bottom absolute altitude, bottom pour mold is cheated in cushion cap 1 and builds cushion cap bed course 11;
Step 4: removing angle brace 4, to support 5 and waist rail 3,1 position of cushion cap is released on cushion cap bed course 11, is existed according to 1 position of cushion cap Laying water-proof coiled material 12 on cushion cap bed course 11,12 periphery of waterproof roll has more 1 position certain length of cushion cap, and carries out protection, Waterproof protective layer 13 is poured on waterproof roll 12;
Step 5: binding cushion cap reinforcing bar 14 in waterproof protective layer 13, and in 1 position surrounding supporting module 6 of cushion cap, mould is installed The reinforcement system 61 of plate 6 pours cushion cap concrete 15 to basement bottom board bottom absolute altitude;
Step 6: removing 1 surrounding template 6 of cushion cap, the waterproof roll 12 that 1 bottom of cushion cap has more certain length is translated into 1 side of cushion cap And it is fixed, it lays waterproof roll 7 in 1 side of cushion cap and rolls up the overlap joint of waterproof roll 12 come with cushion cap bottom and fix, in waterproof roll Waterproofing protection extruded sheet 8 is pasted in 7,12 outside of material, extracts steel sheet pile 2 after 1 side backfill 16 of cushion cap and compacting;
Step 7: this is constructed after all cushion caps press step 1 to step 6 construction in the construction segment limit of division Section levelling of the land, 1 contact surface dabbing of cushion cap cleaning, pours 9 bed course 91 of basement bottom board in 1 top surface of cushion cap, then in basement It successively constructs on 9 bed course 91 of bottom plate base plate waterproofing 92 and waterproof slab protective layer 93;
Step 8: binding baseplate reinforcing bar 94 on waterproof slab protective layer 93, baseplate reinforcing bar 94 anchors into or penetrates through cushion cap reinforcing bar 14, 9 concrete of basement bottom board in pouring construction section completes basement bottom board 9 and constructs.
Preferably, in step 1, apart from steel sheet pile 800mm on the outside of 1 sideline of cushion cap.
Preferably, in step 4, the length that 12 periphery of waterproof roll has more 1 position of cushion cap is 500mm.
For this method compared with traditional construction mode, the Construction Principle of this method is simple, constructs easy to implement, that cheats in hole opens It digs securely and reliably, and steel sheet pile recoverable, saves construction cost, it can simple, efficient, safety completion soft clay area cushion cap Excavation supporting and basement bottom board construction, improve construction quality.

Claims (3)

1. the construction method of a kind of Deep Thick Soft Ground Area cushion cap and basement bottom board, it is characterised in that this method includes following step It is rapid:
Step 1:, according to bearing platform construction drawing surveying setting-out, cushion cap edge positions are determined in the construction segment limit of division, Certain distance construction steel sheet pile on the outside of cushion cap sideline;
Step 2: waist rail is arranged along steel sheet pile by calculating according to the depth of foundation pit, angle brace, length direction are set at waist rail angle Waist rail between be arranged to support;
Step 3: cushion cap earth excavation to cushion cap cheats bottom absolute altitude, in cushion cap hole, bottom pour mold builds cushion cap bed course;
Step 4: removing angle brace, to support and waist rail, cushion cap position is released on cushion cap bed course, according to cushion cap position in cushion cap pad Laying water-proof coiled material on layer, waterproof roll periphery has more cushion cap position certain length, and carries out protection, pours on waterproof roll Waterproof protective layer;
Step 5: binding cushion cap reinforcing bar in waterproof protective layer, and in cushion cap position surrounding supporting module, installation template adds Solid system pours cushion cap concrete to basement bottom board bottom absolute altitude;
Step 6: removing cushion cap surrounding template, the waterproof roll that cushion cap bottom has more certain length is translated into cushion cap side and fixation, It lays waterproof roll in cushion cap side and rolls up the waterproof roll overlap joint come with cushion cap bottom and fix, pasted on the outside of waterproof roll anti- Steel sheet pile is extracted after water conservation extruded sheet, cushion cap side backfill and compacting;
Step 7: this is constructed after all cushion caps press step 1 to step 6 construction in the construction segment limit of division Section levelling of the land, raft contact face dabbing cleaning, pours basement bottom board bed course in cushion cap top surface, then in basement bottom board pad It successively constructs on layer base plate waterproofing and waterproof slab protective layer;
Step 8: binding baseplate reinforcing bar on waterproof slab protective layer, baseplate reinforcing bar anchors into or penetrates through cushion cap reinforcing bar, pouring construction Basement bottom board concrete in section completes basement bottom board construction.
2. the construction method of Deep Thick Soft Ground Area cushion cap according to claim 1 and basement bottom board, it is characterised in that: step In rapid one, apart from steel sheet pile 800mm on the outside of the cushion cap sideline.
3. the construction method of Deep Thick Soft Ground Area cushion cap according to claim 1 and basement bottom board, it is characterised in that: step In rapid four, the length that the waterproof roll periphery has more cushion cap position is 500mm.
CN201811346409.3A 2018-11-13 2018-11-13 The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board Pending CN109322320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811346409.3A CN109322320A (en) 2018-11-13 2018-11-13 The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811346409.3A CN109322320A (en) 2018-11-13 2018-11-13 The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board

Publications (1)

Publication Number Publication Date
CN109322320A true CN109322320A (en) 2019-02-12

Family

ID=65260757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811346409.3A Pending CN109322320A (en) 2018-11-13 2018-11-13 The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board

Country Status (1)

Country Link
CN (1) CN109322320A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130356A (en) * 2019-06-05 2019-08-16 汕头市建筑工程总公司 A kind of muddy soft soil area basement cheats bottom monoblock type back cover construction method
CN110206305A (en) * 2019-05-18 2019-09-06 陕西建工第五建设集团有限公司 A kind of steel reinforcement cage and the whole straight anchoring bit architecture of steel form
CN112195953A (en) * 2020-09-30 2021-01-08 中冶建工集团有限公司 Construction method of basement foundation
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir
CN114108671A (en) * 2021-10-29 2022-03-01 上海建工七建集团有限公司 Construction method of shallow foundation
CN114277807A (en) * 2022-01-20 2022-04-05 中国建筑第八工程局有限公司 Construction method for underground large-section transfer beam serving as pit-in-pit support
CN115233743A (en) * 2022-09-02 2022-10-25 中建八局发展建设有限公司 Construction method of brick-free base plate waterproof coiled material with base film

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005076438A (en) * 2003-08-31 2005-03-24 Eskandari M Moisture-proof structure of basement
CN203475456U (en) * 2013-08-09 2014-03-12 中建一局集团第三建筑有限公司 GRC forming die plate system
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN106436689A (en) * 2016-10-05 2017-02-22 黄坤坤 Bearing platform steel plate pile support and steel plate pile serving bearing platform template construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005076438A (en) * 2003-08-31 2005-03-24 Eskandari M Moisture-proof structure of basement
CN203475456U (en) * 2013-08-09 2014-03-12 中建一局集团第三建筑有限公司 GRC forming die plate system
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN106436689A (en) * 2016-10-05 2017-02-22 黄坤坤 Bearing platform steel plate pile support and steel plate pile serving bearing platform template construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206305A (en) * 2019-05-18 2019-09-06 陕西建工第五建设集团有限公司 A kind of steel reinforcement cage and the whole straight anchoring bit architecture of steel form
CN110130356A (en) * 2019-06-05 2019-08-16 汕头市建筑工程总公司 A kind of muddy soft soil area basement cheats bottom monoblock type back cover construction method
CN112195953A (en) * 2020-09-30 2021-01-08 中冶建工集团有限公司 Construction method of basement foundation
CN113566019A (en) * 2021-06-29 2021-10-29 中国二十冶集团有限公司 Construction method for laying drainage pipe network without excavating upper part of ground reservoir
CN114108671A (en) * 2021-10-29 2022-03-01 上海建工七建集团有限公司 Construction method of shallow foundation
CN114277807A (en) * 2022-01-20 2022-04-05 中国建筑第八工程局有限公司 Construction method for underground large-section transfer beam serving as pit-in-pit support
CN115233743A (en) * 2022-09-02 2022-10-25 中建八局发展建设有限公司 Construction method of brick-free base plate waterproof coiled material with base film
CN115233743B (en) * 2022-09-02 2023-09-22 中建八局发展建设有限公司 Construction method of brick-free tire membrane bottom plate waterproof coiled material

Similar Documents

Publication Publication Date Title
CN109322320A (en) The construction method of Deep Thick Soft Ground Area cushion cap and basement bottom board
CN105544607B (en) There is the subway station side wall outsourcing waterproof construction method of boatswain chair beam
CN106013172A (en) Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN108678000B (en) U-shaped retaining structure for roadbed underpass highway and construction method thereof
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN108166397A (en) Railway frame bridge construction method
CN105350526B (en) Method for setting up steel platform
CN109403340A (en) A kind of construction method using open caisson as foundation pit enclosure structure
CN108589737A (en) Underground speedy way hands over the construction method that section is built jointly with rail under a kind of major urban arterial highway
CN211340827U (en) Structure for newly building bridge by passing through existing bridge piles in subway tunnel
CN108505805A (en) Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN109706952A (en) Large-scale well-sinking construction method
CN109371763A (en) A kind of phreatic high is low to fill out shallow cut subgrade in swelling soil zone construction method
CN109236322A (en) It a kind of artificial bottom plate preventing soft-rock tunnel pucking and its constructs and method for maintaining
CN207211188U (en) Outer wall of underground structure HCMW engineering methods overlap wall
CN207228173U (en) A kind of underground project waterproof structure
CN206204954U (en) Double-row pile combines Deep Foundation Pit Support for Soft Soil structure with diagonal brace
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN109610516B (en) Basement exterior wall post-cast strip retaining wall construction method
CN204919566U (en) Soft soil area tower crane foundation construction supporting construction
CN209428870U (en) A kind of phreatic high is low to fill out shallow cut subgrade in swelling soil zone structure
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212